Project : Ancillary Builidng (B06/B15A/C09A) Date: 28-01-2023

Location : Kandal

REPORT SUMMARY SUBMITTAL-PMIS

Submitted Date Completed Date


Doc.Type PMIS No. Items Revision Remark
(DD/MM/YY) (DD/MM/YY)
N0 INSPECTION REQUEST_(IR)
MATERIAL INSPECTION REQUEST_(MIR)

TIA_B06_MASTER SCHEDULE_30OCT2022_
NPPIA-G-71-51-SMT-GN-1659 02 29/11/2022 09/12/2022 Resubmit
REV02_DETAIL#STM-001

1 Submittal (SMT)
TIA_B06_MASTER SCHEDULE_2023315_
NPPIA-G-71-51-SMT-GN-2165 03 17-Mar-2023 RR by MCC
REV03_DETAIL#STM-001-a

TIA_C09A_ANCILLARY_BUILDINGS_MASTER_SCHEDULE_30OCT2022_REV02
NPPIA-G-71-51-SMT-GN-1660 02 29/11/2022 09/12/2022 Resubmit
_DETAIL#STM-002

2 Submittal (SMT)
TIA_C09A_ANCILLARY_BUILDINGS_MASTER_SCHEDULE_20230315_REV03_
NPPIA-G-71-51-SMT-GN-2166 03 17-Mar-2023 RR by MCC
DETAIL#STM-002-a

NPPIA-G-71-51-SMT-GN-1661 TIA_B15A_MASTER SCHEDULE_30OCT2022_REV02_DETAIL#STM-003 02 29/11/2022 09/12/2022 Resubmit

3 Submittal (SMT)

NPPIA-G-71-51-SMT-GN-2167 TIA_B15A_MASTER SCHEDULE_2023315_REV03_DETAIL#STM-003-a 03 17-Mar-2023 RR by MCC

4 Submittal (SMT) NPPIA-G-71-51-SMT-GN-1989 TIA_C09A_B15A_B06_STRUCTURAL WORK ITP AND CHECK LIST #STM-004 00 10/02/2023 24/02/2023 Resubmit
Project : Air Traffic Control Tower Date: 28-05-2022
Location : Kandal

REPORT SUMMARY SUBMITTAL-PMIS

Doc.Type PMIS No. From PMC PMIS No. Sub. Items Revision Receive Date Submit Date Complete Date Remark
Field Instruction_(FI)
Field Instruction_(FI)

Non-Conformance Report_(NCR)
Non-Conformance
NPPIA-G-01-51-NC-QC-0012 NPPIA-G-71-51-NC-GN-0017 PMC_AB-C09A-001 Casting lean Concrete without IR 00 11-Feb-23 20-Mar-23 Open
Report_(NCR)
Project : Ancillary Builidng (B06/B15A/C09A) Date: 28-01-2023
Location : Kandal

REPORT SUMMARY SUBMITTAL-PMIS

Submitted Date Completed Date


Doc.Type PMIS No. Items Revision Remark
(DD/MM/YY) (DD/MM/YY)
N0
INSPECTION REQUEST_(IR)
Submittla (STM)
MATERIAL INSPECTION REQUEST_(MIR)

Approved and
NPPIA-G-71-51-SMT-GN-1573 ANCILLARY C09A,B15A,B06-Material Steel Reinforced Bar #SMT-STR-001 00 16-Nov-22 12-Oct-22
Resubmit

Revised and
1 Submittla (STM) NPPIA-G-71-51-SMT-GN-1763 ANCILLARY C09A_B15A_B06-Material Steel Reinforced Bar (E-001-Rev1-a&b) #SMT-STR-001-a 01 16-Nov-22 1-Dec-23
Resubmit

NPPIA-G-71-51-SMT-GN-2005 ANCILLARY C09A,B15A,B06-Material Steel Reinforced Bar #SMT-STR-001-b 02 13-Feb-23 10-Mar-23 Approved

ANCILLARY C09A_B15A_B06_Material Concrete Cy28 MPa +Small Agg + Water tight


2 Submittla (STM) NPPIA-G-71-51-SMT-GN-1668 00 1-Dec-22 17-Dec-22 Approved As Note
Slump 16+-2cm (CONCRETE TRAIL MIX CODE CS112) #STM-STR-002

ANCILLARY C09A_B15A_B06_Material Concrete Cy28 MPa Slump 16+-2cm


3 Submittla (STM) NPPIA-G-71-51-SMT-GN-1669 00 1-Dec-22 17-Dec-22 Approved As Note
(CONCRETE TRAIL MIX CODE CS036) #STM-STR-003

ANCILLARY C09A_B15A_B06_Material Concrete Cy28 MPa + Small Agg Slump 16+-2cm


4 Submittla (STM) NPPIA-G-71-51-SMT-GN-1671 00 1-Dec-22 19-Dec-22 Approved As Note
(CONCRETE TRIAL MIX CODE CS205) #STM-STR-005

Revised and
5 Submittla (STM) NPPIA-G-71-51-SMT-GN-1672 ANCILLARY C09A_B15A_B06_Material Concrete Cy28 MPa Slump 12+-2cm (CONCRETE TRIAL MIX CODE CS006) #STM-STR-006 00 1-Dec-22 19-Dec-22
Resubmit

Reciept
6 Submittla (STM) NPPIA-G-71-51-SMT-GN-1933 ANCILLARY C09A_B15A_B06_Material Concrete Cy28 MPa Slump 12+-2cm (CONCRETE TRIAL MIX CODE CS006) #STM-STR-006-a 01 28-Jan-23 20-Feb-23
Acknowledge

7 Submittla (STM) NPPIA-G-71-51-SMT-GN-1699 ANCILLARY C09A_B15A_B06_Material Concrete Cy16 MPa Slump 16+-2cm (CONCRETE TRIAL MIX CODE CS032-2) #STM-STR-007 00 1-Dec-22 19-Dec-22 Approved As Note

ANCILLARY C09A_B15A_B06_Material Concrete Cy20 MPa + Small Agg+ Water tight Slump 14+-2cm (CONCRETE TRIAL MIX CODE Revised and
8 Submittla (STM) NPPIA-G-71-51-SMT-GN-1764 00 16-Dec-22 30-Dec-22
CS095) #STM-STR-008 Resubmit

Revised and
9 Submittla (STM) NPPIA-G-71-51-SMT-GN-1765 ANCILLARY C09A_B15A_B06_Material Concrete Cy20 MPa Slump 16+-2cm (CONCRETE TRIAL MIX CODE CS034-3) #STM-STR-009 00 16/12/2022 30-Dec-22
Resubmit

ANCILLARY C09A_B15A_B06_Material Concrete Cy20 MPa+Small Agg+ Water tight Slump 12+-2cm (CONCRETE TRIAL MIX CODE Revised and
10 Submittla (STM) NPPIA-G-71-51-SMT-GN-1766 00 16-Dec-22 30-Dec-22
CS080) #STM-STR-010 Resubmit

11 Submittla (STM) NPPIA-G-71-51-SMT-GN-1924 ANCILLARY C09A_B15A_B06_Material Waterproofing #STM-STR-011 00 25-Jan-23 23-Feb-23 AAN

ANCILLARY C09A_B15A_B06_Material Concrete Cy28 MPa Water tight P8 Slump 14+-2cm (CONCRETE TRIAL MIX CODE CS097)
12 Submittla (STM) NPPIA-G-71-51-SMT-GN-1929 00 27-Jan-23 1-Feb-23 Approved
#STM-STR-012

13 Submittla (STM) NPPIA-G-71-51-SMT-GN-2000 ANCILLARY C09A_B15A_B06_Material Anti Termite #STM-STR-013 00 11-Feb-23 17-Mar-23 AAN
Project : Ancillary Builidng (B06/B15A/C09A) Date: 28-01-2023
Location : Kandal

Submittla (STM) NPPIA-G-71-51-SMT-GN-2002 ANCILLARY C09A_B15A_B06_Material Sand backfilled for structural work #STM-STR-014 00 11-Feb-23 17-Mar-23 RR

14

Submittla (STM) NPPIA-G-71-51-SMT-GN-2156 ANCILLARY C09A_B15A_B06_Material Sand backfilled for structural work (Rev1) #STM-STR-014-a 01 15-Mar-23 24-Mar-23 Approved

15 Submittla (STM) NPPIA-G-71-51-SMT-GN-2085 ANCILLARY C09A_B15A_B06_Material coupler 28mm for structural work #STM-STR-015 00 1-Mar-23 24-Mar-23 Approved

16 Submittla (STM) NPPIA-G-71-51-SMT-GN-2130 ANCILLARY C09A_B15A_B06_Material Anti-termite PE pipe fitings #STM-STR-016 00 10-Mar-23 Cancel

Submittla (STM) NPPIA-G-71-51-SMT-GN-2198 ANCILLARY C09A_B15A_B06_Sample TEKCOM Film Faced Plywood #STM-STR-017 00 23-Mar-23 RR

17

Submittla (STM) NPPIA-G-71-51-SMT-GN-2199 ANCILLARY C09A_B15A_B06_Material TEKCOM Film Faced Plywood #STM-STR-017-a 00 23-Mar-23 7-Apr-23 Approved

18 Submittla (STM) NPPIA-G-71-51-SMT-GN-2212 ANCILLARY C09A_B15A_B06_Material Sika for Expansion Joint and others #STM-STR-018 00 24-Mar-23 On progress

19 Submittla (STM) NPPIA-G-71-51-SMT-GN-2221 ANCILLARY C09A_B15A_B06_Material Concrete Block for formwork #STM-STR-019 00 28-Mar-23 6-Apr-23 RR

20 Submittla (STM) NPPIA-G-71-51-SMT-GN-2246 ANCILLARY C09A_B15A_B06_Material Anti termite F.A.C.T #STM-STR-020 00 31-Mar-23 On progress