Ref 20
2. Area/Location
Miskar Platforms
1 of 4
Long-term value:
610 mg/m³, 200 ppm
TIC and contractor personnel directly involved in the job can potentially be exposed
Contact with
eyes
6. Control measures. Give details of existing or planned controls and comment on the
suitability and effectiveness of control, and deviations from procedures.
Control Task Details
Elimination / Substitution
Dying Penetration
on Inspection of
Engineering Welds
Induced ventilation through air blowers when working in confined spaces
Dying Penetration
on Inspection of
Procedural Welds
Adhere to Permit to Work Procedure. Adhere to COSSH assessment.
Other
Dying Penetration
on Inspection of Wear safety glasses, rubber gloves, long sleeved coveralls, visors.
PPE Welds Protection respiratory cartridges.
Emergency response Dying Penetration Apply the control measures stated in section 1 of the COSHH Asst.
on Inspection of
Welds
2 of 4
7. Exposure monitoring: Give brief details of previous or current monitoring
N/A
Insufficient information
3 of 4
13. Action to prevent or ensure adequately control exposure and to ensure compliance.
Action Responsibility/ Completed
Type Description Target date Signature/date
Remedial action
Issuing and
Measures to prevent or Adhere to Permit to Work Procedure. Adhere to
Performing
control exposure COSSH assessment.
Authorities
Wear safety glasses, rubber gloves, long sleeved Performing
Use of controls coveralls, visors. Protection respiratory cartridges. Authority
Maintenance/test exam
Exposure monitoring
Health surveillance
Information/instruction/
training
Review of assessment
Other hazards
4 of 4