Original POW Estimated Test Min. No. of Sample Test Total Test Test Amount of
Item No. Description Unit REMARKS
Quantity Direct Cost (P) Required Test Req'd. Requirements Required Unit Cost Test
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
= (4)/(8) x (7) = (9) x (10)
PART C - EARTHWORKS
100 Clearing and Grubbing ha. IR 1 whole area 1 -
101 Removal of Stuctures and Obstruction ls. IR 1 whole area 1 -
102 Roadway Excavation (Surplus Unclassified) cu.m. IR 1 - (IR) if materials are surplus excavation
P 1 for every 1500 cu m. - Apply (P) test if unsuitable excavation
103 Structure Excavation cu.m. G 1 -
P 1 for every 1500 cu m. - if materials are to be incorporated in the work
C 1 -
104 Embankment cu.m. G 1 -
P 1 for every 1500 cu m. -
C 1 -
FDT 3 for every 500 sq.m. - Layer placed not exceeding 200mm in loose measurement
105 Sub-Grade Preparation sq.m G 1 -
P 1 for every 1500 cu m. - subgrade thickness of 200mm
C 1 -
FDT 3 for every 500 sq.m. - 3 FDT Test per set
PART D - SUBBASE & BASE COURSE
200 Aggregate Sub Base Coarse cu.m. G 1 -
for every 300 cu m.
P 1 -
C 1 -
for every 1500 cu m.
Q1 1
CBR 1 for every 2500 cum -
FDT 3 for every 500 sq.m. - 3-FDT @ every 150mm/layer of subbase coarse
201 Aggregate Base Coarse cu.m. G 1 -
for every 300 cu m.
P 1 -
C 1 -
for every 1500 cu m.
Q1 1 -
FDT 3 for every 500 sq.m. - 3-FDT @ every 150mm/layer of base coarse
PART E - SURFACE COURSE
301 Bitunimous Prime Coat sq.m Q1 1 for every 40 t
1 to 2 L/m2
or 200 drums
310 Bituminous Concrete Surface Course, Hot Laid
a.) Aggregates G 1 for every 75 cu.m
P 1 or 130 t
Q4 1
Q6 for every 1500 cu m. Apply Q3 or Q4 if source not yet tested
F 1
b.) Bituminous Materials Q1 1 for every 40 t 5 to 8 mass percent of total dry aggregates
c.) Mix G 1
E 1 75 cu.m
For every
Sty 1 130 t
C 1
d.) Hydrated Lime Ql 1 for every 100 t
e.) Mineral Filler G 1
for every 75 cu m.
P 1
f. Compacted Pavement (Asphalt) For each full day's operation - at least one but not more
FDT 1 for each day operation
than three samples shall be taken
Ta 1 for every 100 m core drilling and compression test
Page 2 of 3

Annex 9 PHILIPPINE RURAL DEVELOPMENT PROJECT


Sub-Project Title:
Location:
PLGU LOGO
MINIMUM MATERIALS TESTING REQUIREMENT (FOR ROADS)

Original POW Estimated Test Min. No. of Sample Test Total Test Test Amount of
Item No. Description Unit REMARKS
Quantity Direct Cost (P) Required Test Req'd. Requirements Required Unit Cost Test
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
= (4)/(8) x (7) = (9) x (10)
311 Portland Cement Concrete Pavement cu.m.
a.)Cement bags PEC 1 for every delivery -
Project Engineer Certificate or Mill Certificate
MC
Qc 1 for every 2000 bags apply Qc if source is questionable or per concrete trial mix result
b.) Fine Aggregates Q4 1 for every 1500 cu m. apply Q3 test, if source not yet tested
G 1 for every 75 cu m. Additional test (G) if delivered materials are inconsistent
c.) Coarse Aggregates Q6 1 for every 1500 cu m. apply Q5 test, if source not yet tested
G 1 for every 75 cu m. Additional test (G) if delivered materials are inconsistent
d.) Water PEC 1 for the whole work Inspection Report or Qw if source is questionable
Qw 1 for the whole work
e.)Joint Filler PEC -
1 for every Inspection Report or Mill Test Certificate
MC
f.)Steel Bars Q7 1 for every 10000 kg - Dowels
MC for every delivery
g.)Concrete Ft or Ct 3 for every 75 cu.m 3 beam or cylinder samples per set for 75 cu.m or batch day
St 1 for every batch/day Per batch if consistency is questionable
h.) Concrete Pavement sq.m Tc 5 per km/lane core drilling and compression test
407 Concrete Structures
404 Reinforicng Steel works kgs. Q7 1 for every 10000 kg - 1 sample per size
405 Structural Concrete cu.m.
a.)Cement # of bags Qc 1 for every 2000 bags - apply Qc if source is questionable
MC 1 for every delivery
b.) Fine Aggregates cu.m. Q4 1 for every 1500 cu m. apply Q3 test, if source not yet tested
G 1 for every 75 cu m. Additional test (G) if delivered materials are inconsistent
c.) Coarse Aggregates cu.m. Q6 1 for every 1500 cu m. apply Q5 test, if source not yet tested
G 1 for every 75 cu m. Additional test (G) if delivered materials are inconsistent
d.) Water PEC 1
Qw Inspection Report or Qw if source is questionable
e.)Concrete cu.m. Ct 3 for every 75 cu.m 3 cylinder samples per set for 75 cu.m or batch day
St 1 for every batch/day
PART G - DRAINAGE & SLOPE PROTECTION
500 Reinforced Concrete Pipe Culvert (RCPC) l.m.
a.) Pipes PEC 1 for every size
Inspection report or Mill Certificate
MC
b.)Cement Qc 1 for every 2000 bags - apply Qc if source is questionable
MC 1 for every delivery
c.) Fine Aggregates Q4 1 for every 1500 cu m. - apply Q3 test, if source not yet tested
G 1 for every 75 cu m. Additional test (G) if delivered materials are inconsistent
d.)Reinforcing Steel Bars Q7 1 for every 10000 kg. - 1 sample per size
MC 1 for every delivery Mill Test Certficate
505 Stone Masonry cu.m.
a.)Cement Qc 1 for every 2000 bags - apply Qc if source is questionable
MC 1 for every delivery
b.)Fine Aggregates Q4 1 for every 1500 cu m. - apply Q3 test, if source not yet tested
G 1 for every 75 cu m. - Additional test (G) if delivered materials are inconsistent
c.)Stone IR 1 for the whole work
d.)Water PEC 1 for the whole work
Qw 1 for the whole work apply Qw test if source is questionable
TOTAL COST

The number of tests indicated here in were based on the minimum test requirements from one source. In the event that the materials were taken from various sources, each material should be tested separately a number
of test should be on the same basis as the minimum requirements.

Submitted by: Reviewed By: Recommending Approval Approved By: cc: PSO/NPCO
__________________ _______________________ _______________________ _____________________
PROJECT MANAGER (CONTRACTOR) PPMIU ENGINEER PPMIU HEAD LCE
Page 3 of 3

Annex 9 PHILIPPINE RURAL DEVELOPMENT PROJECT


Sub-Project Title:
Location:
PLGU LOGO
MINIMUM MATERIALS TESTING REQUIREMENT (FOR ROADS)

Original POW Estimated Test Min. No. of Sample Test Total Test Test Amount of
Item No. Description Unit REMARKS
Quantity Direct Cost (P) Required Test Req'd. Requirements Required Unit Cost Test
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
= (4)/(8) x (7) = (9) x (10)

LEGEND
IR - Inspection Report Q1 - Quality Test (Grading, Plasticity and Abrasion)
PEC - Project Engineer Certificate Q2 - Quality Test (Grading, Plasticity, Abrasion, Stripping and Bulk Specific Gravity)
G - Grading Q3 - Quality Test (Grading, Elutriation (Wash), Bulk Specific Gravity, Absorption, Mortar Strength, Soundness, Organic Impurities,
P - Plasticity Test Unit Weight, % Clay Lumps and Shale)
C - Laboratory Compaction Test Q4 - Quality Test (Grading Elutriation (Wash), Bulk Specific Gravity, Absorption and Mortar Strength)
FDT - Field Density Test Q5 - Quality Test (Grading, Bulk Specific Gravity, Absorption, Abrasion, Soundness and Unit Weight)
CBR - California Bearing Ratio Q6 - Quality Test (Grading, Bulk Specific Gravity, Absorption and Abrasion)
F - Fractured Face Q7 - Quality Test (Bending, Tension and Chemical Analysis) for Steel Bar
E - Extraction Qw - Physical Test for Water
R - Retained Stability Index Qp - Quality Test for Paint
Sty - Stability Ql - Quality Test for Hydrated Lime
Ft - Flexural Strength Test for Concrete Beam Sample Qs - Quality Test for Asphalt (Bituminous) Materials
Ct - Compressive Strength Test on Concrete Cylinder Sample Qc - Quality Test for Cement (Chemical or Physical)
St - Slump Test Qm - Quality Test for other Materials (Bearing Pad, Premolded Filler, Joint Filler, etc.)
Ta - Thickness Determination (Core Drilling and Compression Test) for Asphalt MC - Mill Test Certificate
Tc - Thickness Determination (Core Drilling and Compression Test) for PCC Pavement