This document contains a bill of quantities (BOQ) for drain and culvert works. It lists 7 items with their descriptions, units of measurement, quantities, rates, and amounts. The items include dressing and leveling drain beds, compacting beds, pouring lean and reinforced concrete in beds, walls and fillings, fixing reinforcement bars, providing formwork, and applying bitumen coating. The total value of works is not provided as it is marked as "-" (minus).
This document contains a bill of quantities (BOQ) for drain and culvert works. It lists 7 items with their descriptions, units of measurement, quantities, rates, and amounts. The items include dressing and leveling drain beds, compacting beds, pouring lean and reinforced concrete in beds, walls and fillings, fixing reinforcement bars, providing formwork, and applying bitumen coating. The total value of works is not provided as it is marked as "-" (minus).
This document contains a bill of quantities (BOQ) for drain and culvert works. It lists 7 items with their descriptions, units of measurement, quantities, rates, and amounts. The items include dressing and leveling drain beds, compacting beds, pouring lean and reinforced concrete in beds, walls and fillings, fixing reinforcement bars, providing formwork, and applying bitumen coating. The total value of works is not provided as it is marked as "-" (minus).
Pouring of lean concrete (Ratio 1 : 4 : 8 ) including shifting of material levelling,
1.03 Cft curing complete as per instruction of site engineer.
In Open Drain Pouring of RCC concrete (Ratio 1 : 2 : 4 ) in bed,walls,fillities etc
1.04 including shifting of material levelling, curing complete as per instruction of site Cft engineer. In Road Cross/Culvets Pouring of RCC concrete (Ratio 1 : 2 : 4 ) in 1.04 bed,walls,fillities etc including shifting of material levelling, curing complete as per Cft instruction of site engineer. Fixing of reinforcement bars including the cutting, bending, fixing and placing as 1.05 per desighn and shifting of material complete works as per instruction of site Kg engineer. Providing, fixing and removal of formwork fair face with marine ply including 1.06 shifting of material, wood, supports, nails and all associated works as per instruction Sft of site engineer.
Providing and applying 2 coat of Bitument on surfaces aginst which earth is to be
1.07 Sft filled shall be coated with two coats of bitumen