Main Activities

1 Depot Site Work

1.1 Concrete casting for piles in Tank-6 (4-piles)

1.2 T-wall repairing inspection for 15 PCs

1.3 T-wall molds inspection for 10 PCs

1.4

1.5

1.6

1.7

1.8

1.9

1.10

1.11

0
Remarks
1.1 Concrete casting for piles in Tank-6 (4-piles) 1.2 T-wall repairing inspection for 15 PCs

1.3 T-wall molds inspection for 10 PCs


1.9
1.2 T-wall repairing inspection for 15 PCs