CCS ACTIVITY DESCRIPTION

ACT
NO.
steel work for 13 columns , core walls (2nd basement floor) had been done and inspected by the
01
consultant
Shuttering for columns and core walls had been done
02
Casting concrete for columns , core walls (2nd basement floor) had been done
03
Plaster work for the shoring piles had been done
04

05 Water proof up to level -2.00 had been started

This report must be submitted no later than 9:00 a.m. Sheet 1 of 4


]

This report must be submitted no later than 9:00 a.m. Sheet 2 of 4


This report must be submitted no later than 9:00 a.m. Sheet 3 of 4
This report must be submitted no later than 9:00 a.m. Sheet 4 of 4