Jadestone Energy Vietnam

BID CIRCULAR

PROVISION OF TRANSPORTATION & INSTALLATION SERVICES


RFQ Description:
FOR BLOCKS 46/07 & 51, OFFSHORE VIETNAM

RFQ Circular No.: NDUM2020-001-BC-003

RFQ Reference: RFQ-NDUM2020-001

Ref. Exerts &


attachments:

Bidders Statement:

Company It is correct the Preliminary Topside Pre-service Sketches dated 22


Clarifications: January 2020 show a topside loadout weight of 5808kN (592 tonnes)
whilst the Installation & Construction Philosophy, Doc. No. JSEV00-GEN-
GENP-D-OTI-PHL-0001-B01 shows a preliminary topside loadout / lift
weight of 492 tonnes. The 492 tonnes figure was extracted from
Company’s EPC contractor Weekly Report dated 24 January 2020.

Company’s EPC contractor has subsequently provided an advance copy


of a Weight Control Report dated 11 February 2020 which defines a
topside gross lifting weight of 595 tonnes (including weight contingency
of 30%). This Weight Control Report is attached for information and
Bidder is requested to incorporate this topside weight into the basis of its
proposal.

Company Derek Tang – Supply Chain Manager


Representative