Abstract and Objective
Solar Power: Day Peak Energy Management Solution

➢ The Presentation proposes Solar Power as Day


Peak Solution, both for Supply and Demand
Energy Management
➢ The Presentation shall discuss solutions
applicable to Distribution Utilities; Commercial
installations for SMEs; Domestic and Home Use
➢ The Presentation shall also put forward an
estimated LCOE and savings
➢ The Presentation intends to propagate the
correct information about Solar Power as an
Energy Management Solution
Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Presentation Outline
➢Supply and Demand Balance
➢Solar PV – Mature Technology
➢Target Capacity Mix
➢Blended Generation Cost
➢Q&A

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Supply and Demand Balance
Capacity Planning must address Demand Profile:
➢ 24hr Load Cycle
➢ Base
➢ Mid-Merit
➢ Peak
➢ Demand Growth
➢ 3Yr
➢ 5Yr
➢ 10Yr

Typically, 5Yr demand growth is used as basis for


capacity planning.
Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Proposition: Solar PV Day Peak Energy
Management Solution

➢ Annual Plant Capacity Factor 18% to 20%

➢ Niche Opportunity As Day Peak Shaver

➢ Technology & Sustainability Mature; High

➢ Future Capacity Expansion Modular and Scalable

➢ Average Area Requirement 7.5m2/kW

➢ Typical Project Volume <US$1M/MW

➢ Ave Generation COST @13.8kV PhP 4.0 to 5.0 per kWh


Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Fears; Mitigation & Benefits
Fears Mitigation/Benefit
1. Capacity Sustainability Proven as Mature Technology
Accurate Weather Info System

2. O&M/C&I Local Skills Available


Micro Grid Technologies
Advanced Scada Systems

3. Cost of Electricity LOWER THAN CURRENT Levels


Cost NOT bottomed yet

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Supply and Demand Balance
Typical 10Yr Demand Projection
15.000

13.000

11.000

9.000

7.000

5.000

3.000

1.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
2028 PGF Gross 8.097 7.863 7.560 7.554 8.115 8.602 7.919 9.091 10.68 10.95 11.20 10.85 11.14 11.44 11.45 11.05 10.21 10.83 15.07 7.889 10.63 11.67 9.683 8.810
2025 PGF Gross 5.739 5.573 5.358 5.354 5.751 6.097 5.613 6.443 7.575 7.766 7.942 7.695 7.899 8.109 8.118 7.833 7.238 7.679 12.64 7.543 7.535 8.278 6.862 6.244
2023 PGF Gross 4.500 4.370 4.201 4.198 4.510 4.781 4.401 5.052 5.940 6.090 6.228 6.034 6.194 6.358 6.366 6.142 5.676 6.021 11.01 5.915 5.909 6.491 5.381 4.896
2021 PGF Gross 3.495 3.394 3.263 3.261 3.503 3.713 3.418 3.924 4.614 4.730 4.837 4.687 4.811 4.939 4.945 4.771 4.409 4.677 9.393 5.259 4.589 5.042 4.180 3.803
2019 PGF Gross 2.699 2.621 2.520 2.518 2.705 2.868 2.640 3.030 3.563 3.653 3.736 3.619 3.715 3.814 3.818 3.684 3.405 3.612 7.807 4.535 3.544 3.893 3.228 2.937
2018 PGF Gross 2.372 2.304 2.215 2.213 2.378 2.520 2.320 2.663 3.131 3.211 3.283 3.181 3.265 3.352 3.356 3.238 2.992 3.174 7.040 4.110 3.115 3.422 2.837 2.581

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
24Hr Demand Cycle
12.00

11.00

10.00

9.00

8.00

7.00

6.00

5.00

4.00

3.00

2.00

1.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
2023 PGF Gross 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.50 6.69 6.65 6.50 6.65 6.68 6.70 6.65 6.60 6.50 7.25 11.0 7.56 6.65 6.01 5.59 5.40

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
24Hr Supply Cycle
12.00

11.00

10.00

9.00

8.00

7.00

6.00
Mid-Merit Capacity
5.00

4.00

3.00 Base Capacity


2.00

1.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Peak - - - - - - - - - - - - - - - - - 0.55 4.30 0.86 - - - -
Mid Merit 0.25 0.13 0.03 - 0.03 0.13 0.63 1.38 1.57 1.53 1.38 1.53 1.56 1.58 1.53 1.48 1.38 1.58 1.58 1.58 1.53 0.89 0.47 0.28
Base 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12
2023 PGF Gross 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.50 6.69 6.65 6.50 6.65 6.68 6.70 6.65 6.60 6.50 7.25 11.0 7.56 6.65 6.01 5.59 5.40

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Capacity Requirement
12.00
Base Capacity - 5.0MW
11.00
Mid-Merit Capacity -1.5MW
10.00 Peak Capacity - 4.5MW
9.00 Peak Demand - 11.0MW
8.00

7.00

6.00
Mid-Merit Demand
5.00

4.00

3.00 Base Demand


2.00

1.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Peak - - - - - - - - - - - - - - - - - 0.55 4.31 0.86 - - - -
Mid Merit 0.25 0.13 0.03 - 0.03 0.13 0.63 1.38 1.57 1.53 1.38 1.53 1.56 1.58 1.53 1.48 1.38 1.58 1.58 1.58 1.53 0.89 0.47 0.28
Base 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12
2023 PGF Gross 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.50 6.69 6.65 6.50 6.65 6.68 6.70 6.65 6.60 6.50 7.25 11.0 7.56 6.65 6.01 5.59 5.40

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
24Hr Capacity Supply Cycle
Design
Capacity Peak MWh LF
Capacity Mix
Peak 4.30 5.71 6% 5%
Mid Merit 1.58 24.03 63% 15%
Base 5.12 122.88 100% 80%
12.00 2023 11.00 152.62 58% 100%
11.00

10.00

9.00

8.00

7.00

6.00
Mid-Merit Demand
5.00

4.00

3.00 Base Demand


2.00

1.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Peak - - - - - - - - - - - - - - - - - 0.55 4.31 0.86 - - - -
Mid Merit 0.25 0.13 0.03 - 0.03 0.13 0.63 1.38 1.57 1.53 1.38 1.53 1.56 1.58 1.53 1.48 1.38 1.58 1.58 1.58 1.53 0.89 0.47 0.28
Base 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12
2023 PGF Gross 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.50 6.69 6.65 6.50 6.65 6.68 6.70 6.65 6.60 6.50 7.25 11.0 7.56 6.65 6.01 5.59 5.40

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Case1: Island Grid ICE Tech-HFO/LFO
11MW Peak by 2023
Base Capacity - 5.0MW
11.00
Mid-Merit Capacity -1.5MW
10.00
Peak Capacity - 4.5MW
9.00
Peak Demand - 11.0MW
8.00

7.00

6.00

5.00

4.00

3.00

2.00

1.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Solar 0.25 0.50 0.75 1.00 3.00 3.50 3.50 3.50 1.25 0.50
HFO/LFO Base 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.25 6.19 5.90 5.50 3.65 3.18 3.20 3.15 5.35 6.00 7.25 11.0 7.56 6.65 6.01 5.59 5.40
Total 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.50 6.69 6.65 6.50 6.65 6.68 6.70 6.65 6.60 6.50 7.25 11.0 7.56 6.65 6.01 5.59 5.40

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Case1: Island Grid ICE Tech-HFO/LFO
11MW Peak by 2023
Supply Capacity Generation, MWH
Capacity
PGUs CF% CF%
MW Peak Daily Annually Mix
Design Actual
HFO or LFO
11.00 85% 51% 11.00 134.870 49,228 88%
Base
Solar 5.00 18% 15% 3.50 17.750 6,479 12%
Total 16.00 40% 11.00 152.620 55,706 100%
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Solar 0.25 0.50 0.75 1.00 3.00 3.50 3.50 3.50 1.25 0.50
HFO/LFO Base 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.25 6.19 5.90 5.50 3.65 3.18 3.20 3.15 5.35 6.00 7.25 11.0 7.56 6.65 6.01 5.59 5.40
Total 5.37 5.25 5.15 5.12 5.15 5.25 5.75 6.50 6.69 6.65 6.50 6.65 6.68 6.70 6.65 6.60 6.50 7.25 11.0 7.56 6.65 6.01 5.59 5.40

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Case1: Island Grid ICE Tech-HFO/LFO
11MW Peak by 2023

Capacity and IPP Cost of Electricity Owned Facility


Generation, MWh
Mix PhP Million PhP Million
PGUs
MW % Peak Daily Annual GenRate Daily Annual GenCost Daily Annual

HFO or LFO
11.00 88% 11.00 134.870 49,228 7.50 1.012 369.207 6.50 0.877 319.979
Base

Solar 5.00 12% 3.50 17.750 6,479 6.50 0.115 42.112 4.50 0.080 29.154

Total 16.00 100% 11.00 152.620 55,706 1.127 411.319 0.957 349.133

Blended 7.38 6.27

AGR=HFO 11.50 11.50

AGR-LFO 18.00 18.00

Savings-
4.12 0.628 229.30 5.23 0.799 291.49
HFO
Savings-
10.62 1.620 591.39 11.73 1.791 653.58
LFO

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Case 2: Grid Connected Base Capacity
40MW Peak by 2023
40.00
Base Capacity - 15MW
35.00
Mid-Merit Capacity - 10MW
30.00 Peak Capacity - 15MW
Peak Demand - 40MW
25.00

20.00

15.00

10.00

5.00

-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Solar 0.50 1.00 1.50 2.00 6.00 7.00 7.00 7.00 2.50 1.00
Hydro2 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 2.50 1.75 1.75 1.75 1.75 1.75
Hydro1 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 2.50 1.75 1.75 1.75 1.75 1.75
GridSupply 15.7 15.1 14.9 14.6 15.1 15.4 17.3 18.6 19.2 19.0 17.9 13.7 13.5 14.0 13.7 18.0 18.7 21.8 35.0 21.8 20.5 17.3 16.7 15.9
Total 19.2 18.6 18.4 18.1 18.6 18.9 20.8 22.6 23.7 24.0 23.4 23.2 24.0 24.5 24.2 24.0 23.2 25.3 40.0 25.3 24.0 20.8 20.2 19.4

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Case 2: Grid Connected Base Capacity
40MW Peak by 2023

Supply Capacity Generation, MWh


Capacity
PGUs
CF%- CF% Mix
MW Peak Daily Annually
Design Actual

Grid Supply 30.00 50% 59% 35.00 424.07 154,784 78%

Hydro1 5.00 50% 36% 2.50 42.75 15,604 8%

Hydro2 5.00 50% 36% 2.50 42.75 15,604 8%

Solar 10.00 19% 15% 7.00 35.50 12,958 7%

Total 50.00 45% 40.00 545.07 198,949 100%

545.07 198,949

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Case 2: Grid Connected Base Capacity
40MW Peak by 2023
Capacity and IPP Cost of Electricity Owned Facility
Generation, MWh
Mix PhP Million PhP Million
PGUs
MW % Peak Daily Annual Daily Annual GenCost Daily Annual
GenRate
Grid
30.00 78% 35.00 424.067 154,784 6.00 2.544 928.706 6.00 2.544 928.706
Supply

Hydro1 5.00 8% 2.50 42.750 15,604 5.50 0.235 85.821 4.25 0.182 66.316

Hydro2 5.00 8% 2.50 42.750 15,604 5.50 0.235 85.821 4.25 0.182 66.316

Solar 10.00 7% 7.00 35.500 12,958 6.50 0.231 84.224 4.50 0.160 58.309

Total 50.00 100% 40.00 545.067 198,949 3.245 1,184.571 3.068 1,119.647

Blended 5.95 5.63

Grid Rate 6.00 6.00 3.270 1,193.70

Savings 0.05 0.025 9.13 0.37 0.203 74.05

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
RE Investment Incentives
➢ 7 Years income Tax Holiday
➢ Duty Free Importation on Capital Equipment
➢ Special Rate on Real Estate Tax
➢ (1.5% of RE asset net Book Value, net book value is maximum of 80% of installed value)
➢ Net Loss Carry-Over (Nolco)
➢ Reduced Corporate Income Tax Rate
➢ (10% of Net Taxable Income, from the 8th Year of Operation and Onwards

➢ Accelerated Depreciation of RE Assets


➢ (ONLY IF RE Project not able to avail of ITH)

➢ Zero Rated VAT


➢ Electricity Sale
➢ Purchase of local goods, properties and services for the development, construction and installation of RE
Power Generation Facility
➢ RE exploration and development up to conversion into power, including services performed by
contractors/subcontractors
➢ Tax Exemption from sale of Carbon Credits
➢ Tax Credit on Domestic Capital Equipment and Services
➢ 100% of VAT and Customs Duties paid

Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.


Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
AVGarcia Power Systems Corp.
The Energy Resource Company
www.avgarciapowersystems.com

Energy Solutions
Integrator and Provider

Adel Garcia, Jr. – PEE


Mobile: +63 917 522 2225
Email - adelgarcia@gmail.com
Email - adel.garcia@avgarciapowersystems.com

Energy Systems Integration AVGarcia Power Systems Corp. Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Q&A
RE Capacity Mix for Long
Term Embedded Capacity
Solutions in DX Grid Systems

Adel Garcia, Jr. – PEE


Mobile: +63 917 522 2225
Email - adelgarcia@gmail.com
Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Energy Systems Integration AVGarcia Power Systems Corp. Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Expertise and Services
Renewable, Alternative and Conventional Energy
Business Development, EPC and O&M
• Resource Identification and Assessment
• Site Assessment and Evaluation
• Engineering Studies: FS; ED; Hydrology; Seismic Hazard;
IEE/EIAS; EESS/Hecras; DIS/DAS & CFSIS/CFAS;
Survey&Topo
• Regulatory Compliance and Permitting
• Financial and Economic Study
• Engineering-Procurement-Construction
• Test and Commissioning
• 3rd Party Engineer for Lenders and Owners
• O&M Set-Up and O&M Services
Energy Systems Integration AVGarcia Power Systems Corp. Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Adelino V. Garcia, Jr.
Professional Electrical Engineer - Fellow
40 Years of Energy Systems Engineering
and
Business Management

Chairman and President Chairman


AVGarcia Power Systems, Corp. Alta Valeo Corporation

Chairman and President Chairman


Abdao Hydro Power Corp. Ballesteros Memorial Park Corp.

President President
Biyao Hydro Power Corporation NARRA RockWater Corporation

Energy Systems Integration AVGarcia Power Systems Corp. Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company
Expertise and Qualifications
• Executive Management of various businesses in Power
Generation and Utilization Industries; Agro-Industrial and
Related enterprises

• Project Development; Engineering, Design and Systems


Integration; Project Execution and Management; Operation
and Maintenance of an aggregate capacity of more than 6GW
of various Conventional and Renewable Power Generation
Technologies, such as Coal, Diesel, NG, Biomass/Biogas,
WTE, Hydro Solar, Wind and Fuel Cells

• Engineering and Execution of at least 6GW of Grid


Connection Facilities; from 15kV to 500kV

Energy Systems Integration AVGarcia Power Systems Corp. Suite 7H, 20 Lansbergh Place, 170 T Morato Ave.
Quezon City, Metro Manila, Tel: 372 9247
Generation - Distribution - Utilization Email: info@avgarciapowersystems.com
The Energy Resource Company

You might also like