GENERAL NOTES DOC # RPEB/ED/02 Rev # 00 Effective Date : 01-06-2020 DRG. DRAWING TITLE DATE REV
1.1) All dimensions are in millimeters (mm) unless noted otherwise. MS-01 Materials Specifications 17.06.22 0
3.1) The Customer (or civil contractor) shall handle: E-03 RIGID FRAME ELEVATION: FRAME LINE 2 ,3 & 6 TO 10 07.06.22 0
5.1) Before starting erection, the Erector MUST check the followings at site:
(a) Critical distances and level of anchor bolts.
(b) Distances between grid lines.
(c) Diagonals between grid lines.
Erector shall report to Rhino PEB in case of any discrepancy with respect
5
to IFC drawings.
5.2) Safety First! The Erector is FULLY RESPONSIBLE for the followings:
(a) Employing safe erection practices used in PEB industry.
(b) Experienced staff.
APPROVAL DRAWINGS 5
PEB STRUCTURE.
5.4) Erection MUST start from the 'braced bay.' Bracings MUST
be kept tight all the times. Proceeding towards next bay requires fixing
in-place ALL the purlins, girts and flange braces in previous bay. PROJECT NAME:
5.5) Make sure that right part is installed at right location.
ANY CHANGES MADE AFTER THE APPROVAL OF THESE DRAWINGS MAY DELAY THE FABRICATION SCHEDULE AND SUBSEQUENTLY THE DELIVERY OF BUILDING.