KW

Blow molder 257 You handed over the manual


Air compressor 235 Mr Manikfan/yourself seen the drawing
Refrigeration for CSD 145 You handed me the manual
Chiller for blower 62 This was shown to you
Air conveyor 25 Do
25 TR Room A/C for blower room 35 Do
Room A/C for the panel room 7
Air extractor for the blower 2
Blower area lighting & misc. 10
Sub total 778

Hope this is reasonable considering


Proposed CSD Expansion 300 sugar treatment & offices
Total KW 1078
Blow mold Section
Total conncted KW 778
Load in KW excluding-SBO10 521
KW @ load factor 90% 469
Estimated totall load 569
Estimated total amps 1028

Proposed filling line


Estimated installed KW 300
Normal running KW 200
Estimated Amps 361

Total running Amps 1389

Also we are thinking of additions to


the above like blowing machine
Compressor est.starting amps 1000
Compressor est.running amps 338
Blow mold Section
Total conncted load. KW 778
Estimated totall running load 569
Estimated total running Amps. 1000
Proposed filling line
Estimated installed KW 300
Normal running KW 200
Estimated Amps 325
Total running Amps 1325

Also we are thinking of additions to


the above, like blowing machine
Compressor est.starting amps 1000
Compressor est.running amps 325