The document summarizes observations from reviewing a load test method statement, including 6 observations with requested clarifications or revisions noted. The key observations were that thermometers should be able to measure concrete temperature, loading should be done as shown in drawings using platforms, temperature corrections should be done for 2-3 days not just 24 hours as per SP51 guidelines, and loading and results should follow SP51 over a 2-3 day period. Revisions to the method statement were requested to address the inconsistencies.
The document summarizes observations from reviewing a load test method statement, including 6 observations with requested clarifications or revisions noted. The key observations were that thermometers should be able to measure concrete temperature, loading should be done as shown in drawings using platforms, temperature corrections should be done for 2-3 days not just 24 hours as per SP51 guidelines, and loading and results should follow SP51 over a 2-3 day period. Revisions to the method statement were requested to address the inconsistencies.
The document summarizes observations from reviewing a load test method statement, including 6 observations with requested clarifications or revisions noted. The key observations were that thermometers should be able to measure concrete temperature, loading should be done as shown in drawings using platforms, temperature corrections should be done for 2-3 days not just 24 hours as per SP51 guidelines, and loading and results should follow SP51 over a 2-3 day period. Revisions to the method statement were requested to address the inconsistencies.
No. 1 MANDATORY SAFETY Measures referred to REQUIREMENTS response to Load test Ramboll comment S. No. 10 may be added 2 Page 2 of document The thermometers used For thermometer a probe SCOPE should be able to measure could be inserted in Thermometers shall be attached the temperature of performed hole in concrete to soffit…… concrete and may be surface for measuring the embedded into the temperature. Concrete. 3 Page 3 of document It is inconsistent with the Loading should be done as Preparation Work drawings. shown in drawing we are It is proposed to use test The loading shown is by using the platforms for Static vehicles weighed properly for using platforms. Pl load and methodology live load reconcile. revised. 4 Page 4 SP51 suggests this should Agreed and revised the Temperature Corrections be done for 2 or 3 statement. The dial gauges and consecutive days, not just thermometers were placed in 24 hours. position 24 hours before commencement of the test. 5 Page 5 It is inconsistent with the Loading shall be done as Load testing drawings. shown in drawing we are The general loading and loading The loading shown is by using the platforms and sequence is as mentioned below using platforms. Pl sequence of loading and reconcile. unloading shall be done with the reference of drawing and IRC:SP51:2015 and statement revised. 6. Page 6 This should be 2 to 3 days. Agreed and we should be Results of Load test Refer SP 51. follow the guidelines as IRC: Readings of Thermometer & Dial SP51:2015, statement Gauges without any Live Load revised. for 24 hrs.