You are on page 1of 1

Performance review of Railway Division 2020-21 of Electrical//TRD Dept.

/IZN
for the month of September-2020
S.N Item (Unit) Proposed target (2020- Proportion Progress Cumulative up to
21) ate Target during September -2020
for September
September -2020
-2020
2 Capacity Enhancement
(b) Railway Section RKM 16 RKM NIL 108 RKM (CRS
Electrification KSJ-BC 108 inspection of KSJ-BC
(in RKM) BC-BPR-PBE 58 completed on
PBE-NRY 16 11.08.2020)
MDA-BRT 8
TOTAL 190

S.N Key Unit of Target Performance in Perform Proporti Cumulat Detailed Action plan for
performance measure last year in the ance in onate ive reason for improvement
indicator ment corresponding current target perform shortfall
month month ance
4.6 OHE 00 - NA 02 - 03 Material Regular foot
failure failure and patrolling of staff
panto is ensured as per
entanglement. ACTM. Stagger is
maintained as per
standard.

SATYENDRA Digitally signed by


SATYENDRA KUMAR SINGH

KUMAR SINGH +05'30'


Date: 2020.10.02 16:43:25

Sr.DEE/TRD/IZN

ADRM/Op/IZN

File No. E/63/TRD/IZN/KPI / dated: 02/10/2020

You might also like