You are on page 1of 2

"safety isn't my job it's a way of life"

Labor no dress
No parking
Inventory on the road
Just covered by cloth
Dust in plant ( raw material hazard)
Fire points labelled
Trucks parked on road
Raw material sand lying uncovered and spread
Surgical mask for safety
Lines for machine on one side but not on the other
Inventory on the way
Automatic machine on the way, ppl walking there
Line for machine done are mitti hui
Sand even in plant
Mixing water coming out
No safety shoes, sandalsz jackets, lose clothing
Water cooler used for cooling, water bad for tiles
Noise pollution
Open doors, mixing of air particles
Mianwali, mansehra attock raw material
Exhaust fans can mix the powdery raw material with each other
Forklift tyres ghissay with powder: safety hazards
Raw Materials mentioned with numbers for uneducated labor
No safe distance from machine specified
Turn off on marks with marker not permanent
Litter (match box) near initial machine
Jumbled up wires
"Safety First" boards, although titles in english, explanation in Urdu
Powder mixing with water, underground, can easily be contaminated
Safety grills in some areas
Ladder attached had grills at a height for safety
BODY DEPT board hanging for label
No distance specified from critical pumps
Heat from underground mixing, safety hazard
Desk of a supervisor on floor without any glass in between
Washroom in close vicinity within the floor
Drinking water, dispenser broken, in a powdery area.
To contain water from flowing in a certain walkway, temporary clay used to form a
barrier
Processed sand overflowing from their inventory bins
Unutilised spaces in between
Steel rods lying on the 2nd level, with risk of falling down due to vibrating
machinery
Welding in front of ppl with no safety helmet for others
HT LT room enclosed (good) with urdu signs of not entring
Name wise production measurement on one control room glass
Safety in writing on control room, not with pictures
Control room measures easy process real time measurement, CCTV
Downtime maintenance (6hrs)
20,000, capacity, using 12000
Weekly once downtime maintenance
Italian machine, in foreign language writings so labor or locals can't understand
Glaze material wasted between tiles
Mono Glaze line parameter manual
Cooler on side with glaze, moisture at a point when quality is important
At places open sewerage line
Waste bins almost full aside the line
At places waste is on the floor along the line
At places visitors have to move from under the line
Company goals written on board in start of plant
Some belt chains open, so dust can clog them
Suppliers multiple
Rush for canteen: labor went through an area where forklifters were operating in a
closed space: Safety hazard and loss of efficiency.