CEILING CASSETTE
Cooling Cap. at 19ºCWB Maximum Piping Length (m)
HP FCU CU
(btu/hr) Total Length Height Difference
2.0 FCF50CVM RZF50CVM 17,100 (10,900-19,100) 50 30
2.5 FCF60CVM RZF60CVM 20,500 (10,900-20,500) 50 30
3.0 FCF71CVM RZF71CVM 24,200 (10,900-27,300) 50 30
4.0 FCF100CVM RZF100CVM 34,100 (17,100-38,200) 50 30
5.0 FCF125CVM RZF125CVM 42,700 (19,500-47,800) 50 30
5.5 FCF140CVM RZF140CVM 47,800 (21,200-52,900) 50 30
CEILING DUCTED
Cooling Cap. at 19ºCWB Maximum Piping Length (m)
HP FCU CU
(btu/hr) Total Length Height Difference
2.0 FBA50BVMA RZR50MVM 17,100 (10,900-19,100) 50 30
2.5 FBA60BVMA RZR60MVM 20,500 (10,900-20,500) 50 30
3.0 FBA71BVMA RZR71MVM 24,200 (10,900-27,300) 50 30
4.0 FBA100BVMA RZR100MVM 34,100 (17,100-38,200) 50 30
5.0 FBA125BVMA RZR125MVM 42,700 (19,500-47,800) 50 30
5.5 FBA140BVMA RZR140MVM 47,800 (21,200-52,900) 50 30
CEILING EXPOSED
Cooling Cap. at 19ºCWB Maximum Piping Length (m)
HP FCU CU
(btu/hr) Total Length Height Difference
2.0 FHA50BVMA RZR50MVM 17,100 (10,900-19,100) 50 30
2.5 FHA60BVMA RZR60MVM 20,500 (10,900-20,500) 50 30
3.0 FHA71BVMA RZR71MVM 24,200 (10,900-27,300) 50 30
4.0 FHA100BVMA RZR100MVM 34,100 (17,100-38,200) 50 30
5.0 FHA125BVMA RZR125MVM 42,700 (19,500-47,800) 50 30
5.5 FHA140BVMA RZR140MVM 47,800 (21,200-52,900) 50 30
\ D’Info NO. CS 20-01 13 April 2020
No. CS 20-01
CEILING CASSETTE
Cooling Cap. at 19ºCWB Maximum Piping Length (m)
HP FCU CU
(btu/hr) Total Length Height Difference
2.0 FCC50AV1M RC50AV1M 18,500 35 20
2.5 FCC60AV1M RC60AV1M 24,000 35 20
3.0 FCC85AV1M RC85AV1M 30,000 50 30
3.5 FCC100AV1M RC100AV1M 36,000 50 30
4.0 FCC125AV1M RC125AY1M 42,000 50 30
5.0 FCC140AV1M RC140AY1M 48,000 50 30
CEILING DUCTED
Cooling Cap. at 19ºCWB Maximum Piping Length (m)
HP FCU CU
(btu/hr) Total Length Height Difference
2.0 FDMC50AV1M RC50AV1M 18,500 35 20
2.5 FDMC60AV1M RC60AV1M 23,500 35 20
3.0 FDMC85AV1M RC85AV1M 30,000 50 30
3.5 FDMC100AV1M RC100AV1M 36,000 50 30
4.0 FDMC125AV1M RC125AY1M 42,000 50 30
5.0 FDMC140AV1M RC140AY1M 48,000 50 30
6.0 FDMC160AV1M RC160AY1M 55,000 50 30
CEILING EXPOSED
Cooling Cap. at 19ºCWB Maximum Piping Length (m)
HP FCU CU
(btu/hr) Total Length Height Difference
2.0 FHC50AV1M RC50AV1M 18,500 35 20
2.5 FHC60AV1M RC60AV1M 23,500 35 20
3.0 FHC85AV1M RC85AV1M 29,500 50 30
3.5 FHC100AV1M RC100AV1M 36,000 50 30
4.0 FHC125AV1M RC125AY1M 42,000 50 30
5.0 FHC140AV1M RC140AY1M 46,000 50 30
6.0 FHC160AV1M RC160AY1M 55,000 50 30
\ D’Info NO. CS 20-01 13 April 2020
No. CS 20-01
30 m
6m
5m
5m
5m
15 m
20 m
5m
30+6+5+5+5+15+20 = 86 m
Actual piping length (Equivalent)
< 165 m
Between the first indoor branch and the farthest indoor 5+5+5+15+20 = 50 m
unit < 90 m
5+5+5+5 = 20 m
Elevation between the indoor units
< 30 m
6+5+5+5+5 = 26 m
Elevation between the outdoor units and the indoor units
< 90 m