You are on page 1of 1

Plan View

75 c/c1 = 250 75
rods to be inserted Standard Quantities
B 7
into flats Type of construction [m3]
4

Hammer dressed
Cement Stone Masonry 1:6 24.09
30
5
15 Concrete 1:3:6 8.77

A A Broken Stone Packing 22.65


6
Total Volume 55.51
7

Detail at A
Nut M36
5 21 22 1 23
58 58

40 27 116 27 40
Bulldog Grips
B Section B-B 2 25
φ 26 or 32 mm
19 20
Section A-A 7 3 Thimble
40 70 20 130 20 40 20 26
4 φ 26 or 32 mm

9 18 ..............
71.61

16 ..............
70.66
A

1 2

M10
4
Broken Stone to be Transfer required reinforcement to
2x15 Stirrups 8 mm φ filled simultaniously
28 Drawing No. 92N (pos 27, 28 & 29)
c/c40 c/c (step by step) so that it
will be as formwrok
for Steel Part Numbers
18
2x8 φ 16 mm 67.36 refer to Drawing No. 92N
29 GL.........
l = 340
HMG / Ministry of Local Development
M10 BROKEN STONE DoLIDAR / Short SpanTrail Bridge Standard
PACKING M10
Bridge Name: Budhi Khola 1

9 nos φ 16 mm, c/c = 50 No: Bank: Left Bank Span: 52


27
l = 240 Construction Drawing :
Walkway & Tower Foundation
M10 for Suspension Bridge with 2 Main Cables φ 26/32 mm
Block Height 4.0m, for all Soil Types
Spanning Cables 2 φ 26 or 2 φ 32 mm
40 70 180 70 40 40 65 40 65 40 ..............
65.86
Tower c/c1 = 2.50m; c/c2 = 383mm
2x6 φ 16 mm, El = GL-1.5
27 250 Foundation Type TF 4
c/c = 50,l = 240 400
Date : Aug. 5, 2002 Drawing No. 92/4Ncon
Produced by Nepal Swiss Association for International Cooperation, in partnership with His Majesty’s Government of Nepal, funded and supported by the Swiss Government (SDC Nepal). 73