GENERAL NOTES
DEC-14-22 0
2.1 The structure has been designed as per codes (b) Distances between grid lines
and lands given in proposel contract.
(c) Diagonals between grid lines
3.1 The Customer (or civil contractor) shall
handle: Erector shall report HH Robertson PEB in case of any
discrepancy with respect to IFC drawings.
(a) Demarcation of grids
(b) Casting the anthor bolts as per critical 5.2 Safety First!
distances given in lssued for Construction for the followings.
(IFC) drawings. (a) Employing safe erection practices used in
PEB industry.
Customer is requested to NOT follow the (b) Experienced staff.
"APPROVAL Drawings" for casting bolts. Erection supervisor MUST have the experience
of safely erection more than 10 PEB building.
4.1 Fabrication complies famous codes as follows.
(c) preper Equipment:
AISC (American Institute of Steel Construction) manual Steel guy wires (free of joints/knots)
or A.W.S (American Welding Society) code Safety harnesses and bolts
Safety dress etc. for workers
Fabrication tolerances are adopted from MBMA (Metal First Aid box.
Building Manufactures Association. USA) code.
NOTE FOR CONSTRUCTION
FOR APPROVAL:
5.3 Steel guy wires MUST be anchore firmly at ground' IN ORDER TO SCHEDULE THIS PROJECT
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR
"APPROVED AS IS"
"APPROVED AS NOTED"
or floor. Do NOT remove steel guy wire before COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE
APPROVAL OF THESE DRAWING MAY
"RESUBMIT AS NOTED"
MUST be kept tight all the times. Proceeding towards TELERISEN PRIVATE LIMITED
next bay requires fixing in-place ALL the purlins,girts
JOB No / QUOTE NO. : HHR-378-21
and flange braces in previous bay. PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C
5.5 Make sure that right part is installed at right location. CUSTOMER : TELERISEN Pvt ( Ltd )
RIDGE LINE
15 16 17 18 19 20 21 22 23
14 24
FRONT SIDE WALL
BP-1 DETAIL BP-2 DETAIL BP-3 DETAIL ANCHOR / CHEMICAL BOLT POURING DETAIL COLUMN LAYOUT PLAN D-03
Web Section I.F WIDTH O.F WIDTH Web Thick. I.F Thick. O.F Thick.
NAME
(mm) (mm) (mm) (mm) (mm) (mm)
20 20
DETAIL-2 1 1
DETAIL-1
A A
ENDWALL COLUMN
ENDWALL COLUMN
END COLUMN
END COLUMN
DETAIL-1
DETAIL-2
NOTE:-
COLUMN SECTION-AA
SP-1 DETAIL SP-2 DETAIL SP-3 DETAIL SP-4 DETAIL CROSS SECTION ALONG GL-14 & GL-24 D-04
Web Section I.F WIDTH O.F WIDTH Web Thick. I.F Thick. O.F Thick.
NAME
(mm) (mm) (mm) (mm) (mm) (mm)
20 20
1 1
SP3
RAFTER-1 SP2 SP2 RAFTER-2
SP1 SP1
DETAIL-1
DETAIL-1
A A
CRANE LOAD 10 TON
MAIN COLUMN
MAIN COLUMN
DETAIL-1 (3D)
NOTE:-
COLUMN SECTION-AA
SP-1 DETAIL SP-2 DETAIL SP-3 DETAIL TYPICAL 2mm TH WELDED PLATE DETAIL CROSS SECTION ALONG GL-15 TO GL-23 D-05
BACK SIDE WALL
15 16 17 18 19 20 21 22 23
14 24
FRONT SIDE WALL
CABLE BRACE DETAIL FLANGE BRACE DETAIL SAG ROD DETAIL ROOF PURLIN PLAN D-06
BACK SIDE WALL
15 16 17 18 19 20 21 22 23
14 24
FRONT SIDE WALL
SCREW FIXING DETAIL SANDWICH PANEL ENDLAP DETAIL RIDGE DETAIL ROOF SHEETING PLAN D-07
20 20
1 1
BRICK WALL
BY OTHER
23 22 21 20 19 18 17 16 15
RIGHT END WALL
BRICK WALL
BY OTHER
WALL BRACING ELEVATION GABLE DETAIL SAG ROD DETAIL AT WALL SIDEWALL ELEVATION ALONG GL-Q D-10
14 24
15 16 17 18 19 20 21 22 23
WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW
FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED
OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING
BRICK WALL
BY OTHER
WALL BRACING ELEVATION GABLE DETAIL SAG ROD DETAIL AT WALL SIDEWALL ELEVATION ALONG GL-T D-11