Professional Documents
Culture Documents
Foot unloading
DRAINAGE Ø3"
4'-102"
1
MEZZANINE TO BE BRACED TO BACK WALL.
1
4" SS TREAD PLATE
(NOT SHOWN)
7'-6"
19'-4"
OPENING
OPENING OPENING HANDRAIL 3 SIDES
10'-2"
LUNG
HANDRAIL 3 SIDES HANDRAIL 3 SIDES
TANK
3 X4 BRACING AT 45°
(TYP)
2'-4"
12'-8"
8'-62"
1
NOTE. SUPPLEMENTARY STRUCTURE WILL BE REQUIRED SPRING LOADED
TO ACCOMMODATE TREAD PLATE. AUTO CLOSE GATES
ALL TREAD PLATE JOINTS TO BE FULLY WELDED.
TREAD PLATE (NOT SHOWN FOR CLARITY).
SEC'D WATER
INFEED HT
APPROX 114"
Exhaust
EL 125' 8" EL 125' 8"
NOTE.
1 1 THE MEZZANINE SHOWN IN THIS LAYOUT IS
10'-22" 10'-02" 9'-0" FOR REPRESENTATION ONLY AND IS NOT A
DEFINITIVE DESIGN.
EL 120' 9"
Vacuum Pipe @ EL 120' 3"
Offal Room
Crawl Space
EL 115' 0"
Chiller Room
Vacuum Cyclone 4" KICKER PLATE
LUNG MAXIMUM LOAD = MAXIMUM LOAD = MAXIMUM LOAD =
Doorframe Height TANK 5,000 LBS. 5,000 LBS. 3,000 LBS.
297"
3'-6"
249"
2'-0"
4'-02"
1
Feather Bin
3 X4 BRACING AT 45°
Muffler
(TYP)
10'-102"
1
Offal Bin 3 X4 BRACING AT 45°
(TYP)
94" Base Elevation 100' 0"
72" Vacuum Pump