221039
FOR TENDER
FOR INFORMATION - BC1 FOR INFORMATION BC2 FOR INFORMATION BC2 BUILDING CONSENT 3 Revisions
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
D4.16-1
other project drawings prior to construction commencing. shown on floor plans 24 Minor Demolition and Alterations
Refer all discrepancies to the Architect for resolution. 1 = Drawing Category CBI Code (e.g.. 1 is General) 4.16 Space Number
1 Consecutive identifier
FL Floor Level TA To Above DIMOND BB900 UNPAINTED ZINCALUME ROOFING Project Manager
FTG Footing TB Tie Beam Greenstone Group
TBA To Be Advised Project Number: 221039
GALV Galvanised TBC To Be Confirmed
GRND Ground TFC Tapered Flange Channel SYMPHONY 303
GT Gully Trap TGV Tongue, Groove and Vee Joint
THK Thick 303 MANUKAU ROAD,
HD Head THR Threshold EPSOM, AUCKLAND
HDG Hot Dipped Galvanised TV Terminal Vent
HGR Hanger TYP Typical
Sheet
HOR Horizontal
HVAC Heating Ventilation and Air Conditioning U/S Underside DRAWING
UB Universal Beam CONVENTIONS
IB Inspection Board UC Universal Column
ID Inside Diameter UNO Unless Noted Otherwise
IJ Inspection Junction
IL Invert Level VERT Vertical SCALE @ A1= 1 : 1
INFO Information
W Watt
kW Kilowatt WB Welded Beam
WC Welded Column
L Litre WPR Waterproofing
LH Left Hand WT Wall Thickness
LN Length ARCHITECTURAL
LNDG Landing Drawing Number Revision
LTG Lighting
A1-002 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER GENERAL SUSPENDED CEILING NOTES GENERAL INTERNAL JOINERY NOTES GENERAL DOOR NOTES Revisions
DOCUMENTATION FOR DEMOLITION WORK ON 1. To comply with AS/NZS1170. Suspended 1. Internal fitout joinery and carpentry to be 1. Door Schedules are to be read in
1. Refer to Services Engineer for services A 100% DEVELOPED 20/12/2021
diversion, capping and/or removal including BLOCK WALL ceiling bracing design shall be undertaken by seismically braced and fixed to comply with conjunction with Architectural Specification, DESIGN
sequencing the ceiling [sub] contractor who shall provide NZS 4104 associated door detail drawings and
2. All MDF used in wet areas to be moisture hardware supplier's Hardware Schedule B FOR INFORMATION 26/05/2022
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: PS1 Design, PS3 Construction and PS4
demolition of structural elements with Construction Review statements to the main resistant 2. All dimensions should be checked on site C BC2 - BUILDING 29/07/2022
particular reference to any temporary pinning REMOVE ALL WALL LININGS, contractor 3. All other MDF used to be EO and with specific details before fabrication of CONSENT ISSUE
and propping requirements FRAMING AND CLADDING BACK 2. Allowance is to be made for integration with 4. All plywood used in wet areas to be coated doorsets D FOR INFORMATION 29/07/2022
3. Refer to Fire Engineer for temporary egress TO STRUCTURE the ceiling services. with polyurethane and marine grade 3. All fire rated and acoustic doors to be fully E FOR TENDER 24/08/2022
and fire equipment relocation REMOVE ALL PAVING, FLOOR 3. Refer to Architectural Specification 5. All height adjustable shelves and interior certified and labelled (refer specification)
4. Demolish all walls shown dashed FINISHES AND FRAMING carcase to be 18mm lpl moisture resistant 4. All smoke doors to be fitted with certified
5. Make good all adjacent surfaces - patch floor MDF with plywood edge clashing unless approved smoke seals
finish, make good wall and ceiling after REMOVE EXISTING COLUMNS otherwise specified 5. Door handles to be fitted 1000mm AFFL
GENERAL INTERNAL PARTITION NOTES 6. Any packer or scribing pieces necessary for unless noted otherwise
alteration. (Note: painting works to cover
areas affected by alteration) 1. Partitions bracing design to comply with the proper fitting of joinery are to be set back 6. Fire rated and acoustic rated doors with
1. REMOVE ALL FLOOR FINISHES AS/NZS1170. Design shall be undertaken by flush with face of carcase not with face of multiple leaves to have rebated meeting
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS Professional Engineer who shall provide PS1 cupboard/drawer fronts. Discuss with stiles
ceiling space
3. REMOVE ALL LIGHT FITTINGS, CEILING Design, Partitions [sub] contractor to provide designer 7. All interior doors to have Solid timber
7. Make adjustment to building services to suit
LININGS AND ASSOCIATED CEILING 7. Allow self-adhesive 7.9mm clear bump-on
(Mechanical, Fire Services, Lighting, Power & PS3 Construction and PS4 Construction (hardwood) clashing to vertical edges unless
STRUCTURES door buffer (ex. Laminex) at the top corner of noted otherwise
Data) Review statements by the engineer.
4. REMOVE ALL REDUNDANT SERVICES internal face of all cupboard doors 8. All exterior doors to be metal faced to
2. Allowance is to be made for integration with
5. REMOVE EXISTING ROOF STRUCTURES 8. All surfaces to be flush and continuous where external face and capped on four sides with
the ceiling and services.
3. Read in conjunction with Architectural units butt together factory welded mitre joints unless noted
Specification 9. The joiner shall confirm all existing site otherwise
conditions/access sizes of rooms and sizes 9. External frames to view panels in exterior
of equipment prior to manufacture doors to have factory welded mitre joints
10. All cupboard doors to be fitted with 115° 10. Refer Fire Services and Fire Safety Reports
opening fully concealed hinges for egress width criteria and hold open
11. No substrate material to be visible except device details
where specified 11. Read in conjunction with Electrical &
12. All joinery shall be securely fixed back to Security drawings for all electrical & security
partitions. Provide sufficient nogs for this requirements to each door set
purpose 12. Refer to Mechanical Engineer's drawings for
13. Where there are appliances, ensure ventilation grille requirements
sufficient ventilation is provided in adjacent 13. All glass in vision panels to be laminated
cupboard door/skirting glass except fire rated doors which must
14. Structural support as required. Contractor to conform to their manufacturer’s certification
ensure sufficient support requirements
15. Confirm size of all client supplied items prior 14. Manifestation to glass doors is to be an
to joinery fabrication opaque glass motif or a decorative
treatment to NZS 4223 part 3
15. All glass doors to be toughened safety
glass, acoustic to include laminated
interlayer right for size to NZS 4223 to
Notes
comply with acoustic report requirements
16. Signage to NZBC F8
17. The Hardware Manufacturer/supplier/
installer responsible to check and provide
hardware to comply with the specification,
relevant standards and code requirements,
including (but not limited to):
a. The pull / push force requirement as
stated in NZS4121 and to fit the door
weight and size
b. Hardware to comply with the
performance requirement of the project
Fire Report, Acoustic Report, Electrical
and Security requirements.
18. Refer to Floor Plan drawings for location of
door numbers.
19. All steel stud framed walls to have 2x timber
studs installed at door jamb for door frame
fixing support.
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
GENERAL NOTES
SCALE @ A1= 1 : 1
ARCHITECTURAL
Drawing Number Revision
A1-003 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
ARCHITECTURAL
Drawing Number Revision
A1-005 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Pt Lot 4 Spouting
Neighbouring
Pt Lot 1 Revisions
0.0848 (0.1045) D
E
CONSENT ISSUE
FOR INFORMATION
FOR TENDER
29/07/2022
24/08/2022
Spouting 84.08
84.10
Pt Lot 1
Spouting
84.07
Spouting
84.07
Spouting
DP 3481
81.19
Neighbouring
Shed
81
.0
80.79
(0.0364)
81.93 81.52 83.65
81.2
81.4
.8 80.40 Parapet
81 .6 87.43
81 80.11
.2 cesspit
80 LL80.04
80.8
81.86 81.57 Neighbouring
80 .
81.38 81.08 Parapet 80.19
Retail Building
80.64 80.35 92°17'80.05
00" 80.03
2
82.27
Fenceline
Tree
80.30 Parapet
83.50 58.24 Parapet
83.48 Parapet 83.36 87.46 Parapet
87.84 Canopy
.6
80 808.408.6 ck U/Side 79.90
81.47 79.89 .2 88.8
0 10.0
.0 80 79.93 79.86 79.87 79.87
80
79.86 Retaining Wa TCBW Gum .0
85.31
80.2
80.4 ll 80.68 79.87
81.83 81.84
79.88 81.84 79.87 79.91 Column WM Canopy
TCBW 79.85 80.2 80.0 Tree Column 79.90 STAIRWELL C ol. 80.19 WM Water 83.65 80.25 80.36
79.85 79.88 79.91
81.2
81.84
m
79.83
m
80.69 Kerbline 79.83 Sealed 79.88
Parapet Meters
oncrete Bea
81.83 81.83
oncrete Bea
79.88 79.82 79.88 79.99 87.93 Light
m
79.90 80.38
Footpath
81.84
Carparking 87.46
8 0. 2
oncrete Bea
Sealed
Tree 79.80 79.82 DECK 79.88 79.90 Standard
ete Beam
IL(
Manhole 79.82 79.8 (Under)
ou
Kerbline
TCBW (above)
T2
79.77 LL79.76
t)=
Manhole
80.0
Neighbouring Sealed Manhole
78
Underside C
81.48 Spouting
Underside C
81.78 TCBW 79.8 LL79.78 LL79.80
Parapet
.86
Bus Lane /
Sign
79.8
89.80
linereside Concr
88.59 8 Spouting Carparking Top of IL(in)=78.77
Carport TCBW 79. IL(out)=78.77
Underside C
81.4
79.85
86.52 85.62 79.74 79.74 IL(in)=78.57 =78.38 80.39 80.23 Notes
82.0
Kerbline
81.74
79.78 81.74 81.73
88.59
al
81.73 79.77
ian
Underside Con 81.84
89.24 FILE RECEIVED FROM YEOMANS
81.2
79.76 81.73
85.3179.73 81.85
Und
79.76 crete Beam 79.78
27.25 82.2
81.74 Column
Edge of Se
81.73 81.83 SURVEY SOLUTIONS DATED 21
Kerb
81.74
79.76 81.73 81.73 81.73 79.75 79.74
81.83 Ridge
Centre Med
79.76 81.74 Underside Con 79.75
JULY 2021. PLEASE REFER
79.76 79.77
81.73
79.76 crete Beam 81.74 79.75 81.85
Spouting Column 79.78 88.98
80.02 Column
81.73
79.76 81.73 81.74
Underside Con 81.84
88.59 79.75 79.75 81.83 81.83 79.96 Ridge
ORIGINAL SURVEY DRAWING
79.88 79.75 79.75 81.85 crete Beam
cesspit 81.83
81.83
Column 81.84
79.87 FOR CONFIRMATION /
m
81.67 81.74 81.83 81.83
79.87 90.72
80.4
79.76 81.84
LL79.70 79.72 79.77 CLARIFICATION. JASMAX TAKES
80.2
oncrete Bea
81.72 Column 81.73
81.72
79.77
m
m
oncrete Bea
Tree Co
79.85 l. 79.98
oncrete Bea
m
81.4
81.71
82.23
oncrete Bea
85.96 Accessway 80.10
m
81.82
oncrete Bea
81.83 81.83 81.83
TCBW 80.03 Sealed 79.96
oncrete Bea
Spouting 80.41
UNDERCROFT PARKING
ssing
79.89
Underside C
m
80.23
oncrete Bea
79.88 81.83 Accessway
Concrete Bea
81.47 81.81 81.81
Underside C
81.82 Parapet 80.2
Underside C
81.73
81.72 81.82
89.25
79.8
8
79.77
Vehicle Cro
80.0
79.
Underside C
79.75
30.15
Sealed 81.72 81.82
Underside C
1.0
uring
rmain
Underside C
81.71
81.91 Carparking 79.81 79.75
08.8
Parapet
79.77 79.77
lic
79.80
80.2
Underside C
08.6
89.83
r
Manhole
Dwelling
7°56'
79.80
150 VC Pub
Wastewate
80.03
08.4
175 CI Wate
in)= LL79.77
808.2
79.86 79.8
Neighbo
Underside
79.81 79.80 79.79 79. Sealed 79.77
89.83
80.24 80.11
cesspits 81.7081.71
81.70 79.80 37
80.0
79.8
80.04 81.71
79.8 81.72 81.72 79.77 Parapet .45 Ca
LL79.75 79.81 Landing
79.77 n)= 7 9 IL( rparking First 80.12
82.21 89.23IL(i81.84 81.83
=7 out) Floor Level 79.89
Sealed Entrance 9.3 (U nder) 82.45 Second 80.41
rete Block
Col. 79.78 7
all
81.84
80.09
80.4
Carparking 79.8
ORIGINAL DRAWING
81.6
81.84 81.84
TCBW 81.72 Parapet 81.84 81.84
79.81 Floor Level
79.98 80.36
81.8
89.10
Pt Lot 16 81.47 80.40 IN COLOUR
81.84 81.84 81.84 81.83
81.84 81.83
Column 79.7681.7179.76 89.28 81.84 Col.
Parapet 79.89 80.32
Underside Con
79.81
81.72
Entrance 89.84 89.85 Parapet 79.83 79.88
80.08
80.4
crete Beam
Tree 81.73 Parapet
80.4
Column 79.83 Ridge 89.28 81.84 81.83
80.21
185°40'
Parapet
79.80 89.30 81.83 Col. Parapet
Con1c.2
82.02 79.76
90.86 If there are any discrepancies in the
DP 2332 79.77
81.7281.73 79.76 Floor Level Parapet 79.83 Parapet
cesspits 79.78 Parapet
8
79.76 81.73 Ridge 79.96 89.28 79.98 89.84 89.84 79.86 80.00 WMPE cesspit
documents please seek clarification
IL(i
LL79.76 Column 79.78 89.09 79.88 Water
before proceeding with any work.
n)=
Tree 81.72 81.72 Ridge LL80.13
Kerbline
IL(i
78.
Meter No building work shall proceed until
80.2
Column 79.
Kerbline
Parapet Parapet Sealed 07
Footpath
98
81.73 Building Consent has been granted
(Nail in Seal) 79.77 89.30 89.21
Sealed
79.8
80.2
Concrete Bea
81.71
81.33 80.07 Accessway IL(in)=79.11 80.21
Concrete Bea
80 .
Ridge Parapet 81.71 81.71 IL(in)=78.99 LL80.20
85.28 81.31 88.14 81.73
m
2
82.28 79.77 IL(in)=7
8.95 IL(out)=78.98 300 Concrete P
ublic
oncrete Bea
Underside
79.84
L and/ Ridge 79.89 81.71 79.82 79.90 81.71 IL(in) Client
IL(in)=79.00
82.07 81.70 81.70 Second Sealed =78.9
6 Manhole 80.33 =79.06
IL(out)
e
Underside
81.46
ssing
81.31 Kerbline 81.46 81.71 85.65 79.83 300 Concrete P
STAIRS
ublic
(above)
Consultant Team
81.34 81.71 81.72
79.86 Stormwater
Underside C
Vehicle Cro
81
.6
79.89 79.93 LL80.22 BGT
.8 Sealed First 79.96
80.4
81.58.0 81 Floor Slab Level Floor Level 80
80.05 80.36 Civil Engineer
82.28 82 81.71
Carparking 82.45 =79.0
7 80.31 80.39
80.12
.0
Parapet IL(in) 80.32 80.32 80.44 Babbage Consultants
82.2
80.4
81.73
Services Engineer
Parapet 79.88
81.73 Sealed 22 Degrees
Kerbline
Parapet
Parapet Spouting
279.86
75°0C9ol'0 79.89
79.88 81.72 81.73
80.27 Palm
0" 89.24
79.88
90.09 89.42 80.17 Marshall Day
59.2279.94 79.98
80.2
82.42 umn
79.90 79.89 LID
Trees Fire Engineer
82.39 Spouting
80.0 80.01 80.04 80.33 Holmes Fire
Parapet
80.72 89.43 Parapet 80.08 80.31 Facade Engineer
89.30 89.24 79.98 80.45
80.
79.93 Fenceline 80.05 80.12 80.26 LID Symetrix
Kerbline 80.18 80.36
2
80.00 80.22 80.27
80.4
Parapet
80.23 80.35 Phone Project Manager
90.09 .2 80.0 80.16
80.10 Kerbline Booth
80 Greenstone Group
Sealed Parapet Fenceline 80.37 221039
Carparking 84.64 80.61 Project Number:
ian
cesspit 80.17 80.32 80.37 80.31
SYMPHONY 303
80.4
80.22
Seat
LL79.96 PLINTH
Centre Med
80.43 Sealed 80.33
Parapet
80.27 Carparkin 84.63 LID
all
g Parapet Tall Palm 303 MANUKAU ROAD,
al
T2
80.14 80.39
Concrete W
85.77
Edge of Se
Tree EPSOM, AUCKLAND
D
Parapet
Kerbline
Bus Lane /
85.75
Footpath
Sealed
Kerbline
Neighbouring Deck FFL Sheet
80.4
80.91
UKAU ROA
Office Building SURVEY
80
Light
.4
Standard
80.40 FH 80.36 80.49
Neighbouring 80.25 80.50 80.52
Fire
Office Building 80.53 Hydrant SCALE @ A1= 1 : 100
80.42
Lot 1 Parapet
85.79
80.38
Parapet
DP 75513 85.77
87.44
A1-010 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
SITE INFORMATION
PLANTER
EXISTING WASTEWATER
MANHOLE BELOW
ROSSING
303 MANUKAU ROAD
OAD
OFFICE BUILDING & UNDERCROFT PARKING
VEHICLE C
MANUKAU R
PLANTER
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
ROSSING
No building work shall proceed until
Building Consent has been granted
EXTERIOR CARPARK
for the work described.
VEHICLE C
EXISTING STORMWATER
PLANTER EXISTING UTILITY BOX Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
5 KIMBERLY ROAD Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
1 KIMBERLY ROAD Symetrix
Project Manager
Greenstone Group
Sheet
KIMBER
L EY ROAD
ARCHITECTURAL
Drawing Number Revision
A1-011 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
Notes
PLANTER
LAMP POST
PROPOSED LOCATION
OAD
PLANTER
MANUKAU R
ORIGINAL DRAWING
IN COLOUR
G
LE CROSSIN
Client
NEW VEHIC
LCO EPSOM LTD
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
5 KIMBERLY ROAD Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
1 KIMBERLY ROAD Symetrix
Project Manager
Greenstone Group
Sheet
SITE PLAN -
PROPOSED
KIMBER
L EY ROAD
ARCHITECTURAL
Drawing Number Revision
A1-012 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
UP
Notes
EXISTING PLANTER
TO BE RETAINED
EXISTING CROSSING
TO BE REMOVED
EXISTING
CESSPIT
RETAINED
OAD
EXISTING CORE TO BE REMOVED If there are any discrepancies in the
documents please seek clarification
EXISTING
before proceeding with any work.
CESSPIT
MANUKAU R
RETAINED No building work shall proceed until
UP Building Consent has been granted
for the work described.
EXISTING PLANTER
TO BE REMOVED
UP Client
Consultant Team
Structural Engineer
BGT
Acoustic Engineer
EXISTING CROSSING Marshall Day
TO BE REMOVED
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
EXISTING PLANTER TO Greenstone Group
BE REMOVED
Project Number: 221039
SYMPHONY 303
Sheet
SITE PLAN -
DEMOLITION &
EARTHWORKS PLAN
A1-013 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
BOUNDARY POINT
Northing 799186.182
Easting 400999.327
5886
BOUNDARY POINT
Northing 799188.497
Easting 400941.139 BOUNDARY
87
.1
24
°
G
TO BOUNDARY POINT
6439
5013
°
Notes
76
.8
92
F
1025
E
BOUNDARY
BOUNDARY
6710
MANUKAU ROAD
DIMENSIONS TAKEN PARALLEL WITH GRID 1
D
6504 3223
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
3880
C
1430
B
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
8815
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
90
°
00
.0
Marshall Day
SET-OUT A8
.0
00
90
°
Fire Engineer
347
Holmes Fire
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
BOUNDARY
347
SET-OUT A8
SYMPHONY 303
BOUNDARY POINT BOUNDARY POINT
Northing 799161.506 7206 3097 Northing 799156.185
Easting 400937.379 Easting 400996.357 303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
GRID SETOUT
ARCHITECTURAL
Drawing Number Revision
A1-014 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
Notes
1 3D View
If there are any discrepancies in the
SOUTH EAST - MANUKAU ROAD documents please seek clarification
before proceeding with any work.
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
PERSPECTIVES
SCALE @ A1=
2 3D View
ARCHITECTURAL
Drawing Number Revision
A1-020 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
Notes
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
RENDERS
SCALE @ A1= 1 : 1
ARCHITECTURAL
Drawing Number Revision
A1-021 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
REAR OF BUILDING VIEW COPYRIGHT © JASMAX
Revisions
209
210 201 REGULAR PARK 27 SECURED CYCLE 43
20
SMALL PARK 13 PARK
TANDEM PARK 4 VISITOR CYCLE PARK 4
8
3 1 : 500 Plan If there are any discrepancies in the
44 51 documents please seek clarification
A1-201 LEVEL 2 - GFA before proceeding with any work.
103
104 1 BED I
Client
1 BED II
LCO EPSOM LTD
106 105 102 1 BED M
107 Consultant Team
101 2 BED I
Structural Engineer
BGT
110 2 BED II
Civil Engineer
108 2 BED III Babbage Consultants
109
Services Engineer
2 BED IV 22 Degrees
SYMPHONY 303
Sheet
AREA PLANS
ARCHITECTURAL
Drawing Number Revision
A1-030 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
APARTMENT TYPOLOGY Revisions
Typology Number Name Level Comments Balcony Type* Kitchen Type Bathroom Type A 100% DEVELOPED 20/12/2021
DESIGN
B BC2 - BUILDING 29/07/2022
106 2F-1 Not
CONSENT ISSUE
Placed
C FOR INFORMATION 29/07/2022
D FOR TENDER 24/08/2022
1 BED I 110 1E-1 LEVEL 1 N/A K1 B1
1 BED I 210 1A-2 LEVEL 2 MIRRORED TYPE 3 K1 B1
1 BED I 211 1B-2 LEVEL 2 TYPE 3 K1 B1
1 BED I 310 1A-3 LEVEL 3 MIRRORED TYPE 3 K1 B1
1 BED I 311 1B-3 LEVEL 3 TYPE 3 K1 B1
1 BED I 410 1A-4 LEVEL 4 MIRRORED TYPE 3 K1 B1
1 BED I 411 1B-4 LEVEL 4 TYPE 3 K1 B1
1 BED I/1 109 1D-1 LEVEL 1 SIMILAR AND MIRROR OF 1 BED I. N/A K1 B1
LEVEL 1 APARTMENT WITH
EXISTING STRUCTURE
2 BED II/1 102 2C-1 LEVEL 1 SIMILAR AND MIRROR OF 2 BED II. TYPE 1 K7 B1 / B1
LEVEL 1 APARTMENT WITH
EXISTING STRUCTURE
1 1 : 200 Plan
A1-050A APARTMENT KEY PLAN - LEVEL 1 2 BED III 204 2D-2 LEVEL 2 TYPE 1 K3 B1 / B1
2 BED III 304 2D-3 LEVEL 3 TYPE 1 K3 B1 / B1
2 BED III 404 2D-4 LEVEL 4 TYPE 1 K3 B1 / B1
2 BED III/1 103 2D-1 LEVEL 1 SIMILAR TO 2 BED III. LEVEL 1 TYPE 1 K8 B1 / B1
APARTMENT WITH EXISTING
STRUCTURE If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
2 BED IV 201 2A-2 LEVEL 2 TYPE 1 K4 B1
2 BED IV 301 2A-3 LEVEL 3 TYPE 1 K4 B1 No building work shall proceed until
2 BED IV 401 2A-4 LEVEL 4 TYPE 1 K4 B1 Building Consent has been granted
for the work described.
3 BED I 205 3A-2 LEVEL 2 TYPE 1 K5 B4 / B5
3 BED I 305 3A-3 LEVEL 3 TYPE 1 K5 B4 / B5
3 BED I 405 3A-4 LEVEL 4 TYPE 1 K5 B4 / B5
Structural Engineer
3 BED II 308 3B-3 LEVEL 3 TYPE 2 K6 B6 / B7
205/305/405 BGT
2 BED III 3 BED II 408 3B-4 LEVEL 4 TYPE 2 K6 B6 / B7
3A-2 Civil Engineer
1 BED I Total: 46
Babbage Consultants
3 BED II
2 1 : 200 Plan
A1-031 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
RL 82450
LEVEL 1
20
RL 81730 RL 81730
20
20
CONCRETE STRUCTURE - REFER TO
STRUCTURAL ENGINEER
1840
1902
1905
RL 79410
RL 79380
1 1 : 20 Section
A1-050 SECTION THROUGH SECONDARY EGRESS If there are any discrepancies in the
documents please seek clarification
ROUTE (REAR) before proceeding with any work.
7590 7350
Structural Engineer
BGT
EXISTING BEAM EXISTING BEAM EXISTING BEAM Civil Engineer
SURVEYED RL SURVEYED RL SURVEYED RL Babbage Consultants
20
20
Services Engineer
20
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
FRP WRAPPING TO EXISTING
CONCRETE STRUCTURE - REFER TO Facade Engineer
Symetrix
STRUCTURAL ENGINEER
Project Manager
Greenstone Group
221039
1903
Project Number:
EXTERIOR OPEN AIR CAR PARK EXTERIOR COURTYARD
1960
2054
SYMPHONY 303
NEW CONCRETE SLAB ON HARDFILL. 303 MANUKAU ROAD,
REFER STRUCTURAL
DOCUMENTATION RL 79841
EPSOM, AUCKLAND
RL 79766
RL 79907 Sheet
SECTION THROUGH
RL 79960
GROUND LEVEL
SECONDARY EGRESS
ROUTE
SCALE @ A1= 1 : 20
ARCHITECTURAL
Drawing Number Revision
2 1 : 20 Section A1-050A C
A1-050 SECTION THROUGH EGRESS ROUTE (FRONT) DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
SITE BOUNDARY
SITE BOUNDARY
TRANSFORMER
5309
Notes
F MSB ROOM
1025
E
6710
2 2
TOTAL PARKS - 44 A1-050A A1-050A
MANUKAU ROAD
VEHICLE ENTRY
D
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
3880
C VLV RM
1430
FACP
BIKE STORE PARCEL
B
Client
LOBBY
LCO EPSOM LTD
Consultant Team
MAIL
Structural Engineer
BGT
Civil Engineer
8815
Babbage Consultants
Services Engineer
PATH TO REFUSE 30m 22 Degrees
FROM LIFT EXIT
VEHICLE Acoustic Engineer
WASTE ENTRY Marshall Day
Fire Engineer
Holmes Fire
1 1 Facade Engineer
Symetrix
A A1-050A A1-050A
Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
SYMPHONY 303
Sheet
PERFORMANCE PLAN
PERFORMANCE PLAN KEY - GROUND
INTERSTOREY SEISMIC DRIFT FIRE ACOUSTIC
MAXIMUM INTERSTOREY ULS SLS (30)/30/30 FRR STC 57 SCALE @ A1= 1 : 100
SEISMIC DRIFT
(60)/60/60 FRR STC 64
REAR BLOCK (GRIDS 1-4) 40mm 10mm
(WEST ZONE)
(120)/120/120 FRR ADDITIONAL 2 X NOISELINE
TO EXTERNAL BUILDUP
FRONT BLOCK (GRIDS 4-8) 20mm 5mm
(EAST ZONE) SEISMIC GAP SEPERATION
FOR TENDER
Holmes Fire LP - February 2022 ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
SITE BOUNDARY
G CONCRETE
ROOF TO
2D-1
TRANSFORMER
BELOW
PARKING BELOW
5309
Notes
3A-1
F
1025
3B-1
6710
2C-1
D
If there are any discrepancies in the
SEISMIC GAP - 200mm documents please seek clarification
before proceeding with any work.
3880
C 1C-1
1430
CORRIDOR
B
Client
Civil Engineer
8815
Services Engineer
22 Degrees
VEHICLE ENTRY BELOW
Acoustic Engineer
Marshall Day
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
SYMPHONY 303
Sheet
PERFORMANCE PLAN
PERFORMANCE PLAN KEY - LEVEL 1
INTERSTOREY SEISMIC DRIFT FIRE ACOUSTIC
MAXIMUM INTERSTOREY ULS SLS (30)/30/30 FRR STC 57 SCALE @ A1= 1 : 100
SEISMIC DRIFT
(60)/60/60 FRR STC 64
REAR BLOCK (GRIDS 1-4) 40mm 10mm
(WEST ZONE)
(120)/120/120 FRR ADDITIONAL 2 X NOISELINE
TO EXTERNAL BUILDUP
FRONT BLOCK (GRIDS 4-8) 20mm 5mm
(EAST ZONE) SEISMIC GAP SEPERATION
FOR TENDER
Holmes Fire LP - February 2022 ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
2 X LAYER OF NOISELINE
ON STEEL STUD
REQUIRED AT LEVEL 3/4
ONLY. REFER TO SHEET
SITE BOUNDARY
A1-132.
SITE BOUNDARY
2D-2
G
SEISMIC GAP - 200mm
5309
Notes
3A-2
F
1025
2F-2
6710
3B-2 2E-2
2C-2
D
If there are any discrepancies in the
SEISMIC GAP - 200mm documents please seek clarification
before proceeding with any work.
3880
C
1430
CORRIDOR 2B-2
B
Client
Consultant Team
1B-2 Structural Engineer
COURTYARD BELOW BGT
Civil Engineer
8815
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
2 X LAYER OF NOISELINE Project Number: 221039
ON STEEL STUD
REQUIRED AT LEVEL 4 SYMPHONY 303
ONLY. REFER TO SHEET
A1-141. 303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
PERFORMANCE PLAN
PERFORMANCE PLAN KEY - LEVEL 2-4
INTERSTOREY SEISMIC DRIFT FIRE ACOUSTIC
MAXIMUM INTERSTOREY ULS SLS (30)/30/30 FRR STC 57 SCALE @ A1= 1 : 100
SEISMIC DRIFT
(60)/60/60 FRR STC 64
REAR BLOCK (GRIDS 1-4) 40mm 10mm
(WEST ZONE)
(120)/120/120 FRR ADDITIONAL 2 X NOISELINE
TO EXTERNAL BUILDUP
FRONT BLOCK (GRIDS 4-8) 20mm 5mm
(EAST ZONE) SEISMIC GAP SEPERATION
FOR TENDER
Holmes Fire LP - February 2022 ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
(60)/60/60 FRR
A B N C D (120)/120/120 FRR
A1-211 A1-211 A1-211 A1-211
A1-301
SEISMIC GAP SEPERATION
1
A4-002
SITE BOUNDARY
PROPOSED LAMP
POST LOCATION
SITE BOUNDARY
G
32 33 34 35 36 37 38 39 40
EXISTING PLANTER
LANDSCAPED AREA AT REAR 7 TRANSFORMER 6
5309
Notes
A4-003 A4-003 SMALL PARK SMALL PARK
F EXISTING PARKS
SMALL PARK
EXISTING PARKS
MSB ROOM
EXISTING PARKS
1025
E
4 4
NEW PLANTER
A1-202 A1-202
16
MANUKAU ROAD
A1-302
E
6710
VEHICLE ENTRY
14
D EXISTING PARKS 44 43 42 41
1:12
C VLV RM
1430
3 PARCEL 3
FACP
12 STAIR BIKE STORE x 33
B A1-202 A1-202
CORRIDOR
Client
06 04 01 LOBBY
ABOVE
2 3 2 LCO EPSOM LTD
A1-201 11 LIFT FFL 79960
A1-201
A1-303 OPEN ABOVE
MAIL Consultant Team
EXISTING PARKS SPRINKLER VALVE
& PANEL Structural Engineer
BGT
07 4 05 02
Civil Engineer
1 2
8815
A4-021
VEHICLE ENTRY
10 PROPOSED PARKS PROPOSED PARKS
Babbage Consultants
BALCONY ABOVE
A1-303 A1-303 Services Engineer
PROPOSED PARKS NEW VEHICLE 22 Degrees
CROSSING
08 6 5 03 GATE Acoustic Engineer
Marshall Day
A4-021 WASTE A4-021
1 09 1 Fire Engineer
A1-201 SMALL PARK A1-201 Holmes Fire
Facade Engineer
7 PATH TO REFUSE 30m FROM LIFT EXIT Symetrix
1 S C
A B D Sheet
ARCHITECTURAL
Drawing Number Revision
A1-100 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
(60)/60/60 FRR
A 1 B N C 1 D (120)/120/120 FRR
A1-211 A1-211 A1-211 A1-112 A1-211
A1-113 A1-301
SEISMIC GAP SEPERATION
ZONE NW
ZONE NE
Holmes Fire LP - February 2022
SITE BOUNDARY
SITE BOUNDARY
103
G GARDEN BELOW 2D-1
78.8 m²(NIA)
7767
PARKING BELOW
5309
Notes
E
4 4
A1-202 A1-202
107 A1-302
3B-1 E
6710
104.7 m²(NIA)
DB
106 105
2F-1 2E-1 102
75.5 m²(NIA) 75.2 m²(NIA) FFL 82450 2C-1
77.8 m²(NIA)
D
If there are any discrepancies in the
A1-301
44.6 m²(NIA)
3 3
B A1-202 A1-202
Client
1D-1 A8-020
1 1 Fire Engineer
44.5 m²(NIA) Holmes Fire
A1-201 A1-201
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
ZONE SW
ZONE SE
SYMPHONY 303
A B S
1 C 1 D Sheet
A1-302
A1-211 A1-114 A1-211 A1-211
A1-111 A1-211 FLOOR PLAN - LEVEL
1
ARCHITECTURAL
Drawing Number Revision
A1-101 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
(60)/60/60 FRR
A B N C 1 D
A1-211
1 A1-211 A1-211 A1-211
(120)/120/120 FRR
A1-123 A1-301 A1-122
SEISMIC GAP SEPERATION
ZONE NW
ZONE NE
Holmes Fire LP - February 2022
EXISTING LAMPOST
SITE BOUNDARY
7767
5309
Notes
1025
E
4 4
A1-202 A1-202
6710
3B-2 2E-2
103.9 m²(NIA) 75.5 m²(NIA) 75.2 m²(NIA) DB
203
2C-2
77.5 m²(NIA)
FFL 85730
D
If there are any discrepancies in the
A1-301
3880
ZONE SE No building work shall proceed until
Building Consent has been granted
for the work described.
C UP
DN
202
1430
1430
3 2B-2 3
77.4 m²(NIA)
B A1-202 A1-202
Client
8815
1M-2 Babbage Consultants
58.0 m²(NIA) A1-303 A1-303 Services Engineer
22 Degrees
Acoustic Engineer
210 201 Marshall Day
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
ZONE SW
ZONE SE
SYMPHONY 303
A B S C D
1 Sheet
A1-302 1
A1-211 A1-124 A1-211 A1-211
A1-121
A1-211 FLOOR PLAN - LEVEL
2
ARCHITECTURAL
Drawing Number Revision
A1-102 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8
(60)/60/60 FRR
N (120)/120/120 FRR
A1-301
SEISMIC GAP SEPERATION
A B C 1 D
ZONE NW
ZONE NE
Holmes Fire LP - February 2022
A1-211 A1-211 A1-211 A1-132 A1-211
SITE BOUNDARY
7767
5309
Notes
305
3A-3
115.9 m²(NIA)
F
1025
1025
E
4 4
A1-202 A1-202
6710
3B-3
105.0 m²(NIA) 75.6 m²(NIA) 75.3 m²(NIA)
1560
303
D 2C-3
78.3 m²(NIA)
If there are any discrepancies in the
A1-301
3880
ZONE SE No building work shall proceed until
Building Consent has been granted
for the work described.
C 302
2B-3
1430
1430
3 3
78.2 m²(NIA)
B A1-202 A1-202
Client
8815
1M-3 Babbage Consultants
58.4 m²(NIA) A1-303 A1-303 Services Engineer
22 Degrees
Acoustic Engineer
310 301 Marshall Day
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
ZONE SW
ZONE SE
SYMPHONY 303
ARCHITECTURAL
Drawing Number Revision
A1-103 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8
(60)/60/60 FRR
A B N C D
(120)/120/120 FRR
A1-211 A1-211 A1-211 A1-211
A1-301
SEISMIC GAP SEPERATION
ZONE NW
ZONE NE
Holmes Fire LP - February 2022
SITE BOUNDARY
7767
5309
Notes
405
3A-4
115.9 m²(NIA)
F
1025
1025
E
4 4
A1-202 A1-202
6710
3B-4 2E-4
105.0 m²(NIA) 75.6 m²(NIA) 75.4 m²(NIA) DB
FFL 92450
403
D 2C-4
78.2 m²(NIA)
If there are any discrepancies in the
A1-301
3880
ZONE SE No building work shall proceed until
Building Consent has been granted
for the work described.
C 402
2B-4
1430
1430
3 3
78.1 m²(NIA)
B A1-202 A1-202
Client
8815
1M-4 Babbage Consultants
58.4 m²(NIA) A1-303 A1-303 Services Engineer
22 Degrees
Acoustic Engineer
410 401 Marshall Day
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
ZONE SW
ZONE SE
SYMPHONY 303
A S C 1
B D Sheet
A1-302 A1-141
A1-211 A1-211 A1-211 A1-211 FLOOR PLAN - LEVEL
4
ARCHITECTURAL
Drawing Number Revision
A1-104 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
A B N C D
A1-211 A1-211 A1-211 A1-211
A1-301
2
GUTTER SECTION
A4-230
1 1
2 A4-226 SITE BOUNDARY
A4-232 A4-611
Ø65 DP
01
SITE BOUNDARY
1
G A4-059
1 1
A4-054 A4-056 SEISMIC JOINT COVER 3
3° A4-225
5309
Notes
01
Ø85 DP
GUTTER NE
Ø110 DP
02
F Ø65 DP
2
3°
3°
3°
A4-271
1025
E 4
sim
4 2
A4-225 1 3 4
A1-202 A4-232 A4-223 A1-202
A4-225 sim
01 1 5° 6°
RL 95913 RL 95921
1:60
A4-271
A1-302
ROOFSAFE RAIL
3°
E
6710
1:60
A4-283
5°
ROOFSAFE RAIL
01
A4-230
No building work shall proceed until
Building Consent has been granted
RL 96263 ROOFSAFE RAIL for the work described.
ROOF ACCESS HATCH
C
1:36
1430
3 2 1:60 1:60 3 03 3
RL 96100 HP
B A1-202 A4-231 A4-231 A1-202
4 Client
2 A4-251
1 3 3 1 1 2 LCO EPSOM LTD
A4-241
A1-201 A4-225 A4-224 A1-303 A4-223 A1-201
Consultant Team
01 Structural Engineer
01 BGT
Civil Engineer
1 2
8815
Babbage Consultants
3 A1-303 A1-303 Services Engineer
5°
A4-051 22 Degrees
3° 01 1
RL 95909
Acoustic Engineer
A4-284 01 Marshall Day
1 2 4 2 1 Fire Engineer
A1-201 A4-251 A4-224 01 A4-223 A1-201 Holmes Fire
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY Ø65 DP RL 95772 HP SITE BOUNDARY
1 2 3 3 Project Number: 221039
A4-226 A4-226 A4-232
A4-251 1 SYMPHONY 303
A4-282
303 MANUKAU ROAD,
2 EPSOM, AUCKLAND
GUTTER SECTION
A4-230
A B S C D Sheet
A1-302
A1-211 A1-211 A1-211 A1-211 FLOOR PLAN - ROOF
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 6 7 8 Revisions
(120)/120/120 FRR
BIKE STORE
10 BIKES
2
A1-050A 2090
B 3 C D 1
MECH SERVICE A1-211 A4-143 A1-211 A1-211 A3-313
AREA. NO CYCLE MB15
OR MOTORCYCLE
PARKING
VEHICLE ENTRY
RL 80336
D MB20
8
STRIP DRAIN 1 1:2
RF1 CF1
5110
A4-133
3 MB15 RL 80240
A4-144 CONDENSER UNITS
ABOVE CARPARKS
1250MM MIN FROM FFL
3880
Notes
1:12
D0.04
MB20 PC200 PC250 MB20
3
A4-308
RL 79995
C
FAP ROOM
VLV RM
RL 80300
1430
FACP
STAIR WS06 MB15 BIKE STORE x 33 MB15 PARCEL MB15
3 RF1 3
D0.03
A1-202 A1-202
D0.05
DS.06
B
D0.02
D0.07
MB20 PC180
RL 79995
PC150 1
A4-301
2 2 2
LIFT LOBBY D0.01 1:46 RL 80250
A1-201 A4-141 A1-201
RL 79960 1:56
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
RL 79922
No building work shall proceed until
PC180 PC180 Building Consent has been granted
for the work described.
PROPOSED PARKS
3
1 1 A4-131
A5-510
8815
A5-520
Client
Civil Engineer
STRIP DRAIN
Babbage Consultants
Services Engineer
1 1 22 Degrees
A1-201 A1-201
Acoustic Engineer
Marshall Day
SYMPHONY 303
B C D
A1-211 A1-211 A1-211 303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
SCALE @ A1= 1 : 50
ARCHITECTURAL
Drawing Number Revision
A1-110 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
ADDITIONAL FRAMING INFORMATION 6 7 8 Revisions
EXTERIOR WALL FRAMING LEGEND A 100% DEVELOPED 20/12/2021
LEVEL 1-3 WALL FRAMING
LINTEL JAMB STUD 7350 7590 DESIGN
LEVEL 1 - 3 TOP PLATE SUPPORTED BY CONTINUOUS 1.15BMT DEFLECTION PERFORMANCE KEY B BC2 - BUILDING 29/07/2022
1 3/140x45 SG8 HEAD TRACK W/ 2/14g T17 HWF SCREWS @ 600 CRS. W/ 45 MIN. CONSENT ISSUE
3/140x45 SG8 140x45 SG8 @ 600CRS. EMBEDMENT - TYPICAL FIRE
C FOR INFORMATION 29/07/2022
2 140x135 GL8 (30)/30/30 FRR D BC2 - AMENDMENTS 05/08/2022
2.50BMT 600 MIN. LONG DHT @ LINTEL JAMBS & MID-SPAN @
LEVEL 4* 1800 CRS. MAX. - FIXED W/ 4/14g T17 HWF SCREWS W/ 45 MIN. (60)/60/60 FRR
E FOR INFORMATION 05/08/2022
<3.5m 140x45 SG8 EMBEDMENT - TYPICAL F BC2 AMENDMENTS 09/08/2022
41 140x135 GL8 5/140x45 SG8
@ 400CRS. (120)/120/120 FRR
G FOR INFORMATION 09/08/2022
42 140x135 GL8 5/150x45 HySPAN BUILT UP LINTELS TO BE NAILED TOGETHER @ 150 CRS. MIN. + H FOR TENDER 24/08/2022
3.5-4.4m 2/140x45 SG8 @ SEISMIC GAP SEPERATION
M10 COACH BOLT @ DHT LOCATIONS
43 140x135 GL12 3/150x45 HySPAN 400CRS.
Holmes Fire LP - February 2022
or LINTEL FIXING - PAIR OF MULTI GRIPS @ EACH END
44 180x135 GL12 4/150x45 HySPAN 150x45 HySPAN @
45 180x180 GL12 4/150x45 HySPAN 400CRS. TYPICAL STUD FIXINGS 4/3.15 DIA. SKEW NAILS TOP & BOTTOM
D2C-1/02
3
20
D A4-481
140
2 1
A5-251
1
A5-120
1510
1534
EXTERIOR WALL FRAMING
A4-133
3
WS.01
WS01
A4-144
203
TV
3 1
140
225
A4-894 A5-102
3880
3 WS20 WS04
6 A5-910 1 Notes
2230
FRAMING AND ROUGH OPENINGS.
2121
101 ADDITIONAL WALL STRAPING,
CORRIDOR 1C-1 REFER TO A5 SERIES.
44.6 m²(NIA) JOINERY DETAILS, REFER TO
86.0 m²(NIA)
SHOP DRAWINGS.
1 1
4135
1 / A5-150
C WS02
A5-701 A4-893
INTER-TENNANCY FRAMING
2
1430
1
3 A5-601 A4-308 3
A1-202 3 A1-202
B A5-250
WT05
WS07
475
92 597
DS.01 TV
90
3
4 A4-301
LIFT LOBBY A5-250 PC150
4.8 m²(NIA) WS01
2 2
1 2 LOBBY VOID
A1-201 LIFT A1-201
A5-250 A5-250
4.5 m²(NIA)
8340
8250
8126
Client
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
A Facade Engineer
Symetrix
CORRIDOR FRAMING
ARCHITECTURAL
Drawing Number Revision
A1-111 H
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 6 7 8 Revisions
92 1552 92 3607
CORRIDOR FRAMING
5
B C REFER D
2 A1-211 1 A1-211 STRUCTURAL FOR Sim A1-211
A4-057 FLASHING ACROSS TO Sim BLOCK WALL INFILL. 1 1
A4-002
NEIGHBOURING BUILDING ROOF 1 A5-708 A5-121
A5-121
TV
G 1
A5-605
D-42
WS21
1
D-51
WS22
3400
A4-035
D-40
225
D2D-1/02
INTERSECTION G8
103 2
W3A-1/01
WS21 WS21
TRANSFORMER / MSB ROOF 1 2D-1
7767
950
D-43
2
INTERSECTION G4
D-42
A5-601 78.8 m²(NIA) Notes
A5-102
260
1 / A5-151 ZONE PLAN SETS OUT PRIMARY
92
140
6439
1 REFER TO A5 SERIES.
A4-003 JOINERY DETAILS, REFER TO
1575
A4-003
4968
2 SHOP DRAWINGS.
104 A5-251
3A-1
D-42
D-43
2
2890
116.8 m²(NIA)
3400
A4-701
1 / A5-157
D-61
W2D-1/02
1200
WS02
D3A-1/02
3180
140
1
D-42
250 115
2
A5-709 1
F A5-601
250
WS22
W2D-1/03
4 WS20 1
850
1005
913
1025
1
A5-102 A4-341
D-40
E 1
225
400
140
20
A5-601
W3A-1/03 W3A-1/02
W2C-1/03
WS01
1245
850
WS02 1
4 5 4
D-61
1 1
D-61
170
A1-202 A1-202 documents please seek clarification
140
3 before proceeding with any work.
D-42 2
3283
A5-102 No building work shall proceed until
A5-104
5 Building Consent has been granted
W2C-1/02
for the work described.
A4-133
D-61
D-45 WS01
D-54
WS04 WS04 WS01
2915
2915
D-40
D-43
D-61
1
3
6710
6470
A5-601
6598
92
D-61 A4-133
1 Client
D-43
DB ROOM
WS02 DB.03 WS02
LCO EPSOM LTD
D-42
1525
102 D-43 W2C-1/01
D3A-1/01
D-43
140
D-42 2C-1 Consultant Team
277
77.8 m²(NIA) Structural Engineer
6 BGT
1 / A5-154
D2C-1/02
D2C-1/01
92
A5-120 Civil Engineer
2 Babbage Consultants
3
2270
WS07 1
WS01 CORRIDOR 1 WS02
A5-120
WS01 D-61 Services Engineer
4
1719
86.0 m²(NIA) A5-604 A4-034 22 Degrees
A5-120 1
Acoustic Engineer
WT08
3300
Marshall Day
WC.01/02
WT07
D Fire Engineer
140
20
Holmes Fire
WS01 1
EXTERIOR PENETRATIONS
EXTERIOR WALL FRAMING
1510
1534
A5-707 A4-133
A4-896 A4-143 Project Manager
A4-701
1 WS20 WS04 Greenstone Group
A4-701
203
TV Project Number: 221039
1
140
225
SEISMIC GAP - 200mm
SK-831
SYMPHONY 303
INTER-TENNANCY FRAMING
EXTERIOR OPENINGS
B C D EPSOM, AUCKLAND
A1-211 A1-211 A1-211
92 3772 Sheet
CORRIDOR FRAMING
EXTERIOR WALL FRAMING LEGEND ZONE PLAN - LEVEL 1
• ZONE PLANS INCLUDE EXTERNAL FRAMING, LINTEL JAMB STUD - ZONE NE
140 1900
EXTERNAL OPENING SET-OUT, CORRIDOR FRAMING LEVEL 1 - 3
EXTERIOR OPENINGS EXTERIOR OPENINGS 365 950 720
AND INTER-TENNANCY FRAMING, REFER TO A1 1 3/140x45 SG8
1900 SERIES. 3/140x45 SG8 140x45 SG8 @ 600CRS. 140 2035 90 40
EXTERIOR WALL FRAMING 2 140x135 GL8 EXTERIOR WALL FRAMING SCALE @ A1= 1 : 50
• STRUCTURAL SET-OUT, REFER TO A3 SERIES.
• WALL TYPES AND APARTMENT PLANS AND SET-OUT, LEVEL 4*
<3.5m 140x45 SG8
REFER TO A5 SERIES. 41 140x135 GL8 5/140x45 SG8
@ 400CRS.
42 140x135 GL8 5/150x45 HySPAN
3.5-4.4m 2/140x45 SG8 @
43 140x135 GL12 3/150x45 HySPAN 400CRS.
44 180x135 GL12 4/150x45 HySPAN
or
150x45 HySPAN @ ARCHITECTURAL
45 180x180 GL12 4/150x45 HySPAN 400CRS. Drawing Number Revision
REFER TO DRAWING A1-111 FOR ADDITIONAL FRAMING, LINTEL & DEFLECTION A1-112 F
HEAD INFORMATION
DO NOT SCALE OFF THIS DRAWING
*REFER TO LEVEL 2 ZONE PLANS FOR LEVEL 4 INFORMATION IF ZONE PLAN NOT IN SET
EXTERIOR WALL CALCULATIONS SUPPLIED BY BGT - REFER TO BGT FOR ANY CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
ADDITIONAL INFORMATION
COPYRIGHT © JASMAX
• ZONE PLANS INCLUDE EXTERNAL FRAMING, EXTERNAL OPENING SET-OUT,
Revisions
CORRIDOR FRAMING AND INTER-TENNANCY FRAMING, REFER TO A1
•
SERIES.
STRUCTURAL SET-OUT, REFER TO A3 SERIES.
1 2 3 4 A 100% DEVELOPED 20/12/2021
DESIGN
• WALL TYPES AND APARTMENT PLANS AND SET-OUT, REFER TO A5 SERIES.
PERFORMANCE KEY B BC2 - BUILDING 29/07/2022
7575 7350 7575 CONSENT ISSUE
FIRE
C FOR INFORMATION 29/07/2022
EXTERIOR WALL FRAMING LEGEND (30)/30/30 FRR D BC2 - AMENDMENTS 05/08/2022
LINTEL JAMB STUD E FOR INFORMATION 05/08/2022
(60)/60/60 FRR
LEVEL 1 - 3 F FOR TENDER 24/08/2022
(120)/120/120 FRR
1 3/140x45 SG8
3/140x45 SG8 140x45 SG8 @ 600CRS.
2 140x135 GL8 SEISMIC GAP SEPERATION
2504
2450
F
1025
20
20
E
140
140
Notes
440
TV
TV
3600
4775
WS04 WS04
107
D3B-1/04
2
3B-1
6710
D-61 D-61
104.7 m²(NIA) WS20
1 / SK-158
D-43
D-43
REFER ZONE NE
735
TV
140
92
1 1
3 A5-702 A5-702
1575
A5-251
1719
1675
1 D-42
4
A4-701
D-43 WS21
400
D-43 D-43
2 D-43 1
Client
W3B-1/02
3880
D2E-1/01
2 Civil Engineer
D2F-1/01
WS21 WS02 Babbage Consultants
D-62
A4-896
225 150
92 151
C WT07 WS20 WS01 Services Engineer
22 Degrees
92
670
Acoustic Engineer
D-62 WS20 WS01 WS01
1430
WC.01/01
1187
1187
3 3
W3B-1/03
1055
1
D-43 1 1 1 1 Fire Engineer
A1-202 A5-601 A5-601 CORRIDOR A5-603 A1-202 Holmes Fire
1200
B D-61 D-61
WS01 WS01 WS02 WS01
Facade Engineer
415
415
530
Symetrix
2
A4-896 Project Manager
92
TV
92
D-42 WS02
2
EXTERIOR OPENINGS
CORRIDOR FRAMING
A4-141 SYMPHONY 303
2 2
D-62
1
A1-201
A5-607 REFER ZONE SW A1-201 303 MANUKAU ROAD,
D1E-1/02 EPSOM, AUCKLAND
D-58
WS02
337
Sheet
EXTERIOR OPENINGS
EXTERIOR WALL FRAMING
INTER-TENNANCY FRAMING
CORRIDOR FRAMING
SCALE @ A1= 1 : 50
ARCHITECTURAL
Drawing Number Revision
140 140 1740 120
EXTERIOR WALL FRAMING
20
EXTERIOR WALL FRAMING
20 A1-113 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
1 2 3 4 Revisions
2
A2-200
Notes
530
415
D-61 D-61
9
140
WS01 TV
92
A4-811
680
2
2277
WS01
D-42
1 A4-141
2970
2 A5-607 WS02 2
D-62
A1-201 WS03 A1-201
1 1
ZONE NW A5-601 1E-1
A5-701
337
D-58
44.6 m²(NIA)
4138
If there are any discrepancies in the
ZONE SW
2900
WS02
1 / A5-152 documents please seek clarification
2 before proceeding with any work.
D-42
WS20 WS22
D1E-1/02
1 D-57
D1M-1/02
2
6203
D-40
WS01 4 3 for the work described.
A4-021 A5-101
2600
1
58.0 m²(NIA)
800
225
2 / A5-152
D1D-1/01 1
A5-601 WS20 Client
D-40
1 TV LCO EPSOM LTD
D1D-1/02
320
A4-051 1 WS02 2
D-43 D-57 Consultant Team
A5-602 WS02
5 3
W1M-1/01
DR.01
Structural Engineer
1200
2900
1 D1M-1/01 A4-021 SK-830 BGT
92 276 92
D-56
D-58
4032
D-62
WS03
22 Degrees
WS22
D-62
D-61
Acoustic Engineer
TV
1725
1645
Marshall Day
865
WT05
WT07 7 Holmes Fire
A
TV
A4-021 Facade Engineer
Symetrix
Project Manager
INTER-TENNANCY FRAMING
CORRIDOR FRAMING
Greenstone Group
3 Project Number: 221039
5 A4-020
A5-102 EXTERIOR BLOCK SYMPHONY 303
WALL BELOW
ARCHITECTURAL
Drawing Number Revision
A1-114 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
6 7 8 Revisions
D2C-2/02
20
D
140
1
A5-251
1
A4-133
3
WS.02
WS01 WS20
A4-144 Sim
250
3 TV
225
A4-894
EXTERIOR OPENINGS
190
3880
TV
WS20 Notes
D-50
FRAMING AND ROUGH OPENINGS.
2121
2120
1 1 ADDITIONAL WALL STRAPING,
A5-703 REFER TO A5 SERIES.
A5-120 1
D2B-2/02
JOINERY DETAILS, REFER TO
2 A4-031 SHOP DRAWINGS.
3400
C WS01
2B-2
77.4 m²(NIA)
D-61
1 / A5-154
1430
3 3
A1-202 3 A1-202
250
D2B-2/01
B A5-250
210
3
140
D-42
DS.02
W2B-2/01 A5-121
1 D-43
1
4 A5-601
1595
A5-250
2931
2 2
D-43
2995
A1-201 A1-201
WS01 1
4452
4581
A5-601
W2B-2/02
1200
WS01
D-61
WS04
Sim If there are any discrepancies in the
1 1 documents please seek clarification
153
4 before proceeding with any work.
A5-120
D2A-2/01
A4-481
D-42
200
A4-344 No building work shall proceed until
140
D-61
WT02 Building Consent has been granted
WS06 1 for the work described.
3
W2B-2/03
A5-104
1060
WS20 1 A4-131
8815
225
230
W2A-2/01
200
1200
TV
1 1
WS21 WS20
A5-604 Client
D-40
D-43 LCO EPSOM LTD
3
410
5731
A4-134 2
D-42
D-43
Consultant Team
A4-031 Structural Engineer
W2A-2/02
BGT
D2A-2/02
1200
4009
3600
4000
2A-2 2 Civil Engineer
D-60
1 61.0 m²(NIA)
Babbage Consultants
Services Engineer
A1-201 1 / A5-153 22 Degrees
D-62
Acoustic Engineer
1553
1 Marshall Day
200
2
A A4-481
2 Facade Engineer
Symetrix
EXTERIOR OPENINGS
A4-481
INTER-TENNANCY
EXTERIOR JOINERY
CORRIDOR
EXTERIOR WALL
Project Manager
Greenstone Group
ARCHITECTURAL
Drawing Number Revision
A1-121 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 6 7 8 Revisions
92 1554 92 3605
CORRIDOR FRAMING
B C D
A1-211 A1-211 A1-211
Sim
Sim 1
1 A5-121
A4-058
TV
G Sim 1
A5-703
1
D-51
WS21 2
D-40
A5-121 WS22 2
D-42
3400
A4-035
43
225
D2D-2/02
INTERSECTION G8
W3A-2/01
1 D-43 Notes
2D-2
7767
1 WS02
950
WS21
INTERSECTION G4
260
D-42 1 / A5-155 ADDITIONAL WALL STRAPING,
140
6439
REFER TO A5 SERIES.
TV W2D-2/01 JOINERY DETAILS, REFER TO
D2D-2/01
1
D-43
RL 85730 1 42
SHOP DRAWINGS.
A5-601
1850
1575
4968
2
D-42 A5-251
2965
RL 85890 RL 85730
D-61
W2D-2/02
2
WS02
1200
3A-2 42
45 116.0 m²(NIA)
D-42
1 / A5-157
140
1 1
2400
125 190
D3A-2/02
A5-601 A4-342
F
W2D-2/03
175
WS22
850
WS20 41 1
1
D-40
1005
912
1025
A5-705
20
180
225
450
140
WS01
W2C-2/03
5 W3A-2/03 W3A-2/02
1170
If there are any discrepancies in the
D-61
850
A5-121 1 41 1 41 41 1 documents please seek clarification
4 WS02 4 before proceeding with any work.
220 95
A1-202 A1-202
140
1
D-61
D-42
No building work shall proceed until
A5-601 Building Consent has been granted
for the work described.
5
W2C-2/02
D-45
WS01
1200
D-54 A4-133
D-61
42
D-61
2990
D-43
D-40
WS02 3 Client
6470
6710
6598
92
D-43
1570
D-61 A4-133 LCO EPSOM LTD
1 42
DB ROOM
D-42 WS02 DB.02
Consultant Team
1525
D-43
1 1 W2C-2/01
Structural Engineer
D3A-2/01
D-42
140
A5-601 BGT
A5-703
210
D-43
Civil Engineer
D2C-2/02
D2C-2/01 Babbage Consultants
92
2
Services Engineer
2 22 Degrees
2270
4 WS01 WS01 WS02 WS02 D-61 43 A4-034 Acoustic Engineer
1
1719
A5-107
4 Marshall Day
1 42 A5-121 A5-601 2C-2
Fire Engineer
3400
77.5 m²(NIA)
WC.02/02 Holmes Fire
1 / A5-154
D
140
Facade Engineer
20
D-50
Symetrix
1
EXTERIOR PENETRATIONS
EXTERIOR WALL FRAMING
Sim
3 A5-251
1 Project Manager
1
1510
1534
6 A4-133 Greenstone Group
3 A4-701 A5-121
A4-143 3 WS20 Project Number: 221039
A5-107 A4-144 WS01
SYMPHONY 303
170
TV
250
225
TV 303 MANUKAU ROAD,
EPSOM, AUCKLAND
C D
CORRIDOR FRAMING
INTER-TENNANCY FRAMING
REFER TO DRAWING A1-111 FOR ADDITIONAL FRAMING, LINTEL & DEFLECTION A1-122 F
HEAD INFORMATION
DO NOT SCALE OFF THIS DRAWING
*REFER TO LEVEL 2 ZONE PLANS FOR LEVEL 4 INFORMATION IF ZONE PLAN NOT IN SET
CONTRACTOR MUST VERIFY ALL DIMENSIONS
EXTERIOR WALL CALCULATIONS SUPPLIED BY BGT - REFER TO BGT FOR ANY
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
ADDITIONAL INFORMATION
COPYRIGHT © JASMAX
• ZONE PLANS INCLUDE EXTERNAL FRAMING, EXTERNAL OPENING SET-OUT,
CORRIDOR FRAMING AND INTER-TENNANCY FRAMING, REFER TO A1 1 2 3 4 Revisions
SERIES.
A 100% DEVELOPED 20/12/2021
• STRUCTURAL SET-OUT, REFER TO A3 SERIES.
DESIGN
• WALL TYPES AND APARTMENT PLANS AND SET-OUT, REFER TO A5 SERIES. 7575 7350 7575
PERFORMANCE KEY B BC2 - BUILDING 29/07/2022
EXTERIOR WALL FRAMING LEGEND CONSENT ISSUE
FIRE
C FOR INFORMATION 29/07/2022
LINTEL JAMB STUD (30)/30/30 FRR D BC2 - AMENDMENTS 05/08/2022
LEVEL 1 - 3
(60)/60/60 FRR
E FOR INFORMATION 05/08/2022
1 3/140x45 SG8
3/140x45 SG8 140x45 SG8 @ 600CRS. F FOR TENDER 24/08/2022
(120)/120/120 FRR
2 140x135 GL8
SEISMIC GAP SEPERATION
LEVEL 4*
<3.5m 140x45 SG8
41 140x135 GL8 5/140x45 SG8 Holmes Fire LP - February 2022
@ 400CRS.
42 140x135 GL8 5/150x45 HySPAN
3.5-4.4m 2/140x45 SG8 @
43 140x135 GL12 3/150x45 HySPAN 400CRS. 20 30
or SG
44 180x135 GL12 4/150x45 HySPAN 150x45 HySPAN @ 140 7285 140 5760 390 1230 1150 140 6115 170 200 140
EXTERIOR WALL FRAMING
45 180x180 GL12 4/150x45 HySPAN 400CRS.
440 2900 1020 2006 919 365 2400 1415 1200 380 95 800 600 800 85 660 1200 1460 2400 405
EXTERIOR OPENINGS
REFER TO DRAWING A1-111 FOR ADDITIONAL FRAMING, LINTEL & DEFLECTION Sim Sim
HEAD INFORMATION
*REFER TO LEVEL 2 ZONE PLANS FOR LEVEL 4 INFORMATION IF ZONE PLAN NOT IN SET
1 1
EXTERIOR WALL CALCULATIONS SUPPLIED BY BGT - REFER TO BGT FOR ANY A4-053 A A4-055 6 1 SEISMIC GAP - 200mm
ADDITIONAL INFORMATION
A1-211 A4-153 A4-542
2504
2450
F
1025
20
20
E
140
140
Notes
W2F-2/01 W2E-2/01
440
TV
TV
2
D3B-2/04
W2F-2/02 W2E-2/02
3600
4775
45 1 41 1 41 WS04 WS04
6710
D-61 D-61
3B-2 WS20
D-43
D-43
103.9 m²(NIA)
1 / SK-158
735
TV
140
92
1 2F-2 2E-2
1
3 A5-702 75.5 m²(NIA) 75.2 m²(NIA)
A5-702
1 / A5-156 1 / A5-156 4
1575
A5-251
1719
1675
D-42
42
D-43
3 SEISMIC GAP - 200mm
WS21 A5-107
400
D-43 D-43
2 D-43
Client
W3B-2/02
3880
D2E-2/01
Civil Engineer
D2F-2/01
WS21 WS02 Babbage Consultants
D-62
225 149
92 149
C WT07
WS02 Services Engineer
300
22 Degrees
92
670
Acoustic Engineer
D-62 WS21 WS01 WS01
1430
WC.02/01
1189
1189
3 3
1056
D-43
1
1400
2 1 Fire Engineer
W3B-2/03
A5-122 A5-122
B D-61 D-61
WS01 WS02 WS02 WS01
41 Facade Engineer
415
415
42
530
Symetrix
401
Project Manager
92
TV
92
Greenstone Group
EXTERIOR OPENINGS
CORRIDOR FRAMING
SYMPHONY 303
2 2 2
D-62
1
A1-201 A5-607
A4-141 A1-201 303 MANUKAU ROAD,
EPSOM, AUCKLAND
D-58
WS02
225
Sheet
D1B-2/02
EXTERIOR OPENINGS
EXTERIOR WALL FRAMING
INTER-TENNANCY FRAMING
CORRIDOR FRAMING
A SCALE @ A1= 1 : 50
A1-211
ARCHITECTURAL
Drawing Number Revision
140 140 1740 140
EXTERIOR WALL FRAMING
20
EXTERIOR WALL FRAMING
20 A1-123 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
1 2 3 4 Revisions
Notes
530
WS01 TV
92
140
380
WS02
2390
D-42
2970
2 5 1 WS02 2
D-62
A1-201 A5-122 A5-607 WT07 A1-201
D-58
225
A5-701
3200
4000
If there are any discrepancies in the
documents please seek clarification
WS02 1B-2 before proceeding with any work.
D-42
WS20 WS21
D1B-2/02
D-57 45.1 m²(NIA) 2
D1M-2/02
6203
D-40
WS01
2 44
for the work described.
43
A5-101
2600
1M-2 D1B-2/01
8815
420
58.0 m²(NIA)
1
225
140
2 / A5-152 1
240
A4-041
Sim A5-702 D1A-2/01
1 WS20 Client
A4-051 TV LCO EPSOM LTD
D1A-2/02
2
320
DR.02
1 Structural Engineer
1200
3200
D-56
3935
4031
45.1 m²(NIA)
D-58
42 Civil Engineer
RISER
D-42
D-62
22 Degrees
D-62
WS22 3
D-61
Acoustic Engineer
TV
1645
1810
495
Holmes Fire
WS04
A
TV
Symetrix
85
Project Manager
EXTERIOR OPENINGS
EXTERIOR WALL FRAMING
EXTERIOR OPENINGS
INTER-TENNANCY FRAMING
CORRIDOR FRAMING
Greenstone Group
4 Project Number: 221039
1 A5-122
1
A A5-602 A5-701
SYMPHONY 303
A1-211
303 MANUKAU ROAD,
EPSOM, AUCKLAND
3176 225 3949
INTER-TENNANCY FRAMING Sheet
ARCHITECTURAL
Drawing Number Revision
A1-124 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 6 7 8 Revisions
92 1551 95 3605
CORRIDOR FRAMING
B C D
A1-211 A1-211 A1-211
1 Sim
A4-058 3
A5-122
4
A4-581 TV
WS04
G 1
WS04 A5-605 WS20 2
D-40
WS21 1 1
D-51
D-42
3400
A5-703 A4-036
225
D2D-3/02
INTERSECTION G8
W3A-3/01
1 D-43 Notes
2D-3
7767
WS21
INTERSECTION G4
78.1 m²(NIA)
260
D-42 1 / A5-155
140
6439
TV W2D-3/01
D2D-3/01 D-43
WS02
1 RL 89130
A5-601 1
1575
4969
WS01 D-42
D-43
2965
5380
RL 89130
WS01
1
W2D-3/02
2
190 1200
3A-3 A5-601
115.9 m²(NIA)
D-61
1 / A5-157
140
D-42
D3A-3/02
125
F 1
W2D-3/03
175
850
1
1005
912
D-40
1025
A5-704
20
225
450
140
W3A-3/03 W3A-3/02
W2C-3/03
1170
If there are any discrepancies in the
D-61
850
1 1 WS22 WS20 1 documents please seek clarification
4 before proceeding with any work.
WS02
220 95
A1-202
140
D-61
D-42
No building work shall proceed until
1 WS01
Building Consent has been granted
A5-604 for the work described.
5
W2C-3/02
D-45
1200
D-54 A4-133
D-61
1
D-61
A5-601
2990
D-43
D-40
3 Client
6470
6710
6598
92
D-43
1570
D-61 A4-133 LCO EPSOM LTD
1
DB ROOM
DB.03
1
D-42
Consultant Team
1525
WS02 A5-601 D-43 W2C-3/01
Structural Engineer
140
BGT
210
D-43 D-42
1 Civil Engineer
D2C-3/02
D2C-3/01 Babbage Consultants
92
A5-703 2
Sim Services Engineer
2 22 Degrees
2270
WS01 WS02 WS01 D-61
A4-034 Acoustic Engineer
1719
Marshall Day
1 2C-3
WS01 78.3 m²(NIA) Fire Engineer
3400
WC.03/02 Holmes Fire
1 / A5-154
D
140
Facade Engineer
20
D-50
Symetrix
EXTERIOR PENETRATIONS
EXTERIOR WALL FRAMING
1510
1534
A4-133 Greenstone Group
A4-143 3 WS20 WS20 Project Number: 221039
WS01
A4-144
SYMPHONY 303
170
TV
250
225
TV 303 MANUKAU ROAD,
EPSOM, AUCKLAND
B
CORRIDOR FRAMING
INTER-TENNANCY FRAMING
*REFER TO LEVEL 2 ZONE PLANS FOR LEVEL 4 INFORMATION IF ZONE PLAN NOT IN SET CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
EXTERIOR WALL CALCULATIONS SUPPLIED BY BGT - REFER TO BGT FOR ANY
ADDITIONAL INFORMATION COPYRIGHT © JASMAX
6 7 8 Revisions
D2C-4/02'
20
D
140
D-50
WS01
1
A4-133
3
WS.04
WS20
A4-144
Sim
250
TV
1 3
225
EXTERIOR WALL FRAMING
EXTERIOR OPENINGS
A4-894
200
3880
SK-831 TV
Sim
WS20 1 Notes
A5-120
D-50
2122
2120
1
A5-703
D2B-4/02'
Sim
43 1
3400
A4-031
C WS01
2B-4
78.1 m²(NIA)
D-61
1 / A5-154
1430
3 3
A1-202 D2B-4/01 A1-202
250
B D-42
200
140
DS.04
W2B-4/01
D-43
42
1
1595
A5-601
2931
2 2
D-43
WS02
2995
A1-201 A1-201
4452
4581
W2B-4/02
Sim 42
A5-601
1200
D-61
WS04
1 If there are any discrepancies in the
documents please seek clarification
A4-481
153
before proceeding with any work.
D-42
D2A-4/01
70 200
No building work shall proceed until
140
D-61
WT02 Building Consent has been granted
WS06 Sim
W2B-4/03
for the work described.
1 3
1060
875
42
A5-104 WS20 A4-131
8815
190 115
225
230
W2A-4/01
1200
TV
41
1 WS21 1 WS20 Sim Client
D-40
A5-604 A5-704 2
D-43 LCO EPSOM LTD
3 A4-031
410
5731
A4-134
D-42
D-43
Consultant Team
Structural Engineer
W2A-4/02
D2A-4/02'
BGT
1200
41
3600
4009
4000
2A-4 43 Civil Engineer
D-60
1 61.3 m²(NIA) 1 Babbage Consultants
Services Engineer
A1-201 D-62 1 / A5-153 A1-201
22 Degrees
Acoustic Engineer
1553
Marshall Day
WS04 WS04
D-40 Fire Engineer
Holmes Fire
Sim
210
A 2 Facade Engineer
Symetrix
A4-481
EXTERIOR OPENINGS
INTER-TENNANCY
EXTERIOR JOINERY
CORRIDOR
EXTERIOR WALL
Project Manager
Sim Greenstone Group
ARCHITECTURAL
Drawing Number Revision
A1-141 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8 B BC2 - BUILDING
CONSENT ISSUE
29/07/2022
2 Sim
A4-241 4
A5-103
RL 97250
TOP OF ROOF
2000
RL 92450
LEVEL 4
311
3400
308 302
3B-3 1B-3 LIFT LOBBY 2B-3
RL 89050
LEVEL 3
3 1 1
MANUKAU ROAD
A4-151 A4-141 A4-132
3400
RL 85650 Notes
LEVEL 2
LIFT
107 110 SHAFT
3200
RL 82450
LEVEL 1 NGL
LOBBY
2490
KERB
CARPARK
RL 79960
GROUND LEVEL
2 1 : 100 Section
RL 97250
TOP OF ROOF
2000
Client
RL 95250
ROOF LEVEL LCO EPSOM LTD
Consultant Team
1M-4 1A-4 2A-4 Structural Engineer
BGT
Services Engineer
22 Degrees
309 310 301
3400
Acoustic Engineer
1M-3 1A-3 2A-3 Marshall Day
1
1 1 A4-131 Fire Engineer
RL 89050 Holmes Fire
LEVEL 3 A4-151 A4-144
Facade Engineer
Symetrix
1M-1 1D-1
Sheet
RL 82450
LEVEL 1 PROPOSED LONG
VEHICLE ENTRANCE SECTIONS
2490
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8 B BC2 - BUILDING
CONSENT ISSUE
29/07/2022
RL 97250
TOP OF ROOF
3
2000
A4-230
RL 95250
ROOF LEVEL
408
2800
308
3B-3 CORRIDOR 302
2B-3
RL 89050
LEVEL 3
MANUKAU ROAD
1 2 3
A4-152 A4-142 A4-132
3400
208
3B-2 CORRIDOR 202
2B-2
RL 85650 Notes
LEVEL 2
CORRIDOR
107 101
3200
250
630
RL 82450
LEVEL 1 NGL
2490
KERB
STAIR LOBBY BIKE STORE PARCEL
CARPARK
RL 79960
GROUND LEVEL
3 1 : 100 Section
Consultant Team
Services Engineer
22 Degrees
3400
Fire Engineer
RL 89050 Holmes Fire
LEVEL 3
1 Facade Engineer
MANUKAU ROAD
Symetrix
A4-134
2 Project Manager
3400
KERB
CARPARK 3
A4-701
RL 79960 SCALE @ A1= 1 : 100
GROUND LEVEL
4 1 : 100 Section
ARCHITECTURAL
Drawing Number Revision
A1-100 LONG SECTION 4 - SNORKEL
A1-202 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
F E D C B A F E D C B A B BC2 - BUILDING
CONSENT ISSUE
29/07/2022
1
RL 96263 A4-231
RL 97250
TOP OF ROOF
RL 95850
2000
RL 95250
ROOF LEVEL
RL 92450
LEVEL 4
3400
2 3 1
3400
A4-153
208 209 A4-162 205 A4-143
3B-2 1M-2 3A-2
RL 85650 Notes
LEVEL 2
RL 82450
LEVEL 1
NGL
2490
CARPARK
CARPARK
RL 79960 NGL
GROUND LEVEL
A1-100 CROSS SECTION A - GRIDS 1 & 2 - REAR A1-100 CROSS SECTION B - GRIDS 4 & 5 -
BLOCK TRANSFORMER / PROPOSED STRUCTURE
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
Client
RL 95250
ROOF LEVEL LCO EPSOM LTD
Consultant Team
3A-4 2A-4 2D-4 2C-4 2B-4 2A-4 Structural Engineer
BGT
A4-161
301 304 303 302 301 Acoustic Engineer
3A-3 A4-161 A4-162
2A-3 2D-3 2C-3 2B-3 2A-3 Marshall Day
Fire Engineer
RL 89050 Holmes Fire
LEVEL 3
Facade Engineer
1 Symetrix
A4-162
205 Project Manager
3400
ARCHITECTURAL
Drawing Number Revision
C 1 : 100 Section D 1 : 100 Section
A1-100 CROSS SECTION C - GRIDS 6 & 7 - STAIR / A1-100 CROSS SECTION D - GRIDS 7 & 8 - LOBBY A1-211 D
LIFT CORE DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
8 7 6 5 4 3 2 1 B BC2 - BUILDING
CONSENT ISSUE
29/07/2022
16M HEIGHT
270
SEISMIC GAP PLANE - BUILDING
16288
RL 97744
RL 97250 RL 97355
TOP OF ROOF
1830
2000
MC1 MC1 MC1
RL 95870
RL 95250
ROOF LEVEL
AJ2 AJ2
GL2 GL2 MC1 MC1 HPL1
2800
HI A R
MC1
RE
RB NE
- T IGH
RL 92450
HA B
LEVEL 4
B Z OU
MC1
ON R
E
AJ2 AJ2
3400
RL 89050
LEVEL 3 BAL1 BAL1
MC1
AJ2
GL2 MC1 HPL1
3400
MC3
RL 85650 Notes
LEVEL 2
MC1
EXISTING
AJ2 NEIGHBOURING
AJ2 BUILDING
3200
RL 82450 NGL
LEVEL 1 BAL1
BAL1 MC1 BAL1
BLK1 BLK2
2490
BLK1
RL 79960
GROUND LEVEL
N 1 : 100 Elevation
1730
PC2 PRE CAST CONCRETE PANEL GL1 SINGLE GLAZED PC ALUM. GLAZING SYSTEM
16M HEIGHT PLANE
- BUILDING RL 97744 TEXTURED FINISH
RL 97355 RL 97457
RL 97250 BLK1 BLOCK WALL - EXISTING GL2 DOUBLE GLAZED JOINERY
TOP OF ROOF
MC1 MC1 AJ1 ALUMINIUM JOINERY - CHAMPAGNE
2000
Consultant Team
Services Engineer
AJ2 AJ2 AJ2 AJ2 22 Degrees
3400
Fire Engineer
RL 89050 Holmes Fire
LEVEL 3 BAL1 EXISTING Facade Engineer
NEIGHBOURING Symetrix
AJ2 AJ2 BUILDING
GL2 Project Manager
3400
MC1 GL2
GL2 MC1 GL2 GL2
INTERSTOREY JOINT TO
ALIGN WITH WINDOW HEAD
Sheet
RL 82450
LEVEL 1 NGL
PROPOSED
BLK2 BAL1 BAL1 ELEVATIONS - NORTH
& WEST
2490
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8 B BC2 - BUILDING
CONSENT ISSUE
29/07/2022
7320 7575 7350 7575 3800 7675 7350 7590 3015 C FOR INFORMATION 29/07/2022
D FOR TENDER 24/08/2022
18M HEIGH
T PLANE - R
OOF
16M HEIGHT
PLANE - BUILDING
RL 97744
275
670
760
RL 97457 RL 97355
RL 97250
TOP OF ROOF 2000
RL 95250 1575
ROOF LEVEL
2800
MC1
MC1
MC1
HB NE
R
OU
IG ZO
RL 92450 NE AB
AR TH
LEVEL 4
RE RB -
HI
AJ2
3400
RL 89050
MANUKAU ROAD
LEVEL 3
MC2
3400
MC1 MC1
RL 85650 Notes
LEVEL 2
3200
MC3 AJ2
MC1 GL1 MC1 INTERSTOREY JOINT TO
PC2 ALIGN WITH WINDOW HEAD
RL 82450 NGL
LEVEL 1
2490
BLK1 BLK2
BLK2
RL 79960
GROUND LEVEL
PRECAST CONCRETE
PANEL WITH CAST
PROFILE ON FACE
EXISTING CONCRETE
BLOCK WALL
S 1 : 100 Elevation
315
RL 97744
705
RL 97250 RL 97357 RL 97355
TOP OF ROOF
16M HEIGHT PLANE - BUILDING
2000
Consultant Team
TEXTURED FINISH
Structural Engineer
BAL1 GL2 BLK1 BLOCK WALL - EXISTING GL2 DOUBLE GLAZED JOINERY BGT
BAL1
RL 92450 Civil Engineer
LEVEL 4 BAL1 BAL1 AJ1 ALUMINIUM JOINERY - CHAMPAGNE
BLK2 BLOCK WALL - PROPOSED Babbage Consultants
A1-302 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
18M HEIGHT
455
350
PLANE - ROOF 18M HEIGHT
60
RL 97744 PLANE - ROOF
RL 97455 RL 97355 RL 97355
RL 97250
TOP OF ROOF
16M HEIGHT PLANE PC2
2000
BALUSTRADES
- BUILDING MC1 16M HEIGHT PLANE
INTERSTOREY JOINT
- BUILDING
RL 95250
ROOF LEVEL
AJ1 AJ2
GL2 MC1
HPL1 GL2 MC1
2800
2590
AJ1
GL1 BAL1
1800
RL 92450
90
LEVEL 4
615
BAL1
AJ1
PC2
3400
GL2 AJ2
2785
2590
GL1 INTERSTOREY JOINT - ALIGNS
WITH WINDOW HEAD & TOP OF
BAL1 OPENEING FOR BALCONY
1800
RL 89050
90
LEVEL 3
615
BAL1
AJ1 AJ2
3400
2785
AJ1 MC1
GL1
BAL1
RL 85650 Notes
LEVEL 2 BAL1
820
AJ1 PC2 RL 84830
3200
AJ2
GL2 NU-WALL BASE
GL1
RL 82450
LEVEL 1 BAL1
VEHICLE ENTRANCE
2490
RL 97744
565
175
18M HEIGHT
PLANE - ROOF
RL 97250 RL 97355
TOP OF ROOF Client
MATERIALS FINISHES LEGEND LCO EPSOM LTD
2000
Services Engineer
RL 92450 AJ1 ALUMINIUM JOINERY - CHAMPAGNE
BLK2 BLOCK WALL - PROPOSED 22 Degrees
LEVEL 4
Acoustic Engineer
MC1 NUWALL CLADDING - STANDING SEAM AJ2 ALUMINIUM JOINERY - TITANIA
Marshall Day
AJ2 PROFILE
Fire Engineer
3400
HPL1 MC1
SYMPHONY 303
INTERSTOREY JOINT - ALIGNS
WITH WINDOW HEAD & TOP OF
RL 85650
OPENEING FOR BALCONY 303 MANUKAU ROAD,
LEVEL 2 EPSOM, AUCKLAND
Sheet
3200
AJ2
MC1 GL1 MC1 PROPOSED
INTERSTOREY JOINT - ALIGNS
WITH WINDOW HEAD & TOP OF
ELEVATIONS -
RL 82450 OPENEING FOR BALCONY COURTYARD
LEVEL 1
BLK2 BLK2
RL 79960 NGL
GROUND LEVEL
ARCHITECTURAL
Drawing Number Revision
3 1 : 100 Elevation
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
STRENGTHENING
B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
D FOR TENDER 24/08/2022
Notes
1 3D View
AXONOMETRIC - TO BE DEMOLISHED
Client
2112-4.4.1
Consultant Team
CONTRACTOR TO ALLOW FOR TOP OF
EXISTING BLOCK WALLS AND COLUMNS TO Structural Engineer
BE PROPPED BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
DEMOLITION
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER AXONOMETRIC
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SCALE @ A1= 1 : 1
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
and propping requirements FRAMING AND CLADDING BACK
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR
4. Demolish all walls shown dashed FINISHES AND FRAMING
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING
2 3D View A2-000 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
Data)
STRUCTURES AXONOMETRIC - DEMOLITION COMPLETED
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
STRENGTHENING
B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
1 2 3 4 5 6 7 8 D FOR TENDER 24/08/2022
382
C.O.S.
1
A2-200 REFER ELEVATION FOR
EXTENT OF BLOCK WORK TO
3137 BE REMOVED
C.O.S. REFER ELEVATION FOR REMOVE EXISTING
EXTENT OF BLOCK WORK TO STAIR
REMOVE EXISTING BE REMOVED SITE BOUNDARY
BOUNDARY FENCE
E
CARPARK EXISTING CROSSING
TO BE REMOVED
EXISTING METAL GATE AND
FENCE TO BE DEMOLISHED
REMOVE EXISTING ASPHALT
FLOORING AT CARPARK AREA. CARPARK
REGRADE AND REPLACE WITH REMOVE EXISTING BOLLARD 2
ASPHALT TO CIVIL ENGINEER'S
A2-201
DRAWING
D
EXISTING CESS PIT
If there are any discrepancies in the
2 documents please seek clarification
before proceeding with any work.
A2-200
No building work shall proceed until
REMOVE COLUMNS Building Consent has been granted
EXISTING PLANTER for the work described.
TO BE REMOVED
C
B
Client
EXISTING METAL GATE AND EXISTING LOBBY, LIFT, LCO EPSOM LTD
FENCE TO BE DEMOLISHED STAIR AND MACHINE ROOM
TO BE DEMOLISHED Consultant Team
EXISTING PLANTER
TO BE REMOVED Structural Engineer
BGT
EXISTING EXTERIOR
CARPARK TO BE REMOVED EXISTING CROSSING Civil Engineer
REMOVE STEPS,
TO BE REMOVED Babbage Consultants
STAIRS AND LANDING
EXISTING UTILITY BOX Services Engineer
TO BE RELOCATED 22 Degrees
REMOVE EXISTING
BOUNDARY FENCE REPLACE EXISTING Acoustic Engineer
Marshall Day
SERVICE LIDS TO BE
VEHICLE TRAFFICABLE Fire Engineer
Holmes Fire
Facade Engineer
EXISTING PHONE Symetrix
A BOOTH TO BE
RELOCATED Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
EXTENT OF EXISTING LANDSCAPE REMOVE EXISTING STORE ROOM 1 REFER ELEVATION FOR REMOVE EXISTING SYMPHONY 303
TO BE REMOVED AND SLAB A2-201 EXTENT OF EXISTING BOUNDARY FENCE
CONCRETE BLOCK
2673 WALL TO BE REMOVED.
303 MANUKAU ROAD,
C.O.S. EPSOM, AUCKLAND
Sheet
DEMOLITION PLAN-
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER GROUND LEVEL
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SERVICES LEGEND: SCALE @ A1= As indicated
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
FRAMING AND CLADDING BACK EXISTING MANHOLE TO REMAIN
and propping requirements
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR EXISTING MANHOLE TO BE DEMOLISHED.
4. Demolish all walls shown dashed FINISHES AND FRAMING REFER CIVIL
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after EXISTING CESSPIT TO REMAIN
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES EXISTING CESSPIT TO BE DEMOLISHED.
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS REFER CIVIL
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING A2-100 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
STRUCTURES
Data)
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
STRENGTHENING
B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
1 2 3 4 5 6 7 8 D FOR TENDER 24/08/2022
REFER STRUCTURAL
ENGINEER
DOCUMENTATION 7/S502
FOR FLOOR INFILL DETAIL
382
1 REMOVE EXISTING C.O.S.
A2-200 WINDOWS. REFER REFER ELEVATION FOR
STRUCTURAL EXTENT OF BLOCK WORK TO
3222 DOCUMENTATION 6/501 FOR BE REMOVED
C.O.S. REFER ELEVATION FOR BLOCK WALL INFILL DETAIL REMOVE EXISTING
EXTENT OF BLOCK WORK TO STAIR
BE REMOVED SITE BOUNDARY
SITE BOUNDARY
Notes
CARPARK BELOW
REMOVE EXISTING OFFICE FITOUTS,
CEILING, WALLS, & FLOOR LININGS
EXTERIOR WALLS,
CLADDINGS, LININGS 2
AND JOINERY TO BE
A2-201
DEMOLISHED
B
EXISTING DOUBLE TEE
Client
FLOORING TO REMAIN
EXISTING LOBBY, LIFT, LCO EPSOM LTD
STAIR AND MACHINE ROOM
TO BE DEMOLISHED Consultant Team
Structural Engineer
BGT
Acoustic Engineer
Marshall Day
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
REFER ELEVATION FOR
1 EXTENT OF BLOCK WORK TO SYMPHONY 303
BE REMOVED
A2-201 2673
C.O.S. 303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
DEMOLITION PLAN -
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER LEVEL 1
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SCALE @ A1= As indicated
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
and propping requirements FRAMING AND CLADDING BACK
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR
4. Demolish all walls shown dashed FINISHES AND FRAMING
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING A2-101 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
STRUCTURES
Data)
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
STRENGTHENING
B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
1 2 3 4 5 6 7 8 D FOR TENDER 24/08/2022
2112-4.4.1
CONTRACTOR TO ALLOW FOR TOP OF
EXISTING BLOCK WALLS AND COLUMNS TO
BE PROPPED
COLUMNS MAINTAINED ABOVE
LEVEL 2 382
1 C.O.S.
A2-200 REFER ELEVATION FOR
REFER STRUCTURAL ENGINEER EXTENT OF BLOCK WORK TO
DOCUMENTATION 7/S502 FOR BE REMOVED
3222
FLOOR INFILL DETAIL
C.O.S. REFER ELEVATION FOR REMOVE EXISTING
EXTENT OF BLOCK WORK TO STAIR
BE REMOVED SITE BOUNDARY
SITE BOUNDARY
G
EXISTING TIMBER DECK AND
PERGOLA TO BE REMOVE EXISTING OFFICE FITOUTS, Notes
DEMOLISHED. CEILING, WALLS, & FLOOR LININGS
REFER STRUCTURAL
DOCUMENTATION S611 FOR
REMOVAL OF LEVEL 2 COLUMNS.
D
REMOVE EXISTING OFFICE FITOUTS,
CEILING, WALLS, & FLOOR LININGS If there are any discrepancies in the
2 documents please seek clarification
before proceeding with any work.
A2-200 REFER STRUCTURAL
DOCUMENTATION S611 FOR No building work shall proceed until
REMOVAL OF LEVEL 2 COLUMNS. Building Consent has been granted
for the work described.
B
EXISTING DOUBLE TEE
Client
FLOORING TO REMAIN
EXISTING LOBBY, LIFT, LCO EPSOM LTD
STAIR AND MACHINE ROOM
REMOVE BLOCK WALL TO BE DEMOLISHED Consultant Team
Structural Engineer
BGT
Civil Engineer
REMOVE STAIRS,
Babbage Consultants
LANDING, AND ROOFS
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
REFER ELEVATION FOR
1 EXTENT OF BLOCK WORK TO SYMPHONY 303
BE REMOVED
A2-201
303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
DEMOLITION PLAN -
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER LEVEL 2
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SCALE @ A1= As indicated
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
and propping requirements FRAMING AND CLADDING BACK
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR
4. Demolish all walls shown dashed FINISHES AND FRAMING
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING A2-102 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
STRUCTURES
Data)
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
STRENGTHENING
B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
1 2 3 4 5 6 7 8 D FOR TENDER 24/08/2022
382
1 C.O.S.
A2-200 REFER ELEVATION FOR
EXTENT OF BLOCK WORK TO
CONCRETE COLUMNS TO BE CUT BE REMOVED
3222
DOWN TO ALLOW EMBEDED STEEL
C.O.S. COLUMNS SUPPORTING.
REFER ELEVATION FOR
EXTENT OF BLOCK WORK TO SITE BOUNDARY
BE REMOVED
SITE BOUNDARY
G
EXISTING TIMBER DECK AND
PERGOLA TO BE Notes
DEMOLISHED.
2
A2-201
D
If there are any discrepancies in the
2 DEMOLISH EXISTING documents please seek clarification
ROOFS AND PARAPETS before proceeding with any work.
A2-200
No building work shall proceed until
Building Consent has been granted
for the work described.
C
DEMOLISH EXISTING LIFT
OVERRUN STRUCTURE
B
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Facade Engineer
Symetrix
A Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Project Number: 221039
REFER STRUCTURAL REFER ELEVATION FOR
DOCUMENTATION FOR REMOVAL OF 1 EXTENT OF BLOCK WORK TO SYMPHONY 303
LEVEL 2 COLUMNS. BE REMOVED
A2-201
303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
DEMOLITION PLAN -
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER EXISTING ROOF
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SCALE @ A1= As indicated
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
and propping requirements FRAMING AND CLADDING BACK
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR
4. Demolish all walls shown dashed FINISHES AND FRAMING
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING A2-103 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
STRUCTURES
Data)
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
STRENGTHENING
8 7 6 5 4 3 2 1 B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
D FOR TENDER 24/08/2022
EXISTING COLUMNS
AND BLOCK WALL 21.01
PLEASE NOTE STRUCTURE BEYOND TO
MAINTAINED
REMAIN.
MANUKAU ROAD
RL 85650
LEVEL 2
RL 82450
LEVEL 1
RL 79960
GROUND LEVEL
1 1 : 100 Elevation
F E D C B A
Client
Acoustic Engineer
Marshall Day
Fire Engineer
RL 79960 Holmes Fire
GROUND LEVEL
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
2 1 : 100 Elevation
Sheet
DEMOLITION
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER ELEVATIONS
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SCALE @ A1= As indicated
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
and propping requirements FRAMING AND CLADDING BACK
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR
4. Demolish all walls shown dashed FINISHES AND FRAMING
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING A2-200 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
STRUCTURES
Data)
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
A BC 1 - DEMO, 26/05/2022
STRUCTURE &
1 2 3 4 5 6 7 8 STRENGTHENING
B FOR INFORMATION 29/07/2022
C FOR INFORMATION 29/07/2022
D FOR TENDER 24/08/2022
21.01
PLEASE NOTE STRUCTURE BEYOND TO
REMAIN.
MANUKAU ROAD
RL 85650
LEVEL 2
RL 82450
LEVEL 1
RL 79960
GROUND LEVEL
EXISTING COLUMNS EXTENT OF SOUTHERN BOUNDARY WALL TO BE DEMOLISHED
AND BLOCK WALL 320 2673
MAINTAINED C.O.S. Notes
1 1 : 100 Elevation
A B C D E F
21.01 If there are any discrepancies in the
PLEASE NOTE STRUCTURE BEYOND TO documents please seek clarification
REMAIN. before proceeding with any work.
EXISTING COLUMNS
AND BLOCK WALL
MAINTAINED
Client
Civil Engineer
Babbage Consultants
RL 82450
LEVEL 1 Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
RL 79960 Holmes Fire
GROUND LEVEL
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
2 1 : 100 Elevation
Sheet
DEMOLITION
GENERAL DEMOLITION NOTES NOTE: REFER TEMPORARY WORKS ENGINEER ELEVATIONS
DOCUMENTATION FOR DEMOLITION WORK ON
1. Refer to Services Engineer for services
diversion, capping and/or removal including BLOCK WALL
sequencing
2. Refer to Temporary Works Engineer before DEMOLITION LEGEND: SCALE @ A1= As indicated
demolition of structural elements with
particular reference to any temporary pinning REMOVE ALL WALL LININGS,
and propping requirements FRAMING AND CLADDING BACK
3. Refer to Fire Engineer for temporary egress TO STRUCTURE
and fire equipment relocation REMOVE ALL PAVING, FLOOR
4. Demolish all walls shown dashed FINISHES AND FRAMING
5. Make good all adjacent surfaces - patch floor
finish, make good wall and ceiling after
alteration. (Note: painting works to cover
REMOVE EXISTING COLUMNS
ARCHITECTURAL
areas affected by alteration) Drawing Number Revision
1. REMOVE ALL FLOOR FINISHES
6. Remove all redundant cabling and coil up in
2. REMOVE ALL FIXTURES AND FITINGS
ceiling space
7. Make adjustment to building services to suit
3. REMOVE ALL LIGHT FITTINGS, CEILING A2-201 D
LININGS AND ASSOCIATED CEILING
(Mechanical, Fire Services, Lighting, Power & DO NOT SCALE OFF THIS DRAWING
STRUCTURES
Data)
4. REMOVE ALL REDUNDANT SERVICES CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
5. REMOVE EXISTING ROOF STRUCTURES
COPYRIGHT © JASMAX
Revisions
(30)/30/30 FRR
(60)/60/60 FRR
(120)/120/120 FRR
1 2 3 4 5 6 7 8
7575 7350 7575 3800 7675 7350 7590 185
5 35 150 PC PANELS
A3-201
EXISTING WALL
G
8
5310
Notes
A3-201
190
A3 SERIES TO BE READ IN
CONJUNCTION WITH
STRUCTURAL ENGINNEERS
1550
DOCUMENTATION
785
1025
190
SFL 79800
PROPOSED GROUND PROPOSED GROUND
BEAM ON EXISTING BEAM ON EXISTING
190 555 1860 945 GROUND BEAM GROUND BEAM
R.O.
6710
200 3550 1
3 4 A3-313
A3-201 140 115 A3-201
1370
200 840 1825 250
240
1635
If there are any discrepancies in the
documents please seek clarification
3 before proceeding with any work.
3880
3880
3880
2
C IN-SITU CONCRETE
1430
1430
190 1500
THICKENING
FACP
4
B 2 A3-319
565
180 645
A3-201
2130 150
1690 190
2 Client
1880 1 1
A3-201 Consultant Team
A3-319
6
150
Structural Engineer
A3-201 BGT
Sim 65 3040
200 840 Civil Engineer
5
8815
8815
Babbage Consultants
A3-450
Services Engineer
2215 140
22 Degrees
5820
Acoustic Engineer
5085
Marshall Day
7
Fire Engineer
A3-201
1055 140
Holmes Fire
Facade Engineer
190 105
Symetrix
60
A
240
295
Project Manager
180
Greenstone Group
3890 1000 200
Project Number: 221039
R.O.
190 4770 7575 4945 140 4810 140 4890 470 9805 1200 7350 7590 300 2800 SYMPHONY 303
Sheet
STRUCTURAL SETOUT
KEY NOTES
PLAN - GROUND
SERVICES LEGEND:
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE EXISTING MANHOLE TO REMAIN
MB15 15 SERIES MASONRY BLOCK
PROPOSED CONCRETE SLAB SCALE @ A1= As indicated
MB20 20 SERIES MASONRY BLOCK EXISTING GROUND BEAM PROPOSED MANHOLE
REFER STRUCTURAL ENGINEER
MB20E EXISTING 20 SERIES MASONRY BLOCK PROPOSED CONCRETE SLAB WITH EXPOSED AGGREGATE DOCUMENTATION
EXISTING CESSPIT TO REMAIN
PC150 150mm THICK PRECAST CONCRETE PANEL PROPOSED GROUND BEAM
PROPOSED 25mm ASPHALT ON 120mm MIN. HARDFILL REFER STRUCTURAL ENGINEER PROPOSED CESSPIT
PC180 180mm THICK PRECAST CONCRETE PANEL DOCUMENTATION
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
(120)/120/120 FRR
MB20E
EXISTING PLANTER
SITE BOUNDARY
RL 79860
G RL 79865
MB20
F8 TO G8
MB20E
PC150
7767
RL 79890
1:58 DN
1 :3
N
MB20
85
1:72 D
5309
RL 79910 Notes
DN
A3 SERIES TO BE READ IN
1:129 DN
RL 79860 1:70 DN
CONJUNCTION WITH
MB20 STRUCTURAL ENGINNEERS
MB20E
DOCUMENTATION
F MB20 RL 79910 1:70 DN A3 SERIES TO BE READ IN
RL 79750 CONJUNCTION WITH CIVIL
RL 79770
1025
E MB20E
MB20
1:
44
N 1:55 DN
1:165 D
NEW PLANTER
FORM LEVEL THRESHOLD
DN
1:
1:48 DN
23
TO MSB ROOM
1
PC150
DN
RL 79750
1:4
5 1
6710
1:32 DN
1:
DN
1:89 DN
17
A3-410
3
DN
DN
1:251
6
16
1:
RL 79771 RL 79800 MB15
MANUKAU ROAD
RL 79777
VEHICLE ENTRY
1:
MB20 RL 80336
10
N
D
0
1:59 D
DN
PC150
1:27 DN
RL 79780 RL 80240 If there are any discrepancies in the
1 PC250 MB15
documents please seek clarification
before proceeding with any work.
3880
RL 79800 RL 80300
1:24 DN
RL 79750
1:62 DN
MB20E MB20 SK-831
PC200 RL 79920 No building work shall proceed until
1 :6 RL 79920
E 5D
UP
2 MB20 RL 79920 Building Consent has been granted
RL 79818 N for the work described.
1:12
BIKE PLINTH
A3-411 RL 79995
C RL 79806 4
1:23 DN 3
1430
PC180
RL 79760 RL 79995
1:
1:26
10 PC150 PC150 RL 79931 Client
N
1:13
E 1D
3 1 6
PC180
LCO EPSOM LTD
N 2
5D
Babbage Consultants
DN
VEHICLE
N
1:37 DN
1:69
ENTRY
22 Degrees
1:61
RL 79824 1:27 DN
3 Acoustic Engineer
MB15 1:48 DN 1:89 DN MB15 Marshall Day
SK-830
1:27 DN
A RL 80250
Project Manager
Greenstone Group
SITE BOUNDARY MB20 MB20E MB20 PC180 SITE BOUNDARY
Project Number: 221039
RL ALL AROUND
@ FLOOR EDGE SYMPHONY 303
1
A3-430 303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
STRUCTURAL SETOUT
KEY NOTES
PLAN - GROUND
SERVICES LEGEND:
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE EXISTING MANHOLE TO REMAIN
MB15 15 SERIES MASONRY BLOCK
PROPOSED CONCRETE SLAB SCALE @ A1= As indicated
MB20 20 SERIES MASONRY BLOCK PROPOSED MANHOLE
MB20E EXISTING 20 SERIES MASONRY BLOCK PROPOSED CONCRETE SLAB WITH EXPOSED AGGREGATE
EXISTING CESSPIT TO REMAIN
PC150 150mm THICK PRECAST CONCRETE PANEL
PROPOSED 25mm ASPHALT ON 120mm MIN. HARDFILL PROPOSED CESSPIT
PC180 180mm THICK PRECAST CONCRETE PANEL
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8 (30)/30/30 FRR
(60)/60/60 FRR
(120)/120/120 FRR
7575 7350 7575 3800 7675 7350 7590
SEISMIC GAP SEPERATION
SITE BOUNDARY
PC150
SITE BOUNDARY
190 1683 1687 240
G Sim
1
425 15395 1480 1290 6255
A3-112A
CLT CLT
5309
700 2030 1780 1780 1780 1780 2040 1935 1935 260 1280 1325 215 1970 1970 1970 Notes
3305
1550 190
CONJUNCTION WITH
cl
415
STRUCTURAL ENGINNEERS
690
1500
DOCUMENTATION
1.5°
1.5°
1660
E
185
185
PC150
2345
425
1660
SFL 82450
DP DP
1.5° Sim
6965
CLT
2
3970
A3-112A
1660
3015
6710
D65
1660
KIT
1000
PC150
cl
2375
1040 2075
1745
1695
Sim
EXISTING CONCRETE FLOOR IN200 IN200
2
D A3-450
1635
2
If there are any discrepancies in the
A3-101 documents please seek clarification
3880
3880
before proceeding with any work.
SFL 82450 SFL 82450
5310
PC200
No building work shall proceed until
3575 1920 Building Consent has been granted
PC250
3675
PC150
for the work described.
70
KIT
C D65
1430
1430
645
D65
B
650
715
KIT Sim
180
7
2140
2190
2995
VOID VOID A3-450
PC180
3425 LCO EPSOM LTD
2270
2170
1620 300
Consultant Team
Structural Engineer
Sim Sim PC180 PC180 PC300 PC180 PC300 PC300 BGT
Services Engineer
1.5°
6675
CLT
22 Degrees
5830
Acoustic Engineer
1620
Marshall Day
KIT
A
Symetrix
240
Project Manager
SITE BOUNDARY PC180 SITE BOUNDARY Greenstone Group
425 1950
Project Number: 221039
CLT Sim
2375 2
A3-112
7 SYMPHONY 303
CL OF STEEL
260 490 1600
1 1 : 100 Plan
303 MANUKAU ROAD,
D65 D40 D65
EPSOM, AUCKLAND
A1-050A LEVEL 1 230
FWG BA WM
C Sheet
645
WASTE PIPE LEGEND STRUCTURAL SETOUT
KEY NOTES D65 PLAN - LEVEL 1
HWC KIT = KITCHEN SINK WASTE
245
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE HWC = HOT WATER CYLINDER DRAIN
WC BA = BATHROOM VANITY WASTE
MB15 15 SERIES MASONRY BLOCK D100
PROPOSED CONCRETE SLAB SH = SHOWER WASTE SCALE @ A1= As indicated
WC = TOILET WASTE
MB20 20 SERIES MASONRY BLOCK SFL 82450 FWG = FLOOR WASTE GULLEY WASTE
830
PC200 200mm THICK PRECAST CONCRETE PANEL PROPOSED CLT SLAB D100 790
ARCHITECTURAL
570 1385 Drawing Number Revision
1 2 3 4 5 6 7 8 (30)/30/30 FRR
(60)/60/60 FRR
(120)/120/120 FRR
7575 7350 7575 3800 7675 7350 7590 SEISMIC GAP SEPERATION
1970
1
COS
47
A3-112A
SITE BOUNDARY
2290
D80
D75
SITE BOUNDARY
3530
G
D80
6260
NOTE: REFER TO LEVEL 1
5309
3620
2 CONJUNCTION WITH
STRUCTURAL ENGINNEERS
A3-112A DOCUMENTATION
F
1380
F
2°
2°
1900
CLT
45° 500
1025
1025
E
170
SFL 85650
5660
3970
2°
5020
CLT
7735
6710
KIT
1970
D50
970 D80
1
D65
1690
A3-112 WM KIT
PC180
3400
EXISTING CONCRETE FLOOR
740
450
D D50
D
200
1552 8540
PC200
200 840 1823 250 If there are any discrepancies in the
D80 documents please seek clarification
NOTE: REFER TO LEVEL 1
630
SFL 85650 before proceeding with any work.
3880
STRUCTURAL SETOUT
PC250
PLAN FOR BALCONY 3575 D80
SFL 85650 No building work shall proceed until
5310
5304
COS
PC200
STEEL SETOUT
5580
Building Consent has been granted
CLT
2070 470
WM for the work described.
3400
D50 D50
400
C D50
140
70
HWC
8742
PC250
KIT
1430
PC200
B D80
140
2140
Client
2995
PROPOSED CONCRETE FLOOR - RIB &
PC180
LCO EPSOM LTD
PC200
TIMBER INFILL - REFER TO
3910
STRUCTURAL ENGINEER
4970
3590
Consultant Team
Structural Engineer
BGT
D50
RECESS
PC180
SFL 85455
1262
KIT Civil Engineer
8815
Babbage Consultants
8310
CLT
570
525 Services Engineer
D80
6780
2°
CLT
5820
1970
3 Acoustic Engineer
Marshall Day
4121
3520
A3-112A
3620
Fire Engineer
3700 Holmes Fire
240
240
D80 Symetrix
440
A A
270
180
190
Project Manager
Greenstone Group
SITE BOUNDARY 170 SITE BOUNDARY
2194 Project Number: 221039
2 1880 1920 6475 1200 7350 7590
RECESS
270 SYMPHONY 303
A3-112
CLT SLAB
303 MANUKAU ROAD,
EPSOM, AUCKLAND
4 6 7 8
Sheet
STRUCTURAL SETOUT
KEY NOTES
PLAN - LEVEL 2
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE
MB15 15 SERIES MASONRY BLOCK
PROPOSED CONCRETE SLAB SCALE @ A1= As indicated
MB20 20 SERIES MASONRY BLOCK
MB20E EXISTING 20 SERIES MASONRY BLOCK PROPOSED CONCRETE SLAB WITH EXPOSED AGGREGATE
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8 (30)/30/30 FRR
(60)/60/60 FRR
(120)/120/120 FRR
7575 7350 7575 3800 7675 7350 7590 SEISMIC GAP SEPERATION
Sim
1
A3-112A
SITE BOUNDARY
5052
7390
NOTE: REFER TO LEVEL 1 1210 1170
5309
1380
F
1.5°
1.5°
195
1900
1900
45°
1025
2410
2215
1770 60
2185
SFL 89050
Sim
1.5° 2
A3-112A
5020
SEISMIC GAP
6710
PC180
230
200
PC200
14265
NOTE: REFER TO LEVEL 1 1042 2073 If there are any discrepancies in the
STRUCTURAL SETOUT PLAN documents please seek clarification
FOR BALCONY STEEL before proceeding with any work.
3880
PC250
SETOUT FOR SETOUT OF BALCONY
FOR KITCHEN AND
SFL 89050 OUTLET PENETRATIONS No building work shall proceed until
22842
LAUNDRY WASTE
PC200
REFER TO A3-102 Building Consent has been granted
5710
PENETRATIONS REFER TO
SETOUT ON A3-102 for the work described.
7450
8305
PC250
1430
PC200
B
Client
1860
PC180
LCO EPSOM LTD
PC200
Consultant Team
Structural Engineer
BGT
PC180
1260
FOR KITCHEN WASTE Sim 2185 Civil Engineer
8815
8215
SETOUT ON A3-102 A3-112A FOR SETOUT OF BALCONY Services Engineer
1.5°
6780
5820
REFER TO A3-102 Acoustic Engineer
Marshall Day
4120
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
240
240
Project Manager
105
Greenstone Group
SITE BOUNDARY Sim SITE BOUNDARY
221039
2 Project Number:
1200 270
A3-112 SYMPHONY 303
1900 22500 1880 8395 16450
Sheet
STRUCTURAL SETOUT
KEY NOTES
PLAN - LEVEL 3
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE
MB15 15 SERIES MASONRY BLOCK
PROPOSED CONCRETE SLAB SCALE @ A1= As indicated
MB20 20 SERIES MASONRY BLOCK
MB20E EXISTING 20 SERIES MASONRY BLOCK PROPOSED CONCRETE SLAB WITH EXPOSED AGGREGATE
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8 (30)/30/30 FRR
(60)/60/60 FRR
(120)/120/120 FRR
7575 7350 7575 3800 7675 7350 7590 SEISMIC GAP SEPERATION
1900 13715 1210 1170 6405 200 3600 22615 270 Holmes Fire LP - February 2022
SITE BOUNDARY
5052
7378
A3-112A
NOTE: REFER TO LEVEL 1 SEISMIC JOINT
5309
1380
F
1.5°
1.5°
195
1900
1900
45°
1025
2215
1770 60
2185 270
Sim
1.5° 2
A3-112A
5020
6710
PC180
200
14335
PC200
NOTE: REFER TO LEVEL 1 1040 2074 If there are any discrepancies in the
STRUCTURAL SETOUT PLAN documents please seek clarification
FOR BALCONY STEEL before proceeding with any work.
3880
PC250
SETOUT FOR SETOUT OF BALCONY
FOR KITCHEN AND LAUNDRY
1920 OUTLET PENETRATIONS No building work shall proceed until
5310
WASTE PENETRATIONS
5110
PC200
REFER TO A3-102 Building Consent has been granted
REFER TO SETOUT ON A3-102
for the work described.
8305
PC250
1430
PC200
B
600
2140
Client
PC180
LCO EPSOM LTD
PC200
Consultant Team
Structural Engineer
BGT
PC180
2185
1100
FOR KITCHEN WASTE Sim Civil Engineer
8815
Babbage Consultants
PENETRATIONS REFER TO 3
8215
SETOUT ON A3-102 FOR SETOUT OF BALCONY Services Engineer
A3-112A
6675
5820
REFER TO A3-102 Acoustic Engineer
Marshall Day
4210
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
A
205
205
205
Project Manager
Greenstone Group
SITE BOUNDARY SITE BOUNDARY
Sim
Project Number: 221039
2
A3-112 SYMPHONY 303
1900 22500 1880 8395 1200 14940 270
303 MANUKAU ROAD,
EPSOM, AUCKLAND
Sheet
STRUCTURAL SETOUT
KEY NOTES
PLAN - LEVEL 4
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE
MB15 15 SERIES MASONRY BLOCK
PROPOSED CONCRETE SLAB SCALE @ A1= As indicated
MB20 20 SERIES MASONRY BLOCK
MB20E EXISTING 20 SERIES MASONRY BLOCK PROPOSED CONCRETE SLAB WITH EXPOSED AGGREGATE
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
1 2 3 4 5 6 7 8
CL RAFTER
GUTTER PFC'S TO GRID D
225
C
L 2250
CL PARAPET SHS CL RAFTER PFC FACE
MAIN ROOF STRUCTURE 65 100
C
L C
L 940 1585
C
L C
L
4162 2065 3700 5340 2010
240 180
PFC FACE
2020
335
PFC FACE C GRID 1 TO CL C C C
L L L L C
L C
L
2425 352 1540 1540 125 300 223
BALCONY ROOF STRUCTURE
L
C
SITE BOUNDARY
GRID F TO G8
7767
PFC FACE
5309
Notes
A3 SERIES TO BE READ IN
CONJUNCTION WITH
STRUCTURAL ENGINNEERS
DOCUMENTATION
285
F
L
C
550
1025
1110 170
E
L
C
PFC FACE
CL PARAPET SHS
475
SHS WELDED TO
L
C
COLUMN FLANGE
50
6710
CL SHS
107
1745
430
L
C
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
3880
3450
No building work shall proceed until
Building Consent has been granted
for the work described.
395
GUTTER PFC FACE
C
1430
1035
1340
B
305
Client
2910
SHS FIXES TO FACE LCO EPSOM LTD
OF PC PANEL
Consultant Team
L
C
300
Structural Engineer
L
C
1255 540
BGT
L
C
Civil Engineer
8815
Babbage Consultants
L
C
Services Engineer
22 Degrees
6326
CL PARAPET SHS
Acoustic Engineer
PARAPET SHS
Marshall Day
155
Fire Engineer
160
Holmes Fire
Facade Engineer
155
155
Symetrix
A Project Manager
L
L
C
L
C
Greenstone Group
SITE BOUNDARY
BALCONY ROOF
STRUCTURE
MAIN ROOF
2095 C
L C
L C
L
435
PFC FACE GUTTER PFC FACE GUTTER PFC'S TO GRID B 303 MANUKAU ROAD,
SHS FIXES TO FACE EPSOM, AUCKLAND
OF PC PANEL
Sheet
STRUCTURAL
KEY NOTES
SET-OUT PLAN - ROOF
IN250 250mm THICK INSITU CONCRETE EXISTING CONCRETE SLAB CHECK ON SITE ALL DIMENSIONS
RELATING TO THE EXISTING STRUCTURE
MB15 15 SERIES MASONRY BLOCK DHS PURLINS NOT SHOWN FOR CLARITY
PROPOSED CONCRETE SLAB SCALE @ A1= 1 : 100
MB20 20 SERIES MASONRY BLOCK
MB20E EXISTING 20 SERIES MASONRY BLOCK PROPOSED CONCRETE SLAB WITH EXPOSED AGGREGATE
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
6 7 Revisions
G BA
B
D100 D65 D150
D40 D100
800
50
70
600
WC
FWG D40 D80
770
BA FWG
D80
D40
850
SH
1125
3510
D100
970
970 WC
D40 900
D40 BA
D100 D65 D100 D50
850
4300
HWC KIT
385
472 2949
WC
D100 SH
730
D80
90 199
9
FWG D65
D65
SH
D32 D32
D40
Notes
DOUBLE T'S
5050 BELOW A3 SERIES TO BE READ IN
4160
4865
4610
4860
CONJUNCTION WITH SERVICES
250 50 560 930 1000 360 ENGINNEERS DOCUMENTATION
F D65
175 100
FWG HWC
2740 180 640 925 SH
WC D80 D40
400
1 1 : 25 Plan D65 D100 D100 BA
A3-101 A3-112A - STRUCTURAL SET-OUT PLAN - D50
LEVEL 2 - Callout 1
WALL ABOVE
6 7
150 830 930 1000 360
D40
F
30
SH 340 1730
600
620
790
370
(3x32 DIA) No building work shall proceed until
BA Building Consent has been granted
200 235
810
800
D50
430
D65 D100 D100 FWG D40 D100
KIT
WC
235 745 D80 HWC WC
D65
850
600
515
Client
280
SH
3210 D40 Structural Engineer
2650
745
BGT
D65
570
Civil Engineer
450
1000
Babbage Consultants
A
5500
Acoustic Engineer
D100 D50
Marshall Day
140
1860
1565 REFRIGERANT Fire Engineer
PIPE RISER SH Holmes Fire
4750
Greenstone Group
D50 WC
D100
A3-102 A3-112A - STRUCTURAL SET-OUT PLAN - Project Number: 221039
D50
LEVEL 2 - Callout 3
110 1070 600 SYMPHONY 303
D100 D65 D65
303 MANUKAU ROAD,
830
WALL D80
270
20
BA
WC
DUCT PENETRATION WITH
FIRE DAMPER
2 1 : 25 Plan A3-112A C
A3-101 A3-112A - STRUCTURAL SET-OUT PLAN - DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
LEVEL 2 - Callout 2
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
2 3 4 Revisions
350
D50 D50 C FOR TENDER 24/08/2022
KIT KIT
380 380 385 180 600 830 480 1650 600 500 1650 480
D65
D40
FWG
BA
935
625
D100
WC
REFRIGERANT D40 D40
WM D40 D40 WM
PIPES (3 x 32 DIA)
945 175 620 350
DUCT
825
900
900
SH D80 SFL 85650
150
1620
D50 D50
D100 SH DUCT
SH PENETRATIONS
1040
1000
WITH FIRE
DAMPERS
720
720
640
200 120
200 120
D100
200 160
D65 D100
120
C D80
80
30
30
30
30
30
KIT
200
200
D80 D100 DUCT D50
D100 D50 D100 D50 D50 D100 D150 D50
PENETRATIONS WC WC WC
1740 WC WITH FIRE Notes
BA BA BA BA
DAMPERS A3 SERIES TO BE READ IN
830 600 185 700
CONJUNCTION WITH SERVICES
REFRIGERANT 230 200 190 600 930 990 895 935 590 385 225 REFRIGERANT ENGINNEERS DOCUMENTATION
PIPES (3 x 32 DIA) PIPES (3 x 32 DIA)
1230
800 3045
B
600
1000
960
D50
300
1555
1780
D40
D100
D50 KIT
2270
2280
2390
SH
3820
SH
If there are any discrepancies in the
D100 documents please seek clarification
WC before proceeding with any work.
720
D40
WC D100
240
BA D50 D80 D50
750 410 770 300 BA FWG
WM
Civil Engineer
2 3 Babbage Consultants
Services Engineer
3490 1900 300 1660 22 Degrees
Acoustic Engineer
3000 490 250
WASTE PIPE LEGEND Marshall Day
Fire Engineer
KIT = KITCHEN SINK WASTE Holmes Fire
D40 D80 D50 D40 HWC = HOT WATER CYLINDER DRAIN
BA = BATHROOM VANITY WASTE Facade Engineer
FWG WM HWC
BA SH = SHOWER WASTE Symetrix
SYMPHONY 303
SFL 85650
D100
WC
D50 303 MANUKAU ROAD,
D50
EPSOM, AUCKLAND
2220
WM REFRIGERANT SH REFRIGERANT
1860
SLAB PENETRATION
1300
D50 SH
250
205
WC D100
460
D65 D65
410
HWC D40
330
155
SCALE @ A1= 1 : 25
145
A BA D100
3445 200
ARCHITECTURAL
Drawing Number Revision
2 1 : 25 Plan A3-112 C
A3-101 A3-112 - STRUCTURAL SET-OUT PLAN - LEVEL DO NOT SCALE OFF THIS DRAWING
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
VOLTEX GEOTEXTILE
A 6 7 8 WATERPROOFING
MEMBRANE
Revisions
EGRESS ROUTE
BARRIER TAPE
CARPARK A3-312 A3-319
WASTE 1 LIFT LIFT DOOR LOBBY EXTERIOR
COURTYARD A3-311 REFER TO ALLCO SPECIFICATION
3130
EXTERIOR Precast Concrete RL 79901
D0.01 ALL TANKING TO BE INSTALLED
MB20E
MB15 MB15 TO TANKING MANUFACTURER'S
RL 79960 DRAWINGS AND SPECIFICATION
GROUND LEVEL
RL 79660
1
A3-314
FAP ROOM
COURTYARD 4 D0.07 STAIR LOBBY BIKE STORE PARCEL
CARPARK WASTE CARPARK EXTERIOR A3-319 DS.06
PC250 MB15 MB15
Notes
PC150
A3 SERIES TO BE READ IN
3 CONJUNCTION WITH
EXTERIOR
MB15 MB15 A3-313 STRUCTURAL ENGINNEERS
RL 79960 RL 79960 DOCUMENTATION
GROUND LEVEL GROUND LEVEL A3 SERIES TO BE READ IN
CONJUNCTION WITH CIVIL
ENGINNEERS DOCUMENTATION
2
A3-314
Services Engineer
22 Degrees
Fire Engineer
Holmes Fire
2 Facade Engineer
A3-311 Symetrix
Project Manager
EXISTING GROUND BEAM NEW GROUND BEAM - REFER NEW GROUND BEAM - REFER NEW GROUND BEAM - REFER NEW GROUND BEAM - REFER Greenstone Group
STRUCTURAL ENGINEER STRUCTURAL ENGINEER STRUCTURAL ENGINEER STRUCTURAL ENGINEER
Project Number: 221039
5 1 : 50 Section 3 1 : 50 Section SYMPHONY 303
A3-100A CROSS SECTION - TRANSFORMER / MSB - A3-100A CROSS SECTION - STAIR / LIFT PIT -
BTW. GRIDS 4 & 5 GRID 6 -400 303 MANUKAU ROAD,
4 5 EPSOM, AUCKLAND
NEW CONCRETE SLAB ON HARDFILL.
NEW ASPHALT ON HARDFILL. REFER 3800 NEW CONCRETE SLAB ON HARDFILL. NEW CONCRETE SLAB ON HARDFILL.
REFER STRUCTURAL
CIVIL'S DOCUMENTATION REFER STRUCTURAL REFER STRUCTURAL Sheet
DOCUMENTATION
DOCUMENTATION DOCUMENTATION
FOUNDATION
CARPARK TRANSFORMER CARPARK CARPARK BIKE STORE LOBBY
2 3 SECTIONS
A3-312 A3-312 VEHICLE ENTRY
6 MB20 PC150 PC180
A3-312
RL 79960 RL 79960 SCALE @ A1= As indicated
GROUND LEVEL GROUND LEVEL
6
A3-312
ARCHITECTURAL
Drawing Number Revision
NEW GROUND BEAM - REFER EXISTING GROUND BEAM EXISTING GROUND BEAM NEW GROUND BEAM - REFER NEW GROUND BEAM - REFER
STRUCTURAL ENGINEER STRUCTURAL ENGINEER STRUCTURAL ENGINEER
A3-201 C
8 1 : 50 Section 4 1 : 50 Section DO NOT SCALE OFF THIS DRAWING
A3-100A LONG SECTION - TRANSFORMER / MSB A3-100A CROSS SECTION - BIKE STORE / LOBBY - CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
BTW. GRIDS 7 & 8 COPYRIGHT © JASMAX
6 VOLTEX GEOTEXTILE
WATERPROOFING
Revisions
REBATE
RL 79960
GROUND LEVEL
40
RL VARIES - SLAB LAID TO FALLS
SLAB
175
CONCRETE SLAB ON HARDFILL -
125
REFER TO STRUCTURAL ENGINEER
100 50
CETSEAL BEAD OVER JUNCTION
ALLSHEET 500 DPM OR
PC PANEL
25x2 ALUMINIUM TERMINATION BAR
SIMILAR
SOIL FOR WALL CLIMBER PLANT
BENTOSEAL
Notes
MEMBRANE
200
200mm INSITU CONCRETE - REFER
STRUCTURAL ENGINEER
IN-SITU CONCRETE WALL. REFER EXISTING CONCRETE PRECAST CONCRETE WALL
STRUCTURAL COLUMN
ALLCO Waterstop-RX 101T Client
NEW CONCRETE SLAB ON HARDFILL. LCO EPSOM LTD
REFER STRUCTURAL
DOCUMENTATION
CARPARK STAIR ALLSHEET 500 DPM OR SIMILAR Consultant Team
SYMPHONY 303
NEW CONCRETE
GROUND BEAM. REFER
STRUCTURAL 303 MANUKAU ROAD,
NEW GROUND BEAM - REFER TO
STRUCTURAL ENGINEER EPSOM, AUCKLAND
ALLCO ALLGUARD PROTECTION
Sheet
SHEET
ALLCO ALLGUARD PROTECTION NEW PILE AND PILE CAP. FOUNDATION DETAILS
SHEET REFER STRUCTURAL. - LIFT PIT & STAIR
ARCHITECTURAL
Drawing Number Revision
A3-311 C
2 1 : 10 Section Detail 3 3D View DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
A3-201 INSITU WALL BASE / EXISTING GROUND BEAM A3-311 - GRID D AND GRID 6 FOUNDATION
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
A3 SERIES TO BE READ IN
A3-201 TYPICAL INTERNAL GROUND BEAM A3-201 MANUKAU ROAD ENTRY CHANNEL DRAIN CONJUNCTION WITH
C STRUCTURAL ENGINNEERS
DOCUMENTATION
CARPARK BIKE STORE A3 SERIES TO BE READ IN
CONJUNCTION WITH CIVIL
20 SERIES MASONRY BLOCK - REFER LOBBY ENGINNEERS DOCUMENTATION
VEHICLE ENTRY
TO STRUCTURAL ENGINEER
EXTERIOR
VOLCLAY CETCOAT
100 50 100
25x2 ALUMINIUM TERMINATION BAR 25x2 ALUMINIUM TERMINATION BAR
ALLSHEET 500 DPM OR SIMILAR ALLSHEET 500 DPM OR SIMILAR
BARRIER TAPE OVER JUNCTION
BARRIER TAPE OVER JUNCTION
100
MIN. OVERLAP ALLSHEET 500 DPM OR SIMILAR
Client
Consultant Team
2 1 : 10 Section Detail 3 1 : 10 Section Detail
Structural Engineer
A3-201 TYPICAL MASONRY BLOCKWORK TO A3-201 TYPICAL PRE-CAST PANEL TO GROUND BEAM BGT
Services Engineer
CARPARK TRANSFORMER TRANSFORMER CARPARK 22 Degrees
VOLCLAY CETCOAT 4 5 Acoustic Engineer
BARRIER TAPE OVER JUNCTION Marshall Day
Fire Engineer
NEW ASPHALT ON HARDFILL. REFER Holmes Fire
CIVIL'S DOCUMENTATION 20 SERIES MASONRY BLOCK - REFER 20 SERIES MASONRY BLOCK - REFER
TO STRUCTURAL ENGINEER TO STRUCTURAL ENGINEER Facade Engineer
RL 79960 Symetrix
GROUND LEVEL RL 79910
NEW CONCRETE SLAB ON HARDFILL. Project Manager
NEW CONCRETE SLAB ON HARDFILL. Greenstone Group
REFER STRUCTURAL
REFER STRUCTURAL NEW CONCRETE SLAB ON HARDFILL.
CETSEAL BEAD OVER JUNCTION DOCUMENTATION Project Number: 221039
DOCUMENTATION REFER STRUCTURAL
ALLSHEET 500 DPM OR SIMILAR ALLSHEET 500 DPM OR SIMILAR
25x2 ALUMINIUM TERMINATION BAR DOCUMENTATION SYMPHONY 303
ARCHITECTURAL
Drawing Number Revision
6 1 : 10 Section Detail
A3-312 C
DO NOT SCALE OFF THIS DRAWING
A3-201 MASONRY BLOCKWORK TO GROUND BEAM CONTRACTOR MUST VERIFY ALL DIMENSIONS
AT TRANSFORMER ROOM FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
VOLTEX GEOTEXTILE
Revisions
WATERPROOFING
MEMBRANE A BC2 - BUILDING 29/07/2022
8 8 VOLTEX SWELLTITE
WATERPROOFING B
CONSENT ISSUE
FOR INFORMATION 29/07/2022
MEMBRANE C FOR TENDER 24/08/2022
ALLSHEET 500 DPM OR
SIMILAR
35 150 CETCOAT CEMENTITIOUS
MEMBRANE
CARPARK EXTERIOR BARRIER TAPE
CARPARK EXTERIOR
50 100
CETSEAL BEAD OVER JUNCTION NEW CONCRETE SLAB ON HARDFILL.
BARRIER TAPE OVER JUNCTION REFER STRUCTURAL
VOLCLAY CETCOAT DOCUMENTATION
RL 79960 25x2 ALUMINIUM TERMINATION BAR RL 79960
50 100
50 100
GROUND LEVEL ACCESS RAMP. REFER CIVIL ENGINEER GROUND LEVEL
FOR CONCRETE AND GROUND
NEW CONCRETE SLAB ON HARDFILL. COMPACTION DETAILS
ALLCO ALLGUARD PROTECTION
REFER STRUCTURAL
SHEET
DOCUMENTATION ALLCO ALLGUARD PROTECTION
SHEET
GROUT
Notes
A3 SERIES TO BE READ IN
CONJUNCTION WITH
STRUCTURAL ENGINNEERS
DOCUMENTATION
ALLSHEET 500 DPM OR SIMILAR A3 SERIES TO BE READ IN
ALLCO ALLGUARD PROTECTION CONJUNCTION WITH CIVIL
SHEET ENGINNEERS DOCUMENTATION
ALLSHEET 500 DPM OR SIMILAR
2 1 : 10 Section Detail
3130-4.1
100 OR 175
MIN.
22 Degrees
VOLCLAY CETCOAT
BENTOSEAL Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
MINIMUM
BARRIER TAPE OVER JUNCTION Project Manager
ALLCO ALLGUARD PROTECTION
50
Greenstone Group
SHEET
CETSEAL BEAD OVER Project Number: 221039
JUNCTION
ALLSHEET 500 DPM OR SIMILAR SYMPHONY 303
4131AL-4.8
ALLSHEET 500 DPM OR SIMILAR TERMINATION BAR
NEW GROUND BEAM - REFER TO
STRUCTURAL ENGINEER
303 MANUKAU ROAD,
MINIMUM LAP
EPSOM, AUCKLAND
4131AL-4.9
100
PROPRIETARY PROTECTION SHEET
Sheet
3 1 : 10 Section Detail
ARCHITECTURAL
Drawing Number Revision
A3-313 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
VOLTEX GEOTEXTILE
Revisions
WATERPROOFING
MEMBRANE A BC2 - BUILDING 29/07/2022
VOLTEX SWELLTITE CONSENT ISSUE
WASTE EGRESS ROUTE WATERPROOFING B FOR INFORMATION 29/07/2022
MEMBRANE C FOR TENDER 24/08/2022
15 SERIES MASONRY BLOCK ALLSHEET 500 DPM OR
SIMILAR
REFER STRUCTURAL DOCUMENTATION
CETCOAT CEMENTITIOUS
MEMBRANE
RL 79960
GROUND LEVEL BARRIER TAPE
100
CETSEAL BEAD OVER JUNCTION
REFER TO ALLCO SPECIFICATION
NEW ASPHALT ON HARDFILL. REFER
CIVIL'S DOCUMENTATION ALL TANKING TO BE INSTALLED
50
VOLCLAY CETCOAT TO TANKING MANUFACTURER'S
DRAWINGS AND SPECIFICATION
CONCRETE SCREED TO FALLS 25x2 ALUMINIUM TERMINATION BAR
BARRIER TAPE
A3 SERIES TO BE READ IN
CONJUNCTION WITH
STRUCTURAL ENGINNEERS
DOCUMENTATION
A3 SERIES TO BE READ IN
100 CONJUNCTION WITH CIVIL
ENGINNEERS DOCUMENTATION
EXISTING FOUNDATION PAD. REFER
STRUCTURAL DOCUMENTATION
RL 79960
GROUND LEVEL
VOLCLAY CETCOAT Client
100
BARRIER TAPE OVER JUNCTION
1:89 LCO EPSOM LTD
1:89
NEW ASPHALT ON HARDFILL. REFER
CIVIL'S DOCUMENTATION Consultant Team
50
CETSEAL BEAD OVER JUNCTION Structural Engineer
CONCRETE SCREED TO FALLS BGT
100
Babbage Consultants
Services Engineer
22 Degrees
Fire Engineer
Holmes Fire
ALLCO ALLGUARD PROTECTION
Facade Engineer
SHEET
Symetrix
Sheet
FOUNDATION DETAILS
- WASTE ROOM
SCALE @ A1= 1 : 5
ARCHITECTURAL
Drawing Number Revision
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
VOLTEX GEOTEXTILE
Revisions
WATERPROOFING
8 MEMBRANE A BC2 - BUILDING
CONSENT ISSUE
29/07/2022
TREADMASTER MAXI2 TMMS2BR VOLTEX SWELLTITE
FRAMELESS GLAS DOOR WATERPROOFING B FOR INFORMATION 29/07/2022
NON-COMBUSTIBLE
MEMBRANE C FOR TENDER 24/08/2022
MEETING STILE SEAL FOR EXTERIOR ALLSHEET 500 DPM OR
PARCEL SIMILAR
LOBBY EXTERIOR FRAMELESS GLASS
D0.02 CETCOAT CEMENTITIOUS
TRIMMASTER TMMF12 SCREWED TO FRR 30 MINUTES STEEL DOOR MEMBRANE
FLOOR NON-SHRINK GROUT REFER DOOR SCHEDULE BARRIER TAPE
RAVEN RP138 OR SIMILAR HEAVY
20mm PORCELAIN EXTERIOR FLOOR DUTY ANODISED ALUMINIUM
TILES TO MATCH INTERIOR ON 10mm REFER TO ALLCO SPECIFICATION
NON-SHRINK GROUT THRESHOLD RAMP
GROUT
ALL TANKING TO BE INSTALLED
TOP OF 20mm TILE 20mm PORCELAIN EXTERIOR FLOOR NON-SHRINK GROUT TO TANKING MANUFACTURER'S
LEVEL WITH TOP TILES TO MATCH INTERIOR ON 10mm DRAWINGS AND SPECIFICATION
OF MAT FRAME GROUT
20mm PORCELAIN EXTERIOR FLOOR
20 MAX
EXTERIOR FLOOR FALLS TO TILES TO MATCH INTERIOR ON 10mm
1:46 STRIP DRAIN ON GRID 8 GROUT
FALLS AWAY
30
RL 79960
GROUND LEVEL
50
VOLCLAY CETCOAT
LEVELLING COMPOUND
UNDER TREADMASTER CLAMPING BAR
100
BARRIER TAPE OVER JUNCTION
ALLSHEET 500 DPM OR SIMILAR
C STRIP DRAIN
CONTINUOUS ALUMINIUM SILL TRAY
10
before proceeding with any work.
BARRIER TAPE OVER JUNCTION RL 79960
GROUND LEVEL No building work shall proceed until
Building Consent has been granted
25x2 ALUMINIUM TERMINATION BAR CONCRETE SLAB ON HARDFILL - for the work described.
180
6 REFER TO STRUCTURAL ENGINEER
EXPOSED AGGREGATE SOUTHERN
ALLCO ALLGUARD PROTECTION BLEND FINES FINISH. REFER CIVIL
SHEET
60
5mm STEEL CHEQUER PLATE
W/ CAST IN REGLET BARRIER TAPE OVER JUNCTION
1:62 RL 79960
20
RL 79960 Client
GROUND LEVEL VOLCLAY CETCOAT
150
LCO EPSOM LTD
25x2 ALUMINIUM TERMINATION BAR
50
SLAB CAST INTO DOOR OPENING BARRIER TAPE OVER JUNCTION Consultant Team
NEW SLAB OR TOPPING Structural Engineer
SLAB FALLS TO DRAIN IN ALLCO Waterstop-RX 101T BGT
100
AISLE OF CARPARKING
Civil Engineer
Babbage Consultants
Project Manager
FOUNDATION BEAM - REFER TO Greenstone Group
STRUCTURAL ENGINEER Project Number: 221039
SYMPHONY 303
SCALE @ A1= 1 : 5
A3-319 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
B C D E F
REFER STRUCT. DOCUMENTATION Revisions
FOR CAST-IN PLATE SIZE (BACK SIDE PRECAST PANEL JOINT LINE LEGEND - SECTION
OF PANEL) A 100% DEVELOPED 20/12/2021
4563 5112 6040 5709 DESIGN
1458 310 1200 445 1865 750 1200 310 1464 4245 B BC2 - BUILDING 29/07/2022
CONSENT ISSUE
RL 85650
LEVEL 2 C FOR INFORMATION 29/07/2022
20
340 500
REAR SEALANT
D FOR TENDER 24/08/2022
470
99
LOCATION OF PANEL JOINT LINE AS
SHOWN ON PRECAST ELEVATION
3200
1260
SHOWN ON PRECAST ELEVATION
Sim
2030
1900
1900
1900
2840
INTERIOR EXTERIOR
4
A3-450
640
6 3
1087
1110
PC-1 PC-1 PC-1 PC-1
A3-450 A3-450
140 330
330
330
447
470
RL 82450
GL-MR-PC-01B GL-MR-PC-02B GL-MR-PC-03B GL-MR-PC-04B PRECAST PANEL JOINT LINE LEGEND - PLAN
LEVEL 1
405
523
503
500
640
DIMENSION AS SHOWN ON ELEVATION DIMENSION AS SHOWN ON ELEVATION
BUILDING ENTRY
2490
1300
1500
2653
1
A3-450
830
20 725
RL 79960
GROUND LEVEL
GL-MR-PC-01A GL-MR-PC-02A GL-MR-PC-03A GL-MR-PC-04A
20
930 1000 1755 1478 1945 1875 3375 870 15 20* 15
Joint
1 1 : 50 Elevation
A3 SERIES TO BE READ IN
7 31.02
ALIGN JOINTS OF PRECAST PANEL ALONG 8 CONJUNCTION WITH
LOBBY CORRIDOR STRUCTURAL ENGINNEERS
DOCUMENTATION
3151 7590
255 150
RL 85650
150
LEVEL 2
260
3200
1 GL-MR-PC-04B
A3-450
5840
RL 82450 GL-MR-PC-03B
LEVEL 1 If there are any discrepancies in the
GL-MR-PC-02B GL-MR-PC-04A documents please seek clarification
before proceeding with any work.
GL-MR-PC-01B
GL-MR-PC-03A No building work shall proceed until
Building Consent has been granted
2490
2035
2055
GL-MR-PC-02A
2496
GL-LB-PC-04
GL-MR-PC-01A
GL-LB-PC-03A
RL 79960
GL-LB-PC-02A
20 311
GROUND LEVEL
20 280
Consultant Team
553 100
Symetrix
LEVEL 2 ALIGN JOINTS OF PRECAST PANEL ALONG
280
LEVEL 1
MANUKAU ROAD &
ENTRY
SCALE @ A1= As indicated
2490
NOTE: GL-LB-PC-06
1. ELEVATION TAKEN FROM LOBBY GL-LB-PC-05
SIDE GL-LB-PC-04B
2. APPLY SKIM COAT TO BACK SIDE
GL-LB-PC-03B
OF PRECAST TO ACHIEVE A
RL 79960 GL-LB-PC-02B
UNIFORM FINISH ACROSS STITCH
GROUND LEVEL ARCHITECTURAL
280
A3-410 D
6 1 : 50 Elevation 300mm x 600mm PC COLUMN REFER 300mm x 600mm PC COLUMN REFER 5 3D View DO NOT SCALE OFF THIS DRAWING
STRUCTURAL ENGINEER STRUCTURAL ENGINEER CONTRACTOR MUST VERIFY ALL DIMENSIONS
A3-100 PRECAST ELEVATION - VEHICLE ENTRY 3D VIEW - PC PANELS @ MANUKAU ROAD &
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
20
REAR SEALANT
D FOR TENDER 24/08/2022
99
210 175 1050 1430 3880 2339 2330 LOCATION OF PANEL JOINT LINE AS
SHOWN ON PRECAST ELEVATION
209
LOCATION OF LIFT DOOR PRECAST
820 840 LOCATION OF PANEL JOINT LINE AS
SHOWN ON PRECAST ELEVATION
INTERIOR EXTERIOR
RL 97250
TOP OF ROOF
2310
2000
1085
4F-LT-PC-02 DIMENSION AS SHOWN ON ELEVATION DIMENSION AS SHOWN ON ELEVATION
1725
460 400
RL 95250
ROOF LEVEL
210 PC-2 PC-2 PC-2
85
7512
3865
OF PRECAST OF PRECAST
3590
PC-3
TO BACK SIDE
PC-4 PC-4
3357
115mm DEPTH OF PRECAST
2780
200
2800
2800
1480
2320
ø 40
2140
75
15 20* 15
1017
957
85 Joint
550
20
20
20
20
20
20
20
LEVEL 4
PC-2 PC-2 PC-2
1060
3F-LT-PC-02
1240
3380
3380
3380
3380
3380
3400
PC-4 PC-4
200
2320
ø 40
2140
1017
957
20
20
20
20
20
20
LEVEL 3
PC-2 PC-2 PC-2
1060
1240
2F-LT-PC-02
TO BACK SIDE TO BACK SIDE
470 1050 470 PC-4 OF PRECAST PC-4 OF PRECAST
TO BACK SIDE
PC-3 OF PRECAST
PC-4
1 PC-4
3380
3380
3380
3380
3380
3400
200 A3-450
ø 40
2320
2140
290
1017
957
20
RL 85650 2F-ST-PC-04 2F-ST-PC-05 2F-LT-PC-06 2F-LT-PC-07 2F-LT-PC-08 before proceeding with any work.
20
20
20
20
20
LEVEL 2
PC-2 PC-2 PC-2 No building work shall proceed until
100
860
1040
PC-4
3180
3180
3200
200
2320
2140
ø 40
Client
TO BACK SIDE
PC-3 OF PRECAST
LCO EPSOM LTD
1017
957
Consultant Team
1F-ST-PC-04 1F-ST-PC-05 6020 1F-LT-PC-08
445 20
20
20
LEVEL 1 BGT
GL-LT-PC-02 PC-2 PC-2
200 Civil Engineer
ø 40 TO BACK SIDE TO BACK SIDE Babbage Consultants
PC-4 OF PRECAST PC-4 OF PRECAST
200 290 Services Engineer
2490
2490
22 Degrees
ø 40 PC-4
2080
2920
2035
Acoustic Engineer
1700
Marshall Day
20 390 40 957
Fire Engineer
Holmes Fire
RL 79960 Facade Engineer
40
GROUND LEVEL
440
20430
Symetrix
PC-2 GL-ST-PC-04 GL-ST-PC-05 GL-LB-PC-06 GF-LT-PC-08
20
20
Project Manager
20
Greenstone Group
820
470 1050 470 290 534 466 964 652 20 3408 Project Number: 221039
1990 2905 2110
SYMPHONY 303
A3-100 EAST - LOOKING TOWARDS LIFT ENTRY A3-100 SOUTH - INTERIOR LOOKING SOUTH A3-100 NORTH - INTERIOR LOOKING NORTH A3-100 PRECAST ELEVATION - STAIR CORE - SOUTH Sheet
ARCHITECTURAL
Drawing Number Revision
A3-411 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
PRECAST PANEL JOINT LINE LEGEND - SECTION
A 100% DEVELOPED 20/12/2021
DESIGN
B BC2 - BUILDING 29/07/2022
CONSENT ISSUE
20
REAR SEALANT
D FOR TENDER 24/08/2022
99
LOCATION OF PANEL JOINT LINE AS
SHOWN ON PRECAST ELEVATION
INTERIOR EXTERIOR
3880 1430
RL 97250
35
TOP OF ROOF
2000
2095
20 60
RL 95250 PP-ST-PC-03 PP-ST-PC-02 PP-ST-PC-01 PP-LT-PC-01
15 20* 15
20
ROOF LEVEL
Joint
PC-2 PC-2 PC-2 PC-2
2720
Notes
A3 SERIES TO BE READ IN
3380
CONJUNCTION WITH
STRUCTURAL ENGINNEERS
1000
DOCUMENTATION
RL 92450
20 659 100
LEVEL 4
20 659
L4-ST-PC-03 L4-ST-PC-02 L4-ST-PC-01 L4-LT-PC-01
20
PC-2 PC-2 PC-2 PC-2
2720
269
3380
1000
RL 89050
659 100
LEVEL 3
20 659
L3-ST-PC-03 L3-ST-PC-02 L3-ST-PC-01 L3-LT-PC-01
20
If there are any discrepancies in the
20
L
3515
A3-450
1000
RL
9
LE 245
V 0
EL
RL 85650 4
795 100
LEVEL 2 Client
20
L2-ST-PC-03 L2-ST-PC-02 GL2F-ST-PC-01 L2-LT-PC-01 PRECAST JOINT TO BE ALIGNED WITH
20
LE 905
V 0
EL Structural Engineer
520 1000 490 20 3 BGT
3200
Civil Engineer
Babbage Consultants
2385
253
Services Engineer
RL 22 Degrees
8
LE 565
1000
V 0
EL
1036 785 2 Acoustic Engineer
Marshall Day
697 339
RL 82450 Fire Engineer
100
2490
2273
GR
NOTE: OU RL Project Number: 221039
ND 799
LE 60
VE
PC-4 TO BACK SIDE OF WALLS L SYMPHONY 303
25
430
20 420
Sheet
PRECAST
105x40 REBATE
ELEVATIONS -
COURTYARD
A3-100 PRECAST ELEVATION - CORTYARD - LIFT & 3D VIEW - PC PANELS @ COURTYARD / LIFT &
STAIR CORE STAIR CORE
ARCHITECTURAL
Drawing Number Revision
A3-420 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
6 7 8 PRECAST PANEL JOINT LINE LEGEND - SECTION
Revisions
20
REAR SEALANT
1886 2023 2023 2024 2091 2091 2091 2069 D FOR TENDER 24/08/2022
99
LOCATION OF PANEL JOINT LINE AS
SHOWN ON PRECAST ELEVATION
INTERIOR EXTERIOR
RL 92450
LEVEL 4
PRECAST EDGE THICKENING
BEHIND. REFER STRUCTURAL
DOCUMENTATION
PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PRECAST PANEL JOINT LINE LEGEND - PLAN
Sim Sim
3 5
3279
3400
PRECAST EDGE
THICKENING BEHIND.
REFER STRUCTURAL
DOCUMENTATION
L3-AP-PC-08 L3-AP-PC-07 L3-AP-PC-06 L3-AP-PC-05 L3-AP-PC-04 L3-AP-PC-03 L3-AP-PC-02 L3-AP-PC-01
RL 89050
20
LEVEL 3
101
15 20* 15
PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 PC-2 Joint
3 5
3380
A3-430 A3-430
3400
Notes
A3 SERIES TO BE READ IN
CONJUNCTION WITH
STRUCTURAL ENGINNEERS
DOCUMENTATION
L2-AP-PC-08 L2-AP-PC-07 L2-AP-PC-06 L2-AP-PC-05 L2-AP-PC-04 L2-AP-PC-03 L2-AP-PC-02 L2-AP-PC-01
RL 85650
20
LEVEL 2
121
2 4
A3-430 A3-430
3200
6071
OF PRECAST OF PRECAST OF PRECAST OF PRECAST OF PRECAST OF PRECAST OF PRECAST OF PRECAST
6221
RL 82450
LEVEL 1
1
2490
280
GL-VE-PC-04 GL-VE-PC-03 GL-VE-PC-02 GL-VE-PC-01
430
20
20
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
1 1 : 50 Elevation
Acoustic Engineer
A3-100 PRECAST ELEVATION - SOUTH @ ENTRY Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
170
180 170
170
350
350
180
ARCHITECTURAL
Drawing Number Revision
2 1 : 50 Plan 3 1 : 50 Plan 4 1 : 50 Plan 5 1 : 50 Plan
A3-430 GL-VE-PC-08 PRECAST EDGE A3-430 L2-AP-PC-08 & L3-AP-PC-08 PRECAST EDGE A3-430 GL-VE-PC-01 PRECAST EDGE A3-430 L2-AP-PC-01 & L3-AP-PC-01 PRECAST EDGE A3-430 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
VARIES
Revisions
3130 PRECAST CONCRETE REAR AIR 63 15
SEAL SEALANT 5 5 A BC2 - BUILDING 29/07/2022
Continuous vertical rear air seal over PEF CONSENT ISSUE
INTERIOR backing rod. Joint prepared & primed to 3130 PRECAST CONCRETE FLASHING B FOR INFORMATION 29/07/2022
sealant manufacturer's specification 300mm long soaker flashing below C FOR TENDER 24/08/2022
with welded corner joint
3130 PRECAST CONCRETE FLASHING
300mm long soaker flashing below
30
20
3130 PRECAST CONCRETE BAFFLE
Open front joint
15
Santoprene Extrusion
3130 N/S PRECAST CONCRETE
CLADDING PANEL
VARIES
EXTERIOR
15 20 15 Profiled baffle groove
Joint
15
3130 PRECAST CONCRETE WALL EXTERIOR
PANEL
1 1:5 Plan
2 1:5 Plan
VARIES A3-101 BAFFLE JOINT - EXTERNAL CORNER
25 60
Strip to be turned over stainless steel pin and secured. TO SEALANT MANUFACTURER'S
SPECIFICATION BACKING FIXED TO PRECAST
5° Upstand
50
VARIES
steel soaker flashing bedded on sealant to
top edge & sides & fixed to 1 side only.
5º min splay 3130 PRECAST CONCRETE WALL
PANEL
3130 PRECAST CONCRETE BAFFLE
Lower baffle lapped behind flashing.
Baffle strip needs to be mechanically fixed AT TOP to stop it falling down.
Strip to be turned over stainless steel pin and secured
3130 PRECAST CONCRETE WALL
PANEL
Lower Precast Panel
Fire Engineer
Holmes Fire
Facade Engineer
300mm long 0.9mm 316 grade stainless Continuous horizontal rear air seal over Symetrix
steel soaker flashing bedded on sealant PEF backing rod
to top edge & side (fixed 1 side only) Project Manager
Greenstone Group
Continuous horizontal rear air seal over Project Number: 221039
PEF backing rod
20mm
SYMPHONY 303
300mm long 0.9mm 316 grade stainless min
steel soaker flashing with welded corner 303 MANUKAU ROAD,
joint, bedded on sealant to top edge &
80mm Upstand side (fixed 1 side only) EPSOM, AUCKLAND
Sheet
PRECAST DETAILS
20mm
min
SCALE @ A1= As indicated
OR
EX
TE ERI
T
RIO
R EX ARCHITECTURAL
Drawing Number Revision
A3-450 C
DO NOT SCALE OFF THIS DRAWING
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
A3-410 ISOMETRIC - PRECAST PANEL JOINT BASE A3-101 ISOMETRIC - PRECAST PANEL JOINT BASE COPYRIGHT © JASMAX
4 5 4 5 Revisions
3800 F E A 100% DEVELOPED 20/12/2021
190 3370 190 50
TRANSFORMER 3 1025 DESIGN
435 190 2120 190 435 A4-002 B FOR INFORMATION 29/07/2022
C BC3 - BUILDING 29/07/2022
2500 CONSENT ISSUE
PLINTH PARAPET CAP FLASHING TO
TRANSFORMER ROOM - CONTINUE 300 D FOR INFORMATION 05/08/2022
753 1862 755 MIN. UNDER FLASHING FROM BALCONY - E BC3 - AMENDMENTS 05/08/2022
D0.TFM RL's INDICATE FINISHED MEMBRANE NO FIXNGS OR SEALANT BTW. F FOR TENDER 24/08/2022
3 1 ROOF LEVEL - WASHED RIVER FLASHINGS - ALLOWS FOR MOVEMENT
A4-154
STONES INSTALLED ABOVE 4 5 6
G
A4-002
A4-002 A4-002 A4-002
300 MIN.
4 4 RL 82531 50mm SEISMIC GAP
4421N
A4-002 A4-002 Nuraply Membrane Roofing & Decking
RL 82631 Sim
MF FLASHING FROM ADJACENT BALCONY -
DP AND RAINWATER HEAD 1:34 NO FIXING TO TRANSFORMER PARAPET
1
PLINTH
TRANSFORMER 4421N
REMOVABLE METAL Nuraply Membrane Roofing & Decking
GRATE FLOOR GREEN ROOF WITH GRAVEL
190
RL 82450
LEVEL 1
1:
365
4 4
52
190
A4-002 A4-002 2
1:40
Sim A4-004
RL 79910 2
2050
7 6 TRANSFORMER MSB ROOM
2490
A4-022
A4-003 A4-003 RL 82631 RL 82631 SLAB EDGE TO BALCONY ABOVE -
1900
D0.TFM
BLUE DASH 1 2
Sim 300 MIN. A4-005 A4-005
SLAB EDGE TO
5 RIB & TIMBER INFILL FLOOR STRUCTURE -
190
BALCONY ABOVE
3510
390
RL 79960
CR GROUND LEVEL
50
EML
UB BEAM OVER WALL BLOCK WALLS TO MSB ROOM
1550
MSB ROOM
5 5 5 5 Notes
MSB ROOM
2335
MSB
IP
EML
50 190
E E
50
CR
6 6
A4-002 A4-002
D0.MSB DP
STEEL COLUMN ENCASED W/ 3 1 3 TIMBER FRAMED WALLS ABOVE
PERFORMANCE KEY
INSITU CONCRETE - 50mm MIN. A4-002 A4-002
COVER - ENSURE SEPARATION A4-154 FIRE
FROM OTHER STRUCTURE
(30)/30/30 FRR
553 1862 755
D0.MSB (60)/60/60 FRR
200 190 3170 190 50 (120)/120/120 FRR
MSB
SEISMIC GAP SEPERATION
A1-100 DETAIL PLAN - GROUND - TRANSFORMER / A1-112 DETAIL PLAN - LEVEL 1 - TRANSFORMER / A4-002 DETAIL SECTION 1 - TRANSFORMER / MSB
MSB MSB ROOF ROOF
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
4 5 4 5 4 5
Client
3800
3800 3800 LCO EPSOM LTD
Consultant Team
SEISMIC GAP - 200mm
Structural Engineer
SEISMIC GAP - 200mm BGT
3 4421N
3 3 Civil Engineer
Babbage Consultants
Nuraply Membrane Roofing & Decking A4-002
A4-002 SOFT SEAL BTW TOP OF WALL & BEAM A4-002
Services Engineer
1 50mm SEISMIC GAP
22 Degrees
A4-004 CLOSE OFF THIS VOID TO PREVENT
3 VERMIN ETC. MOVING IN
Acoustic Engineer
RL 82800 Marshall Day
A4-004 3A-1
Fire Engineer
350
4 Symetrix
750
2000
MSB ROOM
RL 80300 TRANSFORMER PLINTH COMFLOR "ROOF" - NO FALL SYMPHONY 303
340
D0.TFM D0.MSB
RL 80290 OVERLAND FLOW LEVEL 20 SERIES BLOCK WALL
303 MANUKAU ROAD,
RL 79960 RL 79960 EPSOM, AUCKLAND
GROUND LEVEL GROUND LEVEL
6 6 6 6 Sheet
A3-312 A3-312 A3-312 A3-312 TRANSFORMER ROOM
SCALE @ A1= 1 : 50
3 3
A4-002 3
A4-002
A4-002
ARCHITECTURAL
4 1 : 50 Section 5 1 : 50 Section 6 1 : 50 Elevation
Drawing Number Revision
A4-002 DETAIL SECTION 2 - TRANSFORMER / MSB A4-002 DETAIL SECTION 3 - TRANSFORMER / MSB A4-002 DETAIL SECTION 4 - TRANSFORMER / MSB A4-002 F
ROOF ROOF ROOF DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
MEBRANE ROOFING TO CONCRETE NEW STEEL BEAM TO SUPPORT RIB & A 100% DEVELOPED 20/12/2021
WALL TO NEIGHBOURING EXISTING BLOCK WALL EXISTING STRUCTURE 20 SERIES MASONRY BLOCK TIMBER INFILL - CANTILEVERED FROM
SUBSTRATE W/ PEBBLE BALAST DESIGN
PROPERTY DEMOLISHED BACK TO TO BE RETAINED CONSTRUCTION W/ 50mm MIN. STEEL COLUMN
COLUMN GAP TO EXISTING STRUCTURE B FOR INFORMATION 29/07/2022
C BC3 - BUILDING 29/07/2022
NEW STEEL COLUMN W/ CONCRETE CONSENT ISSUE
COMFLOR ROOF OF MSB ROOM - ENCASEMENT AT CARPARK LEVEL D FOR TENDER 24/08/2022
REFER TO STRUCTURAL ENGINEER
NEW RIB & TIMBER INFILL FLOOR
STRUCTURE BUILT OVER MSB ROOM
Notes
TRANSFORMER & MSB ROOM - EXISTING TRANSFORMER & MSB ROOM - ENCLOSURE TRANSFORMER & MSB ROOM - NEW FLOOR
STRUCTURE BUILT WITHIN EXISTING STRUCTURE STRUCTURE BUILT OVER MSB ROOM
50 651
BTW. TRANSFORMER ROOM & STRUCTURE & TRANSFORMER ROOM No building work shall proceed until
EXISTING BUILDING Building Consent has been granted
for the work described.
SEISMIC GAP 1106 450
2490
2081
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
F E
22 Degrees
A1-100 TRANSFORMER / MSB - EXTERNAL
Acoustic Engineer
ELEVATION - EAST Marshall Day
110
Project Number: 221039
RL 82450 450 4698
SYMPHONY 303
693
LEVEL 1
50
3148 303 MANUKAU ROAD,
475
DP EPSOM, AUCKLAND
Sheet
TRANSFORMER ROOM
- 3D's & ELEVATIONS
RL 79960
GROUND LEVEL
NOTE STRUCTURE & ENCLOSURE SCALE @ A1= 1 : 50
ELEMENTS TO WEST OF SEISMIC
JOINT NOT SHOWN FOR CLARITY
TRANSFORMER & MSB ROOM - COMPLETE TRANSFORMER & MSB ROOM - SHOWING A1-100 TRANSFORMER / MSB - EXTERNAL
WALLS TO EAST ELEVATION - WEST ARCHITECTURAL
Drawing Number Revision
A4-003 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 E Revisions
4161-4.1
DPC NURALITE TERMINATION BAR
5°
NURALITE GRAVEL GUARD
RL 82800
WASHED RIVER STONES
110
SEALANT ON PEF ROD NURALITE GREEN DRAIN
CONTINUOUS AROUND SCUPPER RL 82690
50 MIN.
50
NURAPLY 3PM TWO LAYER SYSTEM ON
RL 82450 PLYWOOD RL 82450
LEVEL 1 LEVEL 1
RIB & TIMBER INFILL FLOOR STRUCTURE -
REFER TO STRUCTURAL ENGINEER
RWH
150
COMFLOR 80 ROOF STRUCTURE -
REFER TO STRUCTURAL ENGINEER SOFT SEAL TO TOP OF WALL
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
360
17mm H3 PLYWOOD
PAINTED TO MATCH BLOCKWORK
Notes
110
REFER TO STRUCTURAL ENGINEER
DP
20 SERIES MASONRY BLOCK - REFER
TO STRUCTURAL ENGINEER RL 82090
4161-4.1
DPC
Sim
2
A4-022
190 50 35 4421N
200 190
Nuraply Membrane Roofing & Decking
Sim 2 LAYER TORCH ON MEMBRANE OVER
H3 STRUCTURAL PLYWOOD
3
Client
A4-821
RL 82450 RL 82450 LCO EPSOM LTD
LEVEL 1 LEVEL 1
Sim
Consultant Team
3 RIB & TIMBER INFILL FLOOR STRUCTURE -
Structural Engineer
A4-821 REFER TO STRUCTURAL ENGINEER
BGT
Civil Engineer
Babbage Consultants
FIREFLY
Services Engineer
4161PC-4.1 67.01 22 Degrees
PRO CLIMA SOLITEX EXTASANA® ADHERO ALIGN STEEL BEAM INTUMESCENT PAINTED
MEMBRANE - PEEL AND STICK EXISTING STRUCTURE Acoustic Engineer
Marshall Day
4933
Aluminium Metalwork SOFT SEAL TO TOP OF WALL
Fire Engineer
1.6mm POWDERCOATED ALUMINIUM Holmes Fire
SHEET CLADDING RL 82140 SOFT SEAL TO TOP OF WALL
Facade Engineer
Symetrix
50
5113G-4.6 RL 82090
GIB® FIRE RATED SYSTEMS Project Manager
17mm H3 PLYWOOD 3821-4.2 Greenstone Group
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
Notes
4161-4.1
GROUND LEVEL GROUND LEVEL
10
Consultant Team
Services Engineer
22 Degrees
RL 79500
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
FOUNDATION - REFER TO FOUNDATION - REFER TO
STRUCTURAL ENGINEER STRUCTURAL ENGINEER Project Manager
Greenstone Group
SYMPHONY 303
Sheet
1 1:5 Section Detail 2 1:5 Section Detail
TRANSFORMER & MSB
A4-002 TRANSFORMER ROOM THRESHOLD A4-002 MSB ROOM - THRESHOLD ROOM - DETAILS
SCALE @ A1= 1 : 5
ARCHITECTURAL
Drawing Number Revision
A4-005 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
3 3
Revisions
140
4 4
1:37
IP
2217
A4-020 A4-020
1:48 WASTE 1:89
RL 79859 HP
RL 79824 LP 10.7 m²(NIA)
1:27
RL 79859 HP 10
D0.WST
D0.WST
140
900
1160 A4-022
Notes
7
A A4-021
A
BOUNDARY BOUNDARY
3
A4-020
(120)/120/120 FRR
REFUSE - TOTAL CAPACITY 3960L
A
3
2 1 BLOCK WALL NOTCHED AROUND EXISTING
A4-022 A4-022 BEAM W/ 50mm GAP FILLED W/ CONTINUOUS Client
RYANSPAN INTUMESCENT STRIP LCO EPSOM LTD
2263
1965 298 302 Consultant Team
Facade Engineer
2490
Symetrix
Project Manager
WASTE CARPARK
2010
Sheet
3 4
1 : 25 Section 1 : 25 Section
ARCHITECTURAL
A1-114 WASTE ROOM CROSS SECTION A4-020 WASTE ROOM LONG SECTION Drawing Number Revision
A4-020 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
Notes
1 3D View 2 3D View
WASTE ROOM - VIEW FROM SOUTH EAST WASTE ROOM - VIEW FROM NORTH WEST
3 A
No building work shall proceed until
Building Consent has been granted
GBUW60 - 90mm TIMBER FRAMED for the work described.
WALL W/ 2x GIB FYRELINE TO
INTERIOR & 13mm GIB WEATHERLINE,
2mm FOLDED ALUMINIUM CLADDING
Ø75 uPVC 75x50 RYANSPAN INTUMESCENT TO EXTERIOR
STRIP Ø20 COPPER Ø115
Ø60 GALV. Ø115 uPVC
240
RL 82450
LEVEL 1 Client
RL 82150 75x50 RYANSPAN INTUMESCENT LCO EPSOM LTD
SOFFIT OF DOUBLE TEE STRIP
Consultant Team
Structural Engineer
BGT
BLOCK WALL NOTCHED AROUND
EXISTING BEAM Civil Engineer
D0.WST Babbage Consultants
SYMPHONY 303
3 A
GBUW60 - 90mm TIMBER FRAMED
WALL W/ 2x GIB FYRELINE TO 15 SERIES MASONRY BLOCK 303 MANUKAU ROAD,
INTERIOR & 13mm GIB WEATHERLINE, EPSOM, AUCKLAND
2mm FOLDED ALUMINIUM CLADDING
Ø60 GLAV. Ø115 uPVC Ø60 GLAV. TO EXTERIOR
Ø115 GALV. Ø75 uPVC Ø115 uPVC Sheet
RL 82450 GBUW60 - 90mm TIMBER FRAMED
LEVEL 1 WALL W/ 2x GIB FYRELINE TO WASTE - 3D's &
INTERIOR & 13mm GIB WEATHERLINE, 75x50 RYANSPAN INTUMESCENT ELEVATIONS
2mm FOLDED ALUMINIUM CLADDING STRIP
TO EXTERIOR
75x50 RYANSPAN INTUMESCENT
STRIP SCALE @ A1= 1 : 50
ARCHITECTURAL
Drawing Number Revision
A4-021 C
4 1 : 50 Elevation 6 1 : 50 Elevation
DO NOT SCALE OFF THIS DRAWING
A1-100 WASTE ROOM EXTERIOR ELEVATION - A1-100 WASTE ROOM EXTERIOR ELEVATION - WEST CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
NORTH COPYRIGHT © JASMAX
Revisions
RL 82450
LEVEL 1
FIRE RATED SEALANT
240
FIRE RATED SEALANT MEMBRANE - PEEL AND STICK
4171GR
GIB Weatherline Rigid Air Barrier
4933
Aluminium Metalwork FLASHING
50
RL 82060 STRIP RL 82060 STRIP
4171GR
GIB Weatherline Rigid Air Barrier
Notes
STEEL FRAMED FIRE DOORSET
WASTE CARPARK
A4-002 BLOCK WALL HEAD - ALONG DOUBLE TEE A4-020 BLOCK WALL HEAD - ALONG DOUBLE TEE
WEBS - SOUTH WALL / DOOR HEAD WEBS - NORTH WALL
210
5mm S.S. CHEQUER PLATE W/ 15 SERIES MASONRY BLOCK
COUNTERSUNK FIXINGS
4933
RL 79960 Aluminium Metalwork
UNDERCUT
Client
4161-4.1 STEEL FRAMED FIRE DOORSET
10 MAX.
GROUND LEVEL
DPC LCO EPSOM LTD
390
116
240
Consultant Team
Structural Engineer
PACKER 5113G-4.6 BGT
CONCRETE SCREED TO FALLS GIB® FIRE RATED SYSTEMS
4161-4.1 Civil Engineer
DPC 2x 13mm GIB FYRELINE TO BASE OF TIMBER Babbage Consultants
FRAMING - CONTINUOUS PAST DOUBLE TEE RIBS
NON-SHRINK GROUT 5mm S.S. CHEQUER PLATE W/ Services Engineer
50
COUNTERSUNK FIXINGS RL 82060 22 Degrees
1200 HIGH CORNER PROTECTION
? Acoustic Engineer
? Marshall Day
15 SERIES MASONRY BLOCK 4521-4.11 7382 FIRE STOPPING SYSTEMS
STRUCTURAL SEALANT Fire Engineer
Holmes Fire
15 SERIES MASONRY BLOCK
4161-4.1 Facade Engineer
DPC Symetrix
Project Manager
Greenstone Group
Sheet
WASTE - DETAILS
SCALE @ A1= 1 : 5
ARCHITECTURAL
Drawing Number Revision
A4-022 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 8 Revisions
Sim
70
180 2
90
A4-811
Sim
3 4254XF-4.2
RL 81 TRESPA® METEON PANEL
A4-821
3 3 3 3
CL COLUMN
1:37
A4-132 A4-132 A4-132 A4-132
2245
2120
4381NJ-4.2
RL 240 TILES / PAVERS / STONE
RL 90 4933-4.2
ALUMINIUM SHEET - BALCONY PARAPET CAP 4254XF
1:23 1:23 Trespa Meteon PXF Facade Cladding
FLASHING
STACKER
FRAMING
HPL SOFFIT
D2B-2/02
RL 31 FCL 2792
3420
3800
3684
3670
OUTLET
260
C RL 81
RL 81 4852SP-4.1 C
SPECTRUM SEAMLESS FIN - BALUSTRADE
SYSTEM
Notes
1:39
1430
1430
4254XF-4.2
TRESPA SETOUT
TRESPA® METEON PANEL
TILE SETOUT
460
175
B B
CL COLUMN
RL 81
OF
42
Sim
250
2
200
365
A4-811
W2B-2/01
140
4
O/F - OPEN ALTHROUGH A4-821
1495
1 1 : 25 Plan TILE SETOUT 3 1 : 25 Reflected Soffit Plan
A1-121 BALCONY PLAN - APARTMENT 2B-2 TO 2B-4 BALCONY SOFFIT - APARTMENT 2B-2 TO 2B-4 5 3D View
3
A4-134
CL COLUMN BALCONY 2B-2
237
2315
3
140 2165 150 140 If there are any discrepancies in the
A4-134
FRAMING documents please seek clarification
1967 before proceeding with any work.
DP & OF 303 No building work shall proceed until
963 Building Consent has been granted
DP - CLOSED ALLTHROUGH OUTLET 2410
4241DA-4.3 TRESPA SHEET for the work described.
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
Sim
9
1 A4-811
230
A4-381 Sim
2
200
Client
A4-898
Consultant Team
Structural Engineer
BGT
3 3
Civil Engineer
A4-134 A4-134
1 1 1 1 Babbage Consultants
EQ
4381NJ-4.2
RL 89 RL 240 TILES / PAVERS / STONE 4254XF Acoustic Engineer
Trespa Meteon PXF Facade Cladding Marshall Day
RL 89
HPL SOFFIT
Fire Engineer
RL 90
1:24 1:22 Holmes Fire
CL COLUMN
Facade Engineer
STACKER
FRAMING
D2A-2/02
FCL 2792
4116
Symetrix
4000
3600
RL 39
4060
3990
Project Manager
4933-4.2 Greenstone Group
ALUMINIUM SHEET - BALCONY PARAPET CAP
FLASHING Project Number: 221039
SYMPHONY 303
EPSOM, AUCKLAND
OUTLET
EQ
1:40
SYSTEM
Sheet
ENCLOSURE DETAIL
PLANS - ZONE SE -
TILE SETOUT
MANUKAU ROAD
510
RL 89 3130 BALCONIES
183
OF
Precast Concrete
200
A A SCALE @ A1= 1 : 25
180
Sim 2
1 A4-381
A4-811 O/F - OPEN ALTHROUGH
1493
TILE SETOUT
6 3D View
A4-031 D
2 1 : 25 Plan 4 1 : 25 Reflected Soffit Plan
DO NOT SCALE OFF THIS DRAWING
BALCONY PLAN - APARTMENT 2A-2 TO 2A-4 BALCONY SOFFIT - APARTMENT 2A-2 TO 2A-4 FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
A1-121
COPYRIGHT © JASMAX
Revisions
Notes
4 3D View
8 8 8
140 2165
Sim 2
140
1 W2C-1/01 W2C-2/01
A4-811 1 A4-811
A4-811
4911-4.3
RL 81 ? RL 81
3 4852SP-4.1 Client
SPECTRUM SEAMLESS FIN - BALUSTRADE LCO EPSOM LTD
A4-897
SYSTEM
1:36
1782
Consultant Team
1668
1:36
1821
Structural Engineer
FCL 2730
4 4
2270
BGT
TRESPA SETOUT
A4-321 1 A4-321 Civil Engineer
RL 31
EXISTING STRUCTURE
1590
4381NJ-4.2 RL 240
D2C-2/02
Services Engineer
TILES / PAVERS / STONE 22 Degrees
1:21 1:19 4254XF
1:24 1:22 Trespa Meteon PXF Facade Cladding Acoustic Engineer
D2C-1/02
3780
3700
3664
Marshall Day
RL 81
OUTLET
OUTLET
RL 81
EXPOSED EXISTING BEAM Fire Engineer
475
475
3 3
350
Holmes Fire
RL 81 FCL 2600
A4-322 A4-322
D 2 D Facade Engineer
Symetrix
PROPOSED STRUCTURE
A4-322
Project Manager
TILE SETOUT
TILE SETOUT
TRESPA SETOUT
Greenstone Group
915
915
1972
1 1 1 1 1 FCL 2730 1
1160
RL 81
SYMPHONY 303
1:39
1493
A4-133 A4-133 A4-133 A4-133 A4-133 A4-133
1380
1510
4254XF
303 MANUKAU ROAD,
3 Trespa Meteon PXF Facade Cladding EPSOM, AUCKLAND
Sim RL 81
A4-321
RL 81
1 Sim Sheet
A4-381 2
ENCLOSURE DETAIL
BALUSTRADE
A4-811
140
SOFFIT
PLANS - ZONE NE -
BALUSTRADE
MANUKAU ROAD
BALCONIES
O/F - OPEN ALTHROUGH 3
SCALE @ A1= 1 : 25
A4-821 O/F - OPEN ALTHROUGH
1495 1 1495
TILE SETOUT TILE SETOUT
A4-322
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 Revisions
DP - CLOSED ALLTHROUGH
3 G
G A4-382
75
4254XF
Trespa Meteon PXF Facade Cladding
RL 81
PACKED OUT OFF COLUMN TO ALIGN
W/ CLADDING TO BEAM ABOVE
PACKED OUT OFF CLOUMN TO ALIGN
W/ PC PANEL EDGE
4254XF
Trespa Meteon PXF Facade Cladding
1:40
4254XF HPL SOFFIT
Trespa Meteon PXF Facade Cladding 4254XF
HPL W/ 35mm CAVITY ON 13mm GIB
Sim WEATHERLINE ON 45mm TIMBER Sim Trespa Meteon PXF Facade Cladding
1 BATTEN 1 FCL 2730 FCL 2425
A4-133 A4-133
RL 240 4381NJ-4.2 FCL 2700
RL 31 TILES / PAVERS / STONE
3975
4000
1:21 4852SP-4.1
1:19 SPECTRUM SEAMLESS FIN - BALUSTRADE SYSTEM HPL SOFFIT
STACKER
D2D-1/02
3982
3400
3330
3906
FCL 2670
RL 81 RL 81
4521
Aluminium Windows & Doors
EXISTING BEAM IN
Sim Notes
SOFFIT SHOWN DASHED
4
A4-321
OUTLET
2010
3130-4.1
1:40
TRESPA SETOUT
PRECAST CONCRETE PANELS
900
HPL W/ 35mm CAVITY ON 13mm GIB 5 3D View
WEATHERLINE ON 140mm TIMBER
TILE SETOUT
BALUSTRADE
SOFFIT
140
BALUSTRADE
BALCONY
Sim
W2D-1/01
1 Sim
A4-811 3
SOFFIT TO BALCONIES ABOVE DONT HAVE EXISTING
A4-897
O/F - OPEN ALTHROUGH CONCRETE BEAM AT PERIMETER, OTHERWISE THE SAME
1495
TILE SETOUT
G 2 G
Client
A4-382
61
LCO EPSOM LTD
RL 81 Consultant Team
Structural Engineer
BGT
Civil Engineer
4852SP-4.1 Babbage Consultants
1:40
3950
3907
3847
Project Manager
6 3D View Greenstone Group
RL 81 RL 81 221039
BALCONY - APARTMENT 2D-2 TO 2D-4 Project Number:
HPL SOFFIT
2010
4933-4.2
1:40
PLANS - ZONE NE -
4254XF MANUKAU ROAD
TILE SETOUT
900
Sim
SCALE @ A1= 1 : 25
2
BALCONY
BALUSTRADE
Sim A4-811
1 W2D-2/01 Sim
4241DA
A4-811 3 Nu-Wall Profiled Metal Cladding
O/F - OPEN ALTHROUGH
A4-897
1495
TILE SETOUT ARCHITECTURAL
Drawing Number Revision
2 1 : 25 Plan 4 1 : 25 Plan
A4-035 D
A1-122 BALCONY PLAN - APARTMENT 2D-2 TO 2D-4 A4-036 - BALCONY RCP - MAN RD - LEVEL 3 - DO NOT SCALE OFF THIS DRAWING
BALCONY PLAN - APARTMENT 2D-2 CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
Notes
4 3D View 5 3D View
8
8
If there are any discrepancies in the
2217 230 2430 documents please seek clarification
before proceeding with any work.
RL 81
Client
4254XF LCO EPSOM LTD
Trespa Meteon PXF Facade Cladding
4254XF
Trespa Meteon PXF Facade Cladding
1:40
Consultant Team
Sim Sim
1 1 HPL SOFFIT Structural Engineer
A4-133 A4-133 BGT
4000
RL 31 FLASHING
3905
Fire Engineer
3805
3400
3863
1:40
SYSTEM
900
Sheet
530
RL 81 ENCLOSURE DETAIL
Sim
260
2 PLANS - ZONE NE -
MANUKAU ROAD
140
Sim A4-811
BALCONIES
1 W2D-3/01 Sim
A4-811 3 SCALE @ A1= 1 : 25
O/F - OPEN ALTHROUGH A4-897
1495
TILE SETOUT
1 1 : 25 Plan 3 1 : 25 Plan
ARCHITECTURAL
Drawing Number Revision
A1-132 A4-036 - BALCONY PLAN - MAN RD - LEVEL 3 - A4-036 - BALCONY RCP - MAN RD - LEVEL 3 -
BALCONY PLAN - APARTMENT 2D-3 TO 2D-4 BALCONY PLAN - APARTMENT 2D-3 TO 2D-4 A4-036 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
4
4
120 20 1740 140 CORRIDOR WALL FRAMING
680 2
B TILE SETOUT A4-141 B
CORRIDOR
TILE SETOUT
728
TRESPA SETOUT
1130
1450
O/F -OPEN ALTHROUGH
HPL W/ 35mm CAVITY ON 13mm GIB
WEATHERLINE ON 140mm TIMBER
FRAMING
2
A4-141
Notes
1:37
RL 80
Sim
D1B-2/02
3910
3220
3884
4000
4000
A4-412
FCL 2692
LEVEL 3 & 4
NO BALCONY
@ LEVEL 1
Sim
3
A4-411
LEVEL 2 DETAIL
1:15
4 TIMBER FRAMING
A4-411 If there are any discrepancies in the
140
140
140
Client
Consultant Team
FCL 2692
Structural Engineer
D1A-2/02
Sim
1 BGT
3220
3935
3819
3935
A4-412 Civil Engineer
3796
NO BALCONY
4005
Babbage Consultants
LEVEL 3 & 4
@ LEVEL 1 Services Engineer
Sim
3 3D View 22 Degrees
3
BALCONIES TO APARTMENTS 1A-2 & 1B-2 Acoustic Engineer
A4-411 Marshall Day
1:36
Facade Engineer
Symetrix
218
Project Manager
TRESPA SETOUT
OF Greenstone Group
HPL W/ 35mm CAVITY ON 13mm GIB Project Number: 221039
TILE SETOUT
128
A A
70
70
EPSOM, AUCKLAND
Sheet
A1-124 COURTYARD BALCONIES - APARTMENTS 1A-2 BALCONY SOFFIT - APARTMENT 1A-2 TO 1A-4
TO A1-4 & 1B-2 TO 1B-4 & 1B-2 TO 1B-4
ARCHITECTURAL
Drawing Number Revision
A4-041 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
5 3D View
1 1 1 Notes
4 3D View
RL -200 HP RL 95535 HP
RL 95870
140
700
RL 110
D1M-1/02
FCL 2460
5980
Services Engineer
3°
6695
5880
1:45
22 Degrees
6615
6497
6260
Acoustic Engineer
310
Marshall Day
1:38 FALL TO CLT
Fire Engineer
Holmes Fire
Project Manager
1200
Greenstone Group
Sim
3 Project Number: 221039
A4-523
LEVEL 3 & 4 RL 95585 SYMPHONY 303
LEVEL 1 DETAIL
BATTEN PROPRIETARY NURALITE SUMP
RL -300 LP
RL 95405 LP SCALE @ A1= 1 : 25
950
4 4
TILE SETOUT
SUMP
600
RL 95388
148
DP
A A
47
105
5
45
A4-581 ARCHITECTURAL
DP - CLOSED ALTHROUGH Drawing Number Revision
1
700
TILE SETOUT
A4-251 A4-051 D
1 1 : 25 Plan 2 1 : 25 Plan 3 1 : 25 Plan
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
A1-114 REAR BALCONY - LEVEL 1 - 4 A5-201 - RCP - LEVEL 1 - SW - Callout 1 A1-105 ROOF PLAN - ROOF H - REAR BALCONY COPYRIGHT © JASMAX
1 2
Revisions
2504 140 7285 140 EXTERIOR FRAMING
1950 7575 A 100% DEVELOPED 20/12/2021
CLT SLAB NOTES: DESIGN
CLT SLAB EDGE • RL's INDICATED ARE FROM
400 200 B FOR INFORMATION 29/07/2022
STRUCTURAL FLOOR LEVEL NOTED
IN A3 DRAWING SERIES (SFL) C BC3 - BUILDING 29/07/2022
330 1550 600 6550 825 • MEMBRANE ROOFING TO PLYWOOD CONSENT ISSUE
GUTTER
GUTTER GUTTER SUMP GUTTER SUMP SUBSTRATE SHOWN DASHED D FOR TENDER 24/08/2022
9920 BELOW DECK TILES
RL -152
2449
1:49
CLT EDGE
TILE SETOUT
F
1:38
1:38
1950
RL 110
325
2610
1025
700
1:38
E
140
660
RL 90 Notes
RL -320
475
SUMP
TILE SETOUT
600
1
7400
A4-581
1:60
4776
RL 110 RL 90
Sim
3
3620
1:38
A4-523
LEVEL 3 & 4 DETAILS APPLY TO BOTH If there are any discrepancies in the
Sim
SIDES OF BALCONY documents please seek clarification
3 before proceeding with any work.
A4-521 No building work shall proceed until
LEVEL 2 DETAIL Building Consent has been granted
for the work described.
Sim
1
A4-521
LEVEL 1 DETAIL
TILE SETOUT
Client
195
GUTTER
Consultant Team
140
EXTERIOR FRAMING
Structural Engineer
BGT
700
Civil Engineer
TILE SETOUT Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
SYMPHONY 303
Sheet
ENCLOSURE DETAIL
PLANS - ZONE NW -
EXTERNAL CORNER
BALCONY
SCALE @ A1= 1 : 25
2 3D View
A4-053 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
1 2 Revisions
140
2mm PARAPET CAP FLASHING
RL 95689 HP
02
3°
2340
A4-225
GUTTER 1:51
HP @ BEAM
345
20
E
450 50
RL 95388
SUMP
Notes
RL 95413 LP
RL 95692 HP
1 2
RL 95585
9895 140
3°
GUTTER 1:34
2400 7450
9860
4895
RL 95585 LP
4395
90 1110
RL 95543 HP
Client
Consultant Team
Structural Engineer
TRESPA SETOUT
BGT
Civil Engineer
1110
Babbage Consultants
Marshall Day
7384
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
1 1 : 25 Plan
Project Manager
A1-105 BALCONY ROOF PLAN - REAR - ZONE NW - Greenstone Group
Sheet
ENCLOSURE DETAIL
PLANS - ZONE NW -
EXTERNAL CORNER
BALCONY
SCALE @ A1= 1 : 25
HPL SOFFIT
ARCHITECTURAL
TRESPA SETOUT
A4-054 F
185
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
2 3D View
2 3 4
30 7350 7575
1:51 1:55
OUTLINE OF CLT -
Consultant Team
NOTCH AROUND SHS
Structural Engineer
BGT
RL -152
RL -152 Civil Engineer
Sim
3 Babbage Consultants
2460
A4-522 Services Engineer
22 Degrees
1:38
1:38
CLT EDGE
TILE SETOUT
TILE SETOUT
F Acoustic Engineer
1950
Marshall Day
325
325
RL 110 RL 110 Fire Engineer
Holmes Fire
Facade Engineer
6 CL SHS RL -100 Symetrix
E 221039
Project Number:
D2F-1/02
W2E-1/01
D2E-1/02
SYMPHONY 303
RL 90 RL 90
665
303 MANUKAU ROAD,
SHS TO RAIL EPSOM, AUCKLAND
620
TILE SETOUT Sheet
1650 525
TILE SETOUT TILE SETOUT ENCLOSURE DETAIL
6 PLANS - ZONE NW -
A4-153 NORTH BALCONIES
SCALE @ A1= 1 : 25
1 1 : 25 Plan
ARCHITECTURAL
Drawing Number Revision
A4-055 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
2 3 4
5980 140 1230 1150 140 6145 140
5430 450 100 1370 1313 5649 450 163 SEISMIC GAP - 200mm
SUMP
3°
3°
2
A4-271
F
RL 95585 LP RL 95405 RL 95388 RL 95543 RL 95593
RL 95535 RL 95585 RL 95388
RL 95593 RL 95413
1 1 : 25 Plan
900 1940
TRESPA SETOUT TRESPA SETOUT
5615 6360 Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
2460
FCL 2460
FCL 2460 Fire Engineer
Holmes Fire
F Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
ENCLOSURE DETAIL
PLANS - ZONE NW -
NORTH BALCONIES
2 3 4
SCALE @ A1= 1 : 25
6
A4-153
2 1 : 25 Reflected Soffit Plan
A4-056 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 Revisions
5960
2500
3 1 1820
A4-154
2 Sim TILE SETOUT
A4-002
A4-581 3 DP - CLOSED ALLTHROUGH
A4-382
G RL 39
Notes
2553
RL 85
W3A-1/01
1:34
950
230
305
1 1 1
A4-155 A4-528 A4-155
RL 82591
7479
3A-1
4381NJ-4.2
RL 270 TILES / PAVERS / STONE
RL 90
Sim
1
A4-527 1868
1:13
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
D3A-1/02
RL 31
1:38
Client
5 2 3D View
LCO EPSOM LTD
A4-002 INTERNAL CORNER BALCONY @ LEVEL 1
Consultant Team
2415
F Civil Engineer
Babbage Consultants
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON Services Engineer
1:21
TIMBER FRAMING
RL 137 Acoustic Engineer
700
Fire Engineer
20
Holmes Fire
E
140
Facade Engineer
W3A-1/03 W3A-1/02
Symetrix
Project Manager
RL 85 Greenstone Group
ENCLOSURE DETAIL
PLANS - ZONE NE -
INTERNAL CORNER
BALCONY
SCALE @ A1= 1 : 25
1 1 : 25 Plan
ARCHITECTURAL
Drawing Number Revision
A4-057 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 Revisions
2500
1820
TILE SETOUT
1 DP - CLOSED ALLTHROUGH
A4-154
G
HPL W/ 20mm CAVITY ON 13mm GIB
WEATHERLINE ON 45mm TIMBER
BATTEN
Sim
2 RL 85
LEVEL 3 & 4 DETAIL
A4-312
RL 89131 HP
Sim
LEVEL 2 DETAIL
2
Notes
W3A-3/01
A4-528
5029
950
4570
1 1
A4-155 A4-155
3A-3
LEVEL 2 DETAIL LEVEL 3 & 4 DETAIL
RL 90
Sim Sim 4381NJ-4.2
2 2 RL 240 TILES / PAVERS / STONE
A4-527 A4-312
3310 RL 89131 HP
4431
D3A-3/02
RL 89131 HP before proceeding with any work.
F
2 3D View
Client
Consultant Team
Structural Engineer
700
BGT
Civil Engineer
20
E
Babbage Consultants
140
RL 85 Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
DP - CLOSED ALLTHROUGH
Facade Engineer
Symetrix
Project Manager
Greenstone Group
1 SYMPHONY 303
A4-154
303 MANUKAU ROAD,
EPSOM, AUCKLAND
1 1 : 25 Plan
Sheet
ARCHITECTURAL
Drawing Number Revision
A4-058 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
1
4 A4-154 5 Revisions
SUMP
RL 95388
400
RL 95413
1:34
1
4482
4 A4-154 5
1 1 Notes
A4-155 A4-155
98
SEISMIC JOINT COVER
27
1:
1298
2183
HPL SOFFIT
1:22
If there are any discrepancies in the
2
1:19
936
RL 95696
1:22
GUTTER
1:24
345
1 1 Client
E A4-155 A4-155 LCO EPSOM LTD
20
Consultant Team
7250
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Fire Engineer
1 Holmes Fire
SYMPHONY 303
F Sheet
TRESPA SETOUT
ENCLOSURE DETAIL
PLANS - ZONE NE -
1290
INTERNAL CORNER
BALCONY
SCALE @ A1= 1 : 25
ARCHITECTURAL
1600 Drawing Number Revision
TRESPA SETOUT 35
2 1 : 25 Reflected Soffit Plan 3437 500 1888 A4-059 D
INTERNAL CORNER BALCONY - APARTMENT 5825 DO NOT SCALE OFF THIS DRAWING
3A-1 CONTRACTOR MUST VERIFY ALL DIMENSIONS
1
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
RL 97250
TOP OF ROOF
HPL1
2000
-2110 -2110
RL 95250
ROOF LEVEL
BALUSTRADES
INTERSTOREY JOINT
2680
Notes
1950
190
RL 92450
LEVEL 4
600
50
170
2800
2680
1950
190
RL 89050
LEVEL 3
17395
615
65
65
170
105
D2A-2/02 D2B-2/02 D2C-2/02 D2D-2/02 If there are any discrepancies in the
3400
W2B-2/03 W2B-2/02 W2C-2/02 W2C-2/03 W2D-2/03 W2D-2/02 documents please seek clarification
before proceeding with any work.
2490
2785
2680
RL 85650
LEVEL 2
820
Client
Consultant Team
W2C-1/03 W2D-1/03
Structural Engineer
2030
1900
2380
BGT
Civil Engineer
Babbage Consultants
1065
Services Engineer
22 Degrees
330
RL 82450
LEVEL 1 Acoustic Engineer
Marshall Day
GLAZING SILL / HEAD
Facade Engineer
2490
Symetrix
Project Manager
Greenstone Group
Sheet
FACADE ELEVATION -
MANUKAU ROAD
SCALE @ A1= 1 : 50
ARCHITECTURAL
Drawing Number Revision
A4-130 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 8
PARAPET CAP FLASHING Revisions
HPL SOFFIT
2
A4-223
4
A4-312
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL 3
A4-896
CLT FLOOR
W2B-4/03
2A-4
D2A-4/02' 3 4852SP-4.1
1 SPECTRUM SEAMLESS FIN - BALUSTRADE
1100
A4-312
A4-821 SYSTEM
3 Notes
4241DA
A4-344 Nu-Wall Profiled Metal Cladding
1950 4
4241DA
240
A4-896
190
Sim
2 1
1 A4-312 A4-896
A4-898
2
190
Fire Engineer
4621
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
FACADE SECTIONS -
STRIP DRAIN
STRIP DRAIN MANUKAU ROAD
RL 79960 RL 79960
GROUND LEVEL GROUND LEVEL
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
A4-131 D
1 1 : 25 Section 3 1 : 25 Section DO NOT SCALE OFF THIS DRAWING
A1-201 MANUKAU ROAD - SECTION 01 - THROUGH A1-110 MANUKAU ROAD - SECTION 02 - THROUGH CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
VEHICLE ENTRY NARROW SNORKEL COPYRIGHT © JASMAX
8 8
Revisions
4254XF
Trespa Meteon PXF Facade Cladding
HPL SOFFIT
4
A4-312
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
4521
Aluminium Windows & Doors
4381NJ-4.2
TILES / PAVERS / STONE
D2B-4/02'
4241DA
Nu-WALLProfiled
Nu-Wall SS200Metal Cladding
/ MONO200
ALTERNATING W/ 20mm CAVITY ON Sim
13mm GIB WEATHERLINE ON 140mm Sim
3
1100
TIMBER FRAMING 2
A4-312
A4-821 Notes
CLT FLOOR
1950
50
Sim
240
190
RL 92450 RL 92450 2
LEVEL 4 LEVEL 4
A4-312
1
A4-312
4241DA
Nu-Wall Profiled Metal Cladding
2B-3
4852SP-4.1
2B-2 SPECTRUM SEAMLESS FIN - BALUSTRADE
D2B-2/02 Sim Sim SYSTEM
3 2
A4-898 A4-821
240
190
2B-2 documents please seek clarification
RL 85650
LEVEL 2
before proceeding with any work.
4 No building work shall proceed until
A4-311 Building Consent has been granted
for the work described.
RL 85650 4241DA
LEVEL 2 Nu-Wall Profiled Metal Cladding
Sim 3
2 A4-893
A4-323
Client
Consultant Team
4241DA-4.4
NU-WALL SOFFIT Structural Engineer
4521 BGT
Aluminium Windows & Doors
Civil Engineer
Babbage Consultants
4521 1C-1
Aluminium Windows & Doors Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
4421N
Nuraply Membrane Roofing & Decking Fire Engineer
2 Holmes Fire
A4-893 Facade Engineer
Symetrix
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
A4-132 D
1 1 : 25 Section 3 1 : 25 Section DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
A1-201 MANUKAU ROAD - SECTION 03 - THROUGH A1-202 MANUKAU ROAD - SECTION 04 - BALCONIES /
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
4254XF
4 Trespa Meteon PXF Facade Cladding
A4-312
RL 95250 Sim
ROOF LEVEL
RL 95250
ROOF LEVEL 3
? A4-896
?
4381NJ-4.2
TILES / PAVERS / STONE
4421N 4241DA
2C-4 Nuraply Membrane Roofing & Decking Nu-Wall Profiled Metal Cladding
Sim 2C-4
4852SP-4.1
3 Sim SPECTRUM SEAMLESS FIN - BALUSTRADE 2
1100
A4-312 2 SYSTEM
D2C-4/02' A4-351 Notes
A4-821
1950
4241DA
240
1
A4-312
Sim
2
D2C-3/02
A4-312
2C-2
4381NJ-4.2
TILES / PAVERS / STONE
2C-2
Sim RL 85650 1
LEVEL 2
D2C-2/02 2 4421N A4-351
Nuraply Membrane Roofing & Decking
A4-821
4241DA
Nu-Wall Profiled Metal Cladding
NU-WALL SS200 / MONO200 If there are any discrepancies in the
4852SP-4.1 ALTERNATING W/ 20mm CAVITY ON documents please seek clarification
SPECTRUM SEAMLESS FIN - BALUSTRADE Sim
13mm GIB WEATHERLINE ON 90mm before proceeding with any work.
SYSTEMSim TIMBER FRAMING 3
240
Sim
3
A4-342
2
Client
A4-321 3130-4.1
2C-1 LCO EPSOM LTD
4254XF PRECAST CONCRETE PANELS
Trespa Meteon PXF Facade Cladding
Consultant Team
4521
Aluminium Windows & Doors Structural Engineer
BGT
4381NJ-4.2
TILES / PAVERS / STONE Civil Engineer
Babbage Consultants
2C-1 4421N Sim
Nuraply Membrane Roofing & Decking 2 Services Engineer
22 Degrees
A4-893
3 Acoustic Engineer
A4-322 RL 82450 Marshall Day
Sim Sim LEVEL 1
3 2 Fire Engineer
Holmes Fire
D2C-1/02 A4-898 A4-821
1 Facade Engineer
2 3D View A4-311 4 3D View Symetrix
3130-4.1
303 MANUKAU ROAD,
PRECAST CONCRETE PANELS EPSOM, AUCKLAND
Sheet
FACADE SECTIONS -
MANUKAU ROAD
ARCHITECTURAL
Drawing Number Revision
A4-133 D
1 1 : 25 Section 3 1 : 25 Section 5 1 : 25 Section DO NOT SCALE OFF THIS DRAWING
A1-110 MANUKAU ROAD - SECTION 05 - BALCONIES A1-112 MANUKAU ROAD - SECTION 06 - TYPICAL A1-112 MANUKAU ROAD - SECTION 06a - TYPICAL CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
FACADE @ EXISTING STRUCTURE FACADE @ EXISTING STRUCTURE @ COPYRIGHT © JASMAX
WINDOWS
8 Revisions
3
A4-223
1266
4241DA 4241DA-4.3
Nu-Wall Profiled Metal Cladding NU-WALL WEATHERBOARDS - VERTICAL
Nu-WALL SS200 / MONO200 OVER CAVITY
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm
RL 95250 Sim TIMBER FRAMING RL 95250
ROOF LEVEL 3 ROOF LEVEL
A4-896
4241DA-4.3
4521-4.5 NU-WALL WEATHERBOARDS - VERTICAL
ALUMINIUM WINDOWS OVER CAVITY
2800
4254XF-4.2
TRESPA® METEON PANEL
W2C-4/03
Sim
4
RL 92450 Nu-WALL SS200 / MONO200 RL 92450
A4-896
LEVEL 4 ALTERNATING W/ 20mm CAVITY ON LEVEL 4
13mm GIB WEATHERLINE ON 140mm Notes
TIMBER FRAMING
4241DA
Nu-Wall Profiled Metal Cladding
Sim
1
A4-896
W2C-3/03 4521-4.5
ALUMINIUM WINDOWS
Sim
2
A4-821 4421N
Nuraply Membrane Roofing & Decking
W2C-2/03 4421N
Nuraply Membrane Roofing & Decking
4241DA
RL 85650 Nu-Wall Profiled Metal Cladding RL 85650
LEVEL 2 NU-WALL SS200 / MONO200 LEVEL 2
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 90mm
TIMBER FRAMING
W2C-1/03
4521-4.5
Client
ALUMINIUM WINDOWS
LCO EPSOM LTD
Civil Engineer
Babbage Consultants
Services Engineer
3130-4.1 22 Degrees
RL 82450 PRECAST CONCRETE PANELS RL 82450
LEVEL 1 LEVEL 1 Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
6
A4-341 Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
2 3D View 4 3D View
UNDERCROFT PARKING MANUKAU ROAD - SECTION 07 SNORKEL MANUKAU ROAD - SECTION 08 - ACROSS 303 MANUKAU ROAD,
NARROW SNORKEL EPSOM, AUCKLAND
Sheet
FACADE SECTIONS -
MANUKAU ROAD
RL 79960 RL 79960
GROUND LEVEL GROUND LEVEL
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 B
RL 97250 Revisions
TOP OF ROOF
RL 97250 A 100% DEVELOPED 20/12/2021
TOP OF ROOF DESIGN
B FOR INFORMATION 29/07/2022
4311RL
RoofLogic Ultratherm MSR Roofing System C BC3 - BUILDING 29/07/2022
CONSENT ISSUE
D FOR TENDER 24/08/2022
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm
TIMBER FRAMING
RL 95250
ROOF LEVEL
RL 95250
ROOF LEVEL
2
A4-412
3
A4-412
4254XF
Trespa Meteon PXF Facade Cladding
4254XF
Trespa Meteon PXF Facade Cladding
4521
Aluminium Windows & Doors
1B-4
2537
4852SP
1100
Notes
D1B-4/02 Spectrum Aluminium & Glass Balustrades
RL 92450
LEVEL 4
RL 92450
LEVEL 4
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL MONO200 W/ 20mm CAVITY
ON 13mm GIB WEATHERLINE ON 90mm
1 TIMBER FRAMING
Sim
A4-412 3
A4-411
4254XF
Trespa Meteon PXF Facade Cladding
1B-2
4852SP
1100
Fire Engineer
4852SP Holmes Fire
Spectrum Aluminium & Glass Balustrades
1190
D1E-1/02
Facade Engineer
Symetrix
1650
Sheet
?
? FACADE SECTIONS -
COURTYARD
RL 79960 RL 79960
GROUND LEVEL GROUND LEVEL
SCALE @ A1= 1 : 25
ARCHITECTURAL
1 1 : 25 Section 2 1 : 25 Section Drawing Number Revision
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 4 4311RL
RoofLogic Ultratherm MSR Roofing System Revisions
4423RL
GUTTER Rooflogic Ultratherm Xtreme Derbigum System
3
A4-231
RL 95250
ROOF LEVEL
RL 95250
ROOF LEVEL
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm
TIMBER FRAMING
Notes
RL 92450
LEVEL 4
RL 92450
LEVEL 4
3
A4-413
EXISTING STRUCTURE PROPOSED STRUCTURE EXISTING STRUCTURE PROPOSED STRUCTURE If there are any discrepancies in the
documents please seek clarification
RL 85650 before proceeding with any work.
LEVEL 2
RL 85650 No building work shall proceed until
LEVEL 2
2 Building Consent has been granted
A4-413 for the work described.
Client
Consultant Team
Structural Engineer
BGT
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
ARCHITECTURAL
Drawing Number Revision
A4-142 D
2 1 : 25 Section 1 1 : 25 Section
DO NOT SCALE OFF THIS DRAWING
A1-202 COURTYARD - SECTION 03 - STRIP WINDOW A1-113 COURTYARD - SECTION 04 - TYPICAL CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
TO CORRIDOR - WINDOW C2 FACADE ALONG GRID 4 COPYRIGHT © JASMAX
D D
Revisions
4311RL
RoofLogic Ultratherm MSR Roofing System 4311RL
RoofLogic Ultratherm MSR Roofing System A 100% DEVELOPED 20/12/2021
RL 97250 RL 97250 DESIGN
TOP OF ROOF TOP OF ROOF
B FOR INFORMATION 29/07/2022
PROFILED METAL CLADDING W/ 20mm PROFILED METAL CLADDING W/ 20mm C BC3 - BUILDING 29/07/2022
CAVITY ON PLY RAB ON TIMBER CAVITY ON PLY RAB ON TIMBER CONSENT ISSUE
FRAMING - TO INSIDE OF ROOF FRAMING - TO INSIDE OF ROOF D FOR TENDER 24/08/2022
PARAPET WALL PARAPET WALL
2
A4-224
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm
TIMBER FRAMING
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm
TIMBER FRAMING
Notes
RL 92450 RL 92450
LEVEL 4 LEVEL 4
3
A4-414
Client
Consultant Team
Structural Engineer
BGT
4241DA
Nu-Wall Profiled Metal Cladding Civil Engineer
Nu-WALL SS200 / MONO200 Babbage Consultants
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm Services Engineer
22 Degrees
TIMBER FRAMING
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Sheet
FACADE SECTIONS -
CAR PARK ENTRY COURTYARD
RL 79960 ? 2 3D View 4 3D View
GROUND LEVEL ?
COURTYARD - SECTION 05 RL 79960 COURTYARD - SECTION 06
GROUND LEVEL
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
RL 95250
ROOF LEVEL RL 95250
ROOF LEVEL
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm
TIMBER FRAMING
2A-4
Notes
WS.04
1185
RL 92450
LEVEL 4 RL 92450
LEVEL 4
2
A4-415
2A-3
WS.02
4241DA If there are any discrepancies in the
Nu-Wall Profiled Metal Cladding documents please seek clarification
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON before proceeding with any work.
2A-2 13mm GIB WEATHERLINE ON 140mm
RL 85650 No building work shall proceed until
TIMBER FRAMING Building Consent has been granted
LEVEL 2
for the work described.
RL 85650
LEVEL 2
1
Client
A4-415
LCO EPSOM LTD
Consultant Team
Structural Engineer
BGT
Civil Engineer
4241DA-4.4 Babbage Consultants
3130 NU-WALL SOFFIT
Precast Concrete Services Engineer
NU-WALL SS200 / MONO200 22 Degrees
1 ALTERNATING SOFFIT
A4-894 Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
WS.01
Facade Engineer
Symetrix
Project Manager
2 Greenstone Group
A4-894 221039
RL 82450 Project Number:
LEVEL 1
SYMPHONY 303
FACADE SECTIONS -
COURTYARD
RL 79960 2 3D View
GROUND LEVEL
COURTYARD - SECTION 08 - VEHICLE ENTRY
SCALE @ A1= 1 : 25
RL 79960
GROUND LEVEL
ARCHITECTURAL
Drawing Number Revision
A4-144 D
3 1 : 25 Section 1 1 : 25 Section
DO NOT SCALE OFF THIS DRAWING
A1-110 COURTYARD - SECTION 07 - GRID 6 BTW C&D A1-201 COURTYARD - SECTION 08 - VEHICLE ENTRY CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
1 1
Revisions
4421N
Nuraply Membrane Roofing & Decking
2 3.0°
A4-251
3
A4-251
RL 95250
ROOF LEVEL RL 95250
FCL 2685 ROOF LEVEL
4254XF
Trespa Meteon PXF Facade Cladding
HPL SOFFIT
4241DA
4241DA Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200 ALTERNATING W/ 20mm CAVITY ON
ALTERNATING W/ 20mm CAVITY ON 13mm GIB WEATHERLINE ON 140mm
13mm GIB WEATHERLINE ON 140mm TIMBER FRAMING
TIMBER FRAMING
Notes
4852SP
1100
1860
RL 92450
LEVEL 4 1:38 RL 92450
LEVEL 4
3
A4-523
1 3
A4-523 A4-511
1930
Building Consent has been granted
RL 85650 for the work described.
RL 85650
LEVEL 2 LEVEL 2
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL MONO 200 W/ 20mm CAVITY 2
ON 13mm GIB WEATHERLINE ON A4-511
140mm TIMBER FRAMING 3 Sim Client
Structural Engineer
BGT
4254XF
Trespa Meteon PXF Facade Cladding 4241DA Civil Engineer
Nu-Wall Profiled Metal Cladding Babbage Consultants
Nu-WALL SS200 / MONO200
3200
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Symetrix
Spectrum Aluminium & Glass Balustrades
Project Manager
Greenstone Group
1860
1860
Project Number: 221039
SYMPHONY 303
110
RL 82450 RL 82450
LEVEL 1 LEVEL 1
2 3D View 4 3D View 303 MANUKAU ROAD,
1 SECTION 01 - REAR BALCONIES 1 SECTION 02 - TYPICAL REAR FACADE ALONG EPSOM, AUCKLAND
A4-521 2 A4-511 GRID 1
A4-521
Sheet
FACADE SECTIONS -
REAR
4254XF
Trespa Meteon PXF Facade Cladding
SCALE @ A1= 1 : 25
RL 79960 RL 79960
GROUND LEVEL GROUND LEVEL
ARCHITECTURAL
Drawing Number Revision
A4-151 D
1 1 : 25 Section 3 1 : 25 Section DO NOT SCALE OFF THIS DRAWING
A1-201 REAR FACADE - SECTION 01 - REAR A1-201 REAR FACADE - SECTION 02 - TYPICAL CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
BALCONIES FACADE ALONG GRID 1 COPYRIGHT © JASMAX
1 3
Revisions
4423RL
Rooflogic Ultratherm Xtreme Derbigum System
1:60
2
A4-231 GUTTER
RL 95250
RL 95250 ROOF LEVEL
ROOF LEVEL
4521
Aluminium Windows & Doors W3B-4/03
Notes
4852SP
Spectrum Aluminium & Glass Balustrades
1
A4-543
1860
RL 92450
RL 92450 LEVEL 4
LEVEL 4
3
A4-551
W3B-3/03
W3B-2/03
If there are any discrepancies in the
1930
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL SS200 / MONO200
ALTERNATING W/ 20mm CAVITY ON
13mm GIB WEATHERLINE ON 140mm 2
TIMBER FRAMING A4-551
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
4521AC-4.15 W3B-1/03
APL METRO SERIES - AWNING WINDOW Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
1860
Project Manager
Greenstone Group
RL 82450 Project Number: 221039
RL 82450 LEVEL 1
LEVEL 1 SYMPHONY 303
REAR FACADE - SECTION 03 - REAR FACADE REAR SNORKEL- ACROSS FACADE SECTIONS -
THROUGH WINDOWS REAR
ARCHITECTURAL
Drawing Number Revision
A4-152 D
1 1 : 25 Section 3 1 : 25 Section DO NOT SCALE OFF THIS DRAWING
A1-202 REAR FACADE - SECTION 03 - GRID 1 A1-202 FACADE SECTION - REAR - ACROSS NORTH CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
THROUGH WINDOWS SNORKEL COPYRIGHT © JASMAX
F E E
Revisions
4421N
Nuraply Membrane Roofing & Decking
4241DA 3°
Nu-Wall Profiled Metal Cladding
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
4521
Aluminium Windows & Doors
4421N-4.1 3B-4
NURAPLY 3PM TWO LAYER SYSTEM ON
PLYWOOD
STRUCTURAL DECK TILES ON JACKS
Notes
D3B-4/02
RL 92450 RL 92450
LEVEL 4 1:38 LEVEL 4
4241DA
Nu-Wall Profiled Metal Cladding 4
A4-542
4421N
Nuraply Membrane Roofing & Decking
3B-3
D3B-3/02
3B-2
Client
Civil Engineer
Babbage Consultants
Services Engineer
3B-1 22 Degrees
Acoustic Engineer
1100
Marshall Day
Fire Engineer
1860
Holmes Fire
Facade Engineer
Symetrix
RL 82450
LEVEL 1 1:38 Project Manager
D3B-1/02 RL 82450
4241DA Greenstone Group
LEVEL 1
Nu-Wall Profiled Metal Cladding
4241DA Project Number: 221039
Nu-Wall Profiled Metal Cladding
SYMPHONY 303
2
A4-541
4421N 303 MANUKAU ROAD,
Nuraply Membrane Roofing & Decking
EPSOM, AUCKLAND
Sheet
FACADE SECTIONS -
4 3D View 5 3D View REAR
REAR - ALONG GRID E - TYPICAL REAR SNORKEL- ALONG
RL 79960 RL 79960
GROUND LEVEL GROUND LEVEL
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
4421N
Nuraply Membrane Roofing & Decking
4241DA
3°
Nu-Wall Profiled Metal Cladding
Nu-WALL MONO 200 W/ 20mm CAVITY
ON 13mm GIB WEATHERLINE ON
RL 95250 140mm TIMBER FRAMING
ROOF LEVEL
4241DA
Nu-Wall Profiled Metal Cladding
4421N
Nuraply Membrane Roofing & Decking 3A-4
1000
Notes
1890
240
RL 92450
LEVEL 4
4241DA
Nu-Wall Profiled Metal Cladding
Nu-WALL MONO 200 W/ 20mm CAVITY
ON 13mm GIB WEATHERLINE ON
140mm TIMBER FRAMING
3A-2
1000
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
1950
240
RL 85650 Building Consent has been granted
LEVEL 2 for the work described.
2
A4-527
Civil Engineer
4852SP 2282 Babbage Consultants
Spectrum Aluminium & Glass Balustrades
Services Engineer
2552
22 Degrees
4421N
Nuraply Membrane Roofing & Decking Acoustic Engineer
3A-1 Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
1
Project Manager
A4-527 Greenstone Group
SCALE @ A1= 1 : 25
RL 79960
GROUND LEVEL
D0.TFM D0.MSB
ARCHITECTURAL
Drawing Number Revision
1 1 : 25 Section A4-154 D
A1-211 REAR FACADE - SECTION 06 - INTERNAL DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
CORNER BALCONY / TRANSFORMER / MSB
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4 5 Revisions
4421N
Nuraply Membrane Roofing & Decking
3°
4241DA
Nu-Wall Profiled Metal Cladding
RL 95250
ROOF LEVEL
4421N
Nuraply Membrane Roofing & Decking
3A-4
Notes
240
RL 92450
LEVEL 4
Sim
2
A4-312
1000
4852SP
Spectrum Aluminium & Glass Balustrades
3A-2
1950
If there are any discrepancies in the
documents please seek clarification
240
RL 85650 before proceeding with any work.
LEVEL 2
No building work shall proceed until
4241DA Building Consent has been granted
Nu-Wall Profiled Metal Cladding for the work described.
3
2 A4-528
A4-528
Client
Consultant Team
Structural Engineer
BGT
Acoustic Engineer
Marshall Day
Fire Engineer
270
Holmes Fire
RL 82450
LEVEL 1 Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
CAR PARK
TRANSFORMER 2 3D View
Sheet
FACADE SECTIONS -
INTERNAL CORNER BALCONIES /
REAR
TRANSFORMER ROOM
SCALE @ A1= 1 : 25
RL 79960
GROUND LEVEL
ARCHITECTURAL
Drawing Number Revision
1 1 : 25 Section A4-155 D
A4-057 REAR FACADE - GRID 5 - SECTION 07 - DO NOT SCALE OFF THIS DRAWING
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
3 3
A4-226 A4-226
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
NEIGHBOURING BUILDING
RL 87840
3
A4-611
4
A4-611
RL 85650
LEVEL 2 NEIGHBOURING BUILDING
RL 83500 Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
RL 82450
RL 82450 LEVEL 1
22 Degrees
LEVEL 1
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
Sheet
FACADE SECTIONS -
BOUNDARY WALLS
RL 79960
RL 79960 GROUND LEVEL
GROUND LEVEL
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
A4-161 D
1 1 : 25 Section 2 1 : 25 Section
DO NOT SCALE OFF THIS DRAWING
A1-211 FACADE SECTION - NE ZONE - SQUARE TO A1-211 FACADE SECTION - NE ZONE - SQUARE TO CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
GRID G - OFF CROSS SECTION D GRID G - OFF CROSS SECTION C COPYRIGHT © JASMAX
A A Revisions
2
A4-226
4311RL
RoofLogic Ultratherm MSR Roofing System
3
A4-226
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
4241DA
Nu-Wall Profiled Metal Cladding
1M-4 Nu-WALL MONO 200 W/ 20mm CAVITY
ON 13mm GIB WEATHERLINE ON
140mm TIMBER FRAMING Notes
CLT FLOOR
RL 92450 RL 92450
LEVEL 4 LEVEL 4
4 3
A4-612 A4-612
4241DA-4.4
NU-WALL SOFFIT
NU-WALL SS200 / MONO200
ALTERNATING SOFFIT
Client
Civil Engineer
Babbage Consultants
1M-1
1 Services Engineer
22 Degrees
A4-305
Acoustic Engineer
4871
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
1 Symetrix
A4-612
RL 82450 Project Manager
2 3D View
LEVEL 1
4 3D View Greenstone Group
500
RL 82450
LEVEL 1 SYMPHONY 303
Sheet
FACADE SECTIONS -
BOUNDARY WALLS
EXISTING 20 SERIES BLOCK WALL
RL 79960
GROUND LEVEL
Proposed Concrete Footing - ARCHITECTURAL
Refer to Engineers Drawings Drawing Number Revision
A4-162 D
1 1 : 25 Section 3 1 : 25 Section DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
A1-211 GRID A - @ VEHICLE ENTRY A1-211 FACADE SECTION - REAR - GRID A
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 8 Revisions
sim
75x6 EA DROPPER @1200 CRS 2
100
W/ 2x M12 COACH BOLTS 75x75x6mm EA
A4-281
2 THROUGH TIMBER
A4-281
CHAMFERED TIMBER FRAMING
35
4161PC-4.1
4337 PRO CLIMA SOLITEX EXTASANA® ADHERO
6.0°
520
Plywood Roofing & Decking Substrate MEMBRANE - PEEL AND STICK
6°
17mm H3 PLYWOOD
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
ADDITIONAL UNDERLAY LAPPED
STEEL OUTRIGGER OFF RHS RL 96960 OVER FLASHING
240
15
4241DA-4.3 NU-WALL CLADDING BASE CHANNEL
NU-WALL WEATHERBOARDS - VERTICAL
W/ 5mm DRAINAGE HOLES @500CRS.
OVER CAVITY
4254XF
40
Trespa Meteon PXF Facade Cladding
0.9mm BLACK POWDERCOATED
4241DA-4.2 ALUMINIUM FLASHING W/
CAVITY BATTENS SEPERATION LAYER BTW. BATTEN &
FLASHING
90x35 H3.2 TRESPA PXF BATTEN Notes
4254XF
BEAM
250
Trespa Meteon PXF Facade Cladding
4161PC-4.1 4171GR
PRO CLIMA SOLITEX EXTASANA® ADHERO GIB Weatherline Rigid Air Barrier
MEMBRANE - PEEL AND STICK
140X45 SG8 FRAMING FIXED OFF STEEL WITH 90X45
4171GR BLOCKING SPANNING BTW. @ 600 CRS. MAX. FIXED
GIB Weatherline Rigid Air Barrier AT EACH EAND W/ PAIR OF MULTIGRIPS
A1-105 MANUKAU ROAD PARAPET - TYPICAL A1-105 MANUKAU ROAD PARAPET @ BALCONY
Structural Engineer
BGT
Acoustic Engineer
sim Marshall Day
2 4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL Fire Engineer
A4-281 OVER CAVITY
100
Holmes Fire
ROOF DETAILS
RL 96600
SCALE @ A1= 1 : 5
4171GR
GIB Weatherline Rigid Air Barrier
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE - ARCHITECTURAL
H3.2 CCA Drawing Number Revision
8 A4-223 F
3 1:5 Section Detail DO NOT SCALE OFF THIS DRAWING
A1-105 MANUKAU ROAD PARAPET @ SNORKEL CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
5 6 Revisions
4161-4.1
DPC
sim
5° sim
1 SPACER 1
RL 97300 A4-281
A4-281
75
TOP OF ROOF TOP OF ROOF
FLASHING REBATE ENDS 300
FROM PANEL EDGE FOR SHS H10-HUS3 @ 600 CRS.
FIXING - SHS IS MEMBER SHOWN TYPICAL INTO CONCRETE
IN DETAIL BELOW AND IS NOT 3821-4.3
CONTINUOUS ALONG PC PANEL EXTERIOR ROOF FRAMING - RADIATA PINE -
4311RL H3.2 CCA
RoofLogic Ultratherm MSR Roofing System
LINE OF CLADDING TO ENCLOSE 4161-4.1
STEEL ETC. SHOWN DASHED DPC
4337
4241DA Plywood Roofing & Decking Substrate
Nu-Wall Profiled Metal Cladding
A1-105 COURTYARD PARAPET - BTW GRIDS A & D D A4-144 COURTYARD PARAPET - TO PC PANEL
C
L 107
SHS C
L 1100
SLAB EDGE BELOW ON GRID Notes
SHS (FIXED TO FACE OF PC PANEL BEYOND - DETAIL ABOVE)
120 20 20 1200
140 SLAB EDGE BELOW
FRAMING 140 1080
FRAMING 90
RL 97250 RL 97250
TOP OF ROOF TOP OF ROOF
RL 97200 sim RL 97200
1
A4-281 1
A4-281 SHS SHOWN IN
DETAIL ABOVE TO
4311RL-4.2 SHOW RELATIONSHIP ROOF BUILD-UP
ROOFLOGIC ULTRATHERM MSR ROOFING W/ PC PANEL
SYSTEM - RL TOPDECK T
4311RL Rooflogic Ultratherm MSR Roofing System
1. TOP DECK
2. SYNTHETIC UNDERLAY
3. 160mm ROCKWOOL INSULATION
4. VAPOUR BARRIER
CL OF COLUMN ON GRID D BTW. 4 & 5 - 5. LINER DECK If there are any discrepancies in the
@ SEISMIC JOINT - REFER TO 2/A4-701 documents please seek clarification
RL RHOM RAIL WITH VTB before proceeding with any work.
4423RL Rooflogic Ultratherm Xtreme Derbigum System
1. DERBIGUM MEMBRANE No building work shall proceed until
4311RL 2. ROOF BOARD HD Building Consent has been granted
RoofLogic Ultratherm MSR Roofing System 4241DA-4.3 3. 160mm ROCKWOOL INSULATION for the work described.
NU-WALL WEATHERBOARDS - VERTICAL 4. VAPOUR BARRIER
OVER CAVITY 5. 17mm H3 PLYWOOD
4337
Plywood Roofing & Decking Substrate
4241DA 4311RL
4241DA-4.2
Nu-Wall Profiled Metal Cladding RoofLogic Ultratherm MSR Roofing System
CAVITY BATTENS Client
3 LCO EPSOM LTD
A4-281
Civil Engineer
Babbage Consultants
4171GR
GIB Weatherline Rigid Air Barrier Services Engineer
22 Degrees
4311RL 4311RL-4.2
RoofLogic Ultratherm MSR Roofing System ROOFLOGIC ULTRATHERM MSR ROOFING Acoustic Engineer
SYSTEM - RL TOPDECK T Marshall Day
Project Manager
4241DA Nu-Wall Profiled Metal cladding Greenstone Group
100 MIN.
RoofLogic Ultratherm MSR Roofing System
MIN.
35
RL 97250 RL 97250
TOP OF ROOF 200 MIN. TOP OF ROOF
5.0°
NOTCH TO UC
400
UC @ GRID E1 NOTCHED @ TOP TO
ALLOW PARAPET CONSTRUCTION -
REFER TO 2/A4-225
sim
3 UC'S @ GRIDS E1 E2 NOTCHED @ TOP TO
4241DA A4-281 ALLOW PARAPET TO CONTINUE PAST
Nu-Wall Profiled Metal Cladding EQ EQ
Notes
4311RL
RoofLogic Ultratherm MSR Roofing System
ROOF BUILD-UP
4241DA-4.3 4311RL Rooflogic Ultratherm MSR Roofing System
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY 1. TOP DECK
2. SYNTHETIC UNDERLAY
3. 160mm ROCKWOOL INSULATION
M12 @ 600 CRS. TYPICAL M12 @ 600 CRS. TYPICAL 4. VAPOUR BARRIER
TIMBER TO STEEL TIMBER TO STEEL 5. LINER DECK
4171GR
GIB Weatherline Rigid Air Barrier
1 1:5 Section Detail 2 1:5 Section Detail If there are any discrepancies in the
documents please seek clarification
A1-105 REAR FACADE PARAPET - BTW GRIDS A & E A1-105 REAR FACADE PARAPET - BTW GRIDS 1 & 6 before proceeding with any work.
100 MIN.
COVER
LCO EPSOM LTD
RL 97300
Consultant Team
sim RL 97250 Structural Engineer
1 TOP OF ROOF BGT
Services Engineer
22 Degrees
NOTCH TO COLUMN
Acoustic Engineer
Marshall Day
Fire Engineer
600
Holmes Fire
ARCHITECTURAL
Drawing Number Revision
A4-225 F
3 1:5 Section Detail 4 1:5 Section Detail
E DO NOT SCALE OFF THIS DRAWING
A1-105 REAR FACADE PARAPET - ALONG GRID 5 BTW A1-105 ROOF DETAIL - REAR - PARAPET @ SNORKEL CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
GRIDS E & G COPYRIGHT © JASMAX
G A Revisions
C
L
160 A FOR INFORMATION 29/07/2022
335
347 B BC3 - BUILDING 29/07/2022
SHS CL CONSENT ISSUE
180 140 C FOR INFORMATION 05/08/2022
87 140 49
FRAMING D BC3 - AMENDMENTS 05/08/2022
FRAMING
E FOR TENDER 24/08/2022
BOUNDARY
5°
RL 97250 RL 97250
TOP OF ROOF TOP OF ROOF
RL 97200 RL 97200
sim
1
51
sim A4-281
1
120
A4-281
4311RL-4.2
ROOFLOGIC ULTRATHERM MSR ROOFING
SYSTEM - RL TOPDECK T
4311RL-4.2
ROOFLOGIC ULTRATHERM MSR ROOFING
SYSTEM - RL TOPDECK T sim
3
A4-281
120
RL RHOM RAIL WITH VTB
4311RL
sim RoofLogic Ultratherm MSR Roofing System
3
A4-281
4241DA
Nu-Wall Profiled Metal Cladding
Notes
4241DA Nu-WALL SS200 / MONO200
Nu-Wall Profiled Metal Cladding ALTERNATING W/ 20mm CAVITY ON
4311RL 13mm GIB WEATHERLINE ON 140mm
RoofLogic Ultratherm MSR Roofing System TIMBER FRAMING
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
BOUNDARY
If there are any discrepancies in the
documents please seek clarification
MIN 50MM EDGE DISTANCE 5° before proceeding with any work.
FROM TIMBER FRAMING
AND 35MM FROM UB No building work shall proceed until
sim Building Consent has been granted
1 for the work described.
RL 97350
A4-281
RL 97300
78
RL 97250
TOP OF ROOF
Client
NOTCH TO CLOUMN
BGT
Civil Engineer
sim
600
Babbage Consultants
2 Services Engineer
A4-281 22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
4311RL
RoofLogic Ultratherm MSR Roofing System Facade Engineer
Symetrix
Project Manager
4241DA Greenstone Group
EXTERIOR WALL BUILD-UP - TYPICAL ROOF BUILD-UP TIMBER FIXING INFORMATION Nu-Wall Profiled Metal Cladding
Project Number: 221039
• TIMBER TO STEEL - M12 @ 600 CRS. Nu-WALL MONO 200 W/ 20mm CAVITY
4241DA Nu-Wall Profiled Metal cladding 4311RL Rooflogic Ultratherm MSR Roofing System • TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS. ON 13mm GIB WEATHERLINE ON SYMPHONY 303
1. TOP DECK (FIXING INTO CONCRETE TO ALLOW FOR 140mm TIMBER FRAMING
AVOIDING EXISTING REINFORCING) EQ EQ
4241DA-4.3 2. SYNTHETIC UNDERLAY
NU-WALL WEATHERBOARDS - VERTICAL 3. 160mm ROCKWOOL INSULATION • HORIZONTAL TIMBER CONNECTIONS - JOIST 303 MANUKAU ROAD,
OVER CAVITY 4. VAPOUR BARRIER HANGERS EPSOM, AUCKLAND
5. LINER DECK • MULTI GRIPS FOR STUDS AND HANGING
4241DA-4.2 CONNECTIONS 4337
CAVITY BATTENS Plywood Roofing & Decking Substrate Sheet
4423RL Rooflogic Ultratherm Xtreme Derbigum System
4161PC-4.1
1. DERBIGUM MEMBRANE
ROOF DETAILS
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK 2. ROOF BOARD HD
3. 160mm ROCKWOOL INSULATION
4171GR 4. VAPOUR BARRIER
GIB Weatherline Rigid Air Barrier 5. 17mm H3 PLYWOOD
3821-4.2 3821-4.2 SCALE @ A1= 1 : 5
EXTERIOR WALL FRAMING - RADIATA PINE - EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA H3.2 CCA
4711
Thermal Insulation
ARCHITECTURAL
Drawing Number Revision
308
A4-226 E
2 1:5 Section Detail UC @ GRID A1 DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
A1-105 PARAPET REAR BLOCK TO BOUNDARY WALL 177 170
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
6 A
B
FOR INFORMATION
BC3 - BUILDING
29/07/2022
29/07/2022
CONSENT ISSUE
C FOR TENDER 24/08/2022
2220 1314
ALL RL's REFER TO
FINISHED MEMBRANE
GUTTERS & ROOFING
2
A4-230
RL 95692
5°
1:60
113
D
1
A4-233 4311RL
RWH 1:32 RoofLogic Ultratherm MSR Roofing System
SCUPPER
4423RL
Rooflogic Ultratherm Xtreme Derbigum System
3880
3880
6°
5197
1:
49
ROOF ACCESS HATCH
HATCH
C
1040
1:36
03
910
B 5° Notes
RL 95627
5°
1:60
1 840
HATCH LIFT OVERRUN
A4-234
360 480
2
A4-230
1 1 : 50 Plan
Client
405 404 C.04 401
LCO EPSOM LTD
3A-4 2D-4 CORRIDOR 2A-4
115.9 m²(NIA) 78.1 m²(NIA) 86.3 m²(NIA) 61.3 m²(NIA)
Consultant Team
Structural Engineer
BGT
Acoustic Engineer
Marshall Day
1 2 3 4 Fire Engineer
Holmes Fire
Facade Engineer
7575 7350 7575 Symetrix
RL 95250
ROOF LEVEL
408 C.04
3B-4 CORRIDOR
105.0 m²(NIA) 86.3 m²(NIA)
ARCHITECTURAL
Drawing Number Revision
3 1 : 50 Section
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
ROOF BUILD-UP
C B Revisions
1430 4311RL Rooflogic Ultratherm MSR Roofing System A 100% DEVELOPED 20/12/2021
DESIGN
1. TOP DECK
2. SYNTHETIC UNDERLAY B FOR INFORMATION 29/07/2022
3. 160mm ROCKWOOL INSULATION C BC3 - BUILDING 29/07/2022
300 140 990 260 140 4. VAPOUR BARRIER CONSENT ISSUE
5. LINER DECK D FOR INFORMATION 05/08/2022
1064 E BC3 - AMENDMENTS 05/08/2022
FINISHED GUTTER 4423RL Rooflogic Ultratherm Xtreme Derbigum System F FOR TENDER 24/08/2022
1. DERBIGUM MEMBRANE
2. ROOF BOARD HD
5° 300 MIN. 300 MIN. 5° 3. 160mm ROCKWOOL INSULATION
50
50 MEMBRANE 4. VAPOUR BARRIER
O/H O/H 5. 17mm H3 PLYWOOD
RL 96258
RL 96218
4311RL
RoofLogic Ultratherm MSR Roofing System
120
RL 96100 HP
RL 95900 LP
4423RL
Rooflogic Ultratherm Xtreme Derbigum System
3821-4.3
EXTERIOR ROOF FRAMING - RADIATA PINE -
H3.2 CCA
INSTALLED TO FALL Notes
RTAL
RAFTER / PO
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
4241DA-4.2
CAVITY BATTENS
RL 95250 4161PC-4.1
ROOF LEVEL PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK
7412AR-4.6
ALLPROOF SCUPPERS
4521-4.11
7412AR-4.6 STRUCTURAL SEALANT
ALLPROOF SCUPPERS CONTINUOUS AROUND SCUPPER
RWH FIXING TO WALL EITHER SIDE
Client
OF OPENING - REMAIN CLEAR OF COMPRESSABLE FOAM CLOSURE
SADDLE FLASHING - PACKER ETC. TO NOTCH TO ROOF BOARD HD STRIP LCO EPSOM LTD
TOP FIXING NOT SHOWN FOR TO RECESS SCUPPER TO TOP & SIDES OF SADDLE FLASHING
CLARITY - REFER BELOW Consultant Team
SEALING TAPE DRESSED AROUND SCUPPER
Structural Engineer
4423RL RL 95990 4311RL-4.3 BGT
RL 95990 Rooflogic Ultratherm Xtreme Derbigum System FLASHINGS - GENERALLY
SADDLE FLASHING Civil Engineer
100 4337 Babbage Consultants
100
OPENING
151
155
22 Degrees
4521-4.11
STRUCTURAL SEALANT Acoustic Engineer
BTW. SADDLE FLASHING & SCUPPER - Marshall Day
ADDITIONAL FRAMING TO STEP TO TOP & SIDES ONLY
MIN. MIN.
Fire Engineer
35
OVER STRUCTURE
50 Holmes Fire
5
DETAIL FOR RHW DETAILS
REFER TO ADJACENT Symetrix
DETAIL FOR SADDLE
FLASHING DETAILS RL 95712 RL 95710 Project Manager
Greenstone Group
SCALE @ A1= 1 : 5
4241DA
Nu-Wall Profiled Metal Cladding
ELEVATION PLAN
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
ARCHITECTURAL
Drawing Number Revision
2 1:5 Section Detail 3 1:5 Section Detail
A1-105 GUTTER OUTLET TO RWH - RWH DETAIL A1-105 GUTTER OUTLET TO RHW - SCUPPER A4-231 F
OUTLET DETAIL DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
6 TIMBER FIXING INFORMATION ROOF BUILD-UP Revisions
• TIMBER TO STEEL - M12 @ 600 CRS.
2895 4311RL Rooflogic Ultratherm MSR Roofing System A FOR INFORMATION 29/07/2022
• TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS.
TO PORTAL JUNCTION (FIXING INTO CONCRETE TO ALLOW FOR B BC3 - BUILDING 29/07/2022
1. TOP DECK
AVOIDING EXISTING REINFORCING) 2. SYNTHETIC UNDERLAY CONSENT ISSUE
• HORIZONTAL TIMBER CONNECTIONS - JOIST 3. 160mm ROCKWOOL INSULATION C FOR INFORMATION 05/08/2022
2065 1585
HANGERS 4. VAPOUR BARRIER D BC3 - AMENDMENTS 05/08/2022
GUTTER PFC FACES • MULTI GRIPS FOR STUDS AND HANGING 5. LINER DECK E FOR INFORMATION 09/08/2022
CONNECTIONS
F BC3 AMENDMENTS 09/08/2022
4423RL Rooflogic Ultratherm Xtreme Derbigum System G FOR TENDER 24/08/2022
2000 140 1465 140
FRAMING FRAMING 1. DERBIGUM MEMBRANE
2. ROOF BOARD HD
1279 3. 160mm ROCKWOOL INSULATION
FINISHED GUTTER 4. VAPOUR BARRIER
5. 17mm H3 PLYWOOD
4423RL
Rooflogic Ultratherm Xtreme Derbigum System
4311RL
RoofLogic Ultratherm MSR Roofing System
300 MIN. 300 MIN.
5° MEMBRANE 50 50 MEMBRAN
E 6°
O/H O/H
RL 95907 RL 95913
ROOF UNDERLAY
RL 95867 RL 95874
FILLET
GUTTER WALL - MEMBRANE ON
125
ROOFBOARD HD 60mm ROCKWOOL
118
ON VAPOUR BARRIER ON 17mm H3
RL 95749 HP GUTTER PLYWOOD
VAPOUR BARRIER
30
30
RTAL
RAFTER /
RL 95620 RL 95620
RL 95574 LP GUTTER
RAFTER / PO
PORTAL
Notes
3821-4.3
EXTERIOR ROOF FRAMING - RADIATA PINE -
H3.2 CCA
INSTALLED TO FALL
4337
EQ EQ EQ Plywood Roofing & Decking Substrate
4311RL-4.2
ROOFLOGIC ULTRATHERM MSR ROOFING A
G SYSTEM - RL TOPDECK T
4311RL
4311RL RoofLogic Ultratherm MSR Roofing System
RoofLogic Ultratherm MSR Roofing System Client
RL ALPHA BARRIER
RL ALPHA BARRIER LCO EPSOM LTD
OVERLAP TO CLADDING
OVERLAP TO CLADDING
- TO OVERLAP MEMBRANE
4711
Thermal Insulation Consultant Team
MEMBRANE
MEMBRANE
200 MIN.
200 MIN.
15
12mm H3 PLYWOOD Services Engineer
CAVITY CLOSURE STRIP 22 Degrees
RL 95907 CAVITY CLOSURE STRIP
15
35
Acoustic Engineer
50
Marshall Day
RL 95870 Fire Engineer
4337
172
NOTE TYPICAL PARALLEL APRON FLASHING EITHER Holmes Fire
Plywood Roofing & Decking Substrate
4241DA
1. 12mm PLY OF CLADDING BUILD-UP TO PC PANEL SIDE OF GUTTER - CLADDING BASE LINE CAN BE Facade Engineer
95
Nu-Wall Profiled Metal Cladding
2. 17mm PLY OF GUTTER & SUMP BUILD-UP - TO OVERLAP HORIZONTAL ACROSS GUTTER Symetrix
1. 2. 1:60
50
12mm RAB - STOP BEFORE CLADDING VAPOUR BARRIER OVERLAP MIN.
420 APPROX.
Project Manager
7412AR-4.1 Greenstone Group
4161PC-4.1 ALLPROOF BRONZE ROOF DRAINS - SMALL
DIAMETER FLANGE, DOMED GRATE Project Number: 221039
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK FILLET
SYMPHONY 303
4423RL VAPOUR BARRIER
Rooflogic Ultratherm Xtreme Derbigum System
3821-4.2 FILLET 303 MANUKAU ROAD,
EXTERIOR WALL FRAMING - RADIATA PINE - RL 95600 4241DA-4.2 EPSOM, AUCKLAND
H3.2 CCA 1:60 CAVITY BATTENS
TO GUTTER SIDES
3821-4.3
53
H3.2 CCA
4171GR ROOF DETAILS -
PFC
SCALE @ A1= 1 : 5
4711
Thermal Insulation
VAPOUR BARRIER 4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
3821-4.3 MEMBRANE - PEEL AND STICK
EXTERIOR ROOF FRAMING - RADIATA PINE -
H3.2 CCA
RL 95250 4171GR RL 95250
RL 95240
ROOF LEVEL GIB Weatherline Rigid Air Barrier ROOF LEVEL
ARCHITECTURAL
RL 95190 Drawing Number Revision
MEMBRANE
OVERLAP
12mm H3 PLYWOOD 4423RL Rooflogic Ultratherm Xtreme Derbigum System
200 MIN.
ADDITIONAL SUPPORT TO RAB FOR 1. DERBIGUM MEMBRANE
MEMBRANE APPLICATION 1824 250 2. ROOF BOARD HD
PC PANEL 3. 160mm ROCKWOOL INSULATION
4. VAPOUR BARRIER
RL 96010 5. 17mm H3 PLYWOOD
RL 95985
6°
15
VERLAP
300 MIN. O
7412AR-4.6 50 MEMBRAN
E
CAVITY CLOSURE STRIP
ALLPROOF SCUPPERS O/H
3130-4.7
SEALANTS 4311RL
4423RL RoofLogic Ultratherm MSR Roofing System
Rooflogic Ultratherm Xtreme Derbigum System
560
ACROSS TOP OF PC PANEL
4161-4.1 3821-4.2
DPC 4161-4.1 EXTERIOR WALL FRAMING - RADIATA PINE -
DPC H3.2 CCA
7412AR-4.7 MEMBRANE DRESSED INTO SCUPPER
RAINWATER HEADS FILLET
50 MIN.
RL 95250
ROOF LEVEL
OVERFLOW
FCL 2507
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
100 MIN.
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Facade Engineer
Symetrix
Project Manager
Greenstone Group
3130
Precast Concrete Project Number: 221039
DHS PURLIN - REFER TO
STRUCTURAL ENGINEER SYMPHONY 303
Sheet
ROOF DETAILS -
4337 GUTTER - FRONT
Plywood Roofing & Decking Substrate
BLOCK
VAPOUR BARRIER
SCALE @ A1= 1 : 5
3821-4.12
TIMBER NOGGING TYPE 1
RL 95250
ROOF LEVEL
4161-4.1
ARCHITECTURAL
Drawing Number Revision
DPC
35 MIN.
15°
RL 95870 CHAMFERED TIMBER FRAMING
OPENING TO ROOF
4423RL
520
1:36
4711-4.2
C
1040
THERMAL BLANKET
2 4337
520
FILLET
CRICKET DIVERTER
4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON
3130 PLYWOOD
Precast Concrete
50
03
B VAPOUR BARRIER
5°
3821
Timber Framing
90x45 TIMBER FRAMING SPANS ACROSS
4311RL
OPENING - SUPPORTS ACCESS HATCH &
RoofLogic Ultratherm MSR Roofing System
UPSTAND WALLS Notes
90 1108 90
3821-4.12
TIMBER NOGGING TYPE 1
RL 95250
ROOF LEVEL
1 1 : 25 Plan
500
A4-230 ROOF ACCESS HATCH 4337
Plywood Roofing & Decking Substrate
15° Client
Consultant Team
4421N-4.1
150 MIN.
NURAPLY 3PM TWO LAYER SYSTEM ON Structural Engineer
BGT
PLYWOOD
Civil Engineer
Babbage Consultants
1016 4337
Plywood Roofing & Decking Substrate Services Engineer
15° TIMBER FRAMING & PLY FORMED CRICKET DIVERTER
22 Degrees
Acoustic Engineer
Marshall Day
FILLET
Fire Engineer
Holmes Fire
ROOF BOARD HD
Facade Engineer
Symetrix
50
VAPOUR BARRIER
Project Manager
Greenstone Group
180
SUPPORTS ACCESS HATCH & UPSTAND WALLS
EPSOM, AUCKLAND
3821-4.12
TIMBER NOGGING TYPE 1
Sheet
ARCHITECTURAL
4852SP Drawing Number Revision
Spectrum Aluminium & Glass Balustrades INSULATED ROOF ACCESS HATCH W/
FOLD DOWN LADDER TO CEILING
3 1:5 Section Detail SPACE A4-234 C
A4-234 ROOF DETAIL - ROOF ACCESS HATCH - 300 870
DO NOT SCALE OFF THIS DRAWING
ALONG 1170
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
CEILING HATCH COPYRIGHT © JASMAX
SK-831
6 6 Revisions
RL 95250 RL 95250
ROOF LEVEL ROOF LEVEL
3
A4-241
LIFT LIFT LOBBY STAIR LIFT 2A-4
A1-105 LIFT OVERRUN ROOF A1-201 LIFT OVERRUN LONG SECTION A1-211 LIFT OVERRUN CROSS SECTION
4337
Plywood Roofing & Decking Substrate
4311RL 4311RL-4.3
2 CRESTS MIN. FLASHINGS - GENERALLY
RoofLogic Ultratherm MSR Roofing System
FLASHING
300 MIN. RL C CHANNEL
ROOF BUILD-UP
5° 50
RL C CHANNEL TURN UP TO TOP OF WALL CLADDING 4311RL Rooflogic Ultratherm MSR Roofing System
O/H
1. TOP DECK
4311RL-4.3 2. SYNTHETIC UNDERLAY
FLASHINGS - GENERALLY
MIN.
100
3. 160mm ROCKWOOL INSULATION
4. VAPOUR BARRIER
5. LINER DECK
MIN.
100
3130
Precast Concrete Client
A4-241 LIFT OVERRUN - EAVE A4-241 LIFT OVERRUN - BARGE Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
ARCHITECTURAL
Drawing Number Revision
A4-241 D
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
A Revisions
MIN.
ROWS OF SEALANT BTW. SADDLE FLASHING &
70
70
5° PARAPET CAP FLASHING 5° STEEL FLAT CLEAT OFF STUB
SPACER
FILLET
90
90
90
180
RL 95770 T.O.S
180
RL 95770 T.O.S
4421N-4.1
75x75x6mm EA NURAPLY 3PM TWO LAYER SYSTEM ON FILLET
70
70
PLYWOOD
4241DA-4.2
CAVITY BATTENS 75x6 EA DROPPER @1200 CRS M12 @ 1200CRS
STEEL STUB OFF SHS - REFER STEEL STUB OFF SHS - REFER TO
TO STRUCTURAL ENGINEER STRUCTURAL ENGINEER
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL 4337
Plywood Roofing & Decking Substrate
OVER CAVITY
4254XF-4.2
TRESPA® METEON PANEL
TIMBER FIXING INFORMATION 1 1:5 Section Detail
• TIMBER TO STEEL - M12 @ 600 CRS. A1-105 BALCONY ROOF PARAPET TO WALL
4 1:5 Section Detail • TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS.
(FIXING INTO CONCRETE TO ALLOW FOR
A1-105 BALCONY ROOF RETURN PARAPET AVOIDING EXISTING REINFORCING)
• HORIZONTAL TIMBER CONNECTIONS - JOIST
HANGERS
• MULTI GRIPS FOR STUDS AND HANGING
CONNECTIONS
1
225
CL RAFTER If there are any discrepancies in the
documents please seek clarification
4241DA before proceeding with any work.
Nu-Wall Profiled Metal Cladding
4161PC-4.1 No building work shall proceed until
PRO CLIMA SOLITEX EXTASANA® ADHERO Building Consent has been granted
MEMBRANE - PEEL AND STICK for the work described.
4241DA
Nu-Wall Profiled Metal Cladding Flashing Tape
3821-4.2
2mm PARAPET CAP FLASHING EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
240
MEMBRANE
3821-4.3
100 MIN.
EXTERIOR ROOF FRAMING - RADIATA PINE - SPACER
H3.2 CCA
5° Client
15
Civil Engineer
NU-WALL CLADDING BASE CHANNEL
70
70
Babbage Consultants
3° W/ 5mm DRAINAGE HOLES @500CRS.
RL 95680
600
RL 95585 LP Services Engineer
CAVITY CLOSURE STRIP 22 Degrees
50
RL 95535 HP
660
130
PFC LOCATION 80mm FURTHER 140x45 RAFTER - REFER TO STRUCTURAL ENGINEER Greenstone Group
OUT FROM BUILDING TO REAR 221039
RL 95405 LP GUTTER Project Number:
BALCONY @ GRID A1 ONLY
M12 @ 1200CRS
FILLET RL 95388 SYMPHONY 303
ADDITIONAL UNDERLAY LAPPED RL 95365
OVER FLASHING 4421N-4.5
303 MANUKAU ROAD,
40
ROOF SUMPS CLOSED CELL FOAM TAPE
PROPRIETARY NURALITE SUMP W/ EPSOM, AUCKLAND
OVERFLOW NU-WALL CLIPS - 138 & 139
A1-105 ROOF DETAIL - REAR - SW - GRID 1 - A4-151 ROOF DETAIL - REAR - SW - GRID 1 - A4-251 F
BALCONY ROOF PARAPET BALCONY ROOF GUTTER DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
ROOF BUILD-UP 4 Revisions
C
L C
L
75 263 A 100% DEVELOPED 20/12/2021
4311RL Rooflogic Ultratherm MSR Roofing System SHS SHS DESIGN
1. TOP DECK B FOR INFORMATION 29/07/2022
2. SYNTHETIC UNDERLAY 90 140 200 140 90
4824CS-4.4 C BC3 - BUILDING 29/07/2022
3. 160mm ROCKWOOL INSULATION 427 CS GROUP ROOF COVERS CONSENT ISSUE
4. VAPOUR BARRIER M12 @ 1200CRS
5. LINER DECK D FOR INFORMATION 05/08/2022
75x6 EA DROPPER @1200 CRS E BC3 - AMENDMENTS 05/08/2022
4423RL Rooflogic Ultratherm Xtreme Derbigum System F FOR TENDER 24/08/2022
RL 97590
25mm DRAINAGE TUBE - REFER TO HYDRAULIC ENGINEER
1. DERBIGUM MEMBRANE
2. ROOF BOARD HD 4311RL-4.3
3. 160mm ROCKWOOL INSULATION FLASHINGS - GENERALLY
4. VAPOUR BARRIER RL 97582
5. 17mm H3 PLYWOOD RL 97582
5° 5°
3821-4.3
EXTERIOR ROOF FRAMING - RADIATA PINE -
H3.2 CCA
100
RL 97457 TURN UP TO WALL CLADDING
TOP OF PARAPET BEYOND 4311RL-4.4
CLOSURE STRIPS
RL RHOM RAIL WITH VTB
PARAPET CAP
SADDLE FLASHING @ PARAPET BEYOND ON GRID E
sim TOP OF PARAPET BEYOND RL 97357
3 RL ALPHA BARRIER
A4-281 RL 97300 4337
PARAPET CAP
Plywood Roofing & Decking Substrate
RL 97250
TOP OF ROOF sim
FLASHING BASE TO ALIGN W/ PARAPET RL 97200 2
FLASHING BASE BEYOND - BOTH SIDES A4-281
4311RL Notes
RoofLogic Ultratherm MSR Roofing System
5.
WIRE NETTING OR SIMILAR VAPOUR BARRIER
TO HOLD INSULATION IN
PLACE
227 200
Client
CL RAFTER SEISMIC GAP
LCO EPSOM LTD
1 1:5 Section Detail
Civil Engineer
25mm DRAINAGE TUBE - REFER TO HYDRAULIC ENGINEER Babbage Consultants
M12 @ 1200CRS
OVER FLASHING ONLY AT END OF WALL AT PARAPET BEYOND Services Engineer
22 Degrees
H3.2 CCA
• TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS. RL 95870 TOP OF PARAPET BEYOND Holmes Fire
(FIXING INTO CONCRETE TO ALLOW FOR 4337
AVOIDING EXISTING REINFORCING) Facade Engineer
Plywood Roofing & Decking Substrate Symetrix
• HORIZONTAL TIMBER CONNECTIONS - JOIST
HANGERS SADDLE FLASHING TO PARAPET BEYOND
Project Manager
• MULTI GRIPS FOR STUDS AND HANGING Greenstone Group
CONNECTIONS 75x75x6mm EA FILLET Project Number: 221039
4337 Sheet
620
190
RL 95250
ROOF LEVEL 140 200 140
ARCHITECTURAL
Drawing Number Revision
124
SHS
301
SHS
A4-271 F
2 1:5 Section Detail C
L C
L
DO NOT SCALE OFF THIS DRAWING
A1-105 ROOF DETAIL - SEISMIC - REAR BALCONY 4 CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
ROOF ALONG GRID 4 COPYRIGHT © JASMAX
PARAPET CAP FLASHING - OVERALL
Revisions
400
A FOR INFORMATION 29/07/2022
288 TIMBER FIXING INFORMATION B BC3 - BUILDING 29/07/2022
FRAMING CONSENT ISSUE
230 0 • TIMBER TO STEEL - M12 @ 600 CRS.
• TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS. C FOR INFORMATION 05/08/2022
(FIXING INTO CONCRETE TO ALLOW FOR D BC3 - AMENDMENTS 05/08/2022
AVOIDING EXISTING REINFORCING)
4311RL-4.3 E FOR TENDER 24/08/2022
• HORIZONTAL TIMBER CONNECTIONS - JOIST
FLASHINGS - GENERALLY HANGERS
IDEAL SITUATION - SLAB EDGE 50mm FROM CL OF SHS 2mm POWDERCOATED ALUMINIUM • MULTI GRIPS FOR STUDS AND HANGING
PARAPET CAP FLASHING CONNECTIONS
NU-WALL CAVITY BATTEN
50 NU-WALL FACADE WALL UNDERLEY TO CONTINUE OVER - NOTE ROOF UNDERLAY TO CONTINUE OVER PARAPET IN
PARAPET & LAP OVER PARAPET WALL UNDERLAY PLACE OF RL ALPHA BARRIER @ SHORT PARAPETS WHERE
UNEQUAL ALUMINIUM ANGLE THERE IS NO PROFILED METAL CLADDING TO BACK OF
FIXING BRACKET 4337 PARAPET
Plywood Roofing & Decking Substrate
5° 17mm H3 PLYWOOD
65x65 EA
TO PROVIDE SUPPORT TO INSIDE EDGE OF PARAPET
IN TYPICAL SITUATION - OMITTED @ SHORT PARAPET
WHEN CLADDING TO INSIDE WALL IS OMITTED
120
TURN UP TO TOP OF PARAPET WALL CLADDING
COVER
50
160
SS200 STANDING SEAM NOTCHED @ TOP TO
ACCOMODATE PARAPET CAP FLASHING FIXING ENSURE FIXING INTO CENTRE OF TOP TIMBER MEMBER
OVERLAP
100 MIN.
RL VARIES
- REFER TO SPECIFIC DETAIL FOR RL
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
4161PC-4.1 H3.2 CCA
PRO CLIMA SOLITEX EXTASANA® ADHERO 4337
MEMBRANE - PEEL AND STICK Plywood Roofing & Decking Substrate
12mm H3 PLYWOOD
RAB
4171GR 4311RL
GIB Weatherline Rigid Air Barrier RoofLogic Ultratherm MSR Roofing System
RL ALPHA BARRIER
4311RL-4.2
ROOFLOGIC ULTRATHERM MSR ROOFING
SYSTEM - RL TOPDECK T
25 11 20 13 140 90 12 28 40
4311RL
RoofLogic Ultratherm MSR Roofing System
RL RHOM RAIL WITH VTB
Client
4311RL-4.2 RL ALPHA BARRIER
ROOFLOGIC ULTRATHERM MSR ROOFING LCO EPSOM LTD
TO OVERLAP FLASHING
SYSTEM - RL TOPDECK T
Consultant Team
RL RHOM RAIL WITH VTB
Structural Engineer
BGT
3821-4.2
RL ALPHA BARRIER Civil Engineer
FLASHING UPSTAND
EXTERIOR WALL FRAMING - RADIATA PINE -
Babbage Consultants
H3.2 CCA
3821-4.2 ADDITIONAL FRAMING TO SUPPORT FLASHING UPSTAND Services Engineer
100 MIN.
EXTERIOR WALL FRAMING - RADIATA PINE - 22 Degrees
FLASHING UPSTAND
DRIPEDGE
Fire Engineer
Holmes Fire
15
Facade Engineer
4311RL-4.3 4311RL Symetrix
35 MIN.
DRIPEDGE
GAP
FLASHINGS - GENERALLY
COVER TO R Project Manager
1.6mm POWDERCOATED ALUMINIUM OOFING
15
SYMPHONY 303
35
2 CRESTS MIN.
50
4311RL-4.4
CLOSURE STRIPS
303 MANUKAU ROAD,
4311RL-4.2 4311RL-4.2
EPSOM, AUCKLAND
50 MIN.
5
SYSTEM - RL TOPDECK T SYSTEM - RL TOPDECK T
5
Sheet
ROOF DETAILS -
ROOF UNDERLAY
TYPICAL
ROOF UNDERLAY CONTINUE UP RAB 200mm MIN.
VAPOUR BARRIER
ARCHITECTURAL
3 1:2 Section Detail 2 1:2 Section Detail Drawing Number Revision
A4-224 PARALLEL APRON FLASHING - TYPICAL A4-223 TRANSVERSE APRON FLASHING - TYPICAL A4-281 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
SIDE CURB FLASHING
200 MIN. PROVIDE SEPARATION LAYER Revisions
BTW. ALL ALUMINIUM
LAP UNDER CRICKET FLASHING
FLASHINGS & METAL ROOFING A FOR INFORMATION 29/07/2022
ROOF BUILD-UP B BC3 - BUILDING 29/07/2022
4311RL REFER TO MECHANICAL ENGINEER CONSENT ISSUE
5°
MIN.
RoofLogic Ultratherm MSR Roofing System 4311RL Rooflogic Ultratherm MSR Roofing System
200
C FOR TENDER 24/08/2022
1. TOP DECK COMPRESSABLE FOAM CLOSURE
APRON
APRON
2. SYNTHETIC UNDERLAY STRIP
SIDE CURB
3. 160mm ROCKWOOL INSULATION
SIDE CURB - LAPPED OVER APRON 4. VAPOUR BARRIER
4161-4.5
3 5. LINER DECK WINDOW/DOOR SEALING SYSTEM
A4-282 FLASHING TAPE
4423RL Rooflogic Ultratherm Xtreme Derbigum System
CRICKET 1. DERBIGUM MEMBRANE
CRICKET - LAPPED OVER SIDE CURB
2. ROOF BOARD HD
250 200
3. 160mm ROCKWOOL INSULATION
MIN.
4. VAPOUR BARRIER
35
SEALANT
5. 17mm H3 PLYWOOD
15°
4311RL-4.3
FLASHINGS - GENERALLY
FLASHING
BACK
MIN.
100
BACK FLASHING - LAPPED OVER CRICKET
SEALANT
4311RL-4.3
FLASHINGS - GENERALLY
200
4311RL-4.2
2 ROOFLOGIC ULTRATHERM MSR ROOFING
A4-282 SYSTEM - RL TOPDECK T
1 1 : 25 Plan
4711-4.2
A1-105 REFERENCE PLAN - TYPICAL DUCT THERMAL BLANKET
PENETRATION - CRICKET FLASHING WITH
BACK OVER FLASHING TO PARAPET Notes
3821-4.3
EXTERIOR ROOF FRAMING - RADIATA PINE -
H3.2 CCA
MIN.
Structural Engineer
35
SEALANT
BGT
15°
4311RL-4.3
2mm ALUMINIUM BACK FLASHING - TO FLASHINGS - GENERALLY Civil Engineer
CONTINUE UP ROOF & LAP 200 MIN. Babbage Consultants
UNDER APRON FLASHING @ PARAPET
100
Services Engineer
22 Degrees
SEALANT
250 MIN. Acoustic Engineer
MIN.
200 MIN. 6 MIN. 4311RL-4.3
35
OVERLAP Marshall Day
FLASHINGS - GENERALLY
15° OPENING DIMENSION APRON FLASHING Fire Engineer
Holmes Fire
REFER TO MECHANICAL ENG. 4711-4.2
THERMAL BLANKET Facade Engineer
MIN.
150
200 MIN. Symetrix
50
5° SYSTEM - RL TOPDECK T SYMPHONY 303
ROOF UNDERLAY
DRESSED UP PLYWOOD UPSTAND WALLS 303 MANUKAU ROAD,
EPSOM, AUCKLAND
4311RL-4.4
CLOSURE STRIPS Sheet
A4-282 C
2 1:5 Section Detail
DO NOT SCALE OFF THIS DRAWING
A4-282 TYPICAL - DUCT PENETRATION - LONG CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
SECTION COPYRIGHT © JASMAX
3
6 A4-283 REFER MECHANICAL ENGINEER Revisions
MIN.
2. ROOF BOARD HD
35
3. 160mm ROCKWOOL INSULATION SEALANT
15°
4. VAPOUR BARRIER
5. 17mm H3 PLYWOOD
4311RL
RoofLogic Ultratherm MSR Roofing System
MIN.
100
ROOF UNDERLAY
SEALANT
90 OPENING DIMENSION
REFER TO MECAHNICAL ENG. DRAWINGS
6 4311RL-4.3
MIN. GAP FLASHINGS - GENERALLY
SIDE CURB FLASHING
4337
2 CRESTS MIN. Plywood Roofing & Decking Substrate
17mm H3 PLYWOOD
1 1 : 25 Plan
4311RL-4.2
A1-105 REFERENCE PLAN - DUCT PENETRATION ROOFLOGIC ULTRATHERM MSR ROOFING
SYSTEM - RL TOPDECK T
NEAR GRID D6 - CRICKET FLASHING WITH
UNDER-SOAKER 4711-4.2
THERMAL BLANKET
3821-4.3
5° EXTERIOR ROOF FRAMING - RADIATA PINE -
H3.2 CCA
CPC80 SCREWED INTO DHS PURLINS -
TYPICAL
30
0
DHS PURLIN - REFER TO
STRUCTURAL ENGINEER
0
1:6
MIN.
Consultant Team
35
• HORIZONTAL TIMBER CONNECTIONS - JOIST
HANGERS Structural Engineer
BGT
• MULTI GRIPS FOR STUDS AND HANGING
CONNECTIONS Civil Engineer
Babbage Consultants
MIN.
100
Services Engineer
22 Degrees
MIN.
6 MIN. Acoustic Engineer
35
300 MIN.
Marshall Day
OVERLAP 200 MIN.
Fire Engineer
15° MIN.
Holmes Fire
150
Facade Engineer
Symetrix
200
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
ROOF DETAILS -
TYPICAL
ARCHITECTURAL
Drawing Number Revision
A4-283 E
2 1:5 Section Detail DO NOT SCALE OFF THIS DRAWING
A4-283 ROOF DETAIL - PENETRATION NEAR GRID D6 CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
- ALONG COPYRIGHT © JASMAX
Revisions
365
CONSENT ISSUE
4311RL Rooflogic Ultratherm MSR Roofing System C FOR TENDER 24/08/2022
1. TOP DECK
2. SYNTHETIC UNDERLAY
350
3. 160mm ROCKWOOL INSULATION
4. VAPOUR BARRIER
200
5. LINER DECK
300
4423RL Rooflogic Ultratherm Xtreme Derbigum System
5°
1. DERBIGUM MEMBRANE
2. ROOF BOARD HD
3. 160mm ROCKWOOL INSULATION
3 4. VAPOUR BARRIER
A4-284 5. 17mm H3 PLYWOOD
1 1 : 25 Plan
4311RL-4.3
VENT PIPE - REFER TO MECHANICAL ENFGINEER FLASHINGS - GENERALLY
2mm COATED TO FINISH ALUMINIUM APRON
FLASHING DRESS OVER METAL ROOFING 300mm MIN.
SIDE CURB APRON FLASHING SITS MECHANICAL FIXING AS PER MANUF REQUIREMENT
5° OVER PROFILED ROOFING RIBS. 300 MIN. AND AS PER ROOFING CODE OF PRACTICE
LAP UNDER 200 MIN.
ENSURE FLASHING TURNS DOWN AND ROOFING 4337
FOLDS OVER FULL WIDTH OF ROOFING FLAT BTW. R
OOFING Plywood Roofing & Decking Substrate
TRAY. TURN ALONG EDGE TO CONFORM 300 MIN. Notes
BTW. CRESTS OF ROOFING TO SUPPORT FLASHING
WITH PROFILED ROOFING RIBS. SIT
50
30
0M OVER LOWER ROOFING TRAY. LAP TO U/S 4311RL-4.4
IN
. UPPER ROOFING CLOSURE STRIPS
20
0 4311RL
RoofLogic Ultratherm MSR Roofing System
2 3D View
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
ROOF DETAILS -
TYPICAL
ARCHITECTURAL
Drawing Number Revision
A4-284 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 Revisions
Sim
2
A4-344
3
A4-302
2 4
A4-302 A4-302
7
1:3
5
1:3
7 RL 82959 4 A4-302
A4-302
EQ EQ
Notes
INTERCOM
1350
A3-319
RL 79960
GROUND LEVEL
ENTRY CANOPY - 3D A4-301 A4-301 - ENTRY PLAN SECTION 1 A4-301 A4-301 - ENTRY PLAN SECTION 2
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
1
A4-302
RL 82959 RL 82959
Client
363
Consultant Team
468
Structural Engineer
BGT
5 5 5 Civil Engineer
823
388
A4-301 A4-301 A4-301 Babbage Consultants
FFL 79950
Services Engineer
22 Degrees
1:37
2096
2094
2129
2142
388
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
388
823
1:36
Project Manager
RL 82959 Greenstone Group
223
172
SYMPHONY 303
RL 82905
303 MANUKAU ROAD,
574 574 574 661
2018 2144 171 269 EPSOM, AUCKLAND
TILE SETOUT 2172 125 269
6
2762 2297 269 Sheet
A4-301
185
6 6 FACADE DETAILS -
A4-301 A4-301 MANUKAU ROAD -
1 1 : 25 Plan 2 1 : 25 Reflected Soffit Plan 3 1 : 25 Plan
BUILDING ENTRY @
A1-110 ENTRY CANOPY - PLAN ENTRY CANOPY - RCP A1-111 ENTRY CANOPY - ROOF PLAN GROUND
SCALE @ A1= 1 : 25
ARCHITECTURAL
Drawing Number Revision
A4-301 C
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
SOFFIT VOID
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA 140x45 TIMBER FRAMING
REFER TO STRUCTURAL ENGINEERS
4254XF-4.4 DOCUMENTATION 4811S-4.2
COLOUR MATCHING TO MID FLOOR SIKAFLEX® AT-FACADE SEALANT -
INTERIOR INTERIOR
FLASHING WEATHER AND AIR SEAL
4171GR 4421N
4337 Nuraply Membrane Roofing & Decking
Plywood Roofing & Decking Substrate GIB Weatherline Rigid Air Barrier
TERMINATION BAR 4311RL-4.3
FLASHINGS - GENERALLY
3821
Timber Framing 4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON
100 MIN
4161-4.1 PLYWOOD
RL 84930
DPC ALUMINIUM FACING TO 4337-4.1
MATCH JOINERY FINISH T&G PLYWOOD 1:36
FCL 4970 Notes
APL SHOPFRONT WINDOW APL SHOPFRONT WINDOW RL 84856
COVER
JAMB FACING TO MATCH
10 MIN
JAMB FLASHING ADHESIVE 4521-4.8
FLASHING. ADHESIVE FIXED TO FIXED TO JOINERY SHOPFRONT - 100MM FCL 4896
JOINERY HEAD FLASHING W/ 30mm MIN.
STOPENDS EITHER SIDE
4521-4.6 4521-4.5
ALUMINIUM SLIDING DOORS 4161PC-4.1
ALUMINIUM WINDOWS PRO CLIMA SOLITEX EXTASANA® ADHERO
INTERIOR EXTERIOR 100mm SHOPFRONT INTERIOR EXTERIOR
MEMBRANE - PEEL AND STICK
4254XF-4.2
4241DA-4.3 TRESPA® METEON PANEL
NU-WALL WEATHERBOARDS - VERTICAL CANOPY TOLERANCE TO
OVER CAVITY 10 CONCRETE WALL
RL 82725
3821-4.3
EXTERIOR ROOF FRAMING - RADIATA PINE - FCL 2765
H3.2 CCA
1 1:5 Plan Detail 3 1:5 Section Detail 5 1:5 Section Detail
A4-301 A4-302 - ENTRY WINDOW JAMB TO PC A4-301 A4-302 - WINDOW HEAD TO SOFFIT A4-301 A4-302 - CANOPY TO PC
100 MIN
RL 83010 PLYWOOD RL 83010 Babbage Consultants
100 MIN
MEMBRANE LAPPING ZONE
MEMBRANE LAPPING ZONE COVERED BY FASCIA Services Engineer
COVERED BY FASCIA 1:36
22 Degrees
FOLDED METAL CAPPING. FINISH TO
MATCH ENTRY JOINERY Acoustic Engineer
330
Marshall Day
365
ALUMINIUM FACING TO 200 PFC. REFER TO STRUCTURAL
MATCH JOINERY FINISH Fire Engineer
ENGINNERS DOCUMENTATION Holmes Fire
35
0.9mm BACK FLASHING Project Number: 221039
RL 2755
RL 82725 LIGHTING ZONE. REFER ELECTRICAL RL 82725 10 128 SYMPHONY 303
INTERIOR 10 ENGINEERS DOCUMENTATION
4521-4.6 EXTERIOR FCL 2765 FCL 2765 4254XF-4.4
ALUMINIUM SLIDING DOORS COLOUR MATCHING TO MID FLOOR 303 MANUKAU ROAD,
4311RL-4.3 FLASHING EPSOM, AUCKLAND
58 115 FLASHINGS - GENERALLY 4254XF-4.2
4 1:5 Section Detail TRESPA® METEON PANEL
Sheet
ARCHITECTURAL
Drawing Number Revision
A4-302 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
A A
B
FOR INFORMATION
BC3 - BUILDING
29/07/2022
29/07/2022
CONSENT ISSUE
C FOR TENDER 24/08/2022
60 180
PC PANEL
4711
Thermal Insulation
30
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
RL 84990 PACK OFF TIMBER TO ALLOW FOR
WIRING FROM SOFFIT VOID
4161-4.1
90
DPC
4337
Plywood Roofing & Decking Substrate
12mm H3 PLYWOOD
6
GAP 40x40 POWDERCOATED ALUMINIUM
CONDUIT BOX - TO MATCH SOFFIT
LINING
3130
Precast Concrete
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
RL 82450
LEVEL 1
Client
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
22 Degrees
Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Project Manager
Greenstone Group
SYMPHONY 303
Sheet
RL 81710
FACADE DETAILS -
VEHICLE ENTRY
SCALE @ A1= 1 : 5
ARCHITECTURAL
Drawing Number Revision
1:12
600
CLEAR ZONE
C 5
A8-011
1:29
2 2
1000
FACP
A4-308 A4-308
165°
A4-308
B
600
CLEAR ZONE
930
7
1:2
Notes
BUILDING ENTRY
1:46
1:56
3 1 : 25 Plan
930 1000
600 600
RL 82450 RL 82450
LEVEL 1 LEVEL 1
185
6
A4-308
CLEAR ZONE
CLEAR ZONE
before proceeding with any work.
1500
ENTRY TO LOBBY No building work shall proceed until
Building Consent has been granted
1850
for the work described.
5
A4-308 1:12
600
428
428
Client
LINE OF MINIMUM
RL 79960 HEIGHT FROM GROUND RL 79960 LCO EPSOM LTD
GROUND LEVEL GROUND LEVEL
Consultant Team
Structural Engineer
BGT
Civil Engineer
Babbage Consultants
Services Engineer
2 1 : 25 Section 1 1 : 25 Elevation 22 Degrees
A1-111 FIRE ATTENDANCE POINT 8 A8-010 FIRE ATTENDANCE POINT Acoustic Engineer
Marshall Day
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
8 8 B Project Manager
Greenstone Group
SYMPHONY 303
4521
ALUMINIUM METALWORK Aluminium Windows & Doors
ELASTOMERIC PAINT ON
4521
Aluminium Windows & Doors NING AN
GLE 303 MANUKAU ROAD,
WATERPROOFING MEMBRANE MIN. OPE 65° EPSOM, AUCKLAND
1 PACKER
PACKER 4337
30
Plywood Roofing & Decking Substrate Sheet
FACADE DETAILS -
30
PACKER 30
SILL TRAY W/ 8mm MIN. UPSTAND TO 3130-4.1 MANUKAU ROAD -
30
REAR & 100mm MIN. UPSTANDS @ PRECAST CONCRETE PANELS FIRE ATTENDANCE
4521-4.2 JAMBS
AIR INFILTRATION 15 ELASTOMERIC PAINT ON POINT
GAP WATERPROOFING MEMBRANE
COVER
AIR INFILTRATION
35
15°
30
ELASTOMERIC PAINT ON
WATERPROOFING MEMBRANE
8
4521 PACKER
Aluminium Windows & Doors 4521-4.2
AIR INFILTRATION
3130-4.1 ARCHITECTURAL
PRECAST CONCRETE PANELS Drawing Number Revision
35 150
A4-308 C
6 1:5 Section Detail 5 1:5 Section Detail 4 1:5 Plan Detail DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FIRE ATTENDANCE POINT HEAD FIRE ATTENDANCE POINT SILL FIRE ATTENDANCE POINT JAMB
FOR TENDER
A4-308 A4-308 A4-308 ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8
8 Revisions
240 270 20
CL BEAM 150 140 A 100% DEVELOPED 20/12/2021
270 DESIGN
SLAB EDGE
5° 4711-4.2 B FOR INFORMATION 29/07/2022
THERMAL BLANKET C BC3 - BUILDING 29/07/2022
150 140 Sim CONSENT ISSUE
2
90
4171GR D FOR INFORMATION 05/08/2022
A4-323
2C-2 3821 Weatherline Rigid Air Barrier
GIB E BC3 - AMENDMENTS 05/08/2022
Timber Framing 4421N-4.3 F FOR TENDER 24/08/2022
NURAJACK & NURAPAD DECK SUPPORT
INFILL FRAMING BTW. BRACKET & EXISTING SLAB EDGE TO SYSTEM
SUPPORT FLOORING ETC.
4381NJ-4.2
3821-4.2 TILES / PAVERS / STONE
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
50
RL 85650 25mm PLYWOOD FLOORING RL 85650
LEVEL 2 LEVEL 2
EXISTING SLAB EDGE RAIN BAR - FIRE STOPPING TO CAVITY RAIN BAR - FIRE STOPPING TO CAVITY
100
NOTCH TO STANDING SEAM FOR PARAPET CAP
FLASHING & BALUSTRADE FIXING
BRACKET TO EXISTING STRUCTURE - TO SUPPORT
FIRE STOPPING - WOULD RETURN DOWN AT COLUMN
TIMBER WALL & ACOUSTIC FLOOR SYSTEM - REFER
TO BE AT LOWER LEVEL TO EXISTING STRUCTURE
TO STRUCTURAL ENGINEER
BRACKET
FRP WRAPPING TO EXISTING 4421N-4.1
325
NURAPLY 3PM TWO LAYER SYSTEM ON
500
4241DA
Nu-Wall Profiled Metal Cladding
DEF
760
20
775
FCL 2700
4161PC-4.1
RL 85150 PC PANEL PRO CLIMA SOLITEX EXTASANA® ADHERO
SEPARATION BETWEEN TIMBER
FRAMING & PC PANEL MEMBRANE - PEEL AND STICK Notes
3821-4.5
15 DEFLECTION HEADS 4171GR
4711-4.3 GIB Weatherline Rigid Air Barrier
MINERAL WOOL BOARD
275
4933 135 39
Aluminium Metalwork Sim NU-WALL CLADDING BASE CHANNEL
4811S 3 W/ 5mm DRAINAGE HOLES @500CRS.
Sika Sealants A4-893
2C-1
DEFLECTION HEAD PACKED OUT OFF
BEAM TO CLEAR PC PANEL BRACKETS
3821-4.4
NO CONNECTION BTW. LININGS - INTERIOR WALL FRAMING - RADIATA PINE -
ALLOW FOR DEFLECTION H1.2 4811S
3130-4.1 Sika Sealants
40 35 PRECAST CONCRETE PANELS
If there are any discrepancies in the
WIRE NETTING OR SIMILAR
2 1:5 Section Detail
TO HOLD INSULATION IN
4 1:5 Section Detail documents please seek clarification
before proceeding with any work.
A4-133 LEVEL 2 MID-FLOOR - PC PANEL TO EXISTING PLACE A4-132 LEVEL 2 MID-FLOOR - PC PANEL TO 240 No building work shall proceed until
STRUCTURE - TYPICAL 4711-4.2
THERMAL BLANKET
PROPOSED STRUCTURE CL OF STEEL Building Consent has been granted
90 40 35 150 for the work described.
4711-4.2
90 40 35 150 THERMAL BLANKET
4711
Thermal Insulation
WIRE NETTING OR SIMILAR TO HOLD
INSULATION IN PLACE
2C-1 3821-4.4 Client
77.8 m²(NIA) 4852SP
INTERIOR WALL FRAMING - RADIATA PINE - Spectrum Aluminium & Glass Balustrades LCO EPSOM LTD
H1.2
3821-4.4
4852SP INTERIOR WALL FRAMING - RADIATA PINE - Consultant Team
Spectrum Aluminium & Glass Balustrades H1.2
Structural Engineer
4161-4.1 BGT
RL 82450 4161-4.1 RL 82450
DPC DPC Civil Engineer
LEVEL 1 LEVEL 1
Babbage Consultants
FIRE STOPPING 50 PROPOSED SLAB EDGE
49 Services Engineer
C 22 Degrees
L FIRE STOPPING
Acoustic Engineer
73 Marshall Day
SEALANT
144 Fire Engineer
EXISTING SLAB EDGE
Holmes Fire
SEALANT
Facade Engineer
Symetrix
3130-4.1
PRECAST CONCRETE PANELS 4711 Project Manager
150mm PRE-CAST CONCRETE PANEL Thermal Insulation Greenstone Group
Sheet
ARCHITECTURAL
Drawing Number Revision
85
3821-4.2
RL 92450 EXTERIOR WALL FRAMING - RADIATA PINE -
LEVEL 4 H3.2 CCA
4171GR
GIB Weatherline Rigid Air Barrier
126
4/14g x 125 LONG SCREWS
THROUGH TOP PLATE INTO
TIMBER ON FLAT RAIN BAR - FIRE STOPPING TO CAVITY
4933-4.1
4711 PROPRIETARY ALUMINIUM LETTER BOXES
Thermal Insulation 424
MULTIGRIP
3821 4241DA-4.2
Timber Framing CAVITY BATTENS
551
304
4241DA-4.3
2-14g TEK SCREWS INTO PURLINS NU-WALL WEATHERBOARDS - VERTICAL
THROUGH TIMBERS AT EACH END OVER CAVITY
3821-4.2 5113G-4.6
EXTERIOR WALL FRAMING - RADIATA PINE - GIB® FIRE RATED SYSTEMS
H3.2 CCA
PAIR OF MULTI GRIPS SCREW FIXED TO
TOP & BOTTOM PLATE
SOFFIT FRAMING DIRECTLY FIXED TO LINTEL
W/ JOIST HANGERS - PROVIDE BLOCKING SHEET BRACE STRAP
BTW. SOFFIT JOISTS FOR RAB FIXING
107
3821-4.5
3821-4.2 DEFLECTION HEADS
WIRE NETTING OR SIMILAR
EXTERIOR WALL FRAMING - RADIATA PINE - RL 91900
13
TO HOLD INSULATION IN
H3.2 CCA
20
PLACE
4171GR
20
Notes
GIB Weatherline Rigid Air Barrier
4
A4-811
M12 @ 1200CRS
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO 140X45 ON FLAT SHOT FIRED
MEMBRANE - PEEL AND STICK TO FRAMING WIRE NETTING OR SIMILAR
TO HOLD INSULATION IN
24° 4254XF-4.2 FINISHED CEILING NO PLACE
TRESPA® METEON PANEL CONNECTION TO EXTERIOR WALL 4711
TO ALLOW FOR DEFLECTION Thermal Insulation
90x35 H3.2 TRESPA PXF BATTEN
1100
APL METRO SERIES - SLIDING DOOR
TOP LIGHT TO BALCONY STACKER
240 270
1950
for the work described.
SYSTEM
3
1272
A4-898 4381NJ-4.2 CLADDING TILE SPACER
TILES / PAVERS / STONE 2mm ALUMINIUM PARAPET CAP
FLASHING
5° Sim
2
90
4421N-4.3 A4-323 Client
NURAJACK & NURAPAD DECK SUPPORT
TIMBER UPSTAND
SYSTEM LCO EPSOM LTD
M12 BOLT
90X45 BRACED 4337
Plywood Roofing & Decking Substrate 12mm H3 PLYWOOD TO ALLOW FOR
FIXED TO 100mm MIN. MEMBRANE
Consultant Team
260
BLOCKING AT 4421N-4.1
240
Structural Engineer
EACH END NURAPLY 3PM TWO LAYER SYSTEM ON BGT
PLYWOOD FILLET
Civil Engineer
100
Babbage Consultants
50
50
Services Engineer
RL 92450 RL 92450 22 Degrees
LEVEL 4 LEVEL 4
4337 Acoustic Engineer
Plywood Roofing & Decking Substrate SOLID BLOCKING @ BALUSTRADE FIXING
BTW CLADDING & WEATHERLINE Marshall Day
4241DA
90mm GIB® FIRE RATED SYSTEMS Nu-Wall Profiled Metal Cladding Project Manager
EMBEDMENT MONO200 INSTALLED BEHIND Greenstone Group
3821-4.2 BALUSTRADES @ LEVELS 3 & 4
EXTERIOR WALL FRAMING - RADIATA PINE - Project Number: 221039
H3.2 CCA 4241DA-4.2
SYMPHONY 303
BEAM
CAVITY BATTENS
550
RL 91900
20
4171GR
GIB Weatherline Rigid Air Barrier CAVITY CLOSURE STRIP SCALE @ A1= 1 : 5
Sim
Trespa Meteon PXF Facade Cladding 0.9mm BLACK POWDERCOATED
ALUMINIUM FLASHING W/
ARCHITECTURAL
1 90x35 H3.2 TRESPA PXF BATTEN SEPERATION LAYER BTW. BATTEN & Drawing Number Revision
FLASHING
A4-898 4521AC-4.17
APL METRO SERIES - SLIDING DOOR 90x35 H3.2 TRESPA PXF BATTEN A4-312 F
3 1:5 Section Detail 2 1:5 Section Detail
8 DO NOT SCALE OFF THIS DRAWING
A4-131 LEVEL 3 & 4 MID-FLOOR @ INSIDE BALCONY A4-036 LEVEL 3 & 4 - TYPICAL BALCONY PERIMETER / CONTRACTOR MUST VERIFY ALL DIMENSIONS
WALL TO SOFFIT BALUSTRADE FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
REFER TO DETAIL 4/A4-311 FOR
8 REFER TO DETAIL 4/A4-311 FOR
BALCONY & BALSUTRADE DETAIL 8 BALCONY & BALSUTRADE DETAIL Revisions
DEF
20
Aluminium Metalwork CAVITY CLOSURE STRIP
4933-4.1 Notes
PROPRIETARY ALUMINIUM LETTER BOXES
RL 84830 RL 84830
15
4811S
15
RL 84775 FCL 2300 Sika Sealants
10 WINDOW HEAD BEYOND NU-WALL CLADDING BASE CHANNEL
W/ 5mm DRAINAGE HOLES @500CRS.
4254XF
1 1:5 Section Detail Trespa Meteon PXF Facade Cladding
0.9mm BACK FLASHING
A4-034 LEVEL 2 - BALCONY PERIMETER WALL / 210 STEEL SHROUD TO PC PANEL - FINISH 20mm MIN. EXISTING CONC. COLUMN TO BE EXPOSED
BALUSTRADE @ PC PANEL TO EXISTING 290 BELOW STRUCTURE ABOVE
STRUCTURE
EXISTING CONC. BEAM TO BE EXPOSED
4852SP-4.1
SPECTRUM SEAMLESS FIN - BALUSTRADE
SYSTEM 2 1:5 Section Detail
SEAMLESS TOP FIXED TO STEEL A4-133 LEVEL 2 - BALCONY PERIMETER WALL /
BALUSTRADE @ PC PANEL TO PROPOSED
STRUCTURE
340
4254XF-4.2
TRESPA® METEON PANEL 4254XF
Trespa Meteon PXF Facade Cladding
1100
50
DPC Fire Engineer
150 SADDLE FLASHING TO WALL EITHER SIDE OF BALCONY Holmes Fire
SADDLE FLASHING TO COLUMN (RED) - 200mm MIN.
(RED) - 200mm MIN. OVERLAP TO FLASHING FROM PC
OVERLAP TO FLASHING FROM PC PANEL - NO SEALANT Facade Engineer
100
Greenstone Group
90 38 35 STRIP
4421N-4.3 Project Number: 221039
NURAJACK & NURAPAD DECK SUPPORT
SYMPHONY 303
320
SYSTEM
EXISTING CONCRETE COLUMN TO
240
240
3821-4.3
EXTERIOR ROOF FRAMING - RADIATA PINE - MIDDLE OF BALCONY - BEYOND 303 MANUKAU ROAD,
H3.2 CCA 3821 EPSOM, AUCKLAND
4161-4.1 Timber Framing
DPC
50
50
Sheet
RL 82450 RL 82450
LEVEL 1 LEVEL 1 FACADE DETAILS -
4161-4.1 MANUKAU ROAD -
FIRE STOPPING DPC
50
BALCONY
4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON
PLYWOOD
4711-4.3
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 Revisions
10
NOTCH TO FIXING TAP OF
ALUMINIUM CLADDING BASE CLOSER
10
35
COMPRESSABLE FOAM CLOSURE
STRIP
BTW. FRAMED SOFFIT & PC PANEL -
8 ABOVE STEEL SHROUD
4171GR
GIB Weatherline Rigid Air Barrier 4 1:5 Plan Detail
FRAMING
3821-4.2 TIMBER FRAMING TO SOFFIT BTW.
EXTERIOR WALL FRAMING - RADIATA PINE - A4-034 RCP DETAIL - STEEL SHROUD TO BALCONY EXISTING BEAM & FACADE
H3.2 CCA SOFFIT
4161-4.1
DPC
4933-4.1
PROPRIETARY ALUMINIUM LETTER BOXES
290 28
STEEL SHROUD (DASH)
FIXING TAB Notes
10 10 4254XF-4.2
10
TRESPA® METEON PANEL
NU-WALL CLADDING BASE CHANNEL
W/ 5mm DRAINAGE HOLES @500CRS. 10
4933 4254XF
Aluminium Metalwork Trespa Meteon PXF Facade Cladding
0.9mm BACK FLASHING
0.9mm BACK FLASHING
4254XF-4.2 4161-4.1
TRESPA® METEON PANEL DPC
SEALANT
90x35 H3.2 TRESPA PXF BATTEN
EXISTING CONCRETE COLUMN 0.9mm BACK FLASHING
ONLY
3821-4.2
3130-4.7 EXTERIOR WALL FRAMING - RADIATA PINE -
SEALANTS H3.2 CCA Client
Services Engineer
90 40 35 150 22 Degrees
FRAMING PC PANEL
4254XF-4.2 Acoustic Engineer
TRESPA® METEON PANEL TIMBER NIB WALL TO BALCONY Marshall Day
BELOW - REFER A4-321 Fire Engineer
Holmes Fire
4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON SCALE @ A1= 1 : 5
PLYWOOD
TIMBER WALL ON SLAB EDGE - CONTINUES
PAST COLUMN TO FORM UPSTAND AT
BALCONY PERIMETER - REFER 3/A4-321
3821-4.12
RL 82450 TIMBER NOGGING TYPE 1
LEVEL 1
4161-4.1
DPC
3130-4.1
PRECAST CONCRETE PANELS
ARCHITECTURAL
Drawing Number Revision
COLUMN @ BALCONY PERIMETER PC PANEL TO HPL CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 Revisions
TIMBER FIXING INFORMATION
A 100% DEVELOPED 20/12/2021
• TIMBER TO STEEL - M12 @ 600 CRS. DESIGN
• TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS.
(FIXING INTO CONCRETE TO ALLOW FOR B FOR INFORMATION 29/07/2022
AVOIDING EXISTING REINFORCING) C BC3 - BUILDING 29/07/2022
• HORIZONTAL TIMBER CONNECTIONS - JOIST CONSENT ISSUE
HANGERS D FOR INFORMATION 05/08/2022
• MULTI GRIPS FOR STUDS AND HANGING E BC3 - AMENDMENTS 05/08/2022
CONNECTIONS
F FOR TENDER 24/08/2022
4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON
PLYWOOD
4337
Plywood Roofing & Decking Substrate
4421N-4.3
NURAJACK & NURAPAD DECK SUPPORT
SYSTEM
240 270 20
CL OF STEEL SLAB EDGE
150 140
FRAMING Notes
SPACER
4933-4.2
ALUMINIUM SHEET - BALCONY PARAPET CAP
FLASHING
4337
Plywood Roofing & Decking Substrate
5° 12mm H3 PLYWOOD RAB IN PLACE OF GIB
FLASHING
WEATHERLINE @ BALUSTRADE PARAPETS -
MEMBRANE
PROVIDES SUBSTRATE TO DRESS MEMBRANE &
MIN.
90
PROVIDES SOLID PACKING @ BALUSTRADE FIXING
MIN.
100
TIMBER UPSTAND
260
SEPERATION LAYER BTW. IF TREATED TIMBER USED
240
4852SP-4.1
SPECTRUM SEAMLESS FIN - BALUSTRADE
SYSTEM
If there are any discrepancies in the
50
FILLET
RL 85650 documents please seek clarification
LEVEL 2 before proceeding with any work.
FIRE STOPPING
RAIN BAR - FIRE STOPPING TO CAVITY No building work shall proceed until
NOTCH TO STANDING SEAM FOR PARAPET CAP Building Consent has been granted
FLASHING & BALUSTRADE FIXING for the work described.
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
Client
4161-4.1 LCO EPSOM LTD
DPC
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL Civil Engineer
OVER CAVITY Babbage Consultants
Services Engineer
4161PC-4.1 22 Degrees
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK Acoustic Engineer
Marshall Day
4171GR
GIB Weatherline Rigid Air Barrier Fire Engineer
Holmes Fire
4711
Thermal Insulation Facade Engineer
Symetrix
75 X 6 EA L-BRACKET FWAR @ 1200CRS MAX
Project Manager
Greenstone Group
ADDITIONAL UNDERLAY LAPPED
OVER FLASHING Project Number: 221039
SYMPHONY 303
NU-WALL CLADDING BASE CHANNEL
W/ 5mm DRAINAGE HOLES @500CRS. 303 MANUKAU ROAD,
RL 84830 EPSOM, AUCKLAND
5
GAP
Sheet
CAVITY CLOSURE STRIP
FAÇADE DETAILS -
4241DA MANUKAU ROAD -
Nu-Wall Profiled Metal Cladding BALCONY
FLASHING
NU-WALL CLADDING BASE CHANNEL
W/ 5mm DRAINAGE HOLES @500CRS. SCALE @ A1= 1 : 5
4241DA-4.4
NU-WALL SOFFIT
2 1:5 Section Detail
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 Revisions
8 B
C
FOR INFORMATION
BC3 - BUILDING
29/07/2022
29/07/2022
CONSENT ISSUE
D FOR TENDER 24/08/2022
140 2165
2007
4711
1152 855 Thermal Insulation 3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
1000 4171GR H3.2 CCA
OUTLET GIB Weatherline Rigid Air Barrier
3130-4.1
PRECAST CONCRETE PANELS
250 140
3130-4.1
250
1:25
A4-341
850
W2D-1/03
1025
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO SEALANT
MEMBRANE - PEEL AND STICK
5° EXISTING CONCRETE COLUMN
1:23 1:17
STEEL SHROUD - FIXED @ JAMBS
ONLY
F
35
2494
E
400
4421N
Nuraply Membrane Roofing & Decking
245
COMPRESSABLE FOAM CLOSURE
STRIP
1245
4254XF
850
W2C-1/03 1:25
4254XF Trespa Meteon PXF Facade Cladding 3130-4.7
Trespa Meteon PXF Facade Cladding SEALANTS
0.9mm BACK FLASHING
3 STEEL SHROUD - FIXED @ JAMBS
A4-341 Notes
170
ONLY
35
140
3130-4.1 10 10
PRECAST CONCRETE PANELS NYLON PACKER
4421N
Nuraply Membrane Roofing & Decking
1 1 : 25 Plan
4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON
PLYWOOD
4911
Steel Metalwork
STEEL SHROUD - FIXED @ JAMBS If there are any discrepancies in the
ONLY documents please seek clarification
25 before proceeding with any work.
3130-4.7
35
4254XF-4.2
TRESPA® METEON PANEL
280
Consultant Team
RL 82450
LEVEL 1 COMPRESSABLE FOAM CLOSURE Structural Engineer
STRIP BGT
4933
Aluminium Metalwork Civil Engineer
Babbage Consultants
FLASHING
NYLON PACKER Services Engineer
22 Degrees
3130-4.7
SEALANTS Acoustic Engineer
10 10
Marshall Day
STEEL SHROUD - FIXED @ JAMBS
3821-4.3 ONLY Fire Engineer
EXTERIOR ROOF FRAMING - RADIATA PINE - Holmes Fire
H3.2 CCA COMPRESSABLE FOAM CLOSURE
Facade Engineer
10 STRIP Symetrix
4161-4.1
DPC 90x35 H3.2 TRESPA PXF BATTEN
Project Manager
Greenstone Group
3821-4.12
TIMBER NOGGING TYPE 1 Project Number: 221039
EXISTING CONCRETE BEAM 4711-4.2
THERMAL BLANKET SYMPHONY 303
ARCHITECTURAL
Drawing Number Revision
A4-341 D
8 DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 TIMBER FIXING INFORMATION
Revisions
Sim
Sim
175 140 3 9
A4-811
A4-811
F
4521-4.5
ALUMINIUM WINDOWS
1:40
W2D-2/03
1025
Sim 4421N
Nuraply Membrane Roofing & Decking
2
A4-896 1:38 1:38
W2C-2/03 4241DA
1:39
Nu-Wall Profiled Metal Cladding
140
Notes
8
1 1 : 25 Plan
86
A4-897
3821-4.2
75
EXTERIOR WALL FRAMING - RADIATA PINE -
4421N-4.1 H3.2 CCA
NURAPLY 3PM TWO LAYER SYSTEM ON
PLYWOOD
109
105
1°
1:54
190
4337
Plywood Roofing & Decking Substrate
3821-4.12 3821-4.12
TIMBER NOGGING TYPE 1
50
Consultant Team
4171GR Structural Engineer
GIB Weatherline Rigid Air Barrier EXISTING STRUCTURE BGT
Civil Engineer
4811S-4.2 Babbage Consultants
4161PC-4.1 SIKAFLEX® AT-FACADE SEALANT -
PRO CLIMA SOLITEX EXTASANA® ADHERO Services Engineer
WEATHER AND AIR SEAL 22 Degrees
RL 85100 MEMBRANE - PEEL AND STICK
4811S-4.2 Acoustic Engineer
DEF
100
TO STRUCTURAL ENGINEER
NYLON PACKER 303 MANUKAU ROAD,
4521-4.5 EPSOM, AUCKLAND
ALUMINIUM WINDOWS 3130-4.7
SEALANTS
25 Sheet
FACADE DETAILS -
STEEL SHROUD - FIXED @ JAMBS
ONLY MANUKAU ROAD -
10 10 COMPRESSABLE FOAM CLOSURE SNORKEL - LEVEL 2
STRIP
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK
4254XF
Trespa Meteon PXF Facade Cladding
0.9mm BACK FLASHING
A4-133 MANUKAU ROAD SNORKEL - SILL @ LEVEL 2 - A4-134 MANUKAU ROAD SNORKEL - PERIMETER @
SOFFIT @ LEVEL 1 LEVEL 2 - SOFFIT @ LEVEL 1 A4-342 F
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
TIMBER FIXING INFORMATION
A 100% DEVELOPED 20/12/2021
• TIMBER TO STEEL - M12 @ 600 CRS. DESIGN
8 • TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS.
(FIXING INTO CONCRETE TO ALLOW FOR B FOR INFORMATION 29/07/2022
SLAB EDGE 2185 TO GRID 8 AVOIDING EXISTING REINFORCING) C BC3 - BUILDING 29/07/2022
• HORIZONTAL TIMBER CONNECTIONS - JOIST CONSENT ISSUE
HANGERS D FOR INFORMATION 05/08/2022
• MULTI GRIPS FOR STUDS AND HANGING E BC3 - AMENDMENTS 05/08/2022
3 140
2165 TO GRID 8 CONNECTIONS
FRAMING F FOR TENDER 24/08/2022
A4-134
4711
Thermal Insulation
WIRE NETTING OR SIMILAR
TO HOLD INSULATION IN
PLACE
140
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
RL 92450 H3.2 CCA
LEVEL 4
4241DA-4.3
W2B-2/03
6
A4-301 4241DA-4.3 4241DA
NU-WALL WEATHERBOARDS - VERTICAL Nu-Wall Profiled Metal Cladding
OVER CAVITY
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
230
4171GR
GIB Weatherline Rigid Air Barrier
4254XF-4.2
TRESPA® METEON PANEL 5113G-4.6
GIB® FIRE RATED SYSTEMS
3 Notes
A4-134
M12 COACH BOLT RIGHT THROUGH @600CRS
4 1 : 25 Plan
1
A4-896
2B-3
W2B-3/03
4521
Aluminium Windows & Doors
3 1:5 Section Detail
A4-131 FACADE DETAIL - MAN. RD. - LEVEL 3 & 4 - If there are any discrepancies in the
MID-FLOOR @ SNORKEL documents please seek clarification
before proceeding with any work.
Sim
4
A4-896
Client
Acoustic Engineer
Marshall Day
Fire Engineer
4711 Holmes Fire
Thermal Insulation
NOTE THERMAL INSULATION TO RAISED Facade Engineer
Symetrix
FLOOR BUILD-UP TO FLOORS ABOVE
EXTERIOR SPACES Project Manager
Greenstone Group
Sheet
75 X 6 EA L-BRACKET FWAR @ 1200CRS MAX
FACADE DETAILS -
4161PC-4.1 MANUKAU ROAD -
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK
LEVELS 2 - 4 @
Sim
NARROW SNORKEL
2
A4-323 SCALE @ A1= As indicated
ARCHITECTURAL
Drawing Number Revision
TOTAL BALUSTRADE
1950
1272
1120
1255
4521-4.5
ALUMINIUM WINDOWS
Sim
4
A4-896
SOLID BLOCKING BTW. CLADDING & RAB -
PROVIDE SEPERATION BTW. BLOCKING &
CLADDING IF TREATED TIMBER USED
4852SP-4.1
SPECTRUM SEAMLESS FIN - BALUSTRADE
SYSTEM
85
4933-4.1 3821-4.2
PROPRIETARY ALUMINIUM LETTER BOXES EXTERIOR WALL FRAMING - RADIATA PINE -
H3.2 CCA
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL Notes
OVER CAVITY
MONO200 BEHIND BALUSTRADES @ LEVEL 3 & 4
4711
5113G-4.6 Thermal Insulation R2.6 ROLL FORM
GIB® FIRE RATED SYSTEMS
MULTIGRIP - PAIR TO TOP AND BOTTOM PLATE
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK
5113G-4.6 4171GR
GIB® FIRE RATED SYSTEMS GIB Weatherline Rigid Air Barrier
RL 91885
3821-4.5
5
DEFLECTION HEADS
35
1
5211-4.3 A4-896
STEEL STUD INTERNAL PARTITION STEEL
STUD AND TRACK SECTIONS
Client
Consultant Team
Structural Engineer
Civil Engineer
Babbage Consultants
TOTAL BALUSTRADE
Services Engineer
22 Degrees
1500
1224
Acoustic Engineer
1258
1120
A4-351 E
1 1:5 Section Detail
8 DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
LEVEL 2 - WINDOW SILL / BALSUTRADE
A4-133
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
Revisions
WS04
90
VARIES
VARIES
INTERTENANCY FIRE SEPARATION (30)/30/30
90
Notes
90x35 H3.2 TRESPA PXF BATTEN
WS20
4254XF-4.2
TRESPA® METEON PANEL
Sim
1
A4-811
Sim
2
A4-898
INTERIOR BALCONY
4254XF-4.2
EXTERIOR TRESPA® METEON PANEL
Client
MIN
50
50
A Structural Engineer
BGT
Civil Engineer
4241DA-4.3 Babbage Consultants
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY CUSTOM PIECE TO COVER END Services Engineer
22 Degrees
Fire Engineer
Holmes Fire
Facade Engineer
Symetrix
Sheet
FACADE DETAILS -
2 1:5 Plan Detail
MANUKAU ROAD -
A4-031 MAN. RD. - ZONE SE @ VEHICLE ENTRY - TYPICAL
LEVEL 2 - CONCRETE BOUNDARY / BALCONY
WALL END
SCALE @ A1= 1 : 5
ARCHITECTURAL
Drawing Number Revision
A4-381 E
DO NOT SCALE OFF THIS DRAWING
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
8 8 Revisions
43
4241DA
Nu-Wall Profiled Metal Cladding FOLDED METAL BOX
FLASHING TO CORNER
3°
4171GR
GIB Weatherline Rigid Air Barrier
3821-4.2 4241DA-4.3
EXTERIOR WALL FRAMING - RADIATA PINE - NU-WALL WEATHERBOARDS - VERTICAL
H3.2 CCA OVER CAVITY
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK
EXTERIOR
10 4852SP-4.1
SPECTRUM SEAMLESS FIN - BALUSTRADE
10 SYSTEM
4254XF-4.2
TRESPA® METEON PANEL
10
10
4254XF-4.2
4254XF TRESPA® METEON PANEL
BALCONY Trespa Meteon PXF Facade Cladding
Notes
4811S-4.2
4254XF-4.2 SIKAFLEX® AT-FACADE SEALANT -
TRESPA® METEON PANEL
WEATHER AND AIR SEAL
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO 4171GR
GIB Weatherline Rigid Air Barrier
MEMBRANE - PEEL AND STICK
A4-035 HPL TO EXISTING CONCRETE COLUMN - A4-036 HPL TO STEEL CONCRETE COLUMN - LEVEL
LEVEL 2 3-4
Client
Services Engineer
154 22 Degrees
Acoustic Engineer
Marshall Day
4254XF-4.2
TRESPA® METEON PANEL Fire Engineer
Holmes Fire
Facade Engineer
BALCONY
4161PC-4.1 Symetrix
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK Project Manager
Greenstone Group
SYMPHONY 303
295
3821
Timber Framing
303 MANUKAU ROAD,
3130-4.7
SEALANTS EPSOM, AUCKLAND
4911 Sheet
Steel Metalwork
FACADE DETAILS -
10 MANUKAU ROAD -
TYPICAL - BALCONY
NYLON PACKER
COMPRESSABLE FOAM CLOSURE
STRIP SCALE @ A1= 1 : 5
4852SP-4.1
SPECTRUM SEAMLESS FIN - BALUSTRADE
SYSTEM
4254XF
Trespa Meteon PXF Facade Cladding
0.9mm BACK FLASHING ARCHITECTURAL
3 1:5 Plan Detail Drawing Number Revision
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
4
TO TOP OF BALUSTRADE
Revisions
2000
1222
SYSTEM E BC3 - AMENDMENTS 05/08/2022
F FOR TENDER 24/08/2022
4421N-4.1 RL 85750
NURAPLY 3PM TWO LAYER SYSTEM ON
PLYWOOD
100
90
90
TOP OF TILES
LEVEL 2 LEVEL 2
295
100
275
1:57 4852SP-4.1
SPECTRUM SEAMLESS FIN - BALUSTRADE
SYSTEM
195
SOLID BLOCKING BTW. CLADDING & RAB @
BALUSTRADE FIXING - SEPERATION LAYER BTW.
BLOCKING & CLADDING IF TREATED TIMBER USED
CLT
126
140x45 TIMBER FRAMING @ NIB BASE FOR BALUSTRADE FIXING
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
MONO200 BEHIND BALUSTRADES
H10 - HUS3-H @ 600CRS
364
Notes
90
80
DEF
20
RL 84850
25
4241DA
FCL 2287 Nu-Wall Profiled Metal Cladding
Sim 10
5
170
JOIST HANGER
A4-811
4254XF
4254XF Trespa Meteon PXF Facade Cladding
Trespa Meteon PXF Facade Cladding
Sim 4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
1 MEMBRANE - PEEL AND STICK
A4-898
(FIXING INTO CONCRETE TO ALLOW FOR Building Consent has been granted
AVOIDING EXISTING REINFORCING) for the work described.
• HORIZONTAL TIMBER CONNECTIONS - JOIST
HANGERS
• MULTI GRIPS FOR STUDS AND HANGING
CONNECTIONS
Sim 4
3
1100
1242
1650
12mm PLY RAB IN PLACE OF GIB WEATHERLINE BELOW MEMBRANE - PEEL AND STICK Civil Engineer
DOOR THRESHOLD TO ALLOW FOR BALUSTRADE FIXING Babbage Consultants
4161-4.5
WINDOW/DOOR SEALING SYSTEM Services Engineer
90
22 Degrees
190x45 TIMBER FRAMING
MIN.
4337 Acoustic Engineer
74
RL 82450 OVERSIZED BOTTOM PLATE TO ALLOW Plywood Roofing & Decking Substrate
SS200 SEAM NOTCH
Marshall Day
LEVEL 1 FOR FIXING TO EXISTING SLAB DOOR THRESHOLD BEYOND
4381NJ-4.2
52
90
330
THERMAL INSULATION
5113G-4.6 SCALE @ A1= 1 : 5
GIB® FIRE RATED SYSTEMS
SEALANT
RL 81750
Drawing Number Revision
30
MAX.
A4-411 F
4311RL-4.3
1 1:5 Section Detail FLASHINGS - GENERALLY 4 1:5 Section Detail DO NOT SCALE OFF THIS DRAWING
4
CONTRACTOR MUST VERIFY ALL DIMENSIONS
FACADE DETAIL - COURTYARD - LEVEL 1 - COURTYARD BALCONY DRAINAGE OUTLET -
A4-141 A4-041
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
4241DA
Nu-Wall Profiled Metal Cladding
4711
Thermal Insulation RL 95480
4161PC-4.1
3821-4.2 PRO CLIMA SOLITEX EXTASANA® ADHERO
EXTERIOR WALL FRAMING - RADIATA PINE - MEMBRANE - PEEL AND STICK
H3.2 CCA
RL 95250 RL 95250
ROOF LEVEL 140x45 ROOF LEVEL
RL 95215 3821-4.2
FCL 2700 EXTERIOR WALL FRAMING - RADIATA PINE -
JOIST HANGER H3.2 CCA
ADDITIONAL UNDERLAY LAPPED
OVER FLASHING
20
90x35 H3.2 TRESPA PXF BATTEN
RL 95060 Notes
10
Sim NU-WALL CLADDING BASE CHANNEL
Sim 5 4254XF-4.2 W/ 5mm DRAINAGE HOLES @500CRS.
TRESPA® METEON PANEL
1 A4-811 CAVITY CLOSURE STRIP
A4-897 0.9mm BACK FLASHING
90x35 H3.2 TRESPA PXF BATTEN
4254XF
Trespa Meteon PXF Facade Cladding
A4-141 FACADE DETAIL - COURTYARD - LEVEL 4 - A4-141 FACADE DETAIL - COURTYARD - LEVEL 4 -
BALCONY TOP OF WALL / SOFFIT BALCONY SOFFIT TO FACADE
205
1000 MIN
A4-898 1100 FROM DECK TILE TO
TOP OF BALUSTRADE
SOLID BLOCKING BTW. CLADDING & RAB -
SEPERATION LAYER BTW. BLOCKING & CLADDING
89
12 IF TREATED TIMBER USED
4421N-4.3
90
TIMBER UPSTAND
RL 92450 SYSTEM
LEVEL 4 Client
4421N-4.1
NURAPLY 3PM TWO LAYER SYSTEM ON 1218 FROM CL OF FIXING TO TOP OF BALUSTRADE LCO EPSOM LTD
295
PLYWOOD
144
4852SP-4.1 Consultant Team
4337 SPECTRUM SEAMLESS FIN - BALUSTRADE
Plywood Roofing & Decking Substrate Structural Engineer
SYSTEM 1800 TOTAL BALUSTRADE HEIGHT BGT
3821-4.12
100
TIMBER NOGGING TYPE 1 Civil Engineer
FILLET Babbage Consultants
476
Symetrix
4241DA-4.3
AND AROUND DUCT NU-WALL WEATHERBOARDS - VERTICAL Project Manager
OVER CAVITY Greenstone Group
ARCHITECTURAL
4 Drawing Number Revision
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
RL 85650 RL 92450 H3.2 CCA
LEVEL 2 LEVEL 4
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK
4161PC-4.1 4241DA
PRO CLIMA SOLITEX EXTASANA® ADHERO Nu-Wall Profiled Metal Cladding
MEMBRANE - PEEL AND STICK
5113G-4.6
GIB® FIRE RATED SYSTEMS 5113G-4.6
GIB® FIRE RATED SYSTEMS
4171GR
GIB Weatherline Rigid Air Barrier
Notes
B 4
2 1:5 Section Detail
1690 190
A4-142 LEVEL 2 MID-FLOOR - COMFLOR @ NORTH / BLOCK WALL
SOUTH CORRIDOR 1880 20
If there are any discrepancies in the
1760 140 documents please seek clarification
FRAMING before proceeding with any work.
4241DA
4241DA-4.3 CORRIDOR Nu-Wall Profiled Metal Cladding
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
Client
4161-4.1
DPC LCO EPSOM LTD
3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE -
RL 82450 H3.2 CCA RL 82450 Consultant Team
LEVEL 1 LEVEL 1 Structural Engineer
BGT
70
Civil Engineer
130
4161-4.1
4161PC-4.1
DPC Babbage Consultants
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK Services Engineer
22 Degrees
Acoustic Engineer
600
GIB Weatherline Rigid Air Barrier
SYMPHONY 303
540
20 SERIES MASONRY BLOCK - REFER
TO STRUCTURAL ENGINEER 4161-4.1
DPC 303 MANUKAU ROAD,
75 X 6 EA FRAME - REFER TO STRUCTURAL CARPARK EPSOM, AUCKLAND
ENGINEERS DETAILS ADDITIONAL UNDERLAY LAPPED
OVER FLASHING
ADDITIONAL UNDERLAY LAPPED Sheet
OVER FLASHING
3821-4.2
FACADE DETAILS -
EXTERIOR WALL FRAMING - RADIATA PINE - 3821 COURTYARD
H3.2 CCA Timber Framing
CAVITY CLOSURE STRIP
INFILL TIMBER FRAMING TO STEEL RL 81780
FRAME TO SUPPORT FACADE SYSTEM
30
RL 81750 5 GAP RL 81750 SCALE @ A1= 1 : 5
OR PROVIDE DPC
4811S
Sika Sealants NU-WALL CLADDING BASE CHANNEL
W/ 5mm DRAINAGE HOLES @500CRS.
ALUMINIUM FLASHING
W/ GUAGE 6 FIXINGS @600 CRS. MAX. & 15mm EDGE DISTANCE 1.6mm POWDERCOATED WALL
BASE CLOSURE FLASHING -
1.6mm POWDERCOATED WALL BASE CLOSURE CONTINUES AROUND WALL, REFER
FLASHING - CONTINUES AROUND WALL, REFER TO TO DETAIL 1/A4-414 - TRIM RETURN
LEG TO WALL AS REQUIRED
ARCHITECTURAL
DETAIL 1/A4-413 & 1/A4-414 - TRIM RETURN LEG TO Drawing Number Revision
WALL AS REQUIRED
4 1:5 Section Detail 1 1:5 Section Detail 20 SERIES MASONRY BLOCK - REFER A4-413 E
TO STRUCTURAL ENGINEER
A4-141 WALL BASE @ CORRIDOR SOUTH END NEAR A4-142 WALL BASE @ CONCRETE WALL DO NOT SCALE OFF THIS DRAWING
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
D D Revisions
TIMBER FIXING INFORMATION
A 100% DEVELOPED 20/12/2021
• TIMBER TO STEEL - M12 @ 600 CRS. DESIGN
• TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS.
(FIXING INTO CONCRETE TO ALLOW FOR B FOR INFORMATION 29/07/2022
AVOIDING EXISTING REINFORCING) 107 C BC3 - BUILDING 29/07/2022
• HORIZONTAL TIMBER CONNECTIONS - JOIST CONSENT ISSUE
HANGERS D FOR INFORMATION 05/08/2022
• MULTI GRIPS FOR STUDS AND HANGING E BC3 - AMENDMENTS 05/08/2022
4241DA-4.3 CONNECTIONS
F FOR TENDER 24/08/2022
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
3821-4.2 3821-4.2
EXTERIOR WALL FRAMING - RADIATA PINE - EXTERIOR WALL FRAMING - RADIATA PINE -
RL 85650 H3.2 CCA RL 92450 H3.2 CCA
LEVEL 2 LEVEL 4
RAIN BAR - FIRE STOPPING TO CAVITY INFILL TIMBER FRAMING TO SUPPORT RAB
4161-4.1 & FACADE CLADDING
DPC
4241DA-4.3
NU-WALL WEATHERBOARDS - VERTICAL
OVER CAVITY
4161PC-4.1
PRO CLIMA SOLITEX EXTASANA® ADHERO
4161PC-4.1 MEMBRANE - PEEL AND STICK
PRO CLIMA SOLITEX EXTASANA® ADHERO
MEMBRANE - PEEL AND STICK 4171GR
GIB Weatherline Rigid Air Barrier
RL 91800
75 X 6 EA L-BRACKET FWAR @ 1200CRS MAX
Sim
FCL 2601 4
GIB METAL TRIM EXPANSION
A4-811
CONTROL JOINT (P35)
Sim
4
A4-811
20 35 20
A4-143 FACADE DETAIL - COURTYARD - LEVEL 2 - A4-143 FACADE DETAIL - COURTYARD - LEVEL 3 & 4 -
BTW GRID 5 & 6 - MID-FLOOR BTW GRID 5 & 6 - MID-FLOOR
If there are any discrepancies in the
documents please seek clarification
before proceeding with any work.
CORRIDOR
Sim Client
4 LCO EPSOM LTD
A4-896
Consultant Team
RL 82450 4161-4.1 RL 82450
LEVEL 1 DPC LEVEL 1 Structural Engineer
BGT
40 4161-4.1
DPC Civil Engineer
Babbage Consultants
CLADDING BASE
4241DA
Nu-Wall Profiled Metal Cladding 4811S Project Manager
Sika Sealants Greenstone Group
700
ALUMINIUM FLASHING Project Number: 221039
TIMBER FRAMED WALL BTW. EXIST.
COLUMN @ GRID D5 & NEW INSITU WALL ALUMINIUM FLASHING SYMPHONY 303
NEAR GRID D6 - APPROX. SPAN 6.2m
100X9 SHS - REFER TO STRUCTURAL
ENGINEERS DETAILS
303 MANUKAU ROAD,
100X9 - REFER TO STRUCTURAL ENGINEERS
EPSOM, AUCKLAND
RL 81938 PACKER
DETAILS
4811S Sheet
Sika Sealants
ADDITIONAL UNDERLAY LAPPED FACADE DETAILS -
OVER FLASHING COURTYARD
ADDITIONAL UNDERLAY LAPPED
OVER FLASHING
CAVITY CLOSURE STRIP
RL 81750 SCALE @ A1= 1 : 5
50
NU-WALL CLADDING BASE CHANNEL RL 81700 W/ 5mm DRAINAGE HOLES @500CRS.
W/ 5mm DRAINAGE HOLES @500CRS.
CAVITY CLOSURE STRIP
1.6mm POWDERCOATED WALL BASE
200 1.6mm POWDERCOATED WALL BASE CLOSURE FLASHING -
190 50 CLOSURE FLASHING - CONTINUES AROUND
CONTINUES AROUND WALL, REFER TO DETAIL 1/A4-413
CONC. WALL NEAR D6
EXIST. COLUMN @ D5
WALL, REFER TO DETAIL 1/A4-414
ARCHITECTURAL
450 Drawing Number Revision
1 1:5 Section Detail COLUMN @ D5 4 1:5 Section Detail INFILL 20 SERIES MASONRY BLOCK WALL -
A4-143 FACADE DETAIL - COURTYARD - LEVEL 1 - A4-143 FACADE DETAIL - COURTYARD - LEVEL 1 -
REFER TO STRUCTURAL ENGINEER
A4-414 F
BTW GRIDS 5 & 6 - VEHICLE ENTRY TO D WALL BASE BTW. GRIDS 4 & 5 D DO NOT SCALE OFF THIS DRAWING
FOR TENDER
ON SITE BEFORE COMMENCING ANY WORK
COPYRIGHT © JASMAX
6 Revisions
1200
TIMBER FIXING INFORMATION A FOR INFORMATION 29/07/2022
SLAB EDGE
140 1080 • TIMBER TO STEEL - M12 @ 600 CRS. B BC3 - BUILDING 29/07/2022
FRAMING • TIMBER TO CONCRETE - H10-HUS3 @ 600 CRS. CONSENT ISSUE
(FIXING INTO CONCRETE TO ALLOW FOR C FOR INFORMATION 05/08/2022
1100
1207
4521-4.5
ALUMINIUM WINDOWS
4521-4.7
40MM COMMERCIAL WINDOW SERIES
2 1:5 Section Detail
Client
Civil Engineer
RL 85650 Babbage Consultants
LEVEL 2
Services Engineer
22 Degrees
Project Manager
Greenstone Group