Professional Documents
Culture Documents
SOLIDWORKS Electrical
0 11.3.2020. PC
REV. DATE NAME CHANGES
MECHATRONIC ENGINEERING REVISION
BILTON D.O.O. BILTON D.O.O.
0
HRVATSKIH BRANITELJA 46 CONTRACT : User data 1 SCHEME
8 User data 2 01
Document realized with version : 2020.0.0.79
1-Document book
REVISION
MECHATRONIC ENGINEERING
BILTON D.O.O. 0
0 11.3.2020. PC
REV. DATE NAME CHANGES SCHEME
CONTRACT: 8
LOCATION:
+L1
User data 1 User data 2
02
Document realized with version : 2020.0.0.79
1 2 3 4 5 6 7 8 9 10
09-3
CRNA 1X2.5 A -S3 GLAVNI PREKIDAČ -H5 GL. PREK. LAMPA A6 -24 VDC CRNA 1X0.75
-H1 KAMERA
027438 004483 9001KP7LGG31
N 0V CRNA 1X0.75
-H3 GREŠKA
9001KP7LGG31
B2
REVISION
MECHATRONIC ENGINEERING
BILTON D.O.O. 0
0 11.3.2020. PC
REV. DATE NAME CHANGES SCHEME
CONTRACT: 8
LOCATION:
+L1
User data 1 User data 2
03
Document realized with version : 2020.0.0.79
1 2 3 4 5 6 7 8 9 10
SMEĐA 1X2.5 DOLAZ 220V -F1 AUTOMATSKI OSIGURAČ F1
220V -G1 (Weidmuller)
A12 N P= U = 24VDC
RELEJ 11
-24 VDC
CRNA 1X0.75
-K2 (K)
-F2 KERAMIČKI OSIGURAČ
In = RELEJ A2
F1 A8 (RLY 14 +24V) RELEJ A1 A3 (CR. 1X0.75 24V)
CRNA 1X5
A0 RELEJ 11
A9 (RLY 24 +24V) RELEJ 21
CRNA 1X2.5
. N 0V PLAVA 1X2.5 A2 - - CRVENA 1X0.75 - A4 CRVENA 1X0.75 RELEJ A1 A5 (CR. 1X0.75 24V)
. A2 CRVENA 1X0.75 24V+ N0V - A12 PLAVA 1X2.5 A11 (RLY 24 +24V) RELEJ 11
B -24VDC RELEJ 11 In =
SOLIDWORKS Electrical
LAMPICA H3
REVISION
MECHATRONIC ENGINEERING
BILTON D.O.O. 0
0 11.3.2020. PC
REV. DATE NAME CHANGES SCHEME
CONTRACT: 8
LOCATION:
+L1
User data 1 User data 2
04
Document realized with version : 2020.0.0.79
SOLIDWORKS Electrical
CONTRACT:
1
-F1
16A
L 220V F1 (L220V)
8
F1 (L220V)
VT
BILTON D.O.O.
-U1
B4 ( L220V) A0' (L 220V) 09-2
3
VT VT
MECHATRONIC ENGINEERING
LOCATION:
-U2
N A12 (N)
N 0V 08-2
4
VT
A12 (N)
+L1
N 0V
VT
-U3
SPAJANJE IZLAZA KAMERE OUT K.
08-8
5
STEZALJKE 1
6
-U4
B' (+24VDC) A2' (+24VDC)
06-2 A2' (+24VDC) A2' (+24VDC) 09-4
VT VT
7
-U5
A4 (+24VDC CRV 1X0.75)
0
06-3 A4 (+24VDC CRV 1X0.75) 09-5
VT
REV.
User data 1
N 0V
DATE
13.3.2020.
PC
8
-U6
NAME
9
-U7
User data 2
CHANGES
-U8
10
05
06-1
SCHEME
REVISION
1 2 3 4 5 6 7 8 9 10
08-2
09-6
09-9
08-2
08-5
08-6
A6 CRNA 1X0.75 -24VDC
B (-24VDC)
B (-24VDC)
A2 (+24VDC)
A2 (+24VDC)
VT
KAM. 24+
KAM. 24+
PAN. 24+
PAN. 24+
VT
VT
VT
+24VDC +24VDC -24VDC -24VDC -24VDC
-U10
-U11
-U12
-U13
-U14
-U15
-U16
-U17
-U18
-U9
B' (+24VDC)
N 0V
05-10
05-6
05-7
08-5
SOLIDWORKS Electrical
REVISION
MECHATRONIC ENGINEERING
BILTON D.O.O. 0
STEZALJKE 2 0 13.3.2020. PC
REV. DATE NAME CHANGES SCHEME
CONTRACT: 8
LOCATION:
+L1
User data 1 User data 2
06
Document realized with version : 2020.0.0.79
1 2 3 4 5 6 7 8 9 10
08-7
08-7
STROJ SIGNAL 1
STROJ SIGNAL 1
STROJ SIGNAL 2
STROJ SIGNAL 2
VT
VT
-U19
-U20
-U21
SOLIDWORKS Electrical
REVISION
MECHATRONIC ENGINEERING
BILTON D.O.O. 0
STEZALJKE 3 0 13.3.2020. PC
REV. DATE NAME CHANGES SCHEME
CONTRACT: 8
LOCATION:
+L1
User data 1 User data 2
07
Document realized with version : 2020.0.0.79
SOLIDWORKS Electrical
CONTRACT:
1
8
-G1 WEIDMULLER
-24V
2
A1' (L 220V)
VT
-K1 (PS)
BILTON D.O.O.
12
14
11
22
24
21
3
32
MECHATRONIC ENGINEERING
34
31
05-10 N 0V A1 A1
N 0V A1 09-3
VT VT
A2
A1
LOCATION:
4
-K2 (K)
12
+L1
A8 CRV1X0.75
09-6 A8 CRV1X0.75 A3 (+24VDC) CRV 1X0.75
VT VT
14
11
22
KAM. 24+
06-9 A3 (+24VDC) CRV 1X0.75
VT
24
21
B (-24VDC) B (-24VDC) A3 (+24VDC) CRV 1X0.75
06-5 B (-24VDC) A3 (+24VDC) CRV 1X0.75 09-4
VT VT
A2
A1
5
-K3 (P)
12
22
PAN. 24+
06-10 PAN. 24+ A5 (+24VDC CRV 1X0.75)
VT VT
24
21
RELEJI I NAPAJANJE
B (-24VDC) A5 (+24VDC CRV 1X0.75) 09-5
6
VT VT
A2
A1
12
B2 CRV 1X0.75
0
09-8 B2 CRV 1X0.75 OUT K.
VT VT
14
11
REV.
STROJ SIGNAL 2
07-2 STROJ SIGNAL 2
VT
22
STROJ SIGNAL 1
User data 1
STROJ SIGNAL 1 07-1
VT
24
21
OUT K. OUT K.
B (-24VDC) OUT K. 05-5
VT VT
A2
A1
DATE
13.3.2020.PC
8
NAME
9
User data 2
CHANGES
10
08
SCHEME
REVISION
1 2 3 4 5 6 7 8 9 10
05-3
08-3
05-6
05-7
08-4
08-6
08-7
A4 (+24VDC CRV 1X0.75)
A4 (+24VDC CRV 1X0.75)
B4 ( L220V)
B2 CRV 1X0.75
B2 CRV 1X0.75
A2' (+24VDC)
A2' (+24VDC)
A8 CRV1X0.75
A8 CRV1X0.75
VT
VT
VT
VT
VT
L 220V CRNA 1X02.5
VT
A1
A0' (L 220V)
A1
X2 X2 X2 2 2
03-3/09-2
03-3/09-1 03-3 03-7 03-7
-S4 STOP -S4 STOP -S3 GLAVNI PREKIDAČ -S1 PREK. KAMERA -S2 PREK. PANEL -H1 KAMERA -H2 PANEL -H3 GREŠKA -H4 STOP LAMPA -H5 GL. PREK. LAMPA
X1 X1 X1 1 1
A3 (+24VDC) CRV 1X0.75
08-5
08-6
06-6
N 0V
SOLIDWORKS Electrical
06-1
REVISION
MECHATRONIC ENGINEERING
BILTON D.O.O. 0
PREKIDAČI I LAMPICE 0 13.3.2020. PC
REV. DATE NAME CHANGES SCHEME
CONTRACT: 8
LOCATION:
+L1
User data 1 User data 2
09
Document realized with version : 2020.0.0.79