You are on page 1of 1

TRANSMISSION CONTROL (A4B MODEL) (Revision 1209) F5–5

3-3 COMPUTER TERMINAL WIRING DIAGRAM

10 9 8 7 6 5 4 3 2 1 6 5 4 3 2 1 6 5 4 3 2 1
22 21 20 19 18 17 16 15 14 13 12 11 16 15 14 13 12 11 10 9 8 7 17 16 15 14 13 12 11 10 9 8 7
30 29 28 27 26 25 24 23 24 23 22 21 20 19 18 17 26 25 24 23 22 21 20 19 18

A B C

T11K5006S10

1. Connector A
Do not use main connector.
2. Connector B
Terminal Terminal Terminal Terminal
Terminal Name Terminal Name
No. Code No. Code

1 BAT2 Back Up Power Supply 13 - -

2 BAT1 Back Up Power Supply 14 - -

3 +B1 ECU Power Supply 15 - -

4 - - 16 STR Start Relay Output

5 E01 A/T Power Grounding 17 - -

6 E02 A/T Power Grounding 18 - -

7 R Neutral Start SW(R) 19 LCAN CAN Communication LO

8 REG1 Engine revolution numbers 20 CANL CAN Communication LO

9 HCAN CAN Communication HI 21 - -

10 CANH CAN Communication HI 22 - -

11 - - 23 - -

12 - - 24 E1 Sensor Earth

3. Connector C
Terminal Terminal Terminal Terminal
Terminal Name Terminal Name
No. Code No. Code
1 C3B2 − Solenoid No.3(−) 14 OTMP Oil Temperature Sensor

2 C3B2 + Solenoid No.3(+) 15 P Neutral Start SW(P)

3 C2 − Solenoid No.2(−) 16 2 Neutral start SW(3)

4 C2 + Solenoid No.2(+) 17 D Neutral Start SW(D)

5 B1 − Solenoid No.1(−) 18 EOPT Output Revolution Sensor Earth

6 B1 + Solenoid No.1(+) 19 E1OP Turbine Revolution Sensor Shield Earth

7 VBOP Output Revolution Sensor Power Supply 20 ETBN Turbine Revolution Sensor Earth

8 ROPT Output Revolution Sensor 21 E1TB Output Revolution Sensor shield Earth

9 VBTB Turbine Revolution Sensor Power Supply 22 - -

10 RTBN Turbine Revolution Sensor 23 LUCC Duty Solenoid

11 LUCR LUC Solenoid 24 N Neutral Start SW(N)

12 SOLR Switch Solenoid 25 L Neutral Start SW(2)

13 ETMP Oil temperature Sensor Earth 26 - -

You might also like