BOQ of Drain & Culverts

Sr # Item Description Unit Qty Rate Amount Rs.

1.01 Dressing and Levelling of Drain bed. Sft

10.1 Compaction of bed complete works. Cft

Pouring of lean concrete (Ratio 1 : 4 : 8 ) including shifting of material levelling,


1.03 Cft
curing complete as per instruction of site engineer.

In Open Drain Pouring of RCC concrete (Ratio 1 : 2 : 4 ) in bed,walls,fillities etc


1.04 including shifting of material levelling, curing complete as per instruction of site Cft
engineer.
In Road Cross/Culvets Pouring of RCC concrete (Ratio 1 : 2 : 4 ) in
1.04 bed,walls,fillities etc including shifting of material levelling, curing complete as per Cft
instruction of site engineer.
Fixing of reinforcement bars including the cutting, bending, fixing and placing as
1.05 per desighn and shifting of material complete works as per instruction of site Kg
engineer.
Providing, fixing and removal of formwork fair face with marine ply including
1.06 shifting of material, wood, supports, nails and all associated works as per instruction Sft
of site engineer.

Providing and applying 2 coat of Bitument on surfaces aginst which earth is to be


1.07 Sft
filled shall be coated with two coats of bitumen

Total Value of Amendment in Pak Rs. -