MANAGE DATA Improve Daily Workflow

Customize standard test forms and procedures


CONTROL COMPLIANCE to your processes to provide an efficient and safe
work environment.
TRACK EXECUTION
Streamline Staff & Contractor Hours
TRANSFER CUSTODY Increase work production through best practices
with activity progress tracking. Generate custom
reports, procedures, tags and forms.

Find Information Fast


Cloud-based, real- time information. Asset registry
and management interacts with document
management and contains change control
tracking.

CCMS
Control Access
Ensure accountability by assigning user access
levels based on job needs and levels of
responsibility.

User Dashboards provide a centralized view of an Manage Change


entire project, allowing for quick insight into project Oversee the assigning, tracking, reporting and
performance and the ability to benchmark against approval of action items required to implement
key performance indicators.
COMPLETIONS &
highly regulated changes.

TURNOVER COST
Unlock Communications
Manage review processes, follow RFIs, receive and
COMMISSIONING
PACKAGES ESTIMATING approve submittals in bulk, and share files. MANAGEMENT SYSTEM
ANALYSIS
ASSET / DOC Construction, Pre-Commissioning,
MANAGERS Commissioning, Turnover Management,
Production Ramp-up, Planning,
NON- TASK
COMPLIANCES Preservation, Punchlists, Asset and
COMPLETION
Document Management, Change
Kelowna, BC, Canada Control, Planned Tasks, Testing, Turnover.
250 718 4315
Manage all your projects, large or small, by enabling Everything personnel needs to plan,
your organization to effectively plan, prepare and Salt Lake City, UT, USA execute, and control all information
execute a project. Our CCMS is used on some of 801 263 1460 and tasks throughout a project.
the largest mega-projects throughout the world with
exceptional performance and results. It is a reliable Kuala Lumpur, Malaysia
and predictable system, designed to achieve owners’
603 2615 2720 www.continuum-edge.com
goals. The CE CCMS is the most comprehensive
system on the market because it provides visibility of sales@continuum-edge.com
completions throughout the full project lifecycle. www.continuum-edge.com
How does software help ensure the successful transition from Commissioning to Operations?
Success is achieved through planning, preparation and execution. The CCMS creates an information foundation with traceability
and accountability for custody, control and work processes. This provides the seamless transition to operations and maintenance.

Project Lifecycle: The CE CCMS simplifies detailed information management to support the lifecycle of a project, from Engineering and Procurement to Construction, Commissioning, and
Operations through Turnover.

DESIGN CONSTRUCTION COMMISSIONING OPERATIONS

Mechanical Pre-
Engineering Construction Commissioning Commissioning Turnover
Completions
• Initiate Requests for • Build Standard Jobs, • FICs to verify installation • Build Document for • Track receipt and • Clear up remaining
Information (RFI) and Task Models & Form of Piping, Equipment, Operations (DFO) Compliance of Document Punchlist items
Technical Queries Requirements Cables, Instruments, etc. • Develop Inspection Test for Operations (DFO) • Close out all MOC
• Input Assets & Tags, • Create Bill of Materials • Define Test Equipment Records (ITR) for • Track Task Completion records
Documents and Drawings • Define Start-up and and Consumables Calibrations, Run-Ins, • Wet & Dry Conditions • Build out Completion
• Initiate Management of Consumables • Develop Spare Parts Load & No-Load, Loops • Load & No-load Runs Packages:
Change (MOC) Procedure • Build Field Installation Requirements • Define Custody • Develop Site Acceptance • Docs & Drawings
• Develop Systemization, Checklists (FIC) • Evaluate First Fill Transfer Protocols Testing (SAT)
• Equipment, Line and
Process Systems and • Create Test Forms and Requirements • Administer & Approve • Develop System Instrument Lists
Physical Area Breakdown Task Model Library • Identify Preservation Notice of Energization Performance Testing
(NOE) documentation • Completed Forms
• Coordinate support with • Develop Work Packs and Requirements • Build out Completion (FICs, ITRs)
Suppliers and Vendors Task/Form Assignments • Define Turnover Package • Build out Completion and Turnover Packages
and Turnover Packages • Completion Certificates
• Create DCS & IO Registry • Define Custody Transfer (TOP) Content • Generate Punchlists
• Generate Punchlists • Exceptions, Punchlists
• Build Factory Acceptance Points • Track Assurance Certs • Create Lessons Learned
Testing & Equipment • Agree to Performance • Create RFIs and Lessons • Transfer Completion
• Mech. Completion by • Update “As-Built” Docs and Turnover Packages
Inspection Requirements Criteria System and Punchlisting Learned

Project Governance Safety Risk Ops Development


Management System Management System Management System

Binding the CE CCMS to the CE Project Governance Using the SRMS with the CCMS greatly improves Using the ODMS with the CCMS allows your
Management System (PGMS) allows management your ability to align all safety procedures, analytics, company to utilize existing information to analyze,
to roll up Level 5 data for any phase or discipline of and permitting to project planning and execution. develop and track all operations and maintenance
a project. The PGMS separates CE from any other Administration of safety documentation is no requirements. Effectively transfer custody of plant
completions system on the market. longer a difficult and overly complex process. assests and improve availability while minimizing
downtime.