You are on page 1of 21

SCOPE kVA 25 Kva

EXISTING
Main CB 125
Wire 30
Grounding 14
Conduit 32
Branch Number Branch Name Actual ampereAT Size Wire Size
1 RECTIFER 1 23.16 100 30
2 PERIMETER LIGHT 0 30 5.5
3 NO LABEL 0 20 3.5
4 TOWER LIGHT 0 50 14
5 GLOVE WIFI MACRO 0 20 3.5
6 RECTIFIER 25.29 100 30
7
8

PROPOSED
Branch Number Branch Name Load (VA) Branch Size
1 RECITIFIER 1 10750 100
2 PERIMETER LIGHT 250 30
3 NO LABEL 250 20
4 TOWER LIGHT 250 50
5 GLOBE WIFI MACRO 250 20
6 RECTIFIER 10750 100
7
8
Ampere Calc With DF Needed
97.8260869565 122.2826 0
BOQ
Wire Ground Existing G Wire and Conduit Size
Main 38 14 32 mm Φ IMC
Branch 1 30 8.0 14 30Φmm EMT / 32Φmm PVC
Branch 2 5.5 3.5 3.5 15Φmm EMT / 20Φmm PVC
Branch 3 3.5 3.5 3.5 15Φmm EMT / 20Φmm PVC
Branch 4 14 5.5 5.5 20Φmm EMT / 25Φmm PVC
Branch 5 3.5 3.5 3.5 15Φmm EMT / 20Φmm PVC
Branch 6 30 8.0 14 30Φmm EMT / 32Φmm PVC
Branch 7 0
Branch 8 0
Branch 9 0
Branch 10 0
Branch 11 0
Branch 12 0
BOQ
BRANCH CIRCUIT FEEDER WIRE EXISTING BRANCH CIRCUIT FEEDER WIRE PROPOSED
2 -30mm2 THHN/1 - 14mm2 THHN (G) 2 -38mm2 THHN/1 - 14mm2 THHN (G)
2 -30mm2 THHN/1 - 14mm2 THHN (G) 2 -30mm2 THHN/1 - 8.0mm2 THHN (G)
2 -5.5mm2 THHN/1 - 3.5mm2 THHN (G) 2 -5.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G) 2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -14mm2 THHN/1 - 5.5mm2 THHN (G) 2 -14mm2 THHN/1 - 5.5mm2 THHN (G)
2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G) 2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -30mm2 THHN/1 - 14mm2 THHN (G) 2 -30mm2 THHN/1 - 8.0mm2 THHN (G)
2 -mm2 THHN/1 - FALSEmm2 THHN (G) 2 -mm2 THHN/1 - mm2 THHN (G)
2 -mm2 THHN/1 - FALSEmm2 THHN (G) 2 -mm2 THHN/1 - mm2 THHN (G)
2 -mm2 THHN/1 - FALSEmm2 THHN (G) 2 -mm2 THHN/1 - mm2 THHN (G)
2 -mm2 THHN/1 - FALSEmm2 THHN (G) 2 -mm2 THHN/1 - mm2 THHN (G)
2 -mm2 THHN/1 - FALSEmm2 THHN (G) 2 -mm2 THHN/1 - mm2 THHN (G)
2 -mm2 THHN/1 - FALSEmm2 THHN (G) 2 -mm2 THHN/1 - mm2 THHN (G)
2 -mm2 THHN/1 - 14mm2 THHN (G)
Main Amperage Ampere Frame SCOPE kVA AT Sizes
Existing Wire and Conduit S125 225 25 kVA 20
32 mm Φ IMC 225 37.5 kVA 30
50 kVA 40
50
60
70
100
Wire Sizes Ampere Rating Conduit Size
3.5 60 20
5.5 75 25
8 100 32
14 125 40
22 150 47
30 175 59
38 200
50 225
60 250
80
100
125
150
175
200
250
EXISTING AC POWER (ACPDB)
CKT
LOAD DESCRIPTION VOLTS
NO.

1 RECTIFER 1 230
2 PERIMETER LIGHT 230
3 NO LABEL 230
4 TOWER LIGHT 230
5 GLOVE WIFI MACRO 230
6 RECTIFIER 230

TOTAL

LOAD COMPUTATION
Calculation of Load =
=
=

PROPOSED AC POWER (ACPDB


CKT
LOAD DESCRIPTION VOLTS
NO.
1 RECITIFIER 1 230
2 PERIMETER LIGHT 230
3 NO LABEL 230
4 TOWER LIGHT 230
5 GLOBE WIFI MACRO 230
6 RECTIFIER 230

TOTAL

LOAD COMPUTATION =
=
ITOTAL=
=
WER (ACPDB)
ACTUAL PROTECTION
LOAD (VA)
AMPERE AT AF POLE
697 23.16 100 225 2
0 0 30 100 2
0 0 20 100 2
0 0 50 100 2
0 0 20 100 2
5816.7 25.29 100 225 2

6513.70 48.450

6513.7 VA / 230 V
(48.45 A) (1.25 DF)
60.56 A

OWER (ACPDB)
PROTECTION
LOAD (VA) AMPERE
AT AF POLE
10750 46.739 100 225 2
250 1.087 30 100 2
250 1.087 20 100 2
250 1.087 50 100 2
250 1.087 20 100 2
10750 46.739 100 225 2

22500 97.826

22500 VA / 230 V
97.83 A
(97.826 A) (1.25 DF)
122.28 A
BRANCH CIRCUIT CONDUCTOR

2 -30mm2 THHN/1 - 14mm2 THHN (G)


2 -5.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -14mm2 THHN/1 - 5.5mm2 THHN (G)
2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -30mm2 THHN/1 - 14mm2 THHN (G)

SIZE OF MAIN CB & FEEDER USE:


MAIN: 125 AT, 225 AF 2P/ 230V/240V CB FOR MAIN
FEEDER: 2 -38mm2 THHN/1 - 14mm2 THHN (G)
32mmΦ IMC
BRANCH CIRCUIT CONDUCTOR

2 -30mm2 THHN/1 - 8.0mm2 THHN (G)


2 -5.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -14mm2 THHN/1 - 5.5mm2 THHN (G)
2 -3.5mm2 THHN/1 - 3.5mm2 THHN (G)
2 -30mm2 THHN/1 - 8.0mm2 THHN (G)

SIZE OF MAIN CB & FEEDER USE:


MAIN: 125 AT, 225 AF 2P/ 230V/240V CB FOR MAIN
FEEDER: 2 -38mm2 THHN/1 - 14mm2 THHN (G)
32mmΦ IMC
CONDUIT SIZE

30Φmm EMT / 32Φmm PVC


15Φmm EMT / 20Φmm PVC
15Φmm EMT / 20Φmm PVC
20Φmm EMT / 25Φmm PVC
15Φmm EMT / 20Φmm PVC
30Φmm EMT / 32Φmm PVC
VD = VOLTAGE DROP
I = LOAD CURRENT (AMPERES)
L = ONE WAY LENGTH OF CIRCUIT
R = CONDUCTOR RESISTANCE
E = VOLTAGE

VD = (2) (I) (L) (R)


1000

VD = (2) (118.07)(45)(0.661)
1000
VD = 7.02 V
%VD = 7.02 V
X 100
230
%VD = 3.0539 %

Remarks:
3.0539 % > 5 %

Findings:

The voltage drop calculated PASSED the test of 5% Voltage Drop for operational efficiency
requirement of PEC 2017 Article 2.10.2.1 FPN No. 4 page 42, PEC 2017 Article 2.15.1.2 FPN
No. 2 page 51 and NEC 210-19 FPN N0. 4 at the time and date the analysis was conducted as
appeared in this document.
Length= 45
Resistance= 0.661
Ampere= 118.07
25 kVA
PUXUtility= = 0.025
1000 kVA

2.29% * 25 kVA
PUXTR= = 0.0229
100 * 25 kVA

1.41% * 25 kVA
PURTR= = 0.0141
100 * 25 kVA

(15m/305m)(0.049 Ω/2)* 25 kVA


PUXW1= = 7.53073770491803E-08
100 * 20 kV

(15m/305m)(0.055 Ω/2)* 25 kVA


PURW1= = 8.45286885245902E-08
100 * 20 kV

(45m/305m)(0.057 Ω/2)* 25 kVA


PUXW2-3= = 0.00198720133874616
100 * 0.23 kV

(45m/305m)(0.16 Ω/2)* 25 kVA


PURW2-3= = 0.00557810902104187
100 * 0.23 kV

PUXtotal= PUXUtility + PUXTR + PUXW1 + PUXW2-3 = 0.0498872766461232

PURtotal= PURTR + PURW1 + PURW2-3 = 0.0196781935497304

PUZtotal= SQRT((0.0197^2) + ((0.0499^2)) = 0.0536280866015886

25 kVA
Isc= = 2026.84 A
(0.23 V) * ( 0.0536280866015885)

= USE 10 kAIc
Wire 1
Length 15
Reactance 0.049
Resistance 0.055
Number of wire per phase 2
Multiplier 305
Wire 2
Length 45
Reactance 0.057
Resistance 0.16
Number of wire per phase 2
Multiplier 305
Transformer
%R 1.41
%X 2.29
kVA 25
KVA
KVA Base 25
S.C. Utility 1000
KV Secondary 0.23
KV Primary 20
A.) RECTIFIER LOAD:

2 - 9500 VA, 230V @ 100% DF = 19000 VA

B.) FUTURE LOAD (SPARE):

4 - 200 VA, 230V @ 100% DF = 800 VA


3 - 641.6 VA, 230V @ 100% DF = 1924.8 VA
21724.8 VA

C.) APPLICATION OF DEMAND FACTOR:

FIRST 10000 VA @ 100% DF = 10000 VA


REMAINDER @ 50% DF: (11724.8) = 5862.4 VA
15862.4 VA

D.) CIRCUIT REQUIREMENT:

USE 2 - 70AT, 2 - 50AT,


2 -40AT, 3 - 20AT
BRANCH CIRCUITS

E.) SERVICE ENTRANCE CONDUCTORS:

TOTAL FULL LOAD CURRENT:


15862.4 VA / 230V = 68.97 A
USE TWO 38 mm2 THHN + 1 - 14mm2 THHN (G)

E.) SERVICE EQUIPMENT:


(1) Maximum Current Rating of Protective Dence,
with (see section 4.30, 4.2 & Table 4.30,4.2
of PEC 2017
(1.a) Nontime Delay Fuse:

[9500+ 9500 + 300%(0) + (200 * 4) + (641.6 * 3) ]/230 V = 94.46 A

(1.b) Inverse Time Circuit Breaker:

[9500+ 9500 + 300%(0) + (200 * 4) + (641.6 * 3) ]/230 V = 94.46 A

(2) Service Equipment Rating:


use 125AT / 225AF, 2P, 230V, CB FOR MAIN
RECTIFIER LOAD 9500
SPARE LOAD 200
NO. OF SPARE 4
LO/CO 641.6
NO. OF LO/CO 3

You might also like