Plan View: (M) Type of Construction B
Plan View: (M) Type of Construction B
75 c/c1 = 250 75
rods to be inserted Standard Quantities
B 7
into flats Type of construction [m3]
4
Hammer dressed
Cement Stone Masonry 1:6 24.09
30
5
15 Concrete 1:3:6 8.77
Detail at A
Nut M36
5 21 22 1 23
58 58
40 27 116 27 40
Bulldog Grips
B Section B-B 2 25
φ 26 or 32 mm
19 20
Section A-A 7 3 Thimble
40 70 20 130 20 40 20 26
4 φ 26 or 32 mm
9 18 ..............
71.61
16 ..............
70.66
A
1 2
M10
4
Broken Stone to be Transfer required reinforcement to
2x15 Stirrups 8 mm φ filled simultaniously
28 Drawing No. 92N (pos 27, 28 & 29)
c/c40 c/c (step by step) so that it
will be as formwrok
for Steel Part Numbers
18
2x8 φ 16 mm 67.36 refer to Drawing No. 92N
29 GL.........
l = 340
HMG / Ministry of Local Development
M10 BROKEN STONE DoLIDAR / Short SpanTrail Bridge Standard
PACKING M10
Bridge Name: Budhi Khola 1