PROJECT: DIAMOND
AARTI INDUSTRIES LIMITED
DAHEJ, GUJARAT
DOCUMENT TITLE
MECHANICAL DATA SHEET FOR DRAIN TANK (5ST-0307)
PROJECT NUMBER
017
4 SERVICE SO3 100% / 25% , OLEUM 25% WORKING CAPACITY (m3) 25.00
5 DESIGN DATA
6 DESIGN CODE ASME SECTION VIII DIV.1 EDITION 2017 CODE STAMP NA
10 ORIENTATION HORIZONTAL NA NA
22 MAWP bar(g) - NA NA
25 RADIOGRAPHY FULL NA NA
29 DUTY (Kw) NA NA NA
32 INSULATION NO NA NA
34 INSPECTION WEIGHTS
1 35 POST WELD HEAT TREATMENT AS PER CODE ( IF APPLICABLE ) EMPTY WEIGHT (KG) 8100
42 MATERIALS
43 SHELL SA-516 GR.70 BOLTS & NUTS (EXT) SA 193 GR B7 & SA 194 GR 2H (NOTE-23)
44 HEADS SA-516 GR.70 BOLTS & NUTS (INT) SA 193 GR B7 & SA 194 GR 2H
45 JACKET NA GASKETS SEE NOTE-14
46 NOZZLE NECKS ≤ 200 NB SA-106 Gr.B EXT. ATTCHMENTS SA-283 GR.C / SA-36
47 NOZZLE FLANGES SA-105 EARTHING BOSS SS 304
48 NOZZLE NECKS > 200 NB SA-516 GR.70 NAME PLATE SS 304
49 REINFORCING PAD SA-516 GR.70 LIFTING LUG / PAD SA-283 GR.C / SA-36 / SA-516 GR.70
64 L&P CLIPS-PADS YES SUPPORT (SADDLE / LUG / LEG / SKIRT) RCC SADDLE (NOTE-31)
68 DAVITS(MANWAY) YES
2 of 5
ANCHOR BOLT YES
DIAMOND PROJECT
18 N16 40 SPARE (DRAIN) 1 80 B16.5 150# WNRF 150 -- NOTE-E (ON BOOT)
21
22
23
24 Note A - Thermowell to bottom of vessel
25 Note B - Nozzle flange type may change later
26 Note C - Dip pipe shall have necessary support arrangement in order to minimize the Turbulence effect on Dip pipe from rotating agitators blades. Provide impingement
plate below dip pipe (whenever applicable).
27 Note D - Agitator mounting nozzle shall be designed considering the additional loads like Weight of Agitator, Motor and its Drive Assembly. Also the
28 applicable Dynamic loads shall be considered.
29 Note E - With Blind Flange, Gasket & Stud with Nuts.
30 Note F - With Davit
31 Note G - With Handle
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60 3 of 5
DIAMOND PROJECT
6 As per MR.
7 5) Seismic loads
8 As per MR.
20 Primer Coat : Epoxy Zinc Rich Primer with Activated Zinc (Avantgard-550) 70micron DFT, Hempel make.
21 16) When Dissimilar welds are performed intensive care & welding control shall be applied & detail welding data shall be noted in WPS & PQR.
22 17) All machined surfaces shall be check for surface defects by DP/MP test after machining.
23 18) Hydrotest shall be carried out by service gasket only.
24 19) Deleted
25 20) Bolt holes shall be straddle to principle horizontal & vertical centre line in elevation & the north south centre of plan, unless otherwise specified.
26 21) Nozzle flanges have 1/8" NPT test hole & shall be soap solution tested with air at 15 PSIG & holes closed.
27 22) Deleted
28 23) All CS/ LAS external bolting shall be HDG (Hot Dip Galvanised).
29 24) Weld Seams of Dish Ends shall be 100% radiographed after forming and heat treatment (if any).
30 25) All External attachments welded to the pressure part shall be same as pressure parts / equivalent material.
31 26) Deleted.
32 27) Internal Bolts & Nuts shall be provided with one Hexagonal Bolt, One hexagonal Nut, One Dome Headed Nut, Spring washer and Plain washer.
33 28) Provide 3 sets of Hard Copy Document & 1 set of soft copy Document with Equipment dispatch.
34 29) All vertical nozzle and Saddle shall be perpendicular to true horizontal centre line.
35 30) All Horizontal nozzle shall be parallel to true horizontal centre line.
36 31) Foundation bolt is in Vendors Scope.
37 32) PDS Ref. number - Datasheet and GAD - EP/ AILJ / 5 / GA - 405 by ENPRO Enviro. Tech and Engineers Pvt. Limited
38