You are on page 1of 11

DRG. TITLE DATE REV.

D-01 INDEX SHEET DEC-14-22 0

APPROVAL DRAWINGS D-02

D-03
GENERAL NOTES

COLUMN LAYOUT PLAN


DEC-14-22 0

DEC-14-22 0

D-04 CROSS SECTION ALONG GL-14 & 24 DEC-14-22 0


GENERAL NOTES : CRITICAL REQUIREMENTS FOR ERECTION : D-05 CROSS SECTION ALONG GL-15 TO 23 DEC-14-22 0

D-06 ROOF PURLIN PLAN DEC-14-22 0


D-07 ROOF SHEETING PLAN DEC-14-22 0
1.1 AII dimension are in millimeters (mm) unless 5.1 Before staring erection, the Erector MUST D-08 ENDWALL ELEVATION ALONG GL-14 DEC-14-22 0
noted otherwise (UNO). check the followings at site. D-09 ENDWALL ELEVATION ALONG GL-24 DEC-14-22 0
D-10 SIDEWALL ELEVATION ALONG GL-Q DEC-14-22 0
1.2 AII drawings are NOT TO SCALE (NTS). (a) Critical distances and level of anchor bolts D-11 SIDEWALL ELEVATION ALONG GL-T DEC-14-22 0

2.1 The structure has been designed as per codes (b) Distances between grid lines
and lands given in proposel contract.
(c) Diagonals between grid lines
3.1 The Customer (or civil contractor) shall
handle: Erector shall report HH Robertson PEB in case of any
discrepancy with respect to IFC drawings.
(a) Demarcation of grids
(b) Casting the anthor bolts as per critical 5.2 Safety First!
distances given in lssued for Construction for the followings.
(IFC) drawings. (a) Employing safe erection practices used in
PEB industry.
Customer is requested to NOT follow the (b) Experienced staff.
"APPROVAL Drawings" for casting bolts. Erection supervisor MUST have the experience
of safely erection more than 10 PEB building.
4.1 Fabrication complies famous codes as follows.
(c) preper Equipment:
AISC (American Institute of Steel Construction) manual Steel guy wires (free of joints/knots)
or A.W.S (American Welding Society) code Safety harnesses and bolts
Safety dress etc. for workers
Fabrication tolerances are adopted from MBMA (Metal First Aid box.
Building Manufactures Association. USA) code.
NOTE FOR CONSTRUCTION
FOR APPROVAL:

5.3 Steel guy wires MUST be anchore firmly at ground' IN ORDER TO SCHEDULE THIS PROJECT
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR
"APPROVED AS IS"

"APPROVED AS NOTED"

or floor. Do NOT remove steel guy wire before COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE
APPROVAL OF THESE DRAWING MAY
"RESUBMIT AS NOTED"

DELAY THESE FABRICATION SCHEDULE AND


complete installation of purlins, girts and bracings . SUBSEQUENTLY THE DELIVERY OF THE
BUILDING.
APPROVER : ...................
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................

ABSENCE OF GUY WIRES OR POOR ANCHORING FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


5.4 Erection MUST start from the braced bay, Bracings REV DATE DESCRIPTION DRN CHK DSN

MUST be kept tight all the times. Proceeding towards TELERISEN PRIVATE LIMITED
next bay requires fixing in-place ALL the purlins,girts
JOB No / QUOTE NO. : HHR-378-21
and flange braces in previous bay. PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

5.5 Make sure that right part is installed at right location. CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

INDEX SHEET D-01


GENERAL NOTES TELERISION PRIVATE LIMITED
APPROVAL OF TELERISEN STEEL BUILDINGS DRAWINGS INDICATE THAT TELERISEN STEEL BLOGS.CONRIRECTLY INTERPETED AND
APPLIED THE REQUIREMENT OF THE CONTRACT DRAWINGS AND SPECIFICATIONS.
WHERE DISCREPANCIES EXIST BETWEEN THE TELERISEN STEEL PLAN AND THE PLANS FOR OTHER TRADES, THE STRUCTURAL
STEEL PLANS SHALL GOVERN (SECT 4.2 !AISC CODE OF STANDARD PRACTIXE 9TH EQ.)
DESIGN CONSIDERATIONS OF ANY MATEHIALS IN THE STRUCTURE WHICH ARE NOT FURNSHED BY TELERISEN STEEL BLOGS
ARE THE RESPONSIBLY OF THE CONTRACTORS AND ENGINEERS OTHER THEN TELERISEN STEEL BLOGS. UNLESS SPECIFICALLY
INDICTED.

BUILDINGS LOAD / DESCRIPTION: ROOF PANELS:


WIDTH. 19089 C/C. LENGTH: 60529 C/C. EAVE HEIGHT: 11579 COLORE : EPS PLANEL
(BUILDING DIMENSION ARE NOMINAL REFER TO PLANS.)
WALL PANELS:
THIS STRUCTURE IS DESIGNED UTILIZING THE LOAD INDICATED
AND APPLIED AS REQUIRED BY. MBMA 06 COLORE : EPS PLANEL

THE CONTRACTOR IS TO CONFIRM THAT THESE LOAD COMPLY


WITH THE REQUIREMENTS OF THE LOCAL BUILDING DEPARTMENT.
TRIMS COLORS :
TRIMS : 0.5 mm THICK PPGI (TBE)
ROOF DEAD LOAD : SELF WEIGHT Kn/.m² (ROOF PANELS & PURLINS, RAFTER)
CORNER : (TBE)
COLLATERAL LOAD : 0.00 Kn/.m² (SOLAR LOAD
EAVE : 0.5 mm PPGI (WHITE)
ROOF LIVE LOAD : 0.57 Kn/.m²
MS MATERIAL GRADE 50.
ROOF SNOW LOAD : 0.00 Kn/.m² THIS IS VALID ONLY WHEN THE STEEL STRENGTH IS OF GRADE 50.
PROVIDE COLUMN STIFFENER @ OF 1 METER IN ALL COLUMN.
BASIC WIND LOAD : 180 Kn/hr. (B)
SEISMIC ZONE : 2B (as per UBC 1997) NOTE FOR CONSTRUCTION
FOR APPROVAL:
Rainfall intenslty (for design) 150mm/hr IN ORDER TO SCHEDULE THIS PROJECT
IN AN EFFICIENT MANNER, KINDLY
"APPROVED AS IS"

RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"


of gutters and downspouts) COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE
Design Code MBMA-2006 BUILDING.
PLEASE TICK MARK ONLY ONE OF THE
APPROVER : ...................
SIGNATURE : ...................
FOLLOWING. DATE : ...................

BUILDINGS LOAD / DESCRIPTION: 0


REV
DEC-14-22 ISSUE FOR APPROVAL
DATE DESCRIPTION
HAF
DRN
M.N
CHK
ADL
DSN

WIND LOAD : 1.00 TELERISEN PRIVATE LIMITED


SNOW LOAD : 1.00 JOB No / QUOTE NO. : HHR-378-21

SEISMAC LOAD: 1.00 PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

OTHER LOADS JOB LOCATION


DRAWING TITLE
: ISLAMABAD
DWG NO.

GENERAL NOTES D-02


BACK SIDE WALL

RIGHT END WALL


LEFT END WALL

RIDGE LINE

15 16 17 18 19 20 21 22 23

14 24
FRONT SIDE WALL

COLUMN LAYOUT PLAN

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

BP-1 DETAIL BP-2 DETAIL BP-3 DETAIL ANCHOR / CHEMICAL BOLT POURING DETAIL COLUMN LAYOUT PLAN D-03
Web Section I.F WIDTH O.F WIDTH Web Thick. I.F Thick. O.F Thick.
NAME
(mm) (mm) (mm) (mm) (mm) (mm)

20 20
DETAIL-2 1 1

SP4 SP3 SP4


RAFTER-1 SP2 SP2 RAFTER-2
SP1 SP1

DETAIL-1

CRANE LOAD 10 TON

A A

ENDWALL COLUMN

ENDWALL COLUMN
END COLUMN

END COLUMN
DETAIL-1

DETAIL-2

NOTE:-

COLUMN SECTION-AA

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
Q R S T RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
CROSS SECTION ALONG GL-14 & GL-24 ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

SP-1 DETAIL SP-2 DETAIL SP-3 DETAIL SP-4 DETAIL CROSS SECTION ALONG GL-14 & GL-24 D-04
Web Section I.F WIDTH O.F WIDTH Web Thick. I.F Thick. O.F Thick.
NAME
(mm) (mm) (mm) (mm) (mm) (mm)

20 20
1 1

SP3
RAFTER-1 SP2 SP2 RAFTER-2
SP1 SP1

DETAIL-1
DETAIL-1

CRANE LOAD 10 TON

A A
CRANE LOAD 10 TON
MAIN COLUMN

MAIN COLUMN
DETAIL-1 (3D)

NOTE:-

COLUMN SECTION-AA

NOTE FOR CONSTRUCTION


FOR APPROVAL:
Q T IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
CROSS SECTION ALONG GL-15 TO GL-23 RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE
NOTE:- BUILDING.
APPROVER : ...................
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

SP-1 DETAIL SP-2 DETAIL SP-3 DETAIL TYPICAL 2mm TH WELDED PLATE DETAIL CROSS SECTION ALONG GL-15 TO GL-23 D-05
BACK SIDE WALL

RIGHT END WALL


LEFT END WALL

15 16 17 18 19 20 21 22 23

14 24
FRONT SIDE WALL

ROOF PURLIN PLAN

NOTE FOR CONSTRUCTION


M12x35 Grade 4.6 Bolts For Flange Braces
FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

CABLE BRACE DETAIL FLANGE BRACE DETAIL SAG ROD DETAIL ROOF PURLIN PLAN D-06
BACK SIDE WALL

RIGHT END WALL


LEFT END WALL

15 16 17 18 19 20 21 22 23

14 24
FRONT SIDE WALL

ROOF SHEETING PLAN

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

SCREW FIXING DETAIL SANDWICH PANEL ENDLAP DETAIL RIDGE DETAIL ROOF SHEETING PLAN D-07
20 20
1 1

TYPICAL FIXING DETAIL AT EAVE LOCATION

FRONT SIDE WALL


BACK SIDE WALL

ENDWALL CONNECTION PLATE DETAIL

BRICK WALL
BY OTHER

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................
Q R S T

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


ENDWALL ELEVATION ALONG GL-14
REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

ENDWALL ELEVATION ALONG GL-14 D-08


20 20
1 1

TYPICAL FIXING DETAIL AT EAVE LOCATION


FRONT SIDE WALL

BACK SIDE WALL


WINDOW WINDOW WINDOW
FRAMED OPENING FRAMED OPENING FRAMED OPENING

ENDWALL CONNECTION PLATE DETAIL

BRICK WALL BRICK WALL BRICK WALL


BY OTHER BY OTHER BY OTHER

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................
T S R Q

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


ENDWALL ELEVATION ALONG GL-24
REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

ENDWALL ELEVATION ALONG GL-24 D-09


24 14

23 22 21 20 19 18 17 16 15
RIGHT END WALL

LEFT END WALL


WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW
FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED
OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING

BRICK WALL
BY OTHER

SIDEWALL ELEVATION ALONG GL-Q

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

WALL BRACING ELEVATION GABLE DETAIL SAG ROD DETAIL AT WALL SIDEWALL ELEVATION ALONG GL-Q D-10
14 24

15 16 17 18 19 20 21 22 23

RIGHT END WALL


LEFT END WALL

WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW WINDOW
FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED FRAMED
OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING OPENING

BRICK WALL
BY OTHER

SIDEWALL ELEVATION ALONG GL-T

NOTE FOR CONSTRUCTION


FOR APPROVAL:
IN ORDER TO SCHEDULE THIS PROJECT "APPROVED AS IS"
IN AN EFFICIENT MANNER, KINDLY
RETURN THESE DRAWINGS WITH YOUR "APPROVED AS NOTED"
COMMENTS MARKED IN RED.
ANY CHANGES MADE AFTER THE "RESUBMIT AS NOTED"
APPROVAL OF THESE DRAWING MAY
DELAY THESE FABRICATION SCHEDULE AND
SUBSEQUENTLY THE DELIVERY OF THE APPROVER : ...................
BUILDING.
PLEASE TICK MARK ONLY ONE OF THE SIGNATURE : ...................
FOLLOWING. DATE : ...................

0 DEC-14-22 ISSUE FOR APPROVAL HAF M.N ADL


REV DATE DESCRIPTION DRN CHK DSN

TELERISEN PRIVATE LIMITED

JOB No / QUOTE NO. : HHR-378-21

PROJECT NAME : MULTI-PURPOSE HALL SHOP-0405C

CUSTOMER : TELERISEN Pvt ( Ltd )

JOB LOCATION : ISLAMABAD


DRAWING TITLE DWG NO.

WALL BRACING ELEVATION GABLE DETAIL SAG ROD DETAIL AT WALL SIDEWALL ELEVATION ALONG GL-T D-11