The hydro test procedures for pumps outline that non-metallic pump casings will undergo hydro testing at 1.5 times the maximum allowable working pressure, calculated as 1.1 times the shut off head at maximum impeller diameter plus static pressure. The casings will be held at this pressure for 30 minutes while leakage and pressure drop are monitored, and no leakage or drop indicates an acceptable casing for further assembly. Pressure gauges used in testing are calibrated annually, and project-specific tests will follow approved data sheets and quality assurance plans.
The hydro test procedures for pumps outline that non-metallic pump casings will undergo hydro testing at 1.5 times the maximum allowable working pressure, calculated as 1.1 times the shut off head at maximum impeller diameter plus static pressure. The casings will be held at this pressure for 30 minutes while leakage and pressure drop are monitored, and no leakage or drop indicates an acceptable casing for further assembly. Pressure gauges used in testing are calibrated annually, and project-specific tests will follow approved data sheets and quality assurance plans.
The hydro test procedures for pumps outline that non-metallic pump casings will undergo hydro testing at 1.5 times the maximum allowable working pressure, calculated as 1.1 times the shut off head at maximum impeller diameter plus static pressure. The casings will be held at this pressure for 30 minutes while leakage and pressure drop are monitored, and no leakage or drop indicates an acceptable casing for further assembly. Pressure gauges used in testing are calibrated annually, and project-specific tests will follow approved data sheets and quality assurance plans.
DATE:10.02.2017 17.06.2019 BELOW MENTIONED PROCEDURE WILL BE FOLLOWED FOR HYDRO TEST OF PUMPS
HYDRO TEST WILL BE CONDUCTED ONLY FOR CASING IN NON METALLIC
PUMPS . HYDRO TEST PRESSURE FOR CASINGS WILL BE SET 1.5 TIMES MAWP. MAWP WILL BE CALCULATED BY FORMULA = (1.1 X SHUT OFF HEAD AT MAX IMPELLER DIA OF PROPOSED PUMP MODEL) + S.P. HOLD TIME FOR HYDRO TEST PRESSURE WILL BE 30 MINS. DURING THIS 30 MINS LEAKAGE OR PRESSURE DROP IS TO BE MONITORED. NO LEAKAGE OR NO PRESSURE DROP INDICATES THAT TESTED CASING IS ACCEPTABLE FOR FURTHER ASSEMBLY. PRESSURE GAUGE USED IN HYDRO TESTS ARE CALIBRATED ANNUALLY. FOR PROJECTS HYDRO TEST PRESSURE WILL BE AS PER APPROVED DATA SHEET & QAP. CHLORIDE CONTENT OF LIQUID IS NOT APPLICABLE AS CASING TO BE HYDRO TESTED ARE NON METALLIC MADE OF GFRPP M.O.C.