STATION - BKC

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1

C 08 C 18

C C 04.1 CONCOURSE
07.1 C 05.1 LEVEL
C 06.1

P
P P 13.2
06 3.
1

PLATFORM
LEVEL
P
P 02.1 13.1

BKC - Group-1 Room Dates


Room No. Room Name MEP Access* System Package

C 06.2 AHU Room (N) 11-Nov-20 TVE-01


C 06.1 AHU Room (S) 31-Dec-20 TVE-01
C 04.2 OTE Fan Room (N) 16-Sep-20 TVE-01
C 04.1 OTE Fan Room (S) 19-Apr-21 TVE-01
C 05.2 UPS Fan Room (N) 11-Oct-20 TVE-01
C 05.1 UPS Fan Room (S) 26-Jun-21 TVE-01
C07.2 TVF & TVS Switch Gear Room (N) 14-May-21 TVE-01
C07.1 TVF & TVS Switch Gear Room (S) 15-Jun-21 TVE-01
C17 SCADA (N) 16-May-21 TVE-01
C18 SCADA (S) 9-Apr-21 TVE-01
Electrical Room (N) 3-Jun-21 MEP
C08 Electrical Room (S) 13-Mar-21 MEP
C39 TER 13-Jan-21 STPT
C44 Signalling Equipment Room 21-Dec-20 STPT
C16 Station Control Room 3-Oct-20 STPT, AFC
C40 S&T UPAS Room 20-Jan-21 STPT
P 02.2 ASS Room (N) 8-Jun-21 OCS, PSS
P 02.1 ASS Room (S) 14-Jul-21 OCS, PSS
P 07.2 CCR Room (N) 2-Jan-21 STPT
P 07.1 CCR Room (S) 2-Jan-21 STPT
P 13.1/13.2 PSD Room 27-Nov-20 PSD
P 03.2 UPAS (N) 16-Sep-20 MEP
P 03.1 UPAS (S) 12-Jun-21 MEP
P06 SWS / TSS 30-Jun-21 OCS, PSS
* Anticipated MEP Minimum access dates Telecoms and MEP access all Rooms

Legends : Lits & Escalators


Group-1 rooms as per KD-05
Group-1 rooms as per KD-14 (Inside TBM working shaft area)
N - BKC
26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

C 39
C 16
C 40 C 07.2
C C
05.2 04.2 C 44

C 06.2 C 17

P
P 02.2 7.2

P
7.1 P 3.2

System Access Remark GC Expected


Date

11-Dec-20 70% Completed 20-Sep-20


30-Jan-21 Structure not Conpmleted
16-Oct-20 25-Oct-20
19-May-21 25-Dec-20
10-Nov-20 24-Sep-20
26-Jul-21
13-Jun-21
15-Jul-21
15-Jun-21 Structure not Conpmleted
9-May-21
3-Jun-21
13-Mar-21
12-Feb-21 15-Nov-20
20-Jan-21 25-Nov-20
2-Nov-20 90% Completed 20-Sep-20
19-Feb-21 25-Nov-20
8-Jul-21
13-Aug-21
1-Feb-21
1-Feb-21
27-Dec-20
Structure not Conpmleted
16-Oct-20
12-Jul-21
30-Jul-21
access all Rooms
Room Locati
Sl.no Room Name Room and
Tunnel Ventilation No Grid on
Concours
8 TVS Switch gear room c07.1 2-4 eConcours
9 AHU room for Corridor 9-10 eConcours
10 Retail Electrical Panel c47 9-10 eConcours
11 OTE Fan room c04.1 12-13 e
Concours
12 UPS Fan room c05.1 13-14 eConcours
13 Electrical room c08 13-14 eConcours
14 AHU room for Station c06.1 15-16 eConcours
15 Station control room c16 30-31
31.5- eConcours
16 UPAS fan room c05.2 32.5 eConcours
17 AHU room for Station c06.2 30-31.5 eConcours
18 OTE Fan room c04.2 33-34 eConcours
19 AHU room for Corridor 33-34 eConcours
20 Airconditioning Room 34-35 eConcours
21 Telecom Equipment Room c39 34-35 eConcours
22 Signal Equipment Room c44 34-35 eConcours
23 S&T UPAS room c40 34-35
35.5- eConcours
24 BCC 36.5
36.5- e
Concours
25 BCC CER redundancy System
AFC-CCU 37.5
37.5- eConcours
26 room 38.5 eConcours
27 Air compressor room c09 40-41 eConcours
28 BCC NMS 39-40 eConcours
29 BCC SCADA 39-40 eConcours
30 DB Electrical 39-40 eConcours
31 SYPT Maintenance Room c38 41 e

Tunnel Ventilation Room and Concours


32 TVS Switch gear room c07.2 42-43.5 e

33 ASS p02.1 11-14 Platform

13.5-
34 UPAS p03.1 14.5 Platform
12.5-
35 Traction switching station p06 13.5 Platform

36 Lift & Maintenance Room p16 9.5-12.5 Platform

37 electrical db room p09.1 14.5-15 Platform

38 electrical db room p09.4 14.5-15 Platform

39 PSD room p13.1 24-25 Platform

40 PSD room p13.2 24-25 Platform

41 UPAS p03.2 32-33 Platform

42 Comm.Carrier Room p07.1 31-32 Platform


43 electrical db room p09.3 31-32 Platform

44 ASS p02.2 32-35 Platform

45 Comm.Carrier Room p07.2 35-36 Platform


33.5-
46 electrical db room p09.2 34.5 Platform

47 Sump room p10.3 35-36 Platform

47 Sump room p10.4 33-34 Platform


GC EXPECTED Remark
work Key Date DWP R5 EOT- 01 DATE Structure
not yet
not done complete
not done 10/25/2020 d
not done 10/25/2020
not done 12/25/2020
not done Structure
not yet
not done complete
not
90%done d
done 9/20/2020
not
75%done 9/24/2020
done 9/20/2020
not done 10/25/2020
not done 10/25/2020
not done 11/15/2020
not done 11/15/2020
not done KD 05 15/09/19 08/03/20 11/25/2020
(Deg 03) (Deg 03)
not done 11/25/2020
not done
not done
not done
not done
not done
not done Structure
not yet
not done complete
not done d

not done

not done

not done

not done

not done

not done

not done

not done structure


15/09/19 08/03/20 not yet
KD 05
not done (Deg 03) (Deg 03) complete
d

not done

not done
not done

not done

not done

not done

not done

not done