Professional Documents
Culture Documents
Penawaran BENUO TAKA PDF
Penawaran BENUO TAKA PDF
Kepada Yth,
PT. Benuo Taka
Attn: Bpk. Brisman
DENGAN HORMAT,
With the planned coal drilling work at the company you lead in PT. Benuo Taka Area,
Penajam Paser Utara, Kalimantan Utara. We intend to offer exploration services for the work
plan you need :
DRILLING SERVICES
NO URAIAN PEKERJAAN SATUAN HARGA SATUAN JUMLAH
1 Mobilization – Demobilization 1 Unit Rp 10.000.000 Rp 10.000.000
2 Drill Open Hole (Cuting) 1000 Meters Rp 180.000 Rp 180.000.000
3 Drill Coring 00 Meters Rp 250.000 Rp
4 Moving Charge > 250 meter Per meter Rp 5.000 Insidentil
5 Standby (Social issues) Per Hari/tim Rp 2.000.000 Insidentil
6 Corebox Per pcs Rp 200.000 As Request
7 Geophysical Loging Per Month Rp 100.000.000 Rp 100.000.000
Keterangan :
Drill Units use the Jacro-175 Unit = 5 Unit.
Work plan per point ± 100 meters (maximum).
Pipe type AW and Corebarell type HMLC
Drilling uses Open Hole and Coring drill systems
Implementer : 1 Drilling Team (Driller, Assistant and 3-4 people Helper)
Time Target : 2 Months
Geophysics Loging Unit charge / Month, if more will be calculated prorated
Price of using the geophysical logging unit includes man power (Operator logger and
Helper)
Mob demob cost including Unit and Man Power
Drill Price include PVC casing and Chemical
Total Rp 290.000.000
PPN 10% Rp 29.000.000
GRAND TOTAL Rp 319.000.000
1
3. Others
Location entry permits, security clearance and all compensation penalties caused by third
parties or other parties of any kind in the workplace are the responsibility of the
EMPLOYEE PARTY completely.
The validity period of this offer expires in thirty (30) days, and is negotiable according to
the wishes of PT. Krida Darma Andika
We hope this offer will be on demand and if we have questions we will be happy to explain.
Say thank you for your attention.
Best Regards,
HERDIYANTO T
Phone : 082151518784
Email : intibangunmulya@yahoo.com