Etisalat Acceptance Test Procedures For WDM Networks
Etisalat Acceptance Test Procedures For WDM Networks
Ver 1.1
Project Summary
Version: 6.0.6
Date: 04/11/2014
FFM
IAM
TMC
INDEX
Introduction
List of Test Equipment
Introduction
This document describes the vital tests to be performed for validating the new DWDM networks for Etisalat.
Test cases and procedures can be modified and enhanced according to equipment, design and features
offered.
Results:
Name Description Status
Site Name: OK
Racks (correctly fixed to the ground and structure) OK
Shelf (correctly fixed / Correctly grounded) OK
Power cable to breaker A OK
Power cable to breaker B OK
Fuse Ratings A OK
Fuse Ratings B OK
Rack labeling OK
Shelf labeling OK
Power & fiber cables labeled OK
DCN cable connected and properly labeled N/A
Cards installed according to design OK
Fiber laid and connected according to design OK
NO
Name Signature Date OK Remarks
K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Objective:
It is to check the basic configuration of the equipment (SW release IPs,…etc).
Measurement
Transponder Tx Power
Slot & Port (dBm)
Type Specification [ dBm]
11QPA4 SLOT7/C1 (-6:-1) -3.60
11QPA4 SLOT7/C2 -4.80
11QPA4 SLOT7/C3 -4.90
11DPE12 SLOT/C1 (-8: -4) -6.95
11DPE12 SLOT/C2 -7.97
11DPE12 SLOT/C3 -6.93
11DPE12 SLOT/C4 -6.67
11DPE12 SLOT/C5 -6.59
11DPE12 SLOT/C6 -8.72
11DPE12 SLOT/C7 -8.99
11DPE12 SLOT/C8 -7.96
11DPE12 SLOT/C9 -7.18
11DPE12 SLOT/C10 -7.03
NO
Name Signature Date OK Remarks
K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Measurement
Transponder Tx Power
Slot & Port (dBm)
Type Specification [ dBm]
NO
Name Signature Date OK Remarks
K
Supplier
Etisalat-1
Etisalat-2
Measurement
Transponder Tx Power
Slot & Port (dBm)
Type Specification [ dBm]
NO
Name Signature Date OK Remarks
K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
The test is to check the power level of the DWDM ports of the transponder.
Test procedures:
Connect a power meter to the interface to be measured.
Force the laser on if required
Wait to get power from the optical interface.
To validate that central frequency of WDM interfaces complies with the expected values as per ITU
standards.
Test Procedure:
Connect the OSA to the WDM interface of the transponder under test
Force the laser on if required.
Measure the central frequency deviation.
PSS- Wave Wave length Wave length
Transponder Slot & Frequency Actual Wave length
1830 length Deviation Deviation
Type Port (Ghz) (nm)
Channel (nm) (nm) Range (nm)
11QPA4 SL7/L1 1471 1471nm 1470.125nm -0.875 ±5.5
11QPA4 SL7/L2 1491 1491nm 1491.403nm +0.403 ±5.5
11QPA4 SL7/L3 1571 1571nm 1570.864nm -0.136 ±5.5
11DPE12A SL8/L1 1591 1591nm 1590.578nm -0.422 ±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
±5.5
To validate the receiver sensitivity of client interface of transponders complies with the specification.
Test Setup:
Test procedures:
Configure the test analyzer according to the service under test.
Adjust the optical attenuator 1 to increase the attenuation value gradually, till the test equipment detects
errors.
Now decrease the attenuation till errors get cleared
Wait for 2 minutes.
Check the result Pin 1 with the optical power meter.
Transponder Type Slot & Port Expected Sensitivity (dBm) Measured Sensitivity (dBm)
11QPA4 SLOT7/C1 -13 -17.5
11QPA4 SLOT7/C2 -13 -17.45
11QPA4 SLOT7/C3 -13 -17.00
11DPE12A SLOT8/C1 -21.5 -33.5
11DPE12A SLOT8/C2 -21.5 -33
11DPE12A SLOT8/C3 -21.5 -32
11DPE12A SLOT8/C4 -21.5 -30.13
11DPE12A SLOT8/C5 -21.5 -33.07
11DPE12A SLOT8/C6 -21.5 -32.46
11DPE12A SLOT8/C7 -21.5 -30.89
Note: Please check Appendix A for specifications.
Name Signature Date OK NOK Remarks
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Test Setup:
Test procedures:
Configure the test analyzer according to the service under test.
Adjust the optical attenuator 2 to increase the attenuation value gradually, till the test
equipment detects errors.
Now decrease the attenuation till errors get cleared
Wait for 2 minutes.
Check the result Pin 2 with the optical power meter.
The test is to check the card insertion loss is within range for both multiplexing and de-multiplexing
directions for the used channels.
Test procedures:
Test can be performed by using the instantaneous measurement from NMS for certain vendors or by
manual measurements in others..
Insertion loss Mux
Board type Channel/port Test value Notes
(dB)
SFD44 1471 0.79
SFD44 1491 0.55
SFD44 1571 1.08
SFD44 1591 1.74
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
Note: SFD44 Mux insertion loss : 5.7 dB
NO
Name Signature Date OK Remarks
K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Insertion loss Demux
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
SFD44
NO
Name Signature Date OK Remarks
K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Objective:
Test Setup:
Test procedures:
The test is to check the amplifier gain through the instant measurement of the software.
Amplifier gain = Pout – Pin
Procedures:
Connect the OSA to the transponder’s DWDM side as shown in the above diagram.
Read out the OSNR and the SMSR from the OSA.
Actual Expected OSNR for Actual
Expected SMSR for Both
Optical Interface OSNR Both 40G & 100G SMSR
40G & 100G transponder
(dB) transponder (dB)
RK1/SH1/SL7/L1 50.48 >40dB 49.13 >30dB
RK1/SH1/SL7/L2 50.42 >40dB 49.87 >30dB
RK1/SH1/SL7/L3 52.48 >40dB 46.63 >30dB
RK1/SH1/SL8/L1 53.79 >40dB 53.13 >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
>40dB >30dB
Record the NO
Name Signature Date OK Remarks
results. K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Test procedures:
1. Connect the OSA to the transponder’s DWDM side as shown in the above diagram.
2. Read out the -20dB spectrum width from the OSA.
3. Record the results.
Test Setup:
Test procedures:
Connect the OSA to the optical amplifier monitoring point as shown in the above
diagram.
Read out the OSNR from the OSA.
Record the results.
Test procedures:
Put a service test with analyzer. Switch off/on the power supply of the respect shelves in the following
sequence. Observe the alarms at rack top, CIT and NMS.
Steps
Name Description Expected
NE management and traffic are not
Step 1 Switch the power OFF power Supply A
affected
NE management and traffic are not
Step 2 Switch the power ON power Supply A
affected
NE management and traffic are not
Step 3 Switch the power OFF power Supply B
affected
NE management and traffic are not
Step 4 Switch the power ON power Supply B
affected
NO
Name Signature Date OK Remarks
K
Supplier DORIN MITRIS
Etisalat-1 EDRAMIR AQUINO
Etisalat-2
Test procedures:
NO
Name Signature Date OK Remarks
K
Supplier
Etisalat-1
Etisalat-2
Test procedures:
OK OK
Rx Sensitivity of client interface
NOK
OK OK
Rx Sensitivity of WDM interface
NOK
OK OK
Channel Insertion Loss NOK
NOK
Signature Date
1- Provisioning services
Objective:
To confirm that services can be provisioned, de-provisioned and modified without any issue.
Test procedures:
Create all possible services as per traffic matrix and per the procedure given in the vendor service
provisioning document. Modify and delete services.
Objective:
To verify the ability of the ring to compensate the additional losses within the designed power margin.
Etisalat demands minimum 5dB margin in each span of the ring.
Test procedures:
Simulate link losses using the appropriate attenuator value to be applied on the ring. Insert 5dB
attenuation in each span simultaneously and run a service test including all spans.
Attenuation
Span Name
(dB)
Etisalat-1
Etisalat-2
Test Setup:
Test procedures:
Run a test service. Using a variable attenuator apply a slight attenuation across the ring path carrying
the test service.
Expected: Check that gain of the amplifier is automatically adjusted to compensate the additional
attenuation. No traffic impact should be observed.
Objective:
Test Setup:
Test procedures:
The data network performance analyzer adjusts the length of the frame from small to large till a
maximum length that can be processed by the equipment normally.
Test procedures:
Run test service on the longest route. Measure latency by Y.1564 test. Run the test for main and
protection routes.
Test Setup:
Test procedures:
For the protected services perform an O-SNCP switching by Command
Fill in the table with the test results.
Repeat the same test by breaking the fiber at different points in the equipment and ring.
7-Alarm Reporting
Objective:
To verify the correct alarm reporting of the equipment on the ports and along the path in case of faults
at equipment and NMS levels.
Test procedures:
Create different types of test services on selected interfaces. Simulate various type of faults i.e LOS,
single direction faults and performance related faults. Check alarms transponders and different layers
of the network.
NO
Name Signature Date OK Remarks
K
Supplier
Etisalat-1
Etisalat-2
To check the stability of network for different type of services over 24H period.
Test Setup:
Test procedures:
Create different type of services as per traffic matrix and test at least one service for SDH interface
and one GE service with highest possible rate over a period of 24hrs.
Expected: No error or packet loss should be observed over the test period.
Test Setup:
N/A
Test procedures:
Take back up from the NE by using NMS interface. Make changes at the NE level and restore. The
original configuration should be restored back once restore operation is complete. Node will reset
during restore process. Note the restoration time.
NO
Name Signature Date OK Remarks
K
Supplier
Etisalat-1
Etisalat-2