You are on page 1of 23

TAISEI – DMCI JOINT VENTURE

North – South Commuter Railway Project (CP01)


Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

Casting of Lean Concrete for Pile Cap and Grade Beam


1 15 10-Feb-21 Workshop Building 10.00 15.00 17-Feb-21 26.00 SMTL-BULACAN-21-0217-006 CP01-01-BL-IR-D01-0012 10-Mar-21 27.79 SMTL-BULACAN-21-0310-005 CP01-01-BL-IR-D01-0031 PASSED
on Grid B/14-20
Concrete Casting of Lean Concrete for Pile Cap and
2 15 11-Feb-21 Workshop Building 6.00 6.00 18-Feb-21 29.68 SMTL-BULACAN-21-0218-002 CP01-01-BL-IR-D01-0013 11-Mar-21 30.79 SMTL-BULACAN-21-0311-004 CP01-01-BL-IR-D01-0033 PASSED
Grade Beam Grid A1/14-19
Concrete Casting of Lean Concrete for Pile Cap and
3 15 15-Feb-21 Workshop Building 8.06 8.00 22-Feb-21 13.96 SMTL-BULACAN-21-0222-003 CP01-01-BL-IR-D01-0014 15-Mar-21 25.35 SMTL-BULACAN-21-0315-006 CP01-01-BL-IR-GEN-0038 PASSED
Grade Beam Grid A1/19-20 & B3/14-20
Concrete Casting of Lean Concrete for Pile Cap and
4 15 17-Feb-21 Workshop Building 6.50 7.00 24-Feb-21 16.11 SMTL-BULACAN-21-0224-004 CP01-01-BL-IR-D01-0017 17-Mar-21 25.96 SMTL-BULACAN-21-0317-009 CP01-01-BL-IR-D01-0042 PASSED
Grade Beam Grid C2/14-20; Vol - 6.499 cu.m
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
5 15 19-Feb-21 CAP AND GRADE BEAM AT GRIDLINE D1/14-20 Workshop Building 6.50 7.00 26-Feb-21 16.30 SMTL-BULACAN-21-0226-015 CP01-01-BL-IR-D01-0020 19-Mar-21 29.33 SMTL-BULACAN-21-0319-003 CP01-01-BL-IR-D01-0044 PASSED
(VOLUME = 6.499m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


6 15 23-Feb-21 CAP AT GRIDLINE Workshop Building 2.88 4.00 02-Mar-21 16.84 SMTL-BULACAN-21-0302-003 CP01-01-BL-IR-D01-0022 23-Mar-21 28.26 SMTL-BULACAN-21-0323-006 CP01-01-BL-IR-D01-0048 PASSED
A2-D/17

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


7 15 26-Feb-21 CAP AT GRIDLINE C-E/13 Workshop Building 3.04 3.00 05-Mar-21 15.83 SMTL-BULACAN-21-0305-002 CP01-01-BL-IR-D01-0023 26-Mar-21 26.88 SMTL-BULACAN-21-0326-005 CP01-01-BL-IR-D01-0054 PASSED
(VOLUME = 3.04m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


8 15 27-Feb-21 CAP AT GRIDLINE (A2-A3, B1-B2, C-C1, C3-D/17-18) Workshop Building 8.51 6.00 06-Mar-21 15.97 SMTL-BULACAN-21-0306-006 CP01-01-BL-IR-D01-0028 27-Mar-21 25.86 SMTL-BULACAN-21-0326-005 CP01-01-BL-IR-D01-0055 PASSED
(VOLUME = 8.512m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AT GRIDLINE
9 15 03-Mar-21 Workshop Building 8.51 11.00 10-Mar-21 16.66 SMTL-BULACAN-21-0310-005 CP01-01-BL-IR-D01-0030 31-Mar-21 27.42 SMTL-BULACAN-21-0331-012 CP01-01-BL-IR-D01-0060 PASSED
(A2-A3, B1-B2, C-C1, C3-D/16-17) (VOLUME 8.512m³,
15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AT GRIDLINE
10 15 08-Mar-21 Workshop Building 5.06 7.00 15-Mar-21 14.37 SMTL-BULACAN-21-0315-006 CP01-01-BL-IR-D01-0036 05-Apr-21 28.20 SMTL-BULACAN-21-0405-001 CP01-01-BL-IR-D01-0062 PASSED
(A1, B, B3, C2, & D1/20-21) (VOLUME 5.056m³,
15MPa)

Lean Concreting for Pile Cap @ OCC Bldg. Zone 1 (GL.


11 15 08-Mar-21 A1-A3, B2-B3, C1-C3, D1-D2, E1-E2) OCC Building 7.34 9.00 15-Mar-21 14.29 SMTL-BULACAN-21-0315-006 CP01-01-BL-IR-GEN-0037 05-Apr-21 27.89 SMTL-BULACAN-21-0405-001 CP01-01-BL-IR-D06-0063 PASSED
(Volume=7.34 cubic @ 15MPa)
CONCRETE POURING OF PILE CAP AND GROUND
12 31 09-Mar-21 Workshop Building 27.40 28.00 16-Mar-21 30.19 SMTL-BULACAN-21-0316-013 CP01-01-BL-IR-D01-0041 06-Apr-21 48.60 SMTL-BULACAN-21-0406-003 CP01-01-BL-IR-D01-0064 PASSED
BEAM AT GRIDLINE A1/14-18
LEAN CONCRETE FOR PILE CAP AND GRADE BEAM AT
13 15 11-Mar-21 GRIDLINE (A2/18-19, A3/18-19 & B1/18-19) B2/18-19 Workshop Building 10.91 10.00 18-Mar-21 15.57 SMTL-BULACAN-21-0318-009 CP01-01-BL-IR-D01-0043 08-Apr-21 27.88 SMTL-BULACAN-21-0408-009 CP01-01-BL-IR-D01-0068 PASSED
(VOLUME 3.636m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE (C/18-19,
14 15 13-Mar-21 Workshop Building 4.37 4.00 20-Mar-21 15.40 SMTL-BULACAN-21-0320-005 CP01-01-BL-IR-D01-0045 10-Apr-21 27.71 SMTL-BULACAN-21-0410-005 CP01-01-BL-IR-D01-0074 PASSED
C1/18-19 & C3/18-19) D/18-19 (VOLUME 4.372m³,
15MPa)

Lean Concreting for Pile Cap Preparation @ OCC


15 15 13-Mar-21 Zone-3 GL (9-10) / GL (A-D) OCC Building 8.45 9.00 20-Mar-21 15.15 SMTL-BULACAN-21-0320-005 CP01-01-BL-IR-D06-0046 10-Apr-21 27.39 SMTL-BULACAN-21-0410-005 CP01-01-BL-IR-D06-0075 PASSED
and OCC Zone-1 GL(1-B), SP-A

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE (A2/15-16,
16 15 15-Mar-21 Workshop Building 10.91 9.00 22-Mar-21 15.72 SMTL-BULACAN-21-0322-005 CP01-01-BL-IR-D01-0047 12-Apr-21 28.95 SMTL-BULACAN-21-0412-003 CP01-01-BL-IR-D01-0076 PASSED
A3/15-16 & B1/15-16) B2/15-16 (VOLUME 3.636m³,
15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


17 15 17-Mar-21 CAP AND GRADE BEAM AT GRIDLINE C/15-16, C1/15- Workshop Building 4.37 7.00 24-Mar-21 14.52 SMTL-BULACAN-21-0325-006 CP01-01-BL-IR-D01-0052 14-Apr-21 27.66 SMTL-BULACAN-21-0414-007 CP01-01-BL-IR-D01-0081 PASSED
16, C3/15-16, D/15-16 (VOLUME = 4.372m³, 15MPa)

Lean Concrete for Pile Cap Preparation @ OCC Zone-2


18 15 18-Mar-21 GL (4-8) / GL (A-B); GL (4-8) / C, GL 3-8/D, GL 3-10/E OCC Building 14.00 25-Mar-21 15.03 SMTL-BULACAN-21-0325-006 CP01-01-BL-IR-D06-0051 15-Apr-21 29.59 SMTL-BULACAN-21-0415-011 CP01-01-BL-IR-D06-0084 PASSED
and Sump Pit B
13.60
Lean Concrete for Pile Cap Preparation @ OCC Zone-2
GL (4-8) / GL (A-B); GL (4-8) / C, GL 3-8/D, GL 3-10/E
19 15 19-Mar-21 OCC Building 1.50 26-Mar-21 14.95 SMTL-BULACAN-21-0326-005 CP01-01-BL-IR-D06-0053 16-Apr-21 27.48 SMTL-BULACAN-21-0416-002 CP01-01-BL-IR-D06-0085 PASSED
and Sump Pit B (continuation)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE B1, B2, C, C1, C3
D/19-20 (VOLUME = 5.998m³, 15MPa)
20 15 22-Mar-21 Workshop Building 9.51 14.00 29-Mar-21 14.72 SMTL-BULACAN-21-0329-005 CP01-01-BL-IR-D01-0056 19-Apr-21 27.85 SMTL-BULACAN-21-0419-005 CP01-01-BL-IR-D01-0089 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
CAP AND GRADE BEAM AT GRIDLINE A2, A3, B1, B2 /
14 - 15 (VOLUME = 3.512m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GROUND


21 31 23-Mar-21 BEAM AT GRIDLINE C2 /15 - 19 (VOLUME = 27.396m³, Workshop Building 27.40 28.00 30-Mar-21 30.67 SMTL-BULACAN-21-0330-003 CP01-01-BL-IR-D01-0057 20-Apr-21 47.88 SMTL-BULACAN-21-0420-015 CP01-01-BL-IR-D01-0093 PASSED
31MPa)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE D1/15-


17 (VOLUME = 8.82m³, 31MPa)
22 31 27-Mar-21 Workshop, Malanday Depot 27.40 28.00 03-Apr-21 30.28 SMTL-BULACAN-21-0402-001 CP01-01-BL-IR-D01-0060 24-Apr-21 46.55 SMTL-BULACAN-21-0424-00 CP01-01-BL-IR-D01-0106 PASSED
CONCRETE POURING OF GRADE BEAM AT GRIDLINE
D1/14-18
(VOLUME = 18.576m³, 31MPa)

Lean Concreting for Pile Cap Preparation @LRS Zone-


23 15 27-Mar-21 Light Repair Shop 4.13 6.00 03-Apr-21 14.56 SMTL-BULACAN-21-0405-002 CP01-01-BL-IR-D02-0061 24-Apr-21 27.73 SMTL-BULACAN-21-0424-00 CP01-01-BL-IR-D02-0107 PASSED
1 GL (4-5) / GL (A-C)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE B / 7 - 12
(VOLUME 6.946m³, 15MPa)
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
CAP AND GRADE BEAM AT GRIDLINE A/16-18
24 15 30-Mar-21 Workshop Building 11.76 13.00 06-Apr-21 14.90 SMTL-BULACAN-21-0406-003 CP01-01-BL-IR-D01-0065 27-Apr-21 27.70 SMTL-BULACAN-21-0427-008 CP01-01-BL-IR-D01-0113 PASSED
(VOLUME = 3.057m³, 15MPa)
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
CAP AND GRADE BEAM AT GRIDLINE A2, A3/19-20
(VOLUME = 1.756m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


AT GRIDLINE B3/14-18
25 31 30-Mar-21 Workshop, Malanday Depot 27.40 33.00 06-Apr-21 30.77 SMTL-BULACAN-21-0406-003 CP01-01-BL-IR-D01-0066 27-Apr-21 44.29 SMTL-BULACAN-21-0427-008 CP01-01-BL-IR-D01-0114 PASSED
(VOLUME = 27.396m³, 31MPa

Concrete Placement for Pile Cap (1st Lift) @ OCC


26 36 30-Mar-21 Zone 1 GL-1 / C-E, AND GL-2 / C-E OCC Building 19.00 06-Apr-21 35.74 SMTL-BULACAN-21-0406-003 CP01-01-BL-IR-D06-0067 27-Apr-21 41.93 SMTL-BULACAN-21-0427-008 CP01-01-BL-IR-D06-0115 PASSED
Concrete Volume = 19 mᶾ

Lean Concreting for Pile Cap Preparation @LRS Zone-


27 15 31-Mar-21 1 GL (6/A-C), (7/A-B) & 5A LRS Building 4.14 8.00 07-Apr-21 16.47 SMTL-BULACAN-21-0407-009 CP01-01-BL-IR-D02-0073 28-Apr-21 27.99 SMTL-BULACAN-21-0428-007 CP01-01-BL-IR-D02-0119 PASSED
Total Volume = 4.1346 m³ , 15MPa @ 28days

Concrete Placement for Pile Cap (1st Lift) @ OCC


28 36 06-Apr-21 Zone 1 GL 1-3/A, 1/B, 3/B and 3/C Concrete OCC Building 22.22 16.50 13-Apr-21 30.67 SMTL-BULACAN-21-0413-005 CP01-01-BL-IR-D06-0077 04-May-21 49.00 SMTL-BULACAN-21-0504-009 CP01-01-BL-IR-D06-0131 PASSED
Volume = 22.218 mᶾ

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE C, C1, C3, D/14-
15 (VOLUME = 4.242m³, 15MPa)
29 15 06-Apr-21 Workshop, Malanday Depot 8.48 9.00 13-Apr-21 14.69 SMTL-BULACAN-21-0413-005 CP01-01-BL-IR-D01-0078 04-May-21 27.62 SMTL-BULACAN-21-0504-009 CP01-01-BL-IR-D01-0132 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
CAP AND GRADE BEAM AT GRIDLINE C, C1, C3, D/20-
21 (VOLUME = 4.242m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


30 31 06-Apr-21 AT GRIDLINE D1/17-21 Workshop, Malanday Depot 25.55 26.50 13-Apr-21 30.37 SMTL-BULACAN-21-0413-005 CP01-01-BL-IR-D01-0079 04-May-21 44.65 SMTL-BULACAN-21-0504-009 CP01-01-BL-IR-D01-0133 PASSED
(VOLUME = 25.551m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


31 31 07-Apr-21 AT GRIDLINE C2/18-21 Workshop, Malanday Depot 21.36 23.00 14-Apr-21 30.39 SMTL-BULACAN-21-0414-007 CP01-01-BL-IR-D01-0080 05-May-21 43.09 SMTL-BULACAN-21-0505-004 CP01-01-BL-IR-D01-0135 PASSED
(VOLUME = 21.36m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE E/14-20
(VOLUME = 3.997m³, 15MPa)
1.) SETTING OUT OF LIMITS PRIOR TO HARDCORE
PLACEMENT
32 15 08-Apr-21 2.)PLACEMENT, SPREADING AND COMPACTION OF Workshop, Malanday Depot 4.00 7.00 15-Apr-21 15.03 SMTL-BULACAN-21-0415-011 CP01-01-BL-IR-D01-0082 06-May-21 27.67 SMTL-BULACAN-21-0506-010 CP01-01-BL-IR-D01-0139 PASSED
HARDCORE
3.)CONCRETE POURING OF BLINDING
4.)CHECKING OF ELEVATION AND SLOPE OF BLINDING
CONCRETE

Concrete Placement for Pile Cap (1st Lift) @ OCC


33 36 08-Apr-21 Zone 3 GL (9 / C-D), & GL (10 / C-D) OCC Building 12.69 6.00 15-Apr-21 35.74 SMTL-BULACAN-21-0415-011 CP01-01-BL-IR-D06-0083 06-May-21 50.59 SMTL-BULACAN-21-0506-010 CP01-01-BL-IR-D06-0138 PASSED
Concrete Volume = 12.69 mᶾ

CONCRETE POURING OF PILE CAP AND GRADE BEAM


34 31 10-Apr-21 AT GRIDLINE B3/17-21 Workshop, Malanday Depot 24.30 26.00 17-Apr-21 30.89 SMTL-BULACAN-21-0417-004 CP01-01-BL-IR-D01-0086 08-May-21 43.75 SMTL-BULACAN-21-0508-002 CP01-01-BL-IR-D01-0145 PASSED
(VOLUME = 24.3m³, 31MPa)

LEAN CONCRETE FOR PILE CAP AND GRADE BEAM AT


35 15 12-Apr-21 GRIDLINE A/14-16, A/18-21 (VOLUME = 6.215m³, Workshop, Malanday Depot 6.22 7.50 19-Apr-21 16.06 SMTL-BULACAN-21-0419-005 CP01-01-BL-IR-D01-0087 10-May-21 28.43 SMTL-BULACAN-21-0510-003 CP01-01-BL-IR-D01-0148 PASSED
15MPa)
Pile cap 1st lift @ OCC Building Zone2 & Zone 3. GL.4-
36 36 12-Apr-21 OCC Building 21.89 23.00 19-Apr-21 35.88 SMTL-BULACAN-21-0419-005 CP01-01-BL-IR-D06-0088 10-May-21 51.50 SMTL-BULACAN-21-0510-003 CP01-01-BL-IR-D06-0149 PASSED
8/A, GL.9/B, GL.10/A
LEAN CONCRETE FOR PILE CAP GL (7 / B1-C) / GL (8-
37 15 13-Apr-21 LRS Building 12.40 19.00 20-Apr-21 14.85 SMTL-BULACAN-21-0420-015 CP01-01-BL-IR-D02-0092 11-May-21 27.76 SMTL-BULACAN-21-0511-005 CP01-01-BL-IR-D02-0150 PASSED
12) / GL (A-C)
CONCRETE POURING OF PILE CAP AND GRADE BEAM
38 31 14-Apr-21 Workshop, Malanday Depot 21.36 22.00 21-Apr-21 28.96 SMTL-BULACAN-21-0421-004 CP01-01-BL-IR-D01-0094 12-May-21 44.43 SMTL-BULACAN-21-0512-010 CP01-01-BL-IR-D01-0154 PASSED
AT WORKSHOP GRIDLINE B2/18-21
Concrete Placement for Pile Cap (1st Lift)
39 36 14-Apr-21 @ OCC Zone 1 GL 1/B, Zone 2 GL 3-8/E OCC Building 25.02 30.00 21-Apr-21 34.08 SMTL-BULACAN-21-0421-004 CP01-01-BL-IR-D02-0095 12-May-21 50.57 SMTL-BULACAN-21-0512-010 CP01-01-BL-IR-D06-0155 PASSED
Concrete Volume = 25.016 mᶾ
Concrete Placement for Pile Cap (1st Lift)
40 36 15-Apr-21 OCC Building 25.02 30.00 22-Apr-21 35.38 SMTL-BULACAN-21-0422-003 CP01-01-BL-IR-D06-0096 13-May-21 51.11 SMTL-BULACAN-21-0513-002 CP01-01-BL-IR-D01-0159 PASSED
@ OCC Zone 2 GL 9-10/E, Zone 3 GL 9/A
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


41 31 15-Apr-21 AT GRIDLINE B1/14-18 Workshop, Malanday Depot 27.40 29.00 22-Apr-21 30.63 SMTL-BULACAN-21-0422-003 CP01-01-BL-IR-D01-0097 13-May-21 42.72 SMTL-BULACAN-21-0513-002 CP01-01-BL-IR-D01-0160 PASSED
(VOLUME = 27.396m³, 31MPa)
LEAN CONCRETE FOR SUMP PIT ZONE 1 SP-A AND
42 15 15-Apr-21 ZONE 3 SP-B OCC Building 22-Apr-21 15.32 SMTL-BULACAN-21-0422-003 CP01-01-BL-IR-D06-0102 13-May-21 28.09 SMTL-BULACAN-21-0513-002 CP01-01-BL-IR-D01-0161 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


43 15 16-Apr-21 CAP AND GRADE BEAM AT GRIDLINE B/1-7 (VOLUME Workshop, Malanday Depot 7.46 11.00 23-Apr-21 20.35 SMTL-BULACAN-21-0423-006 CP01-01-BL-IR-D01-0100 14-May-21 27.58 SMTL-BULACAN-21-0514-007 CP01-01-BL-IR-D01-0165 PASSED
= 7.458m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


44 31 16-Apr-21 AT GRIDLINE C1/14-18 Workshop, Malanday Depot 27.40 28.00 23-Apr-21 35.34 SMTL-BULACAN-21-0423-006 CP01-01-BL-IR-D01-0101 14-May-21 41.33 SMTL-BULACAN-21-0514-007 CP01-01-BL-IR-D01-0166 PASSED
( VOLUME = 27.396m³, 31MPa)

Concrete Placement for Pile Cap (1st Lift)


@ OCC BLDG - ELEVATOR PIT (PC2) GL 1/C & GL 10/B
45 36 17-Apr-21 OCC Building 31.36 31.50 24-Apr-21 37.73 SMTL-BULACAN-21-0424-001 CP01-01-BL-IR-D06-0103 15-May-21 51.98 SMTL-BULACAN-21-0515-006 CP01-01-BL-IR-D06-0168 PASSED
Concrete Volume = 31.361 mᶾ ; 36 mpa @ 28 days

Lean Concreting for Ground Beam Preparation Zone-


46 15 17-Apr-21 OCC Building 24-Apr-21 15.74 SMTL-BULACAN-21-0424-001 CP01-01-BL-IR-D06-0104 15-May-21 28.38 SMTL-BULACAN-21-0515-006 CP01-01-BL-IR-D06-0169 PASSED
2 GL 3/D, GL 4-8/B-D
CONCRETE POURING OF PILE CAP AND GRADE BEAM
47 31 17-Apr-21 AT GRIDLINE B1/17-21 Workshop, Malanday Depot 24.30 26.00 24-Apr-21 31.68 SMTL-BULACAN-21-0424-001 CP01-01-BL-IR-D01-0105 15-May-21 44.13 SMTL-BULACAN-21-0515-006 CP01-01-BL-IR-D01-0170 PASSED
( VOLUME = 24.3m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


48 31 19-Apr-21 AT GRIDLINE B2/15-19 Workshop, Malanday Depot 27.40 28.50 26-Apr-21 31.36 SMTL-BULACAN-21-0424-004 CP01-01-BL-IR-D01-0108 17-May-21 42.79 SMTL-BULACAN-21-0517-008 CP01-01-BL-IR-D01-0173 PASSED
( VOLUME = 27.396m³, 31MPa)

PILE CAP AND GRADE BEAM AT WORKSHOP GRIDLINE


49 15 19-Apr-21 A-D/21 Workshop, Malanday Depot 26-Apr-21 15.71 SMTL-BULACAN-21-0424-004 CP01-01-BL-IR-D01-0116 17-May-21 27.99 SMTL-BULACAN-21-0517-008 CP01-01-BL-IR-D01-0174 PASSED
DESIGN STRENGTH: 15 MPA @ 28 DAYS

Lean Concreting for Ground Beam Preparation Zone 2


50 15 20-Apr-21 GL 4-8/A, GL 4-8/A-B, GL 4/C-D, GL 6-7/D, GL 7-8/C-D ; OCC Building 5.00 5.00 19.00 195.00 27-Apr-21 28.92 SMTL-BULACAN-21-0427-008 CP01-01-BL-IR-D06-0111 18-May-21 28.04 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-D06-0177 PASSED
15MPa@28days

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


51 15 20-Apr-21 CAP AND GRADE BEAM AT GRIDLINE A-D/21 Workshop, Malanday Depot 3.46 12.50 27-Apr-21 19.32 SMTL-BULACAN-21-0427-008 CP01-01-BL-IR-D01-0112 18-May-21 27.54 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-D01-0178 PASSED
(CONTINUATION)(VOLUME = 3.456m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


52 31 20-Apr-21 AT GRIDLINE C3/14-18 Workshop, Malanday Depot 27-Apr-21 40.14 SMTL-BULACAN-21-0427-008 CP01-01-BL-IR-D01-0122 18-May-21 42.90 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-D01-0179 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


53 31 21-Apr-21 AT GRIDLINE C1/17-21 Workshop, Malanday Depot 24.30 26.00 28-Apr-21 31.17 SMTL-BULACAN-21-0428-007 CP01-01-BL-IR-D01-0117 19-May-21 44.20 SMTL-BULACAN-21-0519-010 CP01-01-BL-IR-D01-0182 PASSED
( VOLUME = 24.3m³, 31MPa)
Lean Concreting for Pile Cap Preparation GL 13-16/A-
54 15 21-Apr-21 LRS Building 17.00 17.00 28-Apr-21 15.60 SMTL-BULACAN-21-0428-007 CP01-01-BL-IR-D01-0118 19-May-21 27.70 SMTL-BULACAN-21-0519-010 CP01-01-BL-IR-D02-0183 PASSED
C (VOLUME = 17m³, 15MPa)
CONCRETE POURING OF PILE CAP AND GRADE BEAM
55 31 22-Apr-21 AT GRIDLINE C3/17-21 Workshop, Malanday Depot 24.30 26.00 29-Apr-21 31.48 SMTL-BULACAN-21-0429-011 CP01-01-BL-IR-D01-0123 20-May-21 47.08 SMTL-BULACAN-21-0520-002 CP01-01-BL-IR-D01-0184 PASSED
( VOLUME = 24.3m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


56 15 23-Apr-21 CAP AND GRADE BEAM AT GRIDLINE C2/7-12 Workshop Building 4.60 8.00 21.00 160.00 30-Apr-21 15.44 SMTL-BULACAN-21-0430-004 CP01-01-BL-IR-D01-0124 21-May-21 27.40 SMTL-BULACAN-21-0521-014 CP01-01-BL-IR-D01-0187 PASSED
( VOLUME = 4.596m³, 15MPa)

Lean Concreting for Ground Beam Preparation @ OCC


57 15 23-Apr-21 Zone 2 GL 4-8/D-E, GL 3-10/E (Volume = 11m³, OCC Building 11.00 10.50 30-Apr-21 15.66 SMTL-BULACAN-21-0430-004 CP01-01-BL-IR-D06-0127 21-May-21 27.26 SMTL-BULACAN-21-0521-014 CP01-01-BL-IR-D06-0190 PASSED
15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


58 31 24-Apr-21 AT GRIDLINE A3/14-18 Workshop Building 30.00 27.40 20.00 195.00 01-May-21 31.20 SMTL-BULACAN-21-0430-004 CP01-01-BL-IR-D01-0128 22-May-21 47.39 SMTL-BULACAN-21-0521-014 CP01-01-BL-IR-D01-0191 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


59 15 27-Apr-21 CAP AND GRADE BEAM AT GRIDLINE C2/1-7 Workshop Building 10.00 10.00 18.00 170.00 04-May-21 15.40 SMTL-BULACAN-21-0504-009 CP01-01-BL-IR-D01-0129 25-May-21 27.26 SMTL-BULACAN-21-0525-010 CP01-01-BL-IR-D01-0201 PASSED
( VOLUME = 5.268m³, 15MPa)

CONCRETE PLACEMENT OF SLAB FOR SUMP PIT A @


60 36 (w/ WP) 27-Apr-21 ZONE 1 & SUMP PIT B @ ZONE 3 (VOLUME = 4.056m³, OCC Building 6.50 6.50 20.00 225.00 04-May-21 38.13 SMTL-BULACAN-21-0504-009 CP01-01-BL-IR-D06-0130 25-May-21 55.33 SMTL-BULACAN-21-0525-010 CP01-01-BL-IR-D06-0202 FAILED
36MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


61 15 28-Apr-21 CAP AND GRADE BEAM AT GRIDLINE A1/7-12 Workshop Building 9.00 9.00 19.00 200.00 05-May-21 15.36 SMTL-BULACAN-21-0505-004 CP01-01-BL-IR-D01-0134 26-May-21 27.93 SMTL-BULACAN-21-0526-047 CP01-01-BL-IR-D01-0205 PASSED
( VOLUME = 5.268m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


62 15 29-Apr-21 CAP AND GRADE BEAM AT GRIDLINE A1/1-7 Workshop Building 10.00 10.00 20.00 200.00 06-May-21 15.67 SMTL-BULACAN-21-0506-010 CP01-01-BL-IR-D01-0136 27-May-21 27.72 SMTL-BULACAN-21-0527-008 CP01-01-BL-IR-D01-0207 PASSED
( VOLUME = 5.268m³, 15MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE D/13


63 31 29-Apr-21 & E/13 Workshop Building 18.00 17.50 20.00 190.00 06-May-21 31.65 SMTL-BULACAN-21-0506-010 CP01-01-BL-IR-D01-0137 27-May-21 47.02 SMTL-BULACAN-21-0527-008 CP01-01-BL-IR-D01-0208 PASSED
( VOLUME = 16.8m³, 31MPa)

36 (w/ WP) CONCRETE PLACEMENT OF WALL FOR SUMP PIT A @ 36.62 55.17
64 30-Apr-21 ZONE 1 & SUMP PIT B @ ZONE 3 (VOLUME = OCC Building 8.50 8.50 20.00 220.00 07-May-21 SMTL-BULACAN-21-0507-007 CP01-01-BL-IR-D06-0140 28-May-21 SMTL-BULACAN-21-0528-011 CP01-01-BL-IR-D06-0210 PASSED
36 (w/o WP) 7.6176m³, 36MPa) 37.01 54.66
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


65 15 30-Apr-21 CAP AND GRADE BEAM AT GRIDLINE C3/7-12 Workshop Building 9.00 9.00 17.00 195.00 07-May-21 15.60 SMTL-BULACAN-21-0507-007 CP01-01-BL-IR-D06-0141 28-May-21 27.30 SMTL-BULACAN-21-0528-011 CP01-01-BL-IR-D01-0211 PASSED
( VOLUME = 4.6m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR


GROUND BEAM AND CATCH BASIN
PILE CAP (GL 18-19 / A-C) (GL 16/B3-C) GL (17/C)
66 15 30-Apr-21 Light Repair Shop 12.50 12.50 20.00 200.00 07-May-21 15.63 SMTL-BULACAN-21-0507-007 CP01-01-BL-IR-D02-0142 28-May-21 27.81 SMTL-BULACAN-21-0528-011 CP01-01-BL-IR-D02-0212 PASSED
GROUND BEAM (GL 4-6 / B1-B3 )
CATCH BASINS (GL 5, 8, 11, 14, 17)
(VOLUME = 10.9m³, 15MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE D/19-


20
( VOLUME = 16.8m³, 31MPa)
67 31 03-May-21 Workshop Building 18.00 18.00 20.00 200.00 10-May-21 31.49 SMTL-BULACAN-21-0510-003 CP01-01-BL-IR-D01-0146 31-May-21 47.63 SMTL-BULACAN-21-0531-011 CP01-01-BL-IR-D01-0220 PASSED
CONCRETE POURING OF PILE CAP AT GRIDLINE D/17-
18
( VOLUME = 16.8m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR


GROUND BEAM AND CATCH BASIN
PILE CAP (GL 18-19 / A-C) (GL 16/B3-C) GL (17/C)
68 15 03-May-21 Light Repair Shop 6.50 6.50 25.00 180.00 10-May-21 16.26 SMTL-BULACAN-21-0510-003 CP01-01-BL-IR-D02-0147 31-May-21 27.56 SMTL-BULACAN-21-0531-011 CP01-01-BL-IR-D02-0221 PASSED
GROUND BEAM (GL 4-6 / B1-B3 )
CATCH BASINS (GL 5, 8, 11, 14, 17)
(VOLUME = 10.9m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE C/5-12, C1/5-12
69 15 05-May-21 Workshop Building 10.00 10.00 20.00 200.00 12-May-21 15.58 SMTL-BULACAN-21-0512-010 CP01-01-BL-IR-D01-0151 02-Jun-21 28.09 SMTL-BULACAN-21-0602-009 CP01-01-BL-IR-D01-0227 PASSED
( VOLUME = 9.272m³, 15MPa)

LEAN CONCRETING FOR INTERMEDIATE BEAM


70 15 05-May-21 OCC Building 15.50 15.50 20.00 200.00 12-May-21 15.52 SMTL-BULACAN-21-0512-010 CP01-01-BL-IR-D06-0152 02-Jun-21 27.92 SMTL-BULACAN-21-0602-009 CP01-01-BL-IR-D06-0228 PASSED
PREPARATION GL (1-2/C-E, 2-3/A-C)
CONCRETE POURING OF PILE CAP AT GRIDLINE A1/17-
71 31 05-May-21 Workshop Building 27.00 27.00 21.00 200.00 12-May-21 31.61 SMTL-BULACAN-21-0512-010 CP01-01-BL-IR-D01-0153 02-Jun-21 47.60 SMTL-BULACAN-21-0602-009 CP01-01-BL-IR-D01-0229 PASSED
21

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AT GRIDLINE D/7-12
(VOLUME = 3.426m³, 15MPa)
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
CAP AND GRADE BEAM AT GRIDLINE D1/7-12
72 15 06-May-21 Workshop Building 10.00 9.00 20.00 200.00 13-May-21 15.85 SMTL-BULACAN-21-0513-002 CP01-01-BL-IR-D01-0156 03-Jun-21 28.56 SMTL-BULACAN-21-0603-009 CP01-01-BL-IR-D01-0235 PASSED
(VOLUME = 4.596m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AT GRIDLINE E/21
(VOLUME = 0.571m³, 15MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE D/14-


73 31 06-May-21 16 Workshop Building 27.00 27.00 20.00 200.00 13-May-21 31.24 SMTL-BULACAN-21-0513-002 CP01-01-BL-IR-D01-0157 03-Jun-21 48.07 SMTL-BULACAN-21-0603-009 CP01-01-BL-IR-D01-0236 PASSED
( VOLUME = 25.2m³, 31MPa)
LEAN CONCRETING FOR GROUND BEAM
74 15 06-May-21 OCC Building 3.00 3.00 20.00 200.00 13-May-21 16.08 SMTL-BULACAN-21-0513-002 CP01-01-BL-IR-D06-0158 03-Jun-21 28.37 SMTL-BULACAN-21-0603-009 CP01-01-BL-IR-D06-0237 PASSED
PREPARATION B-E/9-10

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


75 15 07-May-21 CAP AND GRADE BEAM AT GRIDLINE A2/7-12 Workshop Building 9.50 9.50 19.00 200.00 14-May-21 15.66 SMTL-BULACAN-21-0514-007 CP01-01-BL-IR-D01-0162 04-Jun-21 27.91 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-D01-0240 PASSED
( VOLUME = 4.596m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


AT GRIDLINE A3/17-21
( VOLUME = 24.3m³, 31MPa)
76 31 07-May-21 Workshop Building 28.00 27.00 19.00 200.00 14-May-21 33.94 SMTL-BULACAN-21-0514-007 CP01-01-BL-IR-D01-0163 04-Jun-21 47.10 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-D01-0241 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR SP11 AT
GL D1-E/20-21 (VOLUME = 0.361m³, 15MPa)

LEAN CONCRETING FOR INTERMEDIATE BEAM


PREPARATION @ ZONE 1 GL (1-2 / C-D, D-E), (2-3 / A-
77 15 07-May-21 OCC Building 7.50 7.50 19.00 200.00 14-May-21 15.61 SMTL-BULACAN-21-0514-007 CP01-01-BL-IR-DPO-0164 04-Jun-21 28.11 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-DPO-0242 PASSED
B, B-C), @ ZONE 2 GL (4-8 / C-D), (3-8/ D-E)

LEAN CONCRETING FOR BEAM PREPARATION GL (6-


78 15 07-May-21 8/B1-B3) Light Repair Shop 8.00 8.00 20.00 200.00 14-May-21 27.58 SMTL-BULACAN-21-0514-007 CP01-01-BL-IR-DPO-0164 04-Jun-21 27.86 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-DPO-0242 PASSED
(VOLUME = 4.5m³, 15MPa)³

CONCRETE POURING OF PILE CAP AT GRIDLINE E/14-


79 31 08-May-21 20 Workshop Building 59.50 59.50 19.00 200.00 15-May-21 31.69 SMTL-BULACAN-21-0515-006 CP01-01-BL-IR-D01-0167 05-Jun-21 46.84 SMTL-BULACAN-21-0605-003 CP01-01-BL-IR-D01-0244 PASSED
( VOLUME = 50.4m³, 31MPa)

LEAN CONCRETING FOR INTERMEDIATE BEAM


80 15 10-May-21 PREPARATION ZONE 2 GL 3-8/D-E, ZONE 3 GL 9-10/C- OCC Building 7.00 7.00 20.00 200.00 17-May-21 16.15 SMTL-BULACAN-21-0517-008 CP01-01-BL-IR-D06-0171 08-Jun-21 28.18 TCT-NSCR-21-0608-87 CP01-01-BL-IR-D06-0249 PASSED
D

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


81 15 10-May-21 CAP AND GRADE BEAM AT GRIDLINE A/4-9 Workshop Building 9.00 9.00 20.00 200.00 17-May-21 15.62 SMTL-BULACAN-21-0517-008 CP01-01-BL-IR-D01-0172 07-Jun-21 29.56 TCT-NSCR-21-0608-88 CP01-01-BL-IR-D01-0250 PASSED
( VOLUME = 7.92m³, 15MPa)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AND GRADE BEAM AT GRIDLINE B3/7-12
82 15 11-May-21 Workshop Building 19.00 19.00 20.00 200.00 18-May-21 16.14 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-D01-0175 08-Jun-21 29.51 TCT-NSCR-21-0608-25 CP01-01-BL-IR-D01-0254 PASSED
( VOLUME = 4.596m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


83 15 11-May-21 CAP AND GRADE BEAM AT GRIDLINE F/7-11 Workshop Building 13.00 13.00 18.00 180.00 18-May-21 16.14 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-D01-0175 08-Jun-21 29.51 TCT-NSCR-21-0608-25 CP01-01-BL-IR-D01-0254 PASSED
( VOLUME = 5.543m³, 15MPa)
LEAN CONCRETING FOR INTERMEDIATE BEAM GL 1-
84 15 11-May-21 OCC Building 1.00 1.00 19.00 200.00 18-May-21 16.25 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-DPO-0176 08-Jun-21 29.60 TCT-NSCR-21-0608-26 CP01-01-BL-IR-DPO-0255 PASSED
2/C-D, 1-2/C AND AREA DRAIN GL 2/E
LEAN CONCRETING FOR GROUND BEAM
85 15 11-May-21 Light Repair Shop 8.00 8.00 19.00 200.00 18-May-21 16.25 SMTL-BULACAN-21-0518-005 CP01-01-BL-IR-DPO-0176 08-Jun-21 29.60 TCT-NSCR-21-0608-26 CP01-01-BL-IR-DPO-0255 PASSED
PREPARATION GL 8-10/B1-B3
CONCRETE CASTING OF LEAN CONCRETE FOR GRADE
86 15 12-May-21 BEAM AT GRIDLINE D/7-12 Workshop Building 6.00 6.00 19.00 190.00 19-May-21 15.99 SMTL-BULACAN-21-0519-010 CP01-01-BL-IR-D01-0180 09-Jun-21 28.18 TCT-NSCR-21-0609-06 CP01-01-BL-IR-D01-0256 PASSED
( VOLUME = 3.36m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


87 15 12-May-21 CAP AND GRADE BEAM AT GRIDLINE A3/7-12 Workshop Building 10.00 10.00 19.00 190.00 19-May-21 16.15 SMTL-BULACAN-21-0519-010 CP01-01-BL-IR-D01-0180 09-Jun-21 28.42 TCT-NSCR-21-0609-07 CP01-01-BL-IR-D01-0256 PASSED
( VOLUME = 4.596m³, 15MPa)

LEAN CONCRETING FOR GROUND BEAM


88 15 12-May-21 PREPARATION GL 10-12/B1-B3 Light Repair Shop 8.00 7.50 19.00 190.00 19-May-21 16.54 SMTL-BULACAN-21-0519-010 CP01-01-BL-IR-DPO-0181 09-Jun-21 28.46 TCT-NSCR-21-0609-08 CP01-01-BL-IR-DPO-0257 PASSED
(VOLUME = 4.5m³, 15MPa)

LEAN CONCRETING FOR GROUND BEAM


89 15 12-May-21 PREPARATION ZONE 2 GL 6-7/B-C, 4-5/B-C ; ZONE 3 OCC Building 5.00 5.00 19.00 190.00 19-May-21 15.78 SMTL-BULACAN-21-0519-010 CP01-01-BL-IR-DPO-0181 09-Jun-21 28.81 TCT-NSCR-21-0609-09 CP01-01-BL-IR-DPO-0257 PASSED
GL 9-10/B-C

CONCRETE PLACEMENT FOR MAIN GIRDER AND


INTERMEDIATE BEAM
90 36 14-May-21 Zone 1 PILE CAP GL 1-2/D-E, MAIN GIRDER GL 1/C-E, OCC Building 39.00 38.50 19.00 200.00 21-May-21 35.93 SMTL-BULACAN-21-0521-014 CP01-01-BL-IR-D06-0185 11-Jun-21 51.06 TCT-NSCR-21-0611-03 CP01-01-BL-IR-D06-0261 PASSED
1-2/D-E, 2/C-E, INTERMEDIATE BEAM GL 1-2/C-E
(VOLUME= 42.1 mᶾ)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


91 15 14-May-21 CAP AND GRADE BEAM AT GRIDLINE D1/2-7 Workshop Building 9.50 9.50 19.00 190.00 21-May-21 16.33 SMTL-BULACAN-21-0521-014 CP01-01-BL-IR-D01-0186 11-Jun-21 28.62 TCT-NSCR-21-0611-04 CP01-01-BL-IR-D01-0262 PASSED
( VOLUME = 4.39m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


92 15 14-May-21 CAP AND GRADE BEAM AT GRIDLINE F/4-7 Workshop Building 14.00 14.00 18.00 200.00 21-May-21 15.43 SMTL-BULACAN-21-0521-014 CP01-01-BL-IR-D01-0186 11-Jun-21 28.77 TCT-NSCR-21-0611-05 CP01-01-BL-IR-D01-0262 PASSED
( VOLUME = 4.39m³, 15MPa)

CONRETE CASTING OF LEAN CONCRETE FOR GROUND


93 15 15-May-21 OCC Building 3.50 3.50 19.00 200.00 22-May-21 17.91 SMTL-BULACAN-21-0522-004 CP01-01-BL-IR-D06-0196 12-Jun-21 28.49 TCT-NSCR-21-0612-25 CP01-01-BL-IR-D06-0264 PASSED
BEAM ZONE 1 GL 1-2/A&B, A-2/A-B, 1-2/B-C

LEAN CONCRETING FOR BEAM PREPARATION


94 15 17-May-21 GL (12-14/ B1-B3) Light Repair Shop 9.50 9.50 23.00 180.00 24-May-21 16.16 SMTL-BULACAN-21-0524-018 CP01-01-BL-IR-D02-0194 14-Jun-21 28.42 TCT-NSCR-21-0614-04 CP01-01-BL-IR-D02-0268 PASSED
(Volume of Concrete = 4.5 m³)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


95 15 17-May-21 CAP AND GRADE BEAM AT GRIDLINE G/4-9 Workshop Building 12.00 12.00 19.00 200.00 24-May-21 16.60 SMTL-BULACAN-21-0524-018 CP01-01-BL-IR-D01-0195 14-Jun-21 28.82 TCT-NSCR-21-0614-05 CP01-01-BL-IR-D01-0269 PASSED
( VOLUME =7.752m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


96 15 18-May-21 CAP AND GRADE BEAM AT GRIDLINE G/4-9 Workshop Building 7.50 7.50 20.00 195.00 25-May-21 17.76 SMTL-BULACAN-21-0525-010 CP01-01-BL-IR-D01-0197 15-Jun-21 28.04 TCT-NSCR-21-0615-06 CP01-01-BL-IR-D01-0271 PASSED
( VOLUME =7.752m³, 15MPa)

CONCRETE POURING OF FOUNDATION COLUMN AND


97 31 18-May-21 GRADE BEAM AT GRIDLINE D/18-20 Workshop Building 23.00 21.50 24.00 195.00 25-May-21 30.94 SMTL-BULACAN-21-0525-010 CP01-01-BL-IR-D01-0198 15-Jun-21 44.90 TCT-NSCR-21-0615-04 CP01-01-BL-IR-D01-0272 PASSED
( VOLUME = 19.143m³, 31MPa)

CONCRETE PLACEMENT FOR MAIN GIRDER AND


INTERMEDIATE BEAM Zone 3
Pile Cap : GL (9/C), GL (9/D), GL (10/C), GL (10/D);
98 36 18-May-21 Main Girder : GL (9/C-D), GL (10/C-D), GL (9-10/C), GL OCC Building 36.00 36.00 21.00 195.00 25-May-21 36.28 SMTL-BULACAN-21-0525-010 CP01-01-BL-IR-D06-0199 15-Jun-21 52.81 TCT-NSCR-21-0615-05 CP01-01-BL-IR-D06-0273 PASSED
(9-10/D)
Intermediate Beam : GL( 9-10/C-D)
(VOLUME= 35 mᶾ)

LEAN CONCRETING FOR GROUND BEAM


99 15 18-May-21 PREPARATION OCC Building 3.00 3.00 20.00 195.00 25-May-21 17.45 SMTL-BULACAN-21-0525-010 CP01-01-BL-IR-D06-0200 15-Jun-21 27.66 TCT-NSCR-21-0615-07 CP01-01-BL-IR-D06-0274 PASSED
@ ZONE 3 GL 9-10/A, 9/A-B, 10/A-B, 9-10/B
LEAN CONCRETING FOR BEAM PREPARATION GL (14-
100 15 19-May-21 16/B2-B3) Light Repair Shop 5.00 4.00 19.00 200.00 26-May-21 16.67 SMTL-BULACAN-21-0526-004 CP01-01-BL-IR-D02-0203 16-Jun-21 28.80 TCT-NSCR-21-0616-04 CP01-01-BL-IR-D02-0280 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


101 15 19-May-21 CAP AND GRADE BEAM AT GRIDLINE C-C1/1-5 Workshop Building 15.50 15.50 20.00 190.00 26-May-21 15.70 SMTL-BULACAN-21-0526-004 CP01-01-BL-IR-D01-0204 16-Jun-21 28.97 TCT-NSCR-21-0616-01 CP01-01-BL-IR-D01-0281 PASSED
( VOLUME =8.48m³, 15MPa)

CONCRETE POURING OF FOUNDATION COLUMN AND


102 31 20-May-21 GRADE BEAM AT GRIDLINE D/15-19 Workshop Building 25.00 23.50 20.00 200.00 27-May-21 31.45 SMTL-BULACAN-21-0527-008 CP01-01-BL-IR-D01-0206 17-Jun-21 44.61 TCT-NSCR-21-0617-02 CP01-01-BL-IR-D01-0283 PASSED
( VOLUME = 24.003m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


103 31 21-May-21 AT GRIDLINE C/18-21 Workshop Building 34.00 34.00 20.00 200.00 28-May-21 31.72 SMTL-BULACAN-21-0528-011 CP01-01-BL-IR-D01-0209 18-Jun-21 45.08 TCT-NSCR-21-0618-06 CP01-01-BL-IR-D01-0286 PASSED
( VOLUME = 32.28m³, 31MPa)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


104 15 22-May-21 CAP AND GRADE BEAM AT GRIDLINE B3/1-7 Workshop Building 8.00 8.00 20.00 195.00 29-May-21 16.53 SMTL-BULACAN-21-0529-006 CP01-01-BL-IR-D01-0213 19-Jun-21 28.42 TCT-NSCR-21-0619-04 CP01-01-BL-IR-D01-0287 PASSED
( VOLUME =5.268m³, 15MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR GRADE


105 15 22-May-21 BEAM AT GRIDLINE E 14-21 & D-E 21 (VOLUME = Workshop Building 8.00 8.00 19.00 190.00 29-May-21 16.53 SMTL-BULACAN-21-0529-006 CP01-01-BL-IR-D01-0213 19-Jun-21 28.50 TCT-NSCR-21-0619-05 CP01-01-BL-IR-D01-0287 PASSED
7.2448m³, 15MPa)
LEAN CONCRETING FOR SLAB @ ZONE 1
106 15 22-May-21 GL 1-2/C-E OCC Building 5.00 5.00 20.00 170.00 29-May-21 16.81 SMTL-BULACAN-21-0529-006 CP01-01-BL-IR-D06-0214 19-Jun-21 28.95 TCT-NSCR-21-0619-03 CP01-01-BL-IR-D06-0288 PASSED

36 (w/ WP) CONCRETE PLACEMENT FOR PILE CAP GL 1-3/-A-C, 37.26 52.40 TCT-NSCR-21-0619-01 PASSED
107 22-May-21 MAIN GIRDER GL 1-3/A-C, INTEMEDIATE BEAM, GL 1- OCC Building 113.00 111.00 18-19 210-225 29-May-21 SMTL-BULACAN-21-0529-006 CP01-01-BL-IR-D06-0217 19-Jun-21 CP01-01-BL-IR-D06-0289
36 (w/o WP) 2/A-B 37.10 52.56 TCT-NSCR-21-0619-02 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


108 31 24-May-21 AT GRIDLINE C2/8-12 Workshop Building 29.00 28.50 20.00 200.00 31-May-21 31.89 SMTL-BULACAN-21-0531-011 CP01-01-BL-IR-D01-0219 21-Jun-21 45.11 TCT-NSCR-21-0621-05 CP01-01-BL-IR-D01-0291 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE 4/C


109 31 25-May-21 and 5/C Light Repair Shop 18.00 18.00 19.00 200.00 01-Jun-21 33.16 SMTL-BULACAN-21-0601-001 CP01-01-BL-IR-D02-0222 22-Jun-21 44.60 TCT-NSCR-21-0622-05 CP01-01-BL-IR-D02-0298 PASSED
(VOLUME = 35.28m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AT GRIDLINE D/3-6
( VOLUME =2.286m³, 15MPa)
110 15 25-May-21 Workshop Building 8.00 8.00 20.00 200.00 01-Jun-21 16.30 SMTL-BULACAN-21-0601-001 CP01-01-BL-IR-D01-0223 22-Jun-21 27.83 TCT-NSCR-21-0622-06 CP01-01-BL-IR-D01-0299 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR GRADE
BEAM AT GRIDLINE D/3-7
( VOLUME =2.816m³, 15MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE 4/B


111 31 26-May-21 and 5/B Light Repair Shop 18.00 18.00 20.00 200.00 02-Jun-21 31.58 SMTL-BULACAN-21-0602-009 CP01-01-BL-IR-D02-0224 23-Jun-21 44.98 TCT-NSCR-21-0623-02 CP01-01-BL-IR-D02-0302 PASSED
(VOLUME = 35.28m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


112 31 26-May-21 AT GRIDLINE C3/8-12 Workshop Building 29.00 28.00 20.00 200.00 02-Jun-21 31.77 SMTL-BULACAN-21-0602-009 CP01-01-BL-IR-D01-0225 23-Jun-21 44.81 TCT-NSCR-21-0623-03 CP01-01-BL-IR-D01-0303 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


113 31 26-May-21 AT GRIDLINE C/15-19 Workshop Building 42.50 41.00 20.00 200.00 02-Jun-21 31.49 SMTL-BULACAN-21-0602-009 CP01-01-BL-IR-D01-0226 23-Jun-21 45.18 TCT-NSCR-21-0623-04 CP01-01-BL-IR-D01-0304 PASSED
( VOLUME = 43.776m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


114 15 27-May-21 GRIDLINE B1-B3/15-20 Workshop Building 48.00 45.00 20.00 200.00 03-Jun-21 15.62 SMTL-BULACAN-21-0603-009 CP01-01-BL-IR-D01-0232 24-Jun-21 25.89 TCT-NSCR-21-0624-01 CP01-01-BL-IR-D01-0307 PASSED
( VOLUME = 39.5048m³, 15MPa)
CONCRETE POURING OF PILE CAP
115 31 27-May-21 Light Repair Shop 35.00 34.50 19.00 200.00 03-Jun-21 32.05 SMTL-BULACAN-21-0603-009 CP01-01-BL-IR-D02-0233 24-Jun-21 45.48 TCT-NSCR-21-0624-02 CP01-01-BL-IR-D02-0308 PASSED
GL 6-7/B-C

36 (w/ WP) CONCRETE PLACEMENT @ ZONE 3 36.31 52.30 TCT-NSCR-21-0624-03 PASSED


PILE CAP : GL (9-10/A-B)
116 27-May-21 OCC Building 60.00 60.00 18-20 215-225 03-Jun-21 SMTL-BULACAN-21-0603-009 CP01-01-BL-IR-D06-0234 24-Jun-21 CP01-01-BL-IR-D06-0309
MAIN GIRDER : GL (9-10/A-C)
36 (w/o WP) INTERMEDIATE BEAM : GL (9-10/A-C) 52.12 TCT-NSCR-21-0624-04 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


117 31 28-May-21 AT GRIDLINE D1/8-12 Workshop Building 29.00 28.50 20.00 165.00 04-Jun-21 31.44 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-D01-0238 25-Jun-21 44.85 TCT-NDCR-21-0625-13 CP01-01-BL-IR-D01-0312 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


118 31 28-May-21 AT GRIDLINE B/18-21 Workshop Building 34.00 31.50 18.00 200.00 04-Jun-21 31.93 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-D01-0238 25-Jun-21 43.78 TCT-NDCR-21-0625-12 CP01-01-BL-IR-D01-0313 PASSED
( VOLUME = 27.396m³, 31MPa)
LEAN CONCRETING FOR GROUND BEAM
119 15 28-May-21 Light Repair Shop 6.00 6.00 19.00 190.00 04-Jun-21 15.90 SMTL-BULACAN-21-0604-013 CP01-01-BL-IR-D02-0239 25-Jun-21 28.09 TCT-NDCR-21-0625-11 CP01-01-BL-IR-D02-0314 PASSED
PREPARATION GL 14-16/B1, 16-18/B2-B3
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
120 15 29-May-21 CAP AND GRADE BEAM AT GRIDLINE C3/3-7 Workshop Building 9.00 8.00 18.00 180.00 05-Jun-21 15.80 SMTL-BULACAN-21-0605-003 CP01-01-BL-IR-D01-0243 26-Jun-21 28.06 TCT-NDCR-21-0626-06 CP01-01-BL-IR-D01-0318 PASSED
( VOLUME =3.512m³, 15MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE 8/B,


121 31 29-May-21 GL. 8/C, GL.9/B, GL.9/C Light Repair Shop 35.00 35.00 20.00 200.00 05-Jun-21 31.44 SMTL-BULACAN-21-0605-003 CP01-01-BL-IR-D02-0245 26-Jun-21 44.13 TCT-NDCR-21-0626-05 CP01-01-BL-IR-D02-0319 PASSED
( VOLUME = 27.396m³, 31MPa)

LEAN CONCRETING FOR GROUND SLAB PREPARATION


122 15 31-May-21 OCC Building 16.00 16.00 19.00 190.00 08-Jun-21 17.23 TCT-NSCR-21-0608-22 CP01-01-BL-IR-D06-0247 28-Jun-21 27.83 TCT-NDCR-21-0628-01 CP01-01-BL-IR-D06-0322 PASSED
GL.1-3/B-C, GL.1-2/C-D, GL.9-10/C-D

CONCRETE POURING OF PILE CAP AND GRADE BEAM


123 31 31-May-21 AT GRIDLINE C2/5-9 Workshop Building 29.00 28.00 20.00 200.00 07-Jun-21 31.54 TCT-NSCR-21-0608-87 CP01-01-BL-IR-D01-0248 28-Jun-21 45.86 TCT-NDCR-21-0628-02 CP01-01-BL-IR-D01-0323 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE POURING OF PILE CAP AT GRIDLINE D/10-


124 31 01-Jun-21 12 Workshop Building 27.00 27.00 20.00 200.00 08-Jun-21 30.69 TCT-NSCR-21-0608-27 CP01-01-BL-IR-D01-0251 29-Jun-21 44.27 TCT-NDCR-21-0629-04 CP01-01-BL-IR-D01-0327 PASSED
( VOLUME = 25.2m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


125 31 01-Jun-21 AT GRIDLINE D1/5-9 Workshop Building 29.00 28.00 20.00 195.00 08-Jun-21 31.80 TCT-NSCR-21-0608-24 CP01-01-BL-IR-D01-0251 29-Jun-21 41.75 TCT-NDCR-21-0629-06 CP01-01-BL-IR-D01-0327 PASSED
( VOLUME = 27.396m³, 31MPa)

126 31 01-Jun-21 CONCRETE PLACEMENT FOR PILE CAP GL 10&12/B&C Light Repair Shop 35.50 34.50 18-20 200.00 08-Jun-21 31.44 x CP01-01-BL-IR-D02-0252 29-Jun-21 44.83 TCT-NDCR-21-0629-075 CP01-01-BL-IR-D02-0328 PASSED

127 15 01-Jun-21 LEAN CONCRETING @ ZONE 1 GL 1-3/A-B OCC Building 10.00 10.00 19.00 190.00 08-Jun-21 16.10 TCT-NSCR-21-0608-21 CP01-01-BL-IR-D06-0253 29-Jun-21 26.16 TCT-NDCR-21-0629-07 CP01-01-BL-IR-D06-0329 PASSED
CONCRETE POURING OF PILE CAP AND GRADE BEAM
128 31 02-Jun-21 AT GRIDLINE A1/8-12 Workshop Building 29.00 28.00 17.00 200.00 09-Jun-21 31.52 TCT-NSCR-21-0609-05 CP01-01-BL-IR-D01-0246 30-Jun-21 45.73 TCT-NDCR-21-0630-03 CP01-01-BL-IR-D01-0334 PASSED
( VOLUME = 27.396m³, 31MPa)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


129 15 03-Jun-21 GRIDLINE C1-C3/15-20 Workshop Building 45.00 45.00 18.00 200.00 10-Jun-21 18.75 TCT-NSCR-21-0610-01 CP01-01-BL-IR-D01-0258 01-Jul-21 28.59 TCT-NDCR-21-0701-01 CP01-01-BL-IR-D01-0337 PASSED
( VOLUME = 39.5048m³, 15MPa)
130 31 04-Jun-21 CONCRETE PLACEMENT FOR PILE CAP GL 13/B&C Light Repair Shop 18.00 18.00 21.00 190-200 11-Jun-21 33.99 TCT-NSCR-21-0611-02 CP01-01-BL-IR-D02-0259 02-Jul-21 44.31 TCT-NDCR-21-0702-12 CP01-01-BL-IR-D02-0341 PASSED
LEAN CONCRETING @ ZONE 1 (EXTERIOR SLAB) GL 2-
131 15 04-Jun-21 3/A, 1-2/E, (INTERIOR SLAB) 2-3/A-B, @ ZONE 3 9- OCC Building 11.00 11.00 19.00 195-200 11-Jun-21 16.15 TCT-NSCR-21-0611-01 CP01-01-BL-IR-D06-0260 02-Jul-21 28.04 TCT-NDCR-21-0702-11 CP01-01-BL-IR-D06-0342 PASSED
10/A-D

CONCRETE POURING OF PILE CAP AT GRIDLINE D/7-9


132 31 05-Jun-21 Workshop Building 27.00 27.00 21.00 200.00 12-Jun-21 32.02 TCT-NSCR-21-0612-26 CP01-01-BL-IR-D01-0263 03-Jul-21 44.46 TCT-NSCR-21-0703-05 CP01-01-BL-IR-D01-0347 PASSED
( VOLUME = 25.2m³, 31MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


133 15 07-Jun-21 GRIDLINE D-D1/15-20 Workshop Building 24.00 23.00 22.00 200.00 14-Jun-21 17.09 TCT-NSCR-21-0614-01 CP01-01-BL-IR-D01-0265 05-Jul-21 28.06 TCT-NSCR-21-0705-01 CP01-01-BL-IR-D01-0349 PASSED
( VOLUME = 19.7542m³, 15MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


134 31 07-Jun-21 AT GRIDLINE D1/2-6 Workshop Building 29.00 27.00 22.00 200.00 14-Jun-21 32.20 TCT-NSCR-21-0614-02 CP01-01-BL-IR-D01-0266 05-Jul-21 45.49 TCT-NSCR-21-0705-02 CP01-01-BL-IR-D01-0350 PASSED
( VOLUME = 27.396m³, 31MPa)

135 31 07-Jun-21 CONCRETE PLACEMENT FOR PILE CAP GL 11/B&C Light Repair Shop 18.00 18.00 22.00 200.00 14-Jun-21 32.11 TCT-NSCR-21-0614-03 CP01-01-BL-IR-D01-0267 05-Jul-21 45.46 TCT-NSCR-21-0705-03 CP01-01-BL-IR-D02-0351 PASSED

36 (w/ WP) 37.70 52.26


TCT-NSCR-21-0615-01 TCT-NSCR-21-0706-03 CP01-01-BL-IR-D06-0355 PASSED
CONCRETE PLACEMENT OF SLAB ON GRADE @ ZONE
136 36 (w/o WP) 08-Jun-21 OCC Building 100.00 100.00 15-Jun-21 37.77 CP01-01-BL-IR-D06-0270 06-Jul-21 52.54
1 GL 1-3/A-E

36 (w/ WP) 37.77 TCT-NSCR-21-0615-03 52.54 TCT-NSCR-21-0706-04 CP01-01-BL-IR-D06-0355 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


137 15 09-Jun-21 CAP AND GRADE BEAM AT GRIDLINE C-E/13-14 Workshop Building 20.00 20.00 16-Jun-21 16.67 TCT-NSCR-21-0616-03 CP01-01-BL-IR-D01-0275 07-Jul-21 28.67 TCT-NSCR-21-0707-05 CP01-01-BL-IR-D01-0359 PASSED
( VOLUME = 39.5048m³, 15MPa)

138 15 09-Jun-21 LEAN CONCRETING FOR SLAB @ ZONE 3 GL 10/B-D OCC Building 3.00 3.00 16-Jun-21 20.21 TCT-NSCR-21-0616-10 CP01-01-BL-IR-D06-0276 07-Jul-21 27.94 TCT-NSCR-21-0707-07 CP01-01-BL-IR-D06-0360 PASSED

139 31 09-Jun-21 CONCRETE PLACEMENT FOR GRADE BEAM GL 5-8/B3 Light Repair Shop 18.00 18.00 16-Jun-21 31.66 TCT-NSCR-21-0616-02 CP01-01-BL-IR-D02-0277 07-Jul-21 44.18 TCT-NSCR-21-0707-06 CP01-01-BL-IR-D02-0361 PASSED

50.17; 52.54; TCT-NSCR-21-0707-08-01;


CONCRETE PLACEMENT FOR GIRDER, PILE CAP &
140 36 10-Jun-21 OCC Building 141.00 141.00 17-Jun-21 36.84 TCT-NSCR-21-06117-01 CP01-01-BL-IR-D06-0282 08-Jul-21 TCT-NSCR-21-0707-08-02; CP01-01-BL-IR-D06-0365 PASSED
INTERMEDIATE BEAM@ ZONE 2 GL 5-7/A-C
52.17 TCT-NSCR-21-0707-08-03

53.08; TCT-NSCR-21-0709-07;
36 (w/ WP) 37.22 TCT-NSCR-21-0618-07 CP01-01-BL-IR-D06-0368 PASSED
CONRETE PLACEMENT OF SLAB ON GRADE @ ZONE 3 52.57 TCT-NSCR-21-0709-06
141 11-Jun-21 9-10/A-D OCC Building 57.00 57.00 18-Jun-21 CP01-01-BL-IR-D06-0284 09-Jul-21
52.84; TCT-NSCR-21-0709-08;
36 (w/o WP) 37.91 TCT-NSCR-21-0618-08 CP01-01-BL-IR-D06-0368 PASSED
51.58 TCT-NSCR-21-0709-09

142 31 11-Jun-21 CONCRETE PLACEMENT FOR GRADE BEAM GL 5-8/B1 Light Repair Shop 36.00 36.00 18-Jun-21 33.41 TCT-NSCR-21-0618-10 CP01-01-BL-IR-D02-0285 09-Jul-21 44.79 TCT-NSCR-21-0709-04 CP01-01-BL-IR-D02-0369 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


143 31 11-Jun-21 AT GRIDLINE A2/15-19 Workshop Building 29.00 29.00 18-Jun-21 32.25 TCT-NSCR-21-0618-05 CP01-01-BL-IR-D01-0278 09-Jul-21 44.87 TCT-NSCR-21-0709-05 CP01-01-BL-IR-D01-0370 PASSED
( VOLUME = 27.396m³, 31MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


144 31 11-Jun-21 AT GRIDLINE B/15-19 Workshop Building 46.00 46.00 18-Jun-21 32.43 TCT-NSCR-21-0618-09 CP01-01-BL-IR-D01-0279 09-Jul-21 44.79 TCT-NSCR-21-0709-04 CP01-01-BL-IR-D01-0371 PASSED
( VOLUME = 43.78m³, 31MPa)
CONCRETE POURING OF PILE CAP AT GRIDLINE D/5-6
145 31 14-Jun-21 (VOLUME = 16.8m³, 31MPA) Workshop Building 18.00 18.00 21-Jun-21 31.20 TCT-NSCR-21-0621-05 CP01-01-BL-IR-D01-0290 12-Jul-21 44.23 TCT-NSCR-21-0712-02 CP01-01-BL-IR-D01-0376 PASSED

CONCRETE PLACEMENT FOR PILECAP AND GRADE


146 36 15-Jun-21 OCC Building 98.00 96.00 22-Jun-21 36.99 TCT-NSCR-21-0622-02 CP01-01-BL-IR-D06-0292 13-Jul-21 52.80 TCT-NSCR-21-0713-02 CP01-01-BL-IR-D06-0378 PASSED
BEAM @ OCC Zone 2 GL 5-7/ C-E
CONCRETE PALCEMENT FOR PILECAP AND GRADE
147 31 15-Jun-21 BEAM GL 8-10/B3 Light Repair Shop 29.00 29.00 22-Jun-21 31.57 TCT-NSCR-21-0622-04 CP01-01-BL-IR-D02-0293 13-Jul-21 44.63 TCT-NSCR-21-0713-05 CP01-01-BL-IR-D02-0379 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


148 15 15-Jun-21 GRIDLINE B3-C1/15-20 Workshop Building 44.00 44.00 22-Jun-21 16.52 TCT-NSCR-21-0622-03 CP01-01-BL-IR-D01-0294 13-Jul-21 28.04 TCT-NSCR-21-0713-06 CP01-01-BL-IR-D01-0380 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


149 15 15-Jun-21 GRIDLINEC3-D/15-20 Workshop Building 23.00 18.00 22-Jun-21 15.97 TCT-NSCR-21-0622-01 CP01-01-BL-IR-D01-0295 13-Jul-21 28.25 TCT-NSCR-21-0713-04 CP01-01-BL-IR-D01-0381 PASSED

CONCRETE POURING OF GRADE BEAM AND PILE CAP


150 31 16-Jun-21 Light Repair Shop 29.00 29.00 23-Jun-21 32.13 TCT-NSCR-21-0623-01 CP01-01-BL-IR-D02-0300 14-Jul-21 44.61 TCT-NSCR-21-0714-01 CP01-01-BL-IR-D02-0386 PASSED
GL 7-11/B2

36 (w/ WP) CONCRETE POURING OF RETAINING WALL, EXTERNAL 36.39 TCT-NSCR-21-0623-05 48.64 TCT-NSCR-21-0714-03 CP01-01-BL-IR-D06-0387 PASSED
151 16-Jun-21 WALL AND COLUMN @ ZONE 1 GL 1-3/A-C, 1-2/D-E, OCC Building 48.00 48.00 23-Jun-21 CP01-01-BL-IR-D06-0301 14-Jul-21
36 (w/o WP) 1-2/E, 2-3/A 36.03 TCT-NSCR-21-0623-06 51.29 TCT-NSCR-21-0714-02 CP01-01-BL-IR-D06-0387 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


152 31 17-Jun-21 AT GRIDLINE C3/6-8 Workshop Building 27.50 27.50 24-Jun-21 31.61 TCT-NSCR-21-0624-06 CP01-01-BL-IR-D01-0305 15-Jul-21 44.47 TCT-NSCR-21-0715-03 CP01-01-BL-IR-D01-0389 PASSED
( VOLUME = 27.396m³, 31MPa)
CONCRETE POURING OF PILE CAP & GRADE BEAM GL
153 31 17-Jun-21 Light Repair Shop 29.00 29.00 24-Jun-21 32.33 TCT-NSCR-21-0624-05 CP01-01-BL-IR-D02-0306 15-Jul-21 41.83 TCT-NSCR-21-0715-02 CP01-01-BL-IR-D02-0390 PASSED
7-11/B1
49.99; TCT-NSCR-21-0716-08
36 (w/ WP) CONCRETE PLACEMENT FOR COLUMN, EXTERNAL 35.53 TCT-NSCR-21-0625-10 CP01-01-BL-IR-D06-0392 PASSED
154 18-Jun-21 WALL & RETAINING WALL (SUB FLOOR)@ ZONE 3 GL OCC Building 34.00 34.00 25-Jun-21 CP01-01-BL-IR-D06-0310 16-Jul-21
36 (w/o WP) 9-10/A-D, 10/B-D 36.85 TCT-NSCR-21-0625-09 50.20 TCT-NSCR-21-0716-09 CP01-01-BL-IR-D06-0392 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


155 31 18-Jun-21 AT GRIDLINE A2/9-10 Workshop Building 19.00 19.00 25-Jun-21 31.88 TCT-NSCR-21-0625-08 CP01-01-BL-IR-D01-0311 16-Jul-21 45.03 TCT-NSCR-21-0716-10 CP01-01-BL-IR-D01-0393 PASSED
( VOLUME = 21.29m³, 31MPa)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


156 15 19-Jun-21 CAP AND GRADE BEAM AT GRIDLINE C3/1-3 Workshop Building 12.00 12.00 26-Jun-21 15.89 TCT-NSCR-21-0626-07 CP01-01-BL-IR-D01-0315 17-Jul-21 28.09 TCT-NSCR-21-0717-05 CP01-01-BL-IR-D01-0397 PASSED
( VOLUME = 1.82m³, 15MPa)
CONCRETE PLACEMENT FOR PILE CAP & GRADE BEAM 44.8; TCT-NSCR-21-0717-04;
157 31 19-Jun-21 GL 10-14/B1-B3 Light Repair Shop 57.00 57.00 26-Jun-21 31.95 TCT-NSCR-21-0626-09 CP01-01-BL-IR-D02-0316 17-Jul-21 44.65 TCT-NSCR-21-0717-03 CP01-01-BL-IR-D02-0398 PASSED

LEAN CONCRETING FOR PILE CAP PREPARATION GL


158 15 19-Jun-21 3/A-C Light Repair Shop 8.00 8.00 26-Jun-21 15.60 TCT-NSCR-21-0626-08 CP01-01-BL-IR-D02-0317 17-Jul-21 27.83 TCT-NSCR-21-0717-06 CP01-01-BL-IR-D02-0399 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


159 15 21-Jun-21 Workshop Building 4.00 4.00 19.00 200.00 28-Jun-21 18.50 TCT-NSCR-21-0628-04 CP01-01-BL-IR-D01-0320 19-Jul-21 28.03 TCT-NSCR-21-0719-42 CP01-01-BL-IR-D01-0404 PASSED
CAP AND GRADE BEAM AT GRIDLINE E/4-7
CONCRETE CASTING OF LEAN CONCRETE FOR
160 15 21-Jun-21 ELEVATOR PIT AND GRADE BEAM AT GRIDLINE Workshop Building 8.00 8.00 20.00 200.00 28-Jun-21 17.89 TCT-NSCR-21-0628-03 CP01-01-BL-IR-D01-0320 19-Jul-21 28.03 TCT-NSCR-21-0719-42 CP01-01-BL-IR-D01-0404 PASSED
A1/18-19 & A-A2/20-21
CONCRETE POURING OF PILE CAP, FOUNDATION
161 31 21-Jun-21 Workshop Building 28.00 26.00 20.00 200.00 28-Jun-21 31.34 TCT-NSCR-21-0628-05 CP01-01-BL-IR-D01-0321 19-Jul-21 44.64 TCT-NSCR-21-0719-41 CP01-01-BL-IR-D01-0405 PASSED
COLUMN & GRADE BEAM AT GRIDLINE A1/6-8
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
162 31 22-Jun-21 Workshop Building 28.00 28.00 20.00 200.00 29-Jun-21 31.95 TCT-NDCR-21-0629-02 CP01-01-BL-IR-D01-0324 20-Jul-21 44.94 TCT-NSCR-21-0720-19 CP01-01-BL-IR-D01-0408 PASSED
GRIDLINE C1/9-11
LEAN CONCRETING FOR SLAB STRUCTURE
163 15 22-Jun-21 PREPARATION ZONE 2 GL 5-7/A-C OCC Building 14.00 14.00 29-Jun-21 15.87 TCT-NDCR-21-0629-03 CP01-01-BL-IR-D06-0325 20-Jul-21 27.91 TCT-NSCR-21-0720-20 CP01-01-BL-IR-D06-0409 PASSED

CONRETE PLACEMENT FOR PILE CAP & GRADE BEAM


164 31 22-Jun-21 GL 13-16/B2, 10-14/B1 Light Repair Shop 47.00 47.00 29-Jun-21 31.64 TCT-NDCR-21-0629-01 CP01-01-BL-IR-D02-0326 20-Jul-21 44.44 TCT-NSCR-21-0720-21 CP01-01-BL-IR-D02-0410 PASSED

CONRETE PLACEMENT FOR PILE CAP & GRADE BEAM


165 31 23-Jun-21 GL 13-15/B3 Light Repair Shop 19.50 19.50 30-Jun-21 32.60 TCT-NDCR-21-0630-04 CP01-01-BL-IR-D02-0332 21-Jul-21 44.71 TCT-NSCR-21-0721-05 CP01-01-BL-IR-D02-0413 PASSED

LEAN CONCRETING FOR SLAB STRUCTURE


166 15 23-Jun-21 OCC Building 21.00 21.00 30-Jun-21 16.23 TCT-NDCR-21-0630-05 CP01-01-BL-IR-D06-0333 21-Jul-21 28.70 TCT-NSCR-21-0721-04 CP01-01-BL-IR-D06-0414 PASSED
PREPARATION ZONE 2 GL 5-7/C-E
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
167 31 24-Jun-21 Workshop Building 22.50 21.50 01-Jul-21 32.27 TCT-NDCR-21-0701-03 CP01-01-BL-IR-D01-0335 22-Jul-21 44.95 TCT-NSCR-21-0722-10 CP01-01-BL-IR-D01-0417 PASSED
GRIDLINE A2/19-20
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
168 31 24-Jun-21 Workshop Building 63.00 61.00 01-Jul-21 31.61 TCT-NDCR-21-0701-02 CP01-01-BL-IR-D01-0336 22-Jul-21 44.48 TCT-NSCR-21-0722-08 CP01-01-BL-IR-D01-0418 PASSED
GRIDLINE A3-C/21
CONCRETE POURING OF FOUNDATION COLUMN &
169 31 25-Jun-21 Workshop Building 34.00 32.50 20.00 200.00 02-Jul-21 31.81 TCT-NDCR-21-0702-10 CP01-01-BL-IR-D01-0338 23-Jul-21 44.69 TCT-NSCR-21-0723-05 CP01-01-BL-IR-D01-0422 PASSED
GRADE BEAM AT GRIDLINE E/15-19
170 31 25-Jun-21 CONCRETE POURING OF PILE CAP GL 16-18/C Light Repair Shop 26.50 26.50 02-Jul-21 32.04 TCT-NDCR-21-0702-09 CP01-01-BL-IR-D02-0339 23-Jul-21 44.61 TCT-NSCR-21-0723-04 CP01-01-BL-IR-D02-0423 PASSED
LEAN CONCRETING FOR GRADE BEAM/GIRDER
PREPARATION (GF)
171 15 25-Jun-21 OCC Building 7.00 7.00 02-Jul-21 16.12 TCT-NDCR-21-0702-08 CP01-01-BL-IR-D06-0340 23-Jul-21 28.26 TCT-NSCR-21-0723-03 CP01-01-BL-IR-D06-0424 PASSED
@ IN BETWEEN ZONE 1 &
ZONE 2 GL 3-4/A-C, 2-3/C-E, 3/C-D

CONCRETE CASTING OF LEAN CONCRETE FOR GRADE


172 15 26-Jun-21 BEAM AT GRIDLINE C-E/12-13 AND FOR PILE CAP AT Workshop Building 5.00 5.00 20.00 200.00 03-Jul-21 15.81 TCT-NSCR-21-0703-02 CP01-01-BL-IR-D01-0343 24-Jul-21 28.33 TCT-NSCR-21-0724-08 CP01-01-BL-IR-D01-0429 PASSED
GRIDLINE E/8-12

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB


173 15 26-Jun-21 Workshop Building 56.00 56.00 21.00 180.00 03-Jul-21 16.01 TCT-NSCR-21-0703-04 CP01-01-BL-IR-D01-0344 24-Jul-21 28.02 TCT-NSCR-21-0724-06/07 CP01-01-BL-IR-D01-0430 PASSED
AT GRIDLINE A1-A3/16-18 AND A3-B1/16-20

LEAN CONCRETING FOR GRADE BEAM/GIRDER


PREPARATION (GF)
174 15 26-Jun-21 OCC Building 7.00 03-Jul-21 16.13 TCT-NSCR-21-0703-01 CP01-01-BL-IR-D06-0345 24-Jul-21 28.12 TCT-NSCR-21-0724-05 CP01-01-BL-IR-D06-0431 PASSED
@ IN BETWEEN ZONE 1 &
ZONE 2 GL 3-4/A-C, 2-3/C-E
175 31 26-Jun-21 CONCRETE PLACEMENT OF PILE CAP GL 14-16/B Light Repair Shop 26.50 03-Jul-21 31.62 TCT-NSCR-21-0703-03 CP01-01-BL-IR-D02-0346 24-Jul-21 44.85 TCT-NSCR-21-0724-04 CP01-01-BL-IR-D02-0432 PASSED
CONCRETE PLACEMENT OF PILE CAP GL 14/C and
176 31 28-Jun-21 Light Repair Shop 18.00 05-Jul-21 31.59 TCT-NSCR-21-0705-04 CP01-01-BL-IR-D02-0348 26-Jul-21 44.69 TCT-NSCR-21-0726-02 CP01-01-BL-IR-D02-0434 PASSED
GL15/C
177 31 29-Jun-21 CONCRETE PLACEMENT OF PILE CAP GL 17&18/B Light Repair Shop 18.00 06-Jul-21 32.56 TCT-NSCR-21-0706-01 CP01-01-BL-IR-D02-0352 27-Jul-21 44.80 TCT-NSCR-21-0727-04 CP01-01-BL-IR-D02-0436 PASSED
CONCRETE POURING OF FOUNDATION COLUMN &
178 31 29-Jun-21 Workshop Building 45.00 45.00 20.00 185.00 06-Jul-21 32.88 TCT-NSCR-21-0706-07 CP01-01-BL-IR-D01-0353 27-Jul-21 44.92 TCT-NSCR-21-0727-03 CP01-01-BL-IR-D01-0437 PASSED
GRADE BEAM AT GRIDLINE E/19-20
CONCRETE POURING OF PILE CAP, FOUNDATION
179 31 29-Jun-21 Workshop Building 43.00 42.00 20.00 190.00 06-Jul-21 32.67 TCT-NSCR-21-0706-02 CP01-01-BL-IR-D01-0354 27-Jul-21 44.86 TCT-NSCR-21-0727-02 CP01-01-BL-IR-D01-0438 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE C1-E/21

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


180 15 30-Jun-21 Workshop Building 6.00 6.00 21.00 200.00 07-Jul-21 15.61 TCT-NSCR-21-0707-02 CP01-01-BL-IR-D01-0356 28-Jul-21 28.16 TCT-NSCR-21-0728-16 CP01-01-BL-IR-D01-0440 PASSED
AND GRADE BEAM AT GRIDLINE C-E/12-13

181 15 30-Jun-21 LEAN CONCRETING OF SUMP PIT GL 1-2/B1-B3 Light Repair Shop 4.00 2.50 20.00 200.00 07-Jul-21 16.07 TCT-NSCR-21-0707-03 CP01-01-BL-IR-DPO-0357 28-Jul-21 28.62 TCT-NSCR-21-0728-17 CP01-01-BL-IR-D02-0441 PASSED
CONCRETE PLACEMENT FOR PILE CAP AND GRADE
182 31 30-Jun-21 Light Repair Shop 42.00 42.00 20-21 190-200 07-Jul-21 31.86 TCT-NSCR-21-0707-01 CP01-01-BL-IR-D02-0358 28-Jul-21 44.67 TCT-NSCR-21-0728-18 CP01-01-BL-IR-D02-0442 PASSED
BEAM GL 13-16/B1, 15-17/B2-B3

183 15 30-Jun-21 LEAN CONCRETING OF STAIR @ ZONE 1 GL 3-4/C-D OCC Building 2.00 2.00 22.00 190.00 07-Jul-21 16.19 TCT-NSCR-21-0707-04 CP01-01-BL-IR-DPO-0357 28-Jul-21 28.01 TCT-NSCR-21-0728-19 CP01-01-BL-IR-D06-0443 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR GRADE


184 15 01-Jul-21 Workshop Building 6.00 6.00 22.00 180.00 08-Jul-21 15.78 TCT-NSCR-21-0708-07 CP01-01-BL-IR-D01-0362 29-Jul-21 27.98 TCT-NSCR-21-0729-04 CP01-01-BL-IR-D01-0444 PASSED
BEAM AT GRIDLINE E/7-12

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


185 15 01-Jul-21 Workshop Building 6.00 6.00 20.00 200.00 08-Jul-21 15.59 TCT-NSCR-21-0708-05 CP01-01-BL-IR-D01-0362 29-Jul-21 28.04 TCT-NSCR-21-0729-03 CP01-01-BL-IR-D01-0445 PASSED
AND GRADE BEAM AT GRIDLINE F1-F2/8-11

CONCRETE POURING OF PILE CAP, FOUNDATION


186 31 01-Jul-21 Workshop Building 31.00 29.00 20.00 190.00 08-Jul-21 31.88 TCT-NSCR-21-0708-04 CP01-01-BL-IR-D01-0363 29-Jul-21 44.50 TCT-NSCR-21-0729-02 CP01-01-BL-IR-D01-0446 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE A3/9-11
CONCRETE PLACEMENT OF PILE CAP GL.3/B and
187 31 01-Jul-21 Light Repair Shop 18.00 08-Jul-21 32.02 TCT-NSCR-21-0708-06 CP01-01-BL-IR-D02-0364 29-Jul-21 44.52 TCT-NSCR-21-0729-01 CP01-01-BL-IR-D02-0447 PASSED
GL.3/C

CONCRETE POURING OF LEAN CONCRETE FOR GRADE


188 15 02-Jul-21 BEAM LRS(GL.16-18/B1); OCC(GL.8-9/A-E , Light Repair Shop & OCC 7.50 5.50 20.00 190.00 09-Jul-21 15.76 TCT-NSCR-21-0709-01 CP01-01-BL-IR-DPO-0366 30-Jul-21 27.94 TCT-NSCR-21-0730-01 CP01-01-BL-IR-D01-0449 PASSED
9&10/D-E)

CONCRETE POURING OF PILE CAP, FOUNDATION


189 31 02-Jul-21 Workshop Building 34.00 34.00 21.00 190.00 09-Jul-21 31.72 TCT-NSCR-21-0709-02 CP01-01-BL-IR-D01-0367 30-Jul-21 44.75 TCT-NSCR-21-0730-02 CP01-01-BL-IR-DPO-0448 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE A1/3-5
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

36 (w/ WP) 20.00 200.00 35.03 TCT-NSCR-21-0710-01 51.65 TCT-NSCR-21-0731-02 PASSED


CONCRETE PLACEMENT FOR GROUND FLOOR SLAB @
190 03-Jul-21 ZONE 2 GL. 5-7/A-E OCC Building 84.00 84.00 10-Jul-21 CP01-01-BL-IR-D06-0372 31-Jul-21 CP01-01-BL-IR-DPO-0448
36 (w/o WP) 19.00 215.00 33.80 TCT-NSCR-21-0710-02 51.91 TCT-NSCR-21-0731-03 PASSED

CONCRETE POURING OF PILE CAP, FOUNDATION


191 31 03-Jul-21 Workshop Building 29.00 29.00 20.00 195.00 10-Jul-21 31.52 TCT-NSCR-21-0710-03 CP01-01-BL-IR-D01-0373 31-Jul-21 44.82 TCT-NSCR-21-0731-01 CP01-01-BL-IR-D01-0451 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE B3/9-11
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
192 31 05-Jul-21 Workshop Building 28.50 28.50 20.00 180.00 12-Jul-21 31.65 TCT-NSCR-21-0712-03 CP01-01-BL-IR-D01-0374 02-Aug-21 44.62 TCT-NSCR-21-0803-12 CP01-01-BL-IR-D01-0459 PASSED
GRIDLINE C1/6-8

48.99 TCT-NSCR-21-0803-09 PASSED


CONCRETE PLACEMENT FOR GIRDER, PILE CAP, MAIN
193 36 05-Jul-21 GIRDER & INTERMEDIATE BEAM@ ZONE 2 GL 3-5/A-E OCC Building 130.00 2.00 22.00 190.00 12-Jul-21 35.18 TCT-NSCR-21-0712-04 CP01-01-BL-IR-D06-0375 02-Aug-21 CP01-01-BL-IR-D06-0460
48.98 TCT-NSCR-21-0803-10 PASSED
48.61 TCT-NSCR-21-0803-11 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR
194 15 06-Jul-21 INTERMEDIATE BEAM AT GL. 8-9/A-B, GL.8-9/B-C, OCC Building 10.00 2.00 22.00 190.00 13-Jul-21 15.78 TCT-NSCR-21-0713-01 CP01-01-BL-IR-D06-0377 03-Aug-21 27.88 TCT-NSCR-21-0803-13 CP01-01-BL-IR-D01-0461 PASSED
GL.8-9/C-D, GL.8-10/D-E

195 31 06-Jul-21 CONCRETE POURING OF PILE CAP AT GRIDLINE D/2-4 Workshop Building 27.00 27.00 19.00 195.00 13-Jul-21 32.69 TCT-NSCR-21-0713-07 CP01-01-BL-IR-D01-0382 03-Aug-21 45.24 TCT-NSCR-21-0803-14 CP01-01-BL-IR-D01-0462 PASSED

CONCRETE PLACEMENT OF PILE CAP AND GRADE


196 31 07-Jul-21 BEAM GL 16-18/B1 Light Repair Shop 12.00 14-Jul-21 31.94 TCT-NSCR-21-0714-04 CP01-01-BL-IR-D02-0385 04-Aug-21 44.96 TCT-NSCR-21-0804-01 CP01-01-BL-IR-D02-0464 PASSED

197 31 08-Jul-21 CONCRETE POURING OF PILE CAP AT GRIDLINE E/4-5 Workshop Building 17.00 17.00 20.00 200.00 15-Jul-21 31.90 TCT-NSCR-21-0715-04 CP01-01-BL-IR-D01-0388 05-Aug-21 45.63 TCT-NSCR-21-0805-01 CP01-01-BL-IR-D02-0466 PASSED

CONCRETE POURING OF PILE CAP, FOUNDATION


198 31 09-Jul-21 Workshop Building 34.00 31.00 16-Jul-21 31.06 TCT-NSCR-21-0716-06 CP01-01-BL-IR-D01-0391 06-Aug-21 44.81 TCT-NSCR-21-0806-18 CP01-01-BL-IR-D01-0472 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE C2/3-5
CONCRETE POURING OF PILE CAP, FOUNDATION
199 31 10-Jul-21 Workshop Building 35.00 35.00 21.00 195.00 17-Jul-21 31.68 TCT-NSCR-21-0717-01 CP01-01-BL-IR-D01-0394 07-Aug-21 44.98 TCT-NSCR-21-0807-18 CP01-01-BL-IR-D01-0476 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE C2/12-15

49.32 TCT-NSCR-21-0807-14
CONCRETE POURING OF PILE CAP GL.8/A-E, GL.9/E,
200 36 10-Jul-21 COLUMN GL.6/B, GL.6/C, GL.6/D, & GRADE BEAM OCC Building 124.00 124.00 20.00 215.00 17-Jul-21 35.06 TCT-NSCR-21-0717-02 CP01-01-BL-IR-D06-0395 07-Aug-21 CP01-01-BL-IR-D06-0477 PASSED
GL.7-9/A-D, GL.7-10/E, GL.7-10/D-E 50.95 TCT-NSCR-21-0807-15
51.90 TCT-NSCR-21-0807-16
LEAN CONCRETING FOR GRADE BEAM GL 18-19/B1-
201 15 10-Jul-21 Light Repair Shop 6.50 17-Jul-21 15.47 TCT-NSCR-21-0717-02 CP01-01-BL-IR-D02-0396 07-Aug-21 28.13 TCT-NSCR-21-0807-17 CP01-01-BL-IR-D02-0478 PASSED
B3, 19/A-C
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
202 15 12-Jul-21 Workshop Building 15.00 12.00 20.00 190.00 19-Jul-21 15.48 TCT-NSCR-21-0719-40 CP01-01-BL-IR-D01-0402 09-Aug-21 28.60 TCT-NSCR-21-0809-03 CP01-01-BL-IR-D01-0481 PASSED
GRIDLINE B1-C/20-21
LEAN CONCRETING FOR SLAB @ ZONE 2B GL 4-5/A-E,
203 15 12-Jul-21 OCC Building 21.00 21.00 20.00 200.00 19-Jul-21 15.53 TCT-NSCR-21-0719-39 CP01-01-BL-IR-D06-0403 09-Aug-21 28.72 TCT-NSCR-21-0809-02 CP01-01-BL-IR-D06-0482 PASSED
3-4/D-E
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
204 31 13-Jul-21 GRIDLINE B/9-10 Workshop Building 29.00 29.00 20.00 195.00 20-Jul-21 31.68 TCT-NSCR-21-0720-23 CP01-01-BL-IR-D01-0406 10-Aug-21 45.30 TCT-NSCR-21-0810-13 CP01-01-BL-IR-D01-0488 PASSED

CONCRETE POURING OF PILE CAP & GRADE BEAM AT


205 31 13-Jul-21 GRIDLINE B/3-5 Workshop Building 42.00 42.00 20.00 190.00 20-Jul-21 31.83 TCT-NSCR-21-0720-22 CP01-01-BL-IR-D01-0407 10-Aug-21 45.04 TCT-NSCR-21-0810-12 CP01-01-BL-IR-D01-0489 PASSED

CONCRETE POURING OF PILE CAP GL.10/E & GRADE


206 36 14-Jul-21 BEAM GL.9-10/D-E OCC Building 10.00 10.00 20.00 200.00 21-Jul-21 35.40 TCT-NSCR-21-0721-02 CP01-01-BL-IR-D06-0411 11-Aug-21 49.52 TCT-NSCR-21-0811-18 CP01-01-BL-IR-D06-0490 PASSED

CONCRETE POURING OF PILE CAP & GRADE BEAM AT


207 31 14-Jul-21 Workshop Building 39.00 36.50 21.00 190.00 21-Jul-21 29.96 TCT-NSCR-21-0721-01 CP01-01-BL-IR-D01-0412 11-Aug-21 43.66 TCT-NSCR-21-0811-20 CP01-01-BL-IR-D01-0491 PASSED
GRIDLINE A-A2/20-21
CONCRETE POURING OF COLUMN AT GRIDLINE 6/A,
208 36 14-Jul-21 OCC Building 9.00 9.00 20.00 220.00 21-Jul-21 34.75 TCT-NSCR-21-0721-03 CP01-01-BL-IR-D06-0419 11-Aug-21 48.36 TCT-NSCR-21-0811-19 CP01-01-BL-IR-D06-0492 PASSED
6/E
CONCRETE POURING OF COLUMN AT GRIDLINE 5/B,
209 36 15-Jul-21 OCC Building 12.50 12.50 20.00 215.00 22-Jul-21 36.79 TCT-NSCR-21-0722-07 CP01-01-BL-IR-D06-0415 12-Aug-21 52.98 TCT-NSCR-21-0812-20 CP01-01-BL-IR-D06-0495 PASSED
5/C,5/D
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
210 15 15-Jul-21 Workshop Building 20.00 20.00 19.00 200.00 22-Jul-21 15.31 TCT-NSCR-21-0722-06 CP01-01-BL-IR-D01-0416 12-Aug-21 28.60 TCT-NSCR-21-0812-17 CP01-01-BL-IR-D01-0498 PASSED
GRIDLINE A1-A3/18-20
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
211 15 15-Jul-21 Workshop Building 20.00 20.00 19.00 185.00 22-Jul-21 15.46 TCT-NSCR-21-0722-04 CP01-01-BL-IR-D01-0426 12-Aug-21 28.06 TCT-NSCR-21-0812-19 CP01-01-BL-IR-D01-0499 PASSED
GRIDLINE C-D/20-21

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


212 15 15-Jul-21 Workshop Building 5.00 5.00 18.00 200.00 22-Jul-21 15.78 TCT-NSCR-21-0722-05 CP01-01-BL-IR-D01-0425 12-Aug-21 28.27 TCT-NSCR-21-0812-18 CP01-01-BL-IR-D01-0500 PASSED
AND GRADE BEAM AT GRIDLINE A2-A3/1-3

213 36 16-Jul-21 CONCRET POURING OF COLUMN @ GL 5/A&E OCC Building 8.00 8.00 20.00 225.00 23-Jul-21 36.84 TCT-NSCR-21-0723-02 CP01-01-BL-IR-D06-0420 13-Aug-21 52.76 TCT-NSCR-21-0813-08 CP01-01-BL-IR-D06-0503 PASSED

214 15 16-Jul-21 LEAN CONCRETING OF SLAB ON GRADE @ GL 7-8/A-D OCC Building 16.00 16.00 20.00 225.00 23-Jul-21 15.62 TCT-NSCR-21-0723-01 CP01-01-BL-IR-D06-0421 13-Aug-21 28.26 TCT-NSCR-21-0813-09 CP01-01-BL-IR-D06-0504 PASSED

36 (w/ WP) CONCRETE POURING OF SUMP PIT SLAB @ GL 1/B1- 52.59 TCT-NSCR-21-0814-06 PASSED
215 17-Jul-21 LRS Building 3.50 3.50 24-Jul-21 36.71 TCT-NSCR-21-0724-02 CP01-01-BL-IR-D02-0427 14-Aug-21 CP01-01-BL-IR-D02-0509
36 (w/o WP) B2 AND GL. 1/B2-B3 51.59 TCT-NSCR-21-0814-05 PASSED

216 15 17-Jul-21 LEAN CONCRETING OF SLAB ON GRADE @ GL 7-8/D-E OCC Building 3.00 3.00 24-Jul-21 15.75 TCT-NSCR-21-0724-09 CP01-01-BL-IR-D06-0428 14-Aug-21 28.08 TCT-NSCR-21-0814-04 CP01-01-BL-IR-D06-0510 PASSED

CONCRETE POURING FOR PILE CAP AND GRADE BEAM


217 31 19-Jul-21 @ GL 16-19/B1-B3 Light Repair Shop 51.00 51.00 26-Jul-21 31.53 TCT-NSCR-21-0726-01 CP01-01-BL-IR-D02-0433 16-Aug-21 44.86 TCT-NSCR-21-0816-02 CP01-01-BL-IR-D012-0515 PASSED

CONCRETE POURING OF COLUMN @ GL 7/A, GL.7/C &


218 36 20-Jul-21 GL.7/D OCC Building 13.50 13.50 27-Jul-21 36.81 TCT-NSCR-21-0727-01 CP01-01-BL-IR-D06-0435 17-Aug-21 53.23 TCT-NSCR-21-0817-08 CP01-01-BL-IR-D06-0517 PASSED

219 36 21-Jul-21 CONCRETE POURING OF COLUMN @ GL 7/B & GL.7/E OCC Building 10.00 10.00 28-Jul-21 36.78 TCT-NSCR-21-0728-15 CP01-01-BL-IR-D06-0439 18-Aug-21 53.28 TCT-NSCR-21-0818-03 CP01-01-BL-IR-D06-0523 PASSED

36.16
36 (w/ WP) TCT-NSCR-21-0802-02 52.72 TCT-NSCR-21-0823-04
CONCRETE POURING OF SLAB ON GRADE @ GL 4-5/A- 36.17
220 25-Jul-21 OCC Building 58.00 58.00 01-Aug-21 CP01-01-BL-IR-D06-0452 23-Aug-21 CP01-01-BL-IR-D06-0536 PASSED
E, 3-4/D-E
36.47
36 (w/o WP) TCT-NSCR-21-0802-01 52.28 TCT-NSCR-21-0823-05
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work
CONCRETE POURING OF Item
SLAB ON GRADE @ GL 4-5/A- Location Temp. Slump Average Average REMARKS
220 25-Jul-21 OCC Building Volume
58.00 (m³)
58.00 01-Aug-21
Testing Date Report Number CP01-01-BL-IR-D06-0452
IR Number 23-Aug-21
Testing Date Report Number CP01-01-BL-IR-D06-0536
IR Number PASSED
MPa) E, 3-4/D-E (Celcius) (mm.) Result (MPa) Result (MPa)
36 (w/o WP) TCT-NSCR-21-0802-01 52.28 TCT-NSCR-21-0823-05
36.14

CONCRETE POURING OF PILE CAP, FOUNDATION


221 31 26-Jul-21 Workshop Building 33.00 33.00 20.00 200.00 02-Aug-21 31.94 TCT-NSCR-21-0803-16 CP01-01-BL-IR-D01-0452 23-Aug-21 44.39 TCT-NSCR-21-0823-02 CP01-01-BL-IR-D01-0541 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE C3/12-14

CONCRETE POURING OF PILE CAP & GRADE BEAM AT


222 31 26-Jul-21 Workshop Building 45.00 45.00 20.00 195.00 02-Aug-21 31.51 TCT-NSCR-21-0803-15 CP01-01-BL-IR-D01-0453 23-Aug-21 44.72 TCT-NSCR-21-0823-01 CP01-01-BL-IR-D01-0542 PASSED
GRIDLINE C/6-8

36 (w/ WP) 37.28 53.07 TCT-NSCR-21-0823-05


CONCRETE POURING OF SUMP PIT WALL @ GL 1/B1-
223 26-Jul-21 Light Repair Shop 6.00 6.00 20.00 225.00 02-Aug-21 TCT-NSCR-21-0803-17 CP01-01-BL-IR-D02-0455 23-Aug-21 CP01-01-BL-IR-D02-0543 PASSED
B3
36 (w/o WP) 37.61 52.90 TCT-NSCR-21-0823-03

37.37
36 (w/ WP) Suspended Slab: GL 1-3/A-C, GL 1-2/C-E 52.89 TCT-NSCR-21-0823-06
Suspended Beams/Girders: GL 1-3/A, 1-3/B, 1-3/C, 1-
2/D, 1-2/E, 1/A-E, 2/A-E, 3/A-C, 1-3/A-B, 36.95
224 26-Jul-21 1-3/B-C, 1-2/C-D, 1-2/D-E OCC Building 200.00 200.00 20.00 225.00 02-Aug-21 TCT-NSCR-21-0803-22 CP01-01-BL-IR-D06-0456 23-Aug-21 CP01-01-BL-IR-D06-0544 PASSED
Zone 2b Beams/Girders: CJ @ (GL 3-4/A, 3-4/B, 3-4/C,
2-3/D, 2-3/E, 3-4/A-B, 3-4/B-C, 2-3/C-D 37.35
36 (w/o WP) 2-3/D-E, 3/C-D) 52.58 TCT-NSCR-21-0823-07
37.26

CONCRETE POURING OF PILE CAP, FOUNDATION


225 31 27-Jul-21 COLUMN, & GRADE BEAM AT GRIDLINE C1/12-14 Workshop Building 33.00 33.00 20.00 190.00 03-Aug-21 31.91 TCT-NSCR-21-0803-19 CP01-01-BL-IR-D01-0453 24-Aug-21 44.56 TCT-NSCR-21-0824-02 CP01-01-BL-IR-D01-0546 PASSED

CONCRETE POURING OF PILE CAP & GRADE BEAM AT


226 31 27-Jul-21 Workshop Building 34.00 32.00 20.00 180.00 03-Aug-21 32.00 TCT-NSCR-21-0803-18 CP01-01-BL-IR-D06-0458 24-Aug-21 45.08 TCT-NSCR-21-0824-03 CP01-01-BL-IR-D01-0547 PASSED
GRIDLINE D1/12-14
CONCRETE POURING OF COLUMN @ GL.8/C, GL. 8/D
227 36 27-Jul-21 OCC Building 13.00 13.00 18.00 220.00 03-Aug-21 37.80 TCT-NSCR-21-0803-20 CP01-01-BL-IR-D06-0467 24-Aug-21 52.61 TCT-NSCR-21-0824-01 CP01-01-BL-IR-D06-0548 PASSED
& GL.8/E
CONCRETE POURING OF COLUMN @ GL.8/A, GL. 8/B
228 36 28-Jul-21 OCC Building 13.00 13.00 18.00 220.00 04-Aug-21 37.74 TCT-NSCR-21-0804-02 CP01-01-BL-IR-D06-0465 25-Aug-21 52.55 TCT-NSCR-21-0825-10 CP01-01-BL-IR-D06-0554 PASSED
& GL.4/E

36.76 52.79 TCT-NSCR-21-0827-09 PASSED

36 (w/ WP) TCT-NSCR-21-0806-22

Suspended Slab: GL 9-10/A-D 36.90 50.92 TCT-NSCR-21-0827-11 PASSED


Suspended Beams/Girders: GL 9-10/A, 9-10/B, 9-10/C,
9-10/D, 9-10/A-B, 9-10/B-C, 9-10/C-D, 9/A-D, 10/A-D
229 30-Jul-21 OCC Building 123.00 123.00 20.00 220.00 06-Aug-21 CP01-01-BL-IR-D06-0468 27-Aug-21 CP01-01-BL-IR-D06-0567
Zone 2c Beams/Girders: CJ 1/3 L @ (GL 8-9/A, 8-9/B,
8-9/C, 8-9/D, 8-9/A-B, 8-9/B-C, 8-9/C-D, 9/D-E, 10/D-
E) 36.89 52.81 TCT-NSCR-21-0827-10 PASSED

36 (w/o WP) TCT-NSCR-21-0806-23

37.15 52.66 TCT-NSCR-21-0827-12 PASSED

230 36 30-Jul-21 CONCRETE POURING OF COLUMN @ GL.4/B & GL.4/D OCC Building 9.00 9.00 19.00 215.00 06-Aug-21 35.94 TCT-NSCR-21-0806-21 CP01-01-BL-IR-D06-0469 27-Aug-21 52.11 TCT-NSCR-21-0827-13 CP01-01-BL-IR-D06-0568 PASSED

CONCRETE POURING OF PILE CAP & GRADE BEAM AT


231 31 30-Jul-21 Workshop Building 47.50 47.50 21.00 190.00 06-Aug-21 31.95 TCT-NSCR-21-0806-19 CP01-01-BL-IR-D01-0470 27-Aug-21 45.00 TCT-NSCR-21-0827-08 CP01-01-BL-IR-D06-0569 PASSED
GRIDLINE C/3-5
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
232 31 30-Jul-21 Workshop Building 27.00 27.00 22.00 200.00 06-Aug-21 31.10 TCT-NSCR-21-0806-20 CP01-01-BL-IR-D01-0471 27-Aug-21 42.99 TCT-NSCR-21-0827-07 CP01-01-BL-IR-D01-0570 PASSED
GRIDLINE A/19-20
CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP
233 15 31-Jul-21 & GRADE BEAM AT GRIDLINE A-B/12-14 Workshop Building 23.00 23.00 20.00 190.00 07-Aug-21 15.86 TCT-NSCR-21-0807-21 CP01-01-BL-IR-D01-0473 28-Aug-21 27.62 TCT-NSCR-21-0828-05 CP01-01-BL-IR-D01-0574 PASSED

CONCRETE POURING OF PILE CAP, FOUNDATION


234 31 31-Jul-21 Workshop Building 27.00 27.00 21.00 200.00 07-Aug-21 31.88 TCT-NSCR-21-0807-19 CP01-01-BL-IR-D01-0474 28-Aug-21 43.31 TCT-NSCR-21-0828-06 CP01-01-BL-IR-D01-0575 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE C3/3-5

235 36 31-Jul-21 CONCRETE POURING OF COLUMN @ GL.4/A & GL.4/C OCC Building 9.00 9.00 20.00 220.00 07-Aug-21 37.39 TCT-NSCR-21-0807-20 CP01-01-BL-IR-D06-0475 28-Aug-21 51.05 TCT-NSCR-21-0828-07 CP01-01-BL-IR-D06-0576 PASSED

CONCRETE POURING OF PILE CAP, FOUNDATION


236 31 02-Aug-21 Workshop Building 45.00 45.00 21.00 190.00 09-Aug-21 32.09 TCT-NSCR-21-0809-01 CP01-01-BL-IR-D06-0463 30-Aug-21 44.96 TCT-NSCR-21-0830-09 CP01-01-BL-IR-D01-0583 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE A/16-18

CONCRETE POURING OF COLUMN @ , GL.1/B, GL.1/C,


237 36 03-Aug-21 GL.1/D & GL.1/E OCC Building 16.50 16.50 20.00 220.00 10-Aug-21 36.44 TCT-NSCR-21-0810-18 CP01-01-BL-IR-D06-0483 31-Aug-21 50.55 TCT-NSCR-21-0831-06 CP01-01-BL-IR-D06-0587 PASSED

CONCRETE POURING OF LEAN CONCRETE FOR SLAB


238 15 03-Aug-21 ON GRADE PREPARARTION @ OCC BLDG. GL.3-4/A-D OCC Building 18.00 15.00 20.00 220.00 10-Aug-21 16.09 TCT-NSCR-21-0810-16 CP01-01-BL-IR-D06-0484 31-Aug-21 27.33 TCT-NSCR-21-0831-08 CP01-01-BL-IR-D06-0588 PASSED
AND GL.2-3/C-E

CONCRETE POURING OF PILE CAP GL.19/B1 GL.19/B2


239 31 03-Aug-21 & GL.19/B3 AND GRADE BEAM ALONG GL.18-19/B1, LRS Building 34.00 31.00 21.00 200.00 10-Aug-21 32.64 TCT-NSCR-21-0810-17 CP01-01-BL-IR-D02-0485 31-Aug-21 44.79 TCT-NSCR-21-0831-05 CP01-01-BL-IR-D02-0589 PASSED
GL. 18-19/B2 & GL.18-19/B3

44.65 TCT-NSCR-21-0831-01 PASSED

44.12 TCT-NSCR-21-0831-02 PASSED


CONCRETE POURING OF SLAB AT GRIDLINE C1-C3/16-
240 31 03-Aug-21 Workshop Building 180.00 180.00 20.00 180.00 10-Aug-21 32.07 TCT-NSCR-21-0810-14 CP01-01-BL-IR-D01-0486 31-Aug-21 CP01-01-BL-IR-D01-0590
21
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)
CONCRETE POURING OF SLAB AT GRIDLINE C1-C3/16-
240 31 03-Aug-21 Workshop Building 180.00 180.00 20.00 180.00 10-Aug-21 32.07 TCT-NSCR-21-0810-14 CP01-01-BL-IR-D01-0486 31-Aug-21 CP01-01-BL-IR-D01-0590
21
44.65 TCT-NSCR-21-0831-03 PASSED

44.56 TCT-NSCR-21-0831-04 PASSED

CONCRETE POURING OF FOUNDATION COLUMN &


241 31 03-Aug-21 GRADE BEAM AT GRIDLINE D/12-15 Workshop Building 27.00 27.00 20.00 200.00 10-Aug-21 32.43 TCT-NSCR-21-0810-15 CP01-01-BL-IR-D01-0487 31-Aug-21 43.67 TCT-NSCR-21-0831-07 CP01-01-BL-IR-D01-0591 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


242 15 05-Aug-21 Workshop Building 21.00 21.00 19.00 180.00 12-Aug-21 15.81 TCT-NSCR-21-0812-22 CP01-01-BL-IR-D01-0493 02-Sep-21 27.74 TCT-NSCR-21-0902-03 CP01-01-BL-IR-D01-0599 PASSED
GRIDLINE A2-B1/20-21

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


243 15 05-Aug-21 GRIDLINE D-D1/20-21 & LEAN CONCRETE FOR Workshop Building 30.00 24.00 20.00 190.00 12-Aug-21 15.92 TCT-NSCR-21-0812-21 CP01-01-BL-IR-D01-0494 02-Sep-21 27.58 TCT-NSCR-21-0902-04 CP01-01-BL-IR-D01-0600 PASSED
SUNKEN PIT AT GRIDLINE D1-E/16-20

CONCRETE POURING OF COLUMN @ GL.1/A, GL.2/A,


244 36 05-Aug-21 OCC Building 23.00 23.00 20.00 220.00 12-Aug-21 36.99 TCT-NSCR-21-0812-23 CP01-01-BL-IR-D06-0495 02-Sep-21 50.35 TCT-NSCR-21-0902-05 CP01-01-BL-IR-D06-0601 PASSED
GL.2/B, GL.2/C, GL.2/D, GL.2/E

36 (w/ WP) 36.95 TCT-NSCR-21-0813-06 52.24 TCT-NSCR-21-0903-05 PASSED


CONCRETE POURING OF SLAB ON GRADE @ OCC
245 06-Aug-21 BLDG. GL.7-8/A-E OCC Building 42.00 42.00 21.00 210.00 13-Aug-21 CP01-01-BL-IR-D06-0496 03-Sep-21 CP01-01-BL-IR-D06-0607
36 (w/o WP) 37.73 TCT-NSCR-21-0813-07 51.10 TCT-NSCR-21-0903-06 PASSED

44.19 TCT-NSCR-21-0903-09 PASSED


CONCRETE POURING OF PILECAP & GRADE BEAM AT
246 31 06-Aug-21 Workshop Building 72.00 72.00 21.00 190.00 13-Aug-21 21.33 TCT-NSCR-21-0813-04 CP01-01-BL-IR-D01-0501 03-Sep-21 CP01-01-BL-IR-D01-0608
GRIDLINE C/11-15
44.17 TCT-NSCR-21-0903-08 PASSED

CONCRETE POURING OF PILECAP, FOUNDATION


247 31 06-Aug-21 Workshop Building 30.00 30.00 21.00 195.00 13-Aug-21 32.21 TCT-NSCR-21-0813-05 CP01-01-BL-IR-D01-0502 03-Sep-21 44.21 TCT-NSCR-21-0903-07 CP01-01-BL-IR-D01-0609 PASSED
COLUMN, & GRADE BEAM AT GRIDLINE B3/3-5

CONCRETE POURING OF COLUMN @ GL.3/C, GL.3/D,


248 36 07-Aug-21 OCC Building 12.00 12.00 19.00 200.00 14-Aug-21 36.85 TCT-NSCR-21-0814-08 CP01-01-BL-IR-D06-0507 04-Sep-21 52.51 TCT-NSCR-21-0904-06 CP01-01-BL-IR-D06-611 PASSED
GL.3/E

44.49 TCT-NSCR-21-0904-07 PASSED


CONCRETE POURING OF SLAB AT GRIDLINE B1-C/16-
249 31 07-Aug-21 Workshop Building 233.00 233.00 20.00 185.00 14-Aug-21 31.14 TCT-NSCR-21-0814-07 CP01-01-BL-IR-D01-0508 04-Sep-21 CP01-01-BL-IR-D01-612
21
44.55 TCT-NSCR-21-0904-08 PASSED

250 36 09-Aug-21 CONCRETE POURING OF COLUMN @ GL.3/A, GL.3/B OCC Building 8.50 8.50 20.00 220.00 16-Aug-21 37.04 TCT-NSCR-21-0816-01 CP01-01-BL-IR-D06-0511 06-Sep-21 52.63 TCT-NSCR-21-0906-03 CP01-01-BL-IR-D06-614 PASSED

CONCRETE POURING OF LEAN CONCRETE @


251 15 09-Aug-21 GL.8-9/A-E, GL.9-10/D-E OCC Building 21.00 21.00 18.00 190.00 16-Aug-21 15.63 TCT-NSCR-21-0816-04 CP01-01-BL-IR-D06-0512 06-Sep-21 28.55 TCT-NSCR-21-0906-06 CP01-01-BL-IR-D06-615 PASSED

252 31 09-Aug-21 CONCRETE POURING OF PILECAP AT GRIDLINE E/6-9 Workshop Building 36.00 36.00 21.00 195.00 16-Aug-21 31.75 TCT-NSCR-21-0816-05 CP01-01-BL-IR-D01-0513 06-Sep-21 42.53 TCT-NSCR-21-0906-05 CP01-01-BL-IR-D01-616 PASSED

CONCRETE POURING OF PILECAP AT GRIDLINE E/10-


253 31 09-Aug-21 Workshop Building 27.00 27.00 20.00 190.00 16-Aug-21 32.17 TCT-NSCR-21-0816-03 CP01-01-BL-IR-D01-0514 06-Sep-21 42.85 TCT-NSCR-21-0906-04 CP01-01-BL-IR-D01-617 PASSED
12

CONCRETE POURING OF FOUNDATION COLUMN AND


254 31 10-Aug-21 Workshop Building 24.00 24.00 22.00 185.00 17-Aug-21 31.65 TCT-NSCR-21-0817-07 CP01-01-BL-IR-D01-0516 07-Sep-21 44.65 TCT-NSCR-21-0907-01 CP01-01-BL-IR-D01-621 PASSED
GRADE BEAM AT GRIDLINE D/9-11

255 15 10-Aug-21 LEAN CONCRETE POURING OF SLAB @ G.L 8-9/A'-B OCC Building 3.50 3.50 17-Aug-21 15.37 TCT-NSCR-21-0817-06 CP01-01-BL-IR-D06-0532 07-Sep-21 28.43 TCT-NSCR-21-0907-02 CP01-01-BL-IR-D06-622 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


256 31 11-Aug-21 Workshop Building 30.00 30.00 20.00 200.00 18-Aug-21 31.94 TCT-NSCR-21-0818-04 CP01-01-BL-IR-D01-0522 08-Sep-21 44.31 TCT-NSCR-21-0908-02 CP01-01-BL-IR-D01-626 PASSED
AT GRIDLINE C/9-10

257 15 11-Aug-21 LEAN CONCRETE FOR PILE CAP @ GRIDLINE 1/A-C LRS Building 5.00 5.00 20.00 195.00 18-Aug-21 16.76 TCT-NSCR-21-0818-05 CP01-01-BL-IR-D02-0533 08-Sep-21 28.93 TCT-NSCR-21-0908-01 CP01-01-BL-IR-D02-627 PASSED

36 (w/ WP) 37.43 TCT-NSCR-21-0819-06 49.13 TCT-NSCR-21-0909-09 PASSED


CONCRETE POURING OF ELEVATOR PIT SLAB AND
258 12-Aug-21 Workshop Building 6.50 6.50 20.00 225.00 19-Aug-21 CP01-01-BL-IR-D01-0524 09-Sep-21 CP01-01-BL-IR-D04-634
WALL AT GRIDLINE A-A1/18-19
36 (w/o WP) 37.87 TCT-NSCR-21-0819-07 52.24 TCT-NSCR-21-0909-10 PASSED

CONCRETE POURING OF PILE CAP, FOUNDATION


259 31 12-Aug-21 Workshop Building 45.00 45.00 20.00 195.00 19-Aug-21 31.27 TCT-NSCR-21-0819-05 CP01-01-BL-IR-D01-0525 09-Sep-21 40.65 TCT-NSCR-21-0909-08 CP01-01-BL-IR-D01-635 PASSED
COLUMN, AND GRADE BEAM AT GRIDLINE A/5-9

CONCRETE CASTING OF LEAN CONCRETE FOR GRADE


260 15 13-Aug-21 BEAM AT GRIDLINE B3-E/1 Workshop Building 8.00 8.00 20.00 200.00 20-Aug-21 16.82 TCT-NSCR-21-0820-01 CP01-01-BL-IR-D01-0530 10-Sep-21 27.78 TCT-NSCR-21-0910-19 CP01-01-BL-IR-D01-641 PASSED

CONCRETE POURING OF COLUMN @ GL.9/C, GL.9/D


261 36 13-Aug-21 OCC Building 13.00 13.00 20.00 200.00 20-Aug-21 34.68 TCT-NSCR-21-0820-02 CP01-01-BL-IR-D06-0531 10-Sep-21 48.74 TCT-NSCR-21-0910-20 CP01-01-BL-IR-D01-642 PASSED
& GL. 9/E

262 36 14-Aug-21 CONCRETE POURING OF COLUMN @ GL.9/A & GL. 9/B OCC Building 8.00 8.00 21.00 200.00 21-Aug-21 37.71 TCT-NSCR-21-0821-05 CP01-01-BL-IR-D06-0534 11-Sep-21 52.95 TCT-NSCR-21-0911-04 CP01-01-BL-IR-D01-0645 PASSED

CONCRETE POURING OF FOUNDATION COLUMN AND


263 31 16-Aug-21 Workshop Building 26.00 24.00 21.00 200.00 23-Aug-21 31.80 TCT-NSCR-21-0823-13 CP01-01-BL-IR-D01-0537 13-Sep-21 44.51 TCT-NSCR-21-0913-06 CP01-01-BL-IR-D01-0658 PASSED
GRADE BEAM AT GRIDLINE D/6-8
CONCRETE POURING OF COLUMN @ GL. 10/B, GL.
264 36 16-Aug-21 OCC Building 16.50 16.00 21.00 200.00 23-Aug-21 35.57 TCT-NSCR-21-0823-12 CP01-01-BL-IR-D06-0538 13-Sep-21 49.53 TCT-NSCR-21-0913-03 CP01-01-BL-IR-D06-0659 PASSED
10/C, GL. 10/D & GL. 10/E
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

36 (w/ WP) 34.61 TCT-NSCR-21-0823-08 51.35 TCT-NSCR-21-0913-01 PASSED


CONCRETE POURING OF GRADE BEAM AT ELEVATOR
265 16-Aug-21 Workshop Building 10.00 10.00 21.00 225.00 23-Aug-21 CP01-01-BL-IR-D01-0539 13-Sep-21 CP01-01-BL-IR-D01-0660
PIT GRIDLINE A-A1/18-19 (SECOND LIFT)
36 (w/o WP) 35.21 TCT-NSCR-21-0823-09 48.12 TCT-NSCR-21-0913-02 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


266 31 16-Aug-21 Workshop Building 44.00 44.00 24.00 185.00 23-Aug-21 31.21 TCT-NSCR-21-0823-10 CP01-01-BL-IR-D01-0540 13-Sep-21 42.33 TCT-NSCR-21-0913-05 CP01-01-BL-IR-D01-0661 PASSED
AT GRIDLINE A/3-5

267 15 16-Aug-21 LEAN CONCRETING OF GRADE BEAM @ G.L 14-19/C LRS Building 23-Aug-21 16.28 TCT-NSCR-21-0823-11 CP01-01-BL-IR-D02-0555 13-Sep-21 26.34 TCT-NSCR-21-0913-04 CP01-01-BL-IR-D02-0662 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


268 31 17-Aug-21 AT GRIDLINE A/9-10 Workshop Building 48.00 48.00 20.00 195.00 24-Aug-21 30.79 TCT-NSCR-21-0824-04 CP01-01-BL-IR-D01-0545 14-Sep-21 42.78 TCT-NSCR-21-0914-01 CP01-01-BL-IR-D01-667 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


269 15 18-Aug-21 GRIDLINE A-A1/16-18, 19-21 Workshop Building 12.00 12.00 20.00 185.00 25-Aug-21 16.13 TCT-NSCR-21-0825-07 CP01-01-BL-IR-D01-0550 15-Sep-21 27.56 TCT-NSCR-21-0915-08 CP01-01-BL-IR-D01-671 PASSED

CONCRETE POURING OF COLUMN (GF) @ GL. 10/A &


270 36 18-Aug-21 2ND FLOOR COLUMN GL. 6/B, GL. 6/C & GL. 6/D OCC Building 13.50 13.50 20.00 225.00 25-Aug-21 36.25 TCT-NSCR-21-0825-09 CP01-01-BL-IR-D06-0551 15-Sep-21 48.19 TCT-NSCR-21-0915-07 CP01-01-BL-IR-D02-672 PASSED

36 (w/ WP) 36.91 50.48 TCT-NSCR-21-0915-10 PASSED


CONCRETE POURING OF SUMP PIT - 11 AT GRIDLINE
271 18-Aug-21 D1-E/20-21 Workshop Building 3.00 3.00 22.00 210.00 25-Aug-21 TCT-NSCR-21-0825-05 CP01-01-BL-IR-D01-0552 15-Sep-21 CP01-01-BL-IR-D01-673
36 (w/o WP) (FIRST LIFT) 36.39 50.21 TCT-NSCR-21-0915-11 PASSED

272 15 18-Aug-21 LEAN CONCRETING FOR GRADE BEAM @ GL. 14-19/B LRS Building 5.00 5.00 20.00 200.00 25-Aug-21 16.07 TCT-NSCR-21-0825-08 CP01-01-BL-IR-D02-0553 15-Sep-21 28.00 TCT-NSCR-21-0915-09 CP01-01-BL-IR-D02-674 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


CAP AT GRIDLINE F1-F2/4-5 AND GRADE BEAM AT
273 15 18-Aug-21 Workshop Building 12.00 12.00 20.00 200.00 25-Aug-21 16.77 TCT-NSCR-21-0825-06 CP01-01-BL-IR-D02-0556 15-Sep-21 27.64 TCT-NSCR-21-0915-06 CP01-01-BL-IR-D01-675 PASSED
GRIDLINE F1-F2/4-6, F-G/4, FOR PILE CAP AND GRADE
BEAM AT GRIDLINE E1/3-7

CONCRETE POURING OF COLUMN (2nd FLOOR) @ GL.


274 36 19-Aug-21 7/B, GL. 7/C, & GL. 7/D OCC Building 10.00 10.00 20.00 225.00 26-Aug-21 35.89 TCT-NSCR-21-0826-05 CP01-01-BL-IR-D06-0561 16-Sep-21 51.34 TCT-NSCR-21-0916-01 CP01-01-BL-IR-D06-0677 PASSED

31.90 44.37 TCT-NSCR-21-0916-02 PASSED


CONCRETE POURING OF PILE CAP AND GRADE BEAM
275 31 19-Aug-21 Workshop Building 72.00 72.00 21.00 195.00 26-Aug-21 TCT-NSCR-21-0826-06 CP01-01-BL-IR-D01-0562 16-Sep-21 CP01-01-BL-IR-D01-0678
AT GRIDLINE A/11-15
31.25 44.04 TCT-NSCR-21-0916-03 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


276 15 20-Aug-21 Workshop Building 10.00 10.00 20.00 200.00 27-Aug-21 15.65 TCT-NSCR-21-0827-15 CP01-01-BL-IR-D01-0563 17-Sep-21 28.40 TCT-NSCR-21-0917-02 CP01-01-BL-IR-D01-691 PASSED
GRIDLINE A-A1/16-18, 19-21
CONCRETE CASTING OF LEAN CONCRETE FOR GRADE
277 15 20-Aug-21 LRS Building 6.00 6.00 21.00 200.00 27-Aug-21 17.07 TCT-NSCR-21-0827-14 CP01-01-BL-IR-D02-0564 17-Sep-21 27.92 TCT-NSCR-21-0917-17 CP01-01-BL-IR-D02-692 PASSED
BEAM AT GRIDLINE 14-19/A
CONCRETE POURING OF PILE CAP AND GRADE BEAM
278 31 20-Aug-21 Workshop Building 43.00 43.00 22.00 190.00 27-Aug-21 32.29 TCT-NSCR-21-0827-17 CP01-01-BL-IR-D01-0565 17-Sep-21 44.39 TCT-NSCR-21-0917-16 CP01-01-BL-IR-D01-693 PASSED
AT GRIDLINE A2/11-15

44.66 TCT-NSCR-21-0917-13 PASSED

CONCRETE POURING OF SLAB ON GRADE AT


279 31 20-Aug-21 GRIDLINE A-B/16-21 Workshop Building 148.00 148.00 20.00 190.00 27-Aug-21 31.93 TCT-NSCR-21-0827-16 CP01-01-BL-IR-D01-0566 17-Sep-21 44.24 TCT-NSCR-21-0917-14 CP01-01-BL-IR-D01-694 PASSED

44.05 TCT-NSCR-21-0917-15 PASSED

CONCRETE POURING OF COLUMN (2nd FLOOR) @ GL.


280 36 21-Aug-21 6/A, GL. 6/E, GL. 7/A & GL. 7/E OCC Building 12.50 12.00 20.00 220.00 28-Aug-21 36.86 TCT-NSCR-21-0828-08 CP01-01-BL-IR-D06-0571 18-Sep-21 50.99 TCT-NSCR-21-0918-04 CP01-01-BL-IR-D06-698 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


281 31 21-Aug-21 Workshop Building 40.00 40.00 18.00 195.00 28-Aug-21 31.41 TCT-NSCR-21-0828-10 CP01-01-BL-IR-D06-0572 18-Sep-21 45.09 TCT-NSCR-21-0918-05 CP01-01-BL-IR-D01-699 PASSED
AT GRIDLINE C1-C3/1-3
CONCRETE CASTING OF LEAN CONCRETE FOR GRADE
282 15 21-Aug-21 LRS Building 5.00 5.00 19.00 190.00 28-Aug-21 15.91 TCT-NSCR-21-0828-09 CP01-01-BL-IR-D02-0573 18-Sep-21 28.11 TCT-NSCR-21-0918-03 CP01-01-BL-IR-D02-700 PASSED
BEAM AT GRIDLINE 14-19/B
CONCRETE POURING OF COLUMN (2nd FLOOR) @ GL.
283 36 22-Aug-21 OCC Building 10.00 10.00 24.00 200.00 29-Aug-21 36.84 TCT-NSCR-21-0830-32 CP01-01-BL-IR-D06-578 19-Sep-21 52.58 TCT-NSCR-21-0920-10 CP01-01-BL-IR-D06-703 PASSED
5/A, GL. 5/B, & GL. 5/C

CONCRETE POURING OF PILE CAP AND GRADE BEAM


284 31 23-Aug-21 AT GRIDLINE C/1-3 Workshop Building 18.00 16.00 20.00 190.00 30-Aug-21 32.07 TCT-NSCR-21-0830-31 CP01-01-BL-IR-D01-579 20-Sep-21 44.64 TCT-NSCR-21-0920-09 CP01-01-BL-IR-D01-707 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR GRADE


285 15 23-Aug-21 Workshop Building 6.00 6.00 18.00 195.00 30-Aug-21 15.94 TCT-NSCR-21-0830-30 CP01-01-BL-IR-D01-580 20-Sep-21 28.22 TCT-NSCR-21-0920-05 CP01-01-BL-IR-D01-708 PASSED
BEAM AT GRIDLINE F-G/4, A-B/1

36 (w/ WP) 37.15 53.03 TCT-NSCR-21-0920-07 PASSED


CONCRETE CASTING OF CATCH BASIN (SLAB & WALL
286 23-Aug-21 LRS Building 4.00 4.00 20.00 200.00 30-Aug-21 TCT-NSCR-21-0830-27 CP01-01-BL-IR-D02-581 20-Sep-21 CP01-01-BL-IR-D02-709
KICKER) @ GL. 14/A, 14/B, 17/A, 17/B
36 (w/o WP) 36.75 52.71 TCT-NSCR-21-0920-08 PASSED

287 31 23-Aug-21 CONCRETE POURING OF PILE CAP @ GL. 1/B & 1/C LRS Building 16.80 19.00 21.00 180.00 30-Aug-21 31.95 TCT-NSCR-21-0830-28 CP01-01-BL-IR-D02-582 20-Sep-21 45.16 TCT-NSCR-21-0920-06 CP01-01-BL-IR-D02-710 PASSED

CONCRETE POURING OF COLUMN (2nd FLOOR) @ GL.


288 36 24-Aug-21 OCC Building 7.00 7.00 20.00 220.00 31-Aug-21 36.87 TCT-NSCR-21-0831-11 CP01-01-BL-IR-D06-0584 21-Sep-21 50.17 TCT-NSCR-21-0921-03 CP01-01-BL-IR-D06-714 PASSED
5/D & GL. 5/E

44.16 TCT-NSCR-21-0921-02 PASSED


CONCRETE POURING OF PILE CAP AND GRADE BEAM
289 31 24-Aug-21 Workshop Building 72.00 72.00 20.00 185.00 31-Aug-21 32.17 TCT-NSCR-21-0831-09 CP01-01-BL-IR-D01-0585 21-Sep-21 CP01-01-BL-IR-D01-715
AT GRIDLINE B/11-15
44.59 TCT-NSCR-21-0921-01 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


290 31 24-Aug-21 AT GRIDLINE A3/12-14 Workshop Building 31.00 29.00 20.00 175.00 31-Aug-21 32.52 TCT-NSCR-21-0831-10 CP01-01-BL-IR-D01-0586 21-Sep-21 44.63 TCT-NSCR-21-0921-04 CP01-01-BL-IR-D01-716 PASSED

CONCRETE POURING OF COLUMN (2nd FLOOR) @ GL.


291 36 25-Aug-21 4/B, 4/C & GL. 3/C OCC Building 10.00 10.00 20.00 220.00 01-Sep-21 37.43 TCT-NSCR-21-0901-03 CP01-01-BL-IR-D06-0592 22-Sep-21 52.37 TCT-NSCR-21-0922-04 CP01-01-BL-IR-D06-718 PASSED

CONCRETE POURING OF LEAN CONCRETE FOR PILE


292 15 25-Aug-21 CAP AND GRADE BEAM GL.9-14/A LRS Building 6.50 6.50 20.00 190.00 01-Sep-21 15.99 TCT-NSCR-21-0901-02 CP01-01-BL-IR-D02-0593 22-Sep-21 28.23 TCT-NSCR-21-0922-02 CP01-01-BL-IR-D02-719 PASSED
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE POURING OF PILE CAP AND GRADE BEAM


293 31 25-Aug-21 Workshop Building 24.00 24.00 19.00 190.00 01-Sep-21 32.59 TCT-NSCR-21-0901-01 CP01-01-BL-IR-D01-0594 22-Sep-21 44.88 TCT-NSCR-21-0922-03 CP01-01-BL-IR-D01-720 PASSED
AT GRIDLINE E/13-15
CONCRETE POURING OF PILE CAP AND GRADE BEAM
294 31 26-Aug-21 Workshop Building 31.00 31.00 20.00 180.00 02-Sep-21 32.16 TCT-NSCR-21-0902-09 CP01-01-BL-IR-D01-0595 23-Sep-21 44.29 TCT-NSCR-21-0923-04 CP01-01-BL-IR-D01-721 PASSED
AT GRIDLINE A1/12-14
CONCRETE POURING OF PILE CAP AND GRADE BEAM
295 31 26-Aug-21 Workshop Building 20.00 20.00 20.00 175.00 02-Sep-21 31.93 TCT-NSCR-21-0902-07 CP01-01-BL-IR-D01-0596 23-Sep-21 43.33 TCT-NSCR-21-0923-03 CP01-01-BL-IR-D01-722 PASSED
AT GRIDLINE B3, D/1-3
CONCRETE POURING OF PILE CAP AND GRADE BEAM
296 31 26-Aug-21 Workshop Building 27.00 27.00 19.00 200.00 02-Sep-21 32.36 TCT-NSCR-21-0902-06 CP01-01-BL-IR-D01-0597 23-Sep-21 44.40 TCT-NSCR-21-0923-05 CP01-01-BL-IR-D01-723 PASSED
AT GRIDLINE A, A1/1-3

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


297 15 26-Aug-21 Workshop Building 8.00 8.00 19.00 190.00 02-Sep-21 15.66 TCT-NSCR-21-0902-08 CP01-01-BL-IR-D01-0598 23-Sep-21 27.93 TCT-NSCR-21-0923-07 CP01-01-BL-IR-D01-724 PASSED
AND GRADE BEAM AT GRIDLINE A2, A3/3-7

CONCRETE POURING OF COLUMN (2F) GL.2/C GL.2/D,


298 36 27-Aug-21 OCC Building 12.50 12.50 20.00 215.00 03-Sep-21 36.88 TCT-NSCR-21-0903-02 CP01-01-BL-IR-D06-0602 24-Sep-21 52.59 TCT-NSCR-21-0924-02 CP01-01-BL-IR-D06-734 PASSED
GL.3/B, GL.3/D
CONCRETE POURING OF PILE CAP @ GRIDLINE F/9-11
299 31 27-Aug-21 Workshop Building 41.00 41.00 20.00 195.00 03-Sep-21 32.04 TCT-NSCR-21-0903-04 CP01-01-BL-IR-D01-0603 24-Sep-21 44.77 TCT-NSCR-21-0924-05 CP01-01-BL-IR-D01-735 PASSED
AND GRADE BEAM AT GRIDLINE F/8-11
CONCRETE POURING OF PILE CAP AND GRADE BEAM
300 31 27-Aug-21 Workshop Building 28.50 28.50 20.00 190.00 03-Sep-21 32.33 TCT-NSCR-21-0903-03 CP01-01-BL-IR-D01-0605 24-Sep-21 44.52 TCT-NSCR-21-0924-04 CP01-01-BL-IR-D06-736 PASSED
AT GRIDLINE D/3-5
CONCRETE POURING OF PEDESTAL COLUMN AND
301 31 27-Aug-21 LRS Building 40.00 40.00 20.00 200.00 03-Sep-21 31.96 TCT-NSCR-21-0903-01 CP01-01-BL-IR-D02-0606 24-Sep-21 44.32 TCT-NSCR-21-0924-03 CP01-01-BL-IR-D02-737 PASSED
GRADE BEAM AT GRIDLINE 15-19/B

36 (w/ WP) 37.15 52.50 PASSED


CONCRETE POURING OF SUMP PIT 11 AT GRIDLINE
302 28-Aug-21 Workshop Building 5.50 5.50 19.00 220.00 04-Sep-21 TCT-NSCR-21-0904-09 CP01-01-BL-IR-D01-0610 25-Sep-21 TCT-NSCR-21-0925-05 CP01-01-BL-IR-D01-738
D1-E/20-21 (SECOND LIFT)
36 (w/o WP) 37.89 52.22 PASSED

45.34 TCT-NSCR-21-0926-23 PASSED


CONCRETE POURING OF PILE CAP AND GRADE BEAM
303 31 29-Aug-21 Workshop Building 48.00 48.00 18.00 185.00 05-Sep-21 35.26 TCT-NSCR-21-0907-03 CP01-01-BL-IR-D06-620 26-Sep-21 CP01-01-BL-IR-D01-740
AT GRIDLINE G/4-7
44.67 TCT-NSCR-21-0926-24 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


31 01-Sep-21 Workshop Building 17.00 17.00 21.00 200.00 08-Sep-21 32.21 TCT-NSCR-21-0908-04 CP01-01-BL-IR-D01-624 29-Sep-21 44.68 TCT-NSCR-21-0929-07 CP01-01-BL-IR-D01-0741 PASSED
AT GRIDLINE E/11-12
304
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
15 01-Sep-21 Workshop Building 54.00 18.00 20.00 190.00 08-Sep-21 15.78 TCT-NSCR-21-0908-05 CP01-01-BL-IR-D01-625 29-Sep-21 28.65 TCT-NSCR-21-0929-06 CP01-01-BL-IR-D01-0742 PASSED
GRIDLINE C-D/13-16

CONCRETE POURING OF COLUMN (2F) GL.1/D, GL.


36 02-Sep-21 OCC Building 10.00 10.00 20.00 215.00 09-Sep-21 34.83 TCT-NSCR-21-0909-18 CP01-01-BL-IR-D06-630 30-Sep-21 52.73 TCT-NSCR-21-0930-09 CP01-01-BL-IR-D06-749 PASSED
2/E, GL.3/A
305
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
15 02-Sep-21 Workshop Building 36.00 09-Sep-21 15.71 TCT-NSCR-21-0909-15 CP01-01-BL-IR-D01-631 30-Sep-21 27.16 TCT-NSCR-21-0930-10 CP01-01-BL-IR-D01-0750 PASSED
GRIDLINE C-D/13-16

42.63 TCT-NSCR-21-0930-11 PASSED


CONCRETE POURING OF SLAB AT GRIDLINE A-A2/17-
306 31 02-Sep-21 20 Workshop Building 61.50 61.50 21.00 185.00 09-Sep-21 31.41 TCT-NSCR-21-0909-17 CP01-01-BL-IR-D01-632 30-Sep-21 CP01-01-BL-IR-D01-751
43.58 TCT-NSCR-21-0930-12 PASSED

CONCRETE POURING OF LEAN CONCRETE FOR GRADE


307 15 02-Sep-21 LRS Building 7.00 7.00 20.00 195.00 09-Sep-21 15.96 TCT-NSCR-21-0909-16 CP01-01-BL-IR-D02-633 30-Sep-21 27.87 TCT-NSCR-21-0930-13 CP01-01-BL-IR-D02-752 PASSED
BEAM AT GL 9-15/C
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
308 15 03-Sep-21 Workshop Building 27.00 27.00 20.00 200.00 10-Sep-21 16.12 TCT-NSCR-21-0910-17 CP01-01-BL-IR-D01-638 01-Oct-21 28.17 TCT-NSCR-21-1001-16 CP01-01-BL-IR-D01-0757 PASSED
GRIDLINE C-D/10-12
CONCRETE POURING OF COLUMN (2F) AT GL 1/B, 1/C,
309 36 03-Sep-21 OCC Building 10.00 10.00 20.00 225.00 10-Sep-21 36.80 TCT-NSCR-21-0910-16 CP01-01-BL-IR-D06-639 01-Oct-21 52.56 TCT-NSCR-21-1001-14 CP01-01-BL-IR-D06-0758 PASSED
1/E
CONCRETE OF POURING OF PILE CAP, GRADE BEAM,
310 31 03-Sep-21 PEDESTAL COLUMN AT GL 15-19/C AND LEAN LRS Building 50.00 50.00 20.00 200.00 10-Sep-21 31.78 TCT-NSCR-21-0910-18 CP01-01-BL-IR-D02-640 01-Oct-21 44.46 TCT-NSCR-21-1001-15 CP01-01-BL-IR-D02-0759 PASSED
CONCRETE AT GL 6-9/C
CONCRETE POURING OF COLUMN (2F) AT GL 8/B, 8/C,
311 36 04-Sep-21 OCC Building 10.00 10.00 20.00 225.00 11-Sep-21 35.32 TCT-NSCR-21-0911-10 CP01-01-BL-IR-D06-0643 02-Oct-21 49.61 TCT-NSCR-21-1002-11 CP01-01-BL-IR-D06-0765 PASSED
9/C
CONCRETE OF POURING OF PILE CAP, GRADE BEAM, 43.04 TCT-NSCR-21-1002-09
312 31 04-Sep-21 LRS Building 58.00 58.00 20.00 200.00 11-Sep-21 31.47 TCT-NSCR-21-0911-09 CP01-01-BL-IR-D02-0644 02-Oct-21 CP01-01-BL-IR-D02-0766 PASSED
PEDESTAL COLUMN AT GL 15-19/A 42.88 TCT-NSCR-21-1002-10

313 36 05-Sep-21 CONCRETE POURING OF COLUMN (2F) AT GL 3/E, 4/E OCC Building 6.50 6.50 20.00 225.00 12-Sep-21 36.87 TCT-NSCR-21-0912-01 CP01-01-BL-IR-D06-649 03-Oct-21 49.77 TCT-NSCR-21-1003-03 CP01-01-BL-IR-D06-0768 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


314 31 06-Sep-21 AT GRIDLINE B3/12-14 Workshop Building 36.00 33.00 23.00 200.00 13-Sep-21 32.53 TCT-NSCR-21-0913-11 CP01-01-BL-IR-D01-0653 04-Oct-21 44.40 TCT-NSCR-21-1004-02 CP01-01-BL-IR-D01-773 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


315 31 06-Sep-21 Workshop Building 18.00 18.00 20.00 200.00 13-Sep-21 31.24 TCT-NSCR-21-0913-09 CP01-01-BL-IR-D01-0654 04-Oct-21 43.12 TCT-NSCR-21-1004-06 CP01-01-BL-IR-D01-774 PASSED
AT GRIDLINE B2/12-15
CONCRETE POURING OF PILE CAP AND GRADE BEAM
316 31 06-Sep-21 Workshop Building 18.00 18.00 20.00 200.00 13-Sep-21 30.02 TCT-NSCR-21-0913-08 CP01-01-BL-IR-D01-0655 04-Oct-21 44.04 TCT-NSCR-21-1004-03 CP01-01-BL-IR-D01-775 PASSED
AT GRIDLINE B1/13-14
CONCRETE POURING OF FOUNDATION COLUMN AND
317 31 06-Sep-21 Workshop Building 16.00 16.00 19.00 200.00 13-Sep-21 31.91 TCT-NSCR-21-0913-10 CP01-01-BL-IR-D01-0656 04-Oct-21 44.45 TCT-NSCR-21-1004-07 CP01-01-BL-IR-D01-776 PASSED
GRADE BEAM AT GRIDLINE E/9-11

CONCRETE POURING OF PILE CAP AT GRIDLINE C1-


318 31 06-Sep-21 Workshop Building 36.00 30.00 20.00 190.00 13-Sep-21 32.41 TCT-NSCR-21-0913-07 CP01-01-BL-IR-D01-0657 04-Oct-21 45.23 TCT-NSCR-21-1004-01 CP01-01-BL-IR-D01-777 PASSED
D/1 AND GRADE BEAM AT GRIDLINE C-D1/1, C1-D/1-2

319 36 07-Sep-21 CONCRETE POURING OF COLUMN (2F) AT GL 8/D, 9/D OCC Building 6.50 6.50 20.00 220.00 14-Sep-21 35.89 TCT-NSCR-21-0914-02 CP01-01-BL-IR-D06-663 05-Oct-21 49.33 TCT-NSCR-21-1005-01 CP01-01-BL-IR-D06-781 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


320 15 07-Sep-21 AND GRADE BEAM AT GRIDLINE B1-B2/9-12 Workshop Building 12.00 10.00 19.00 195.00 14-Sep-21 15.88 TCT-NSCR-21-0914-04 CP01-01-BL-IR-D01-664 05-Oct-21 28.62 TCT-NSCR-21-1005-03 CP01-01-BL-IR-D01-782 PASSED

CONCRETE POURING OF GRADE BEAM AND PEDESTAL


321 31 07-Sep-21 AT GL 12-16/B LRS Building 40.00 24.00 20.00 200.00 14-Sep-21 31.69 TCT-NSCR-21-0914-05 CP01-01-BL-IR-D02-665 05-Oct-21 38.65 TCT-NSCR-21-1005-04 CP01-01-BL-IR-D02-783 PASSED

CONCRETE POURING OF PRW AND STC AT GL 1-2/A,


322 36 07-Sep-21 OCC Building 13.50 13.50 20.00 210.00 14-Sep-21 36.46 TCT-NSCR-21-0914-03 CP01-01-BL-IR-D06-666 05-Oct-21 52.34 TCT-NSCR-21-1005-02 CP01-01-BL-IR-D06-784 PASSED
1-2/A-B, 9-10/A, 9-10/A-B (GF)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE POURING OF GRADE BEAM GB4 AT


323 31 09-Sep-21 Workshop Building 5.00 5.00 20.00 200.00 16-Sep-21 31.98 TCT-NSCR-21-0916-04 CP01-01-BL-IR-D01-676 07-Oct-21 42.07 TCT-NSCR-21-1007-03 CP01-01-BL-IR-D01-793 PASSED
GRIDLINE A1-A2/20-21
CONCRETE POURING OF COLUMN (2F) AT GL.9/E,
324 36 10-Sep-21 OCC Building 13.00 13.00 20.00 210.00 17-Sep-21 36.45 TCT-NSCR-21-0917-21 CP01-01-BL-IR-D06-687 08-Oct-21 52.40 TCT-NSCR-21-1008-12 CP01-01-BL-IR-D06-801 PASSED
GL.10/C, GL.10/D, GL.10/E
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
325 15 10-Sep-21 GRIDLINE C-C1/10-12 Workshop Building 9.00 9.00 19.00 195.00 17-Sep-21 16.15 TCT-NSCR-21-0917-20 CP01-01-BL-IR-D01-688 08-Oct-21 28.86 TCT-NSCR-21-1008-10 CP01-01-BL-IR-D01-802 PASSED

CONCRETE POURING OF PILE CAP AND GRADE BEAM


326 31 10-Sep-21 Workshop Building 18.50 18.50 20.00 200.00 17-Sep-21 31.92 TCT-NSCR-21-0917-19 CP01-01-BL-IR-D01-689 08-Oct-21 44.64 TCT-NSCR-21-1008-09 CP01-01-BL-IR-D01-803 PASSED
AT GRIDLINE B/1-3
CONCRETE POURING OF PILE CAP AND GRADE BEAM
327 31 10-Sep-21 Workshop Building 20.00 20.00 20.00 200.00 17-Sep-21 32.49 TCT-NSCR-21-0917-22 CP01-01-BL-IR-D01-690 08-Oct-21 44.96 TCT-NSCR-21-1008-11 CP01-01-BL-IR-D01-804 PASSED
AT GRIDLINE A3/1-4
CONCRETE POURING OF COLUMN (2F) AT GL.8/A,
328 36 11-Sep-21 OCC Building 6.50 6.50 18.00 220.00 18-Sep-21 37.10 TCT-NSCR-21-0918-08 CP01-01-BL-IR-D06-695 09-Oct-21 52.60 TCT-NSCR-21-1009-04 CP01-01-BL-IR-D06-813 PASSED
GL.8/E,

CONCRETE POURING OF (EC1) ELEVATOR COLUMN @


329 36 11-Sep-21 OCC Building 3.00 3.00 18.00 220.00 18-Sep-21 36.81 TCT-NSCR-21-0918-07 CP01-01-BL-IR-D06-696 09-Oct-21 52.88 TCT-NSCR-21-1009-03 CP01-01-BL-IR-D06-814 PASSED
ZONE 3 GL 9-10/A-B, GL. 9-10/B, GL.10/A-B (GF)

CONCRETE POURING OF GRADE BEAM AND PILE CAP


330 31 11-Sep-21 LRS Building 47.00 47.00 20.00 200.00 18-Sep-21 31.71 TCT-NSCR-21-0918-06 CP01-01-BL-IR-D02-697 09-Oct-21 44.98 TCT-NSCR-21-1009-02 CP01-01-BL-IR-D02-815 PASSED
AT GL 12-16/A

36 (w/ WP) 37.32 TCT-NSCR-21-0920-13 52.39 TCT-NSCR-21-1011-03 PASSED


CONCRETE POURING OF SUMP PIT WALLS - 2ND LIFT
331 13-Sep-21 AT GL 1/B1-B3 LRS Building 6.50 6.50 20.00 225.00 20-Sep-21 CP01-01-BL-IR-D02-705 11-Oct-21 CP01-01-BL-IR-D02-820
36 (w/o WP) 36.45 TCT-NSCR-21-0920-14 52.18 TCT-NSCR-21-1011-04 PASSED

44.63 TCT-NSCR-21-1011-05 PASSED


332 31 13-Sep-21 CONCRETE POURING OF SLAB AT GRIDLINE A-B/19-21 Workshop Building 68.00 66.00 22.00 200.00 20-Sep-21 31.92 TCT-NSCR-21-0920-12 CP01-01-BL-IR-D01-706 11-Oct-21 CP01-01-BL-IR-D01-821
44.46 TCT-NSCR-21-1011-06 PASSED

CONCRETE POURING OF (EC1) ELEVATOR COLUMN @


333 36 14-Sep-21 OCC Building 3.00 3.00 20.00 220.00 21-Sep-21 36.81 TCT-NSCR-21-0921-07 CP01-01-BL-IR-D06-711 12-Oct-21 52.83 TCT-NSCR-21-1012-02 CP01-01-BL-IR-D06-824 PASSED
ZONE 1 GL.1/B-C, GL.1-2/B-C, GL.1-2/C (2F)

CONCRETE POURING OF GRADE BEAM AND PEDESTAL


334 31 14-Sep-21 LRS Building 33.00 30.00 20.00 200.00 21-Sep-21 32.77 TCT-NSCR-21-0921-06 CP01-01-BL-IR-D02-712 12-Oct-21 43.11 TCT-NSCR-21-1012-06 CP01-01-BL-IR-D02-825 PASSED
BEAM GL.12-16/C
CONCRETE POURING OF SLAB AT GRIDLINE C1-D/13- 44.84 TCT-NSCR-21-1012-04 PASSED
335 31 14-Sep-21 Workshop Building 83.00 78.00 24.00 195.00 21-Sep-21 31.96 TCT-NSCR-21-0921-05 CP01-01-BL-IR-D01-713 12-Oct-21 CP01-01-BL-IR-D01-826
17 45.06 TCT-NSCR-21-1012-05 PASSED
CONCRETE POURING OF COLUMN (3F) AT GL.4/B,
336 36 15-Sep-21 OCC Building 15.00 15.00 20.00 200.00 22-Sep-21 37.84 TCT-NSCR-21-0922-01 CP01-01-BL-IR-D06-717 13-Oct-21 52.37 TCT-NSCR-21-1013-02 CP01-01-BL-IR-D06-836 PASSED
GL.4/C, GL.4/D, GL.5/C, GL.5/D
CONCRETE POURING OF COLUMN (3F) AT GL.5/B,
337 36 17-Sep-21 GL.6/D, COLUMN (2F) GL.1/A, GL.2/A, STAIR CASE OCC Building 13.50 13.50 20.00 215.00 24-Sep-21 37.56 TCT-NSCR-21-0924-01 CP01-01-BL-IR-D06-733 15-Oct-21 52.44 TCT-NSCR-21-1015-01 CP01-01-BL-IR-D06-843 PASSED
COLUMN (2F) GL.1-A-B
CONCRETE POURING OF COLUMN (3F) AT GL.6/B &
338 36 23-Sep-21 OCC Building 6.50 6.50 23.00 195.00 30-Sep-21 36.86 TCT-NSCR-21-0930-16 CP01-01-BL-IR-D06-744 21-Oct-21 52.49 TCT-NSCR-21-1021-13 CP01-01-BL-IR-D06-0873 PASSED
GL.6/C
CONCRETE POURING OF PILECAP AT GRIDLINE F1/9-
339 31 23-Sep-21 Workshop Building 27.00 27.00 22.00 195.00 30-Sep-21 32.37 TCT-NSCR-21-0930-17 CP01-01-BL-IR-D01-746 21-Oct-21 44.50 TCT-NSCR-21-1021-15 CP01-01-BL-IR-D01-0874 PASSED
10 AND GRADE BEAM AT GRIDLINE F1/8-11
CONCRETE POURING OF PILECAP AT GRIDLINE F2/9-
340 31 23-Sep-21 10 AND GRADE BEAM AT GRIDLINE F2/8-11 Workshop Building 18.00 18.00 21.00 195.00 30-Sep-21 32.39 TCT-NSCR-21-0930-18 CP01-01-BL-IR-D01-747 21-Oct-21 44.46 TCT-NSCR-21-1021-14 CP01-01-BL-IR-D01-0875 PASSED

31.64 TCT-NSCR-21-0930-19 44.89 TCT-NSCR-21-1021-16 PASSED


CONCRETE POURING OF PILE CAP, FOUNDATION
341 31 23-Sep-21 COLUMN AT GRIDLINE G/8-11 AND GRADE BEAM AT Workshop Building 57.00 57.00 22.00 190.00 30-Sep-21 CP01-01-BL-IR-D01-748 21-Oct-21 CP01-01-BL-IR-D01-0876
GRIDLINE G/7-11
32.19 TCT-NSCR-21-0930-20 44.32 TCT-NSCR-21-1021-17 PASSED

CONCRETE POURING OF GRADE BEAM AND PEDESTAL


342 31 24-Sep-21 LRS Building 25.00 25.00 22.00 200.00 01-Oct-21 31.89 TCT-NSCR-21-1001-19 CP01-01-BL-IR-D02-0753 22-Oct-21 44.15 TCT-NSCR-21-1022-02 CP01-01-BL-IR-D02-0885 PASSED
COLUMN GL.9-13/B
CONCRETE POURING OF GRADE BEAM AND PILE CAP
343 31 24-Sep-21 LRS Building 45.00 45.00 22.00 200.00 01-Oct-21 32.08 TCT-NSCR-21-1001-17 CP01-01-BL-IR-D02-0754 22-Oct-21 44.29 TCT-NSCR-21-1022-05 CP01-01-BL-IR-D02-0886 PASSED
GL.9-13/A
CONCRETE POURING OF LEAN CONCRETE GL.7-9/ A &
344 15 24-Sep-21 LRS Building 4.00 4.00 20.00 200.00 01-Oct-21 15.48 TCT-NSCR-21-1001-18 CP01-01-BL-IR-D02-0755 22-Oct-21 28.35 TCT-NSCR-21-1022-04 CP01-01-BL-IR-D02-0887 PASSED
GL.7-9/B
CONCRETE POURING OF COLUMN (2F) GL 9/A, 9/B,
345 36 25-Sep-21 OCC Building 12.50 12.50 20.00 215.00 02-Oct-21 32.46 TCT-NSCR-21-1002-05 CP01-01-BL-IR-D06-0761 23-Oct-21 52.77 TCT-NSCR-21-1023-03 CP01-01-BL-IR-D06-0892 PASSED
10/A, & 10/B
CONCRETE POURING OF PILE CAP, FOUNDATION
346 31 24-Sep-21 COLUMN AT GRIDLINE D1-E/1 AND GRADE BEAM AT Workshop Building 20.00 19.00 21.00 200.00 01-Oct-21 31.54 TCT-NSCR-21-1001-20 CP01-01-BL-IR-D01-0756 22-Oct-21 44.87 TCT-NSCR-21-1022-03 CP01-01-BL-IR-D01-0888 PASSED
GRIDLINE D-E/1, D1-E/1-2
CONCRETE POURING OF PILE CAP, FOUNDATION
347 31 25-Sep-21 Workshop Building 27.00 27.00 21.00 200.00 02-Oct-21 31.23 TCT-NSCR-21-1002-07 CP01-01-BL-IR-D01-0762 23-Oct-21 44.58 TCT-NSCR-21-1023-01 CP01-01-BL-IR-D01-0893 PASSED
COLUMN AND GRADE BEAM AT GRIDLINE C1/3-5
CONCRETE POURING OF COLUMN (2F) ZONE 3 EC-1 &
348 36 25-Sep-21 3F GL 6/A OCC Building 6.50 6.50 21.00 210.00 02-Oct-21 37.66 TCT-NSCR-21-1002-08 CP01-01-BL-IR-D06-0763 23-Oct-21 53.08 TCT-NSCR-21-1023-04 CP01-01-BL-IR-D06-0894 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


349 15 25-Sep-21 CAP AND GRADE BEAM AT GRIDLINE E-F/4-6 AND Workshop Building 8.00 8.00 22.00 190.00 02-Oct-21 16.00 TCT-NSCR-21-1002-06 CP01-01-BL-IR-D01-0764 23-Oct-21 28.13 TCT-NSCR-21-1023-02 CP01-01-BL-IR-D01-0895 PASSED
E'/4-6
CONCRETE POURING OF COLUMN (3F) GL.4/E and
350 36 26-Sep-21 OCC Building 6.50 6.50 22.00 220.00 03-Oct-21 36.83 TCT-NSCR-21-1003-02 CP01-01-BL-IR-D06-0767 24-Oct-21 53.13 TCT-NSCR-21-1025-21 CP01-01-BL-IR-D06-0897 PASSED
GL.5/E

CONCRETE POURING OF PILE CAP AT GRIDLINE


351 31 27-Sep-21 Workshop Building 28.00 28.00 22.00 200.00 04-Oct-21 31.85 TCT-NSCR-21-1004-05 CP01-01-BL-IR-D01-770 25-Oct-21 44.40 TCT-NSCR-21-1025-19 CP01-01-BL-IR-D01-0900 PASSED
B1/10-12 AND GRADE BEAM AT GRIDLINE B1/9-13

CONCRETE POURING OF PILE CAP AT GRIDLINE


352 31 27-Sep-21 Workshop Building 34.00 34.00 22.00 190.00 04-Oct-21 31.83 TCT-NSCR-21-1004-08 CP01-01-BL-IR-D01-771 25-Oct-21 44.59 TCT-NSCR-21-1025-18 CP01-01-BL-IR-D01-0901 PASSED
B2/10-13 AND GRADE BEAM AT GRIDLINE B2/9-14

CONCRETE POURING OF COLUMN AT GL. 4/A &


353 36 27-Sep-21 OCC Building 7.00 7.00 21.00 220.00 04-Oct-21 38.16 TCT-NSCR-21-1004-04 CP01-01-BL-IR-D06-772 25-Oct-21 52.16 TCT-NSCR-21-1025-20 CP01-01-BL-IR-D06-0902 PASSED
5/A(3rd Floor level)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE POURING OF PILE CAP, FOUNDATION


354 31 28-Sep-21 COLUMN AT GRIDLINE F1-F2/11 AND GRADE BEAM Workshop Building 15.00 15.00 21.00 200.00 05-Oct-21 32.45 TCT-NSCR-21-1005-05 CP01-01-BL-IR-D01-779 26-Oct-21 44.57 TCT-NSCR-21-1026-01 CP01-01-BL-IR-D01-906 PASSED
AT GRIDLINE F-G/11
CONCRETE POURING OF COLUMN (3F) GL. 2/D,
355 36 28-Sep-21 GL.3/D & GL.6/E OCC Building 10.00 10.00 23.00 220.00 05-Oct-21 36.64 TCT-NSCR-21-1005-06 CP01-01-BL-IR-D06-780 26-Oct-21 52.92 TCT-NSCR-21-1026-02 CP01-01-BL-IR-D06-907 PASSED

356 31 29-Sep-21 CONCRETE POURING OF PILECAP AT GRIDLINE E/2 Workshop Building 8.00 8.00 22.00 200.00 06-Oct-21 31.57 TCT-NSCR-21-1006-06 CP01-01-BL-IR-D01-786 27-Oct-21 44.84 TCT-NSCR-21-1027-03 CP01-01-BL-IR-D01-914 PASSED

CONCRETE POURING OF PILE CAP AT GRIDLINE D1/2


357 31 29-Sep-21 Workshop Building 14.00 14.00 22.00 200.00 06-Oct-21 31.73 TCT-NSCR-21-1006-05 CP01-01-BL-IR-D01-787 27-Oct-21 44.83 TCT-NSCR-21-1027-01 CP01-01-BL-IR-D01-915 PASSED
AND GRADE BEAM AT GRIDLINE D1/1-3

CONCRETE POURING OF FOUNDATION COLUMN AT


358 31 29-Sep-21 Workshop Building 33.00 33.00 23.00 195.00 06-Oct-21 32.01 TCT-NSCR-21-1006-07 CP01-01-BL-IR-D01-788 27-Oct-21 44.74 TCT-NSCR-21-1027-02 CP01-01-BL-IR-D01-916 PASSED
GRIDLINE E/6-8 AND GRADE BEAM AT GRIDLINE E/5-9

CONCRETE POURING OF COLUMN (3F) AT GL 1/E, 2/E,


359 36 30-Sep-21 OCC Building 13.00 13.00 21.00 200.00 07-Oct-21 38.86 TCT-NSCR-21-1007-06 CP01-01-BL-IR-D06-790 28-Oct-21 52.62 TCT-NSCR-21-1028-03 CP01-01-BL-IR-D06-0922 PASSED
3/E, 1/D
CONCRETE POURING OF LEAN CONCRETE FOR SLAB
360 15 30-Sep-21 LRS Building 17.00 17.00 20.00 200.00 07-Oct-21 16.84 TCT-NSCR-21-1007-04 CP01-01-BL-IR-D02-791 28-Oct-21 28.42 TCT-NSCR-21-1028-05 CP01-01-BL-IR-D02-0923 PASSED
ON GRADE AT GL 15-19/A-B

CONCRETE POURING OF PILE CAP AT GRIDLINE A-


A3/1, A2/2, FOUNDATION COLUMN AT GRIDLINE A-
361 31 30-Sep-21 Workshop Building 40.00 40.00 21.00 200.00 07-Oct-21 32.41 TCT-NSCR-21-1007-05 CP01-01-BL-IR-D01-792 28-Oct-21 44.81 TCT-NSCR-21-1028-04 CP01-01-BL-IR-D01-0924 PASSED
A3/1 AND GRADE BEAM AT GRIDLINE A-B/1, A/1-2,
A1/1-2, A3/1-2

CONCRETE POURING OF LEAN CONCRETE FOR SLAB


362 15 01-Oct-21 LRS Building 21.00 21.00 21.00 195.00 08-Oct-21 15.90 TCT-NSCR-21-1008-16 CP01-01-BL-IR-D02-796 29-Oct-21 27.89 TCT-NSCR-21-1029-01 CP01-01-BL-IR-D02-0930 PASSED
ON GRADE AT GL 14-19/B-B1
CONCRETE POURING OF PILE CAP, FOUNDATION
363 31 01-Oct-21 COLUMN AT GRIDLINE F1-G/4 AND GRADE BEAM AT Workshop Building 23.50 23.50 21.00 200.00 08-Oct-21 31.96 TCT-NSCR-21-1008-19 CP01-01-BL-IR-D01-797 29-Oct-21 44.69 TCT-NSCR-21-1029-02 CP01-01-BL-IR-D01-0931 PASSED
GRIDLINE F-G/4, F1-G/4-5
CONCRETE POURING OF COLUMN (3F) AT GL 7/B,
364 36 01-Oct-21 OCC Building 13.00 13.00 21.00 200.00 08-Oct-21 37.50 TCT-NSCR-21-1008-17 CP01-01-BL-IR-D06-800 29-Oct-21 51.89 TCT-NSCR-21-1029-03 CP01-01-BL-IR-D06-0932 PASSED
GL.7/C & GL.7/D
CONCRETE POURING OF COLUMN (3F) GL.8/D &
365 36 01-Oct-21 OCC Building 6.50 6.50 20.00 225.00 08-Oct-21 36.85 TCT-NSCR-21-1008-18 CP01-01-BL-IR-D06-799 29-Oct-21 52.56 TCT-NSCR-21-1029-04 CP01-01-BL-IR-D06-0933 PASSED
GL.9/D
CONCRETE POURING OF LEAN CONCRETE FOR SLAB
366 15 02-Oct-21 LRS Building 18.00 18.00 20.00 200.00 09-Oct-21 17.72 TCT-NSCR-21-1009-07 CP01-01-BL-IR-D02-808 30-Oct-21 29.22 TCT-NSCR-21-1030-13 CP01-01-BL-IR-D02-0937 PASSED
ON GRADE AT GL 14-19/B3-C
CONCRETE POURING OF GRADE BEAM AND PEDESTAL
367 31 02-Oct-21 COLUMN GL.9-13/C LRS Building 34.00 34.00 20.00 200.00 09-Oct-21 33.91 TCT-NSCR-21-1009-06 CP01-01-BL-IR-D02-809 30-Oct-21 44.41 TCT-NSCR-21-1030-14 CP01-01-BL-IR-D02-0938 PASSED

CONCRETE POURING OF COLUMN (3F) GL.7/A &


368 36 02-Oct-21 OCC Building 7.00 7.00 20.00 225.00 09-Oct-21 37.88 TCT-NSCR-21-1009-08 CP01-01-BL-IR-D06-810 30-Oct-21 52.68 TCT-NSCR-21-1030-18 CP01-01-BL-IR-D06-0939 PASSED
GL.7/E

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


369 15 02-Oct-21 Workshop Building 15.00 12.50 20.00 190.00 09-Oct-21 15.47 TCT-NSCR-21-1009-09 CP01-01-BL-IR-D01-811 30-Oct-21 27.86 TCT-NSCR-21-1030-17 CP01-01-BL-IR-D01-0940 PASSED
AND GRADE BEAM AT GRIDLINE B1-B2/1-5

CONCRETE POURING OF PILECAP AT GRIDLINE F1/5-8,


370 31 02-Oct-21 FOUNDATION COLUMN AT GRIDLINE F1/5-7 AND Workshop Building 56.00 56.00 20.00 195.00 09-Oct-21 31.64 TCT-NSCR-21-1009-05 CP01-01-BL-IR-D01-812 30-Oct-21 44.68 TCT-NSCR-21-1030-15 CP01-01-BL-IR-D01-0941 PASSED
GRADE BEAM AT GRIDLINE F1/4-9

CONCRETE POURING OF GRADE BEAM, PILE CAP AND


371 31 04-Oct-21 LRS Building 28.00 28.00 20.00 210.00 11-Oct-21 31.80 TCT-NSCR-21-1011-09 CP01-01-BL-IR-D02-817 01-Nov-21 44.89 TCT-NSCR-21-1102-06 CP01-01-BL-IR-D02-0948 PASSED
PEDESTAL COLUMN AT GL.8-10/A and GL.8-10/B

CONCRETE POURING OF COLUMN (3F) GL.3/A, GL.3/B


372 36 04-Oct-21 OCC Building 10.00 10.00 20.00 210.00 11-Oct-21 36.86 TCT-NSCR-21-1011-08 CP01-01-BL-IR-D06-818 01-Nov-21 52.62 TCT-NSCR-21-1102-02 CP01-01-BL-IR-D06-0949 PASSED
& GL.3/C

373 31 04-Oct-21 CONCRETE POURING OF PILECAP AT GRIDLINE E/3 Workshop Building 9.00 9.00 20.00 215.00 11-Oct-21 32.12 TCT-NSCR-21-1011-07 CP01-01-BL-IR-D01-819 01-Nov-21 44.28 TCT-NSCR-21-1102-03 CP01-01-BL-IR-D01-0950 PASSED

CONCRETE POURING OF LEAN CONCRETE FOR SLAB


374 15 05-Oct-21 LRS Building 23.00 23.00 18.00 200.00 12-Oct-21 14.22 TCT-NSCR-21-1012-01 CP01-01-BL-IR-D02-822 02-Nov-21 27.73 TCT-NSCR-21-1102-07 CP01-01-BL-IR-D02-0959 PASSED
ON GRADE AT GL 14-19/B2-B3

CONCRETE POURING OF PILECAP, FOUNDATION 44.76 TCT-NSCR-21-1102-04 PASSED


375 31 05-Oct-21 COLUMN AND GRADE BEAM AT GRIDLINE F2/4-9 Workshop Building 71.00 69.00 21.00 180.00 12-Oct-21 31.52 TCT-NSCR-21-1012-02 CP01-01-BL-IR-D01-823 02-Nov-21 CP01-01-BL-IR-D01-0960
PEDESTAL A/19-21
44.16 TCT-NSCR-21-1102-05 PASSED
CONCRETE POURING OF COLUMN (3F) GL.2/A, GL.2/B
376 36 06-Oct-21 OCC Building 10.00 10.00 20.00 215.00 13-Oct-21 35.61 TCT-NSCR-21-1013-05 CP01-01-BL-IR-D06-828 03-Nov-21 51.57 TCT-NSCR-21-1103-07 CP01-01-BL-IR-D06-0964 PASSED
& GL.2/C
CONCRETE POURING OF LEAN CONCRETE FOR SLAB
377 15 06-Oct-21 LRS Building 28.00 28.00 18.00 200.00 13-Oct-21 15.23 TCT-NSCR-21-1013-12 CP01-01-BL-IR-D02-830 03-Nov-21 28.55 TCT-NSCR-21-1103-01 CP01-01-BL-IR-D02-0965 PASSED
ON GRADE AT GL 14-19/B1-B2

36 (w/ WP) 36.82 TCT-NSCR-21-1013-03 53.03 TCT-NSCR-21-1103-05 PASSED


CONCRETE POURING OF CATCH BASIN 01-07 (FIRST
378 06-Oct-21 Workshop Building 2.00 2.00 20.00 210.00 13-Oct-21 CP01-01-BL-IR-D01-832 03-Nov-21 CP01-01-BL-IR-D01-0966
LIFT)
36 (w/o WP) 36.80 TCT-NSCR-21-1013-04 52.92 TCT-NSCR-21-1103-06 PASSED

CONCRETE POURING OF PILE CAP, FOUNDATION


379 31 06-Oct-21 COLUMN AT GRIDLINE A3/4 Workshop Building 16.50 16.50 21.00 200.00 13-Oct-21 31.99 TCT-NSCR-21-1013-10 CP01-01-BL-IR-D01-833 03-Nov-21 45.02 TCT-NSCR-21-1103-04 CP01-01-BL-IR-D01-0967 PASSED
AND GRADE BEAM AT GRIDLINE A3/3-5
CONCRETE POURING OF FOUNDATION COLUMN AND
380 31 06-Oct-21 Workshop Building 43.50 43.50 21.00 190.00 13-Oct-21 31.26 TCT-NSCR-21-1013-11 CP01-01-BL-IR-D01-834 03-Nov-21 45.04 TCT-NSCR-21-1103-03 CP01-01-BL-IR-D01-0968 PASSED
GRADE BEAM AT GRIDLINE E/2-5
CONCRETE POURING OF GRADEBEAM AND COLUMN
381 31 06-Oct-21 LRS Building 25.00 25.00 20.00 225.00 13-Oct-21 31.85 TCT-NSCR-21-1013-09 CP01-01-BL-IR-D02-835 03-Nov-21 45.32 TCT-NSCR-21-1103-02 CP01-01-BL-IR-D02-0969 PASSED
PEDESTAL GL.7-10/C

382 36 07-Oct-21 CONCRETE POURING OF COLUMN (3F) GL. 1/B & 1/C OCC Building 7.50 7.50 20.00 225.00 14-Oct-21 36.65 TCT-NSCR-21-1014-03 CP01-01-BL-IR-D06-837 04-Nov-21 52.77 TCT-NSCR-21-1104-01 CP01-01-BL-IR-D06-0978 PASSED

CONCRETE POURING OF COLUMN (3F) GL. 8/E &


383 36 07-Oct-21 OCC Building 7.00 7.00 20.00 225.00 14-Oct-21 37.24 TCT-NSCR-21-1014-02 CP01-01-BL-IR-D06-838 04-Nov-21 53.21 TCT-NSCR-21-1104-02 CP01-01-BL-IR-D06-0979 PASSED
GL.9/E
CONCRETE CASTING OF LEAN CONCRETE FOR PIT 16-
384 15 08-Oct-21 02 AT GRIDLINE B3-C/14-15, AND FOR SLAB AT Workshop Building 25.00 20.00 20.00 180.00 15-Oct-21 15.56 TCT-NSCR-21-1015-03 CP01-01-BL-IR-D01-839 05-Nov-21 28.24 TCT-NSCR-21-1105-12 CP01-01-BL-IR-D01-0988 PASSED
GRIDLINE B2-C/13-16
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

36 (w/ WP) CONCRETE POURING OF CB-7, CB-6, CB-5 AND CB-4 36.87 TCT-NSCR-21-1015-05 53.00 TCT-NSCR-21-1105-10 PASSED
WITH WATERSTOP (SIKA WATERBAR V-15) AT
385 08-Oct-21 Workshop Building 3.50 3.50 20.00 200.00 15-Oct-21 CP01-01-BL-IR-D01-840 05-Nov-21 CP01-01-BL-IR-D01-0989
GRIDLINE D1-E/19-20, D1-E/16-17, D1-E/13-14, D1-
36 (w/o WP) E/10-11 (SECOND LIFT) 37.01 TCT-NSCR-21-1015-06 53.03 TCT-NSCR-21-1105-11 PASSED

CONCRETE POURING OF PILE CAP AT GRIDLINE B3/6-


386 31 08-Oct-21 8, FOUNDATION COLUMN AT GRIDLINE B3/6-7 AND Workshop Building 39.00 39.00 21.00 200.00 15-Oct-21 33.20 TCT-NSCR-21-1015-04 CP01-01-BL-IR-D01-841 05-Nov-21 44.49 TCT-NSCR-21-1105-09 CP01-01-BL-IR-D01-0990 PASSED
GRADE BEAM AT GRIDLINE B3/5-9
CONCRETE POURING OF COLUMN (3F) GL. 10/D &
387 36 08-Oct-21 OCC Building 7.00 7.00 20.00 220.00 15-Oct-21 37.31 TCT-NSCR-21-1015-02 CP01-01-BL-IR-D06-842 05-Nov-21 53.00 TCT-NSCR-21-1105-13 CP01-01-BL-IR-D06-0991 PASSED
GL.10/E
CONCRETE POURING OF COLUMN (3F) GL. 1/A & EC1
388 36 09-Oct-21 COLUMN GL.1-2/B-C & GL.1-2/C OCC Building 6.00 6.00 20.00 215.00 16-Oct-21 36.78 TCT-NSCR-21-1016-01 CP01-01-BL-IR-D06-845 06-Nov-21 53.15 TCT-NSCR-21-1106 CP01-01-BL-IR-D06-0996 PASSED

36 (w/ WP) 53.19 TCT-NSCR-21-1108-19 PASSED


CONCRETE POURING OF SUSPENDED SLAB & BEAM
389 10-Oct-21 36.00 17-Oct-21 37.16 TCT-NSCR-21-1018-02 CP01-01-BL-IR-D06-0847 07-Nov-21 CP01-01-BL-IR-D06-0997
(4F) GL 3-6/C-E
36 (w/o WP) OCC Building 52.87 TCT-NSCR-21-1108-20 PASSED
CONCRETE POURING OF COLUMN (3F) GL.8/C, GL.9/C,
400 36 11-Oct-21 OCC Building 14.00 14.00 20.00 220.00 18-Oct-21 36.92 TCT-NSCR-21-1018-05 CP01-01-BL-IR-D06-0848 08-Nov-21 52.86 TCT-NSCR-21-1108-21 CP01-01-BL-IR-D06-0999 PASSED
GL. 10/C & GL.10/B
CONCRETE POURING OF COLUMN (3F) GL.8/B,
401 36 11-Oct-21 GL.9/A, GL. 9/B & STAIR CASE COLUMN GL. 1/A-B & OCC Building 12.50 12.50 20.00 200.00 18-Oct-21 36.93 TCT-NSCR-21-1018-01 CP01-01-BL-IR-D06-0849 08-Nov-21 52.86 TCT-NSCR-21-1108-18 CP01-01-BL-IR-D06-1000 PASSED
EC1 COLUMN GL.1/B-C

CONCRETE POURING OF PILE CAP AT GRIDLINE A2/3-


402 31 11-Oct-21 4, FOUNDATION COLUMN AT GRIDLINE A2/4 AND Workshop Building 22.00 22.00 20.00 215.00 18-Oct-21 32.91 TCT-NSCR-21-1018-04 CP01-01-BL-IR-D01-0850 08-Nov-21 44.72 TCT-NSCR-21-1108-16 CP01-01-BL-IR-D01-1001 PASSED
GRADE BEAM AT GRIDLINE A2/2-5
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
403 15 11-Oct-21 GRIDLINE B1-B2/13-16 Workshop Building 22.00 22.00 21.00 195.00 18-Oct-21 15.51 TCT-NSCR-21-1018-06 CP01-01-BL-IR-D01-0851 08-Nov-21 28.98 TCT-NSCR-21-1108-17 CP01-01-BL-IR-D01-1002 PASSED

36.95 TCT-NSCR-21-1019-04 51.96 TCT-NSCR-21-1109-01 PASSED


36 (w/ WP)
37.26 TCT-NSCR-21-1019-01 52.53 TCT-NSCR-21-1109-02 PASSED
CONCRETE POURING OF SUNKEN PIT WALL AND SLAB
404 12-Oct-21 Workshop Building 65.00 62.00 20.00 190.00 19-Oct-21 CP01-01-BL-IR-D01-852 09-Nov-21 CP01-01-BL-IR-D06-1007
AT GRIDLINE D-E/17-19
37.28 TCT-NSCR-21-1019-03 52.38 TCT-NSCR-21-1109-04 PASSED
36 (w/o WP)
36.42 TCT-NSCR-21-1019-02 52.45 TCT-NSCR-21-1109-03 PASSED

CONCRETE POURING OF SLAB AT GRIDLINE C1-D/10-


405 31 13-Oct-21 Workshop Building 46.00 46.00 20.00 180.00 20-Oct-21 31.97 TCT-NSCR-21-1020-06 CP01-01-BL-IR-D01-863 10-Nov-21 44.64 TCT-NSCR-21-1110-13 CP01-01-BL-IR-D01-1014 PASSED
12

36 (w/ WP) 36.97 TCT-NSCR-21-1020-07 52.88 TCT-NSCR-21-1110-06 PASSED


406 13-Oct-21 CONCRETE POURING OF CATCH BASIN GL 11/B1-B3 LRS Building 2.50 2.50 21.00 195.00 20-Oct-21 CP01-01-BL-IR-D02-864 10-Nov-21 CP01-01-BL-IR-D02-1015
36 (w/o WP) 36.34 TCT-NSCR-21-1020-08 52.59 TCT-NSCR-21-1110-07 PASSED

CONCRETE POURING OF LEAN CONCRETE FOR PIT


407 15 13-Oct-21 LRS Building 45.00 45.00 20.00 185.00 20-Oct-21 15.75 TCT-NSCR-21-1020-09 CP01-01-BL-IR-D02-865 10-Nov-21 28.01 TCT-NSCR-21-1110-08 CP01-01-BL-IR-D02-1016 PASSED
SLAB & SLAB ON GRADE GL 10-14/A-B1
CONCRETE POURING OF PILE CAP AT GRIDLINE E1'/3, 44.42 TCT-NSCR-21-1110-09 PASSED
408 31 13-Oct-21 F/4-6, FOUNDATION COLUMN AT GRIDLINE F/4-6 20-Oct-21 31.81 TCT-NSCR-21-1020-11 CP01-01-BL-IR-D01-852 10-Nov-21 CP01-01-BL-IR-D01-1017
AND GRADE BEAM AT GRIDLINE E1'/3-6, F/4-7 Workshop Building 69.00 69.00 21.00 200.00 44.45 TCT-NSCR-21-1110-10 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR
409 15 13-Oct-21 Workshop Building 11.50 11.50 19.00 190.00 20-Oct-21 15.82 TCT-NSCR-21-1020-10 CP01-01-BL-IR-D01-867 10-Nov-21 28.07 TCT-NSCR-21-1110-11 CP01-01-BL-IR-D01-1018 PASSED
SUNKEN PIT SLAB AT GRIDLINE D-D1/13-16
CONCRETE POURING OF PILECAP AT GRIDLINE B2/2-4,
410 31 13-Oct-21 FOUNDATION COLUMN AT GRIDLINE B2/4, AND Workshop Building 34.00 34.00 20.00 195.00 20-Oct-21 31.97 TCT-NSCR-21-1020-05 CP01-01-BL-IR-D01-868 10-Nov-21 44.67 TCT-NSCR-21-1110-12 CP01-01-BL-IR-D01-1019 PASSED
GRADE BEAM AT GRIDLINE B2/1-5

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


411 15 14-Oct-21 CAP AT GRIDLINE B1-B2/7-8 AND Workshop Building 6.00 6.00 19.00 210.00 21-Oct-21 16.56 TCT-NSCR-21-1021-11 CP01-01-BL-IR-D01-0869 11-Nov-21 28.23 TCT-NSCR-21-1111-03 CP01-01-BL-IR-D01-1030 PASSED
GRADE BEAM AT GRIDLINE B1-B2/7-9

CONCRETE POURING OF COLUMN (3F) GL.8/A,


412 36 14-Oct-21 GL.10/A, & EC1 COLUMN GL.10/A-B, GL.9-10/A-B, OCC Building 9.50 9.50 20.00 225.00 21-Oct-21 37.06 TCT-NSCR-21-1021-10 CP01-01-BL-IR-D06-0870 11-Nov-21 52.88 TCT-NSCR-21-1111-09 CP01-01-BL-IR-D06-1031 PASSED
GL.9-10/B

36 (w/ WP) 36.52 TCT-NSCR-21-1021-03 52.66 TCT-NSCR-21-1111-05 PASSED

36 (w/o WP) 36.98 TCT-NSCR-21-1021-04 52.02 TCT-NSCR-21-1111-07 PASSED


CONCRETE POURING OF SUSPENDED SLAB & BEAM
413 14-Oct-21 OCC Building 86.00 86.00 20.00 200.00 21-Oct-21 CP01-01-BL-IR-D06-0871 11-Nov-21 CP01-01-BL-IR-D06-1032
(4F) GL. 1-4/C-E and (GF) UPSTAND GL.1-3/C-E
36 (w/ WP) 37.11 TCT-NSCR-21-1021-05 52.56 TCT-NSCR-21-1111-06 PASSED

36 (w/o WP) 37.18 TCT-NSCR-21-1021-06 52.74 TCT-NSCR-21-1111-08 PASSED

CONCRETE POURING OF PILECAP AT GRIDLINE B1/2-4,


414 31 14-Oct-21 Workshop Building 30.00 30.00 20.00 200.00 21-Oct-21 31.87 TCT-NSCR-21-1021-12 CP01-01-BL-IR-D01-0872 11-Nov-21 44.42 TCT-NSCR-21-1111-04 CP01-01-BL-IR-D01-1033 PASSED
AND GRADE BEAM AT GRIDLINE B1/1-5

36 (w/ WP) 36.46 TCT-NSCR-21-1022-08 52.56 TCT-NSCR-21-1112-05 PASSED


CONCRETE POURING OF SLAB ON GRADE (GF) GL.3-
415 15-Oct-21 OCC Building 45.00 45.00 20.00 200.00 22-Oct-21 CP01-01-BL-IR-D06-0882 12-Nov-21 CP01-01-BL-IR-D06-1041
4/A-D, & GL.2-3/C-E
36 (w/o WP) 37.34 TCT-NSCR-21-1022-09 53.67 TCT-NSCR-21-1112-06 PASSED

44.43 TCT-NSCR-21-1112-08 PASSED


CONCRETE POURING OF PILE CAP E1/3-5, AND GRADE
416 31 15-Oct-21 BEAM AT GRIDLINE E1/3-6, E'/3-6 56.00 56.00 20.00 180.00 22-Oct-21 31.92 TCT-NSCR-21-1022-06 CP01-01-BL-IR-D01-0883 12-Nov-21 CP01-01-BL-IR-D01-1042
Workshop Building 44.28 TCT-NSCR-21-1112-09 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


417 15 15-Oct-21 Workshop Building 38.00 38.00 21.00 180.00 22-Oct-21 17.32 TCT-NSCR-21-1022-07 CP01-01-BL-IR-D01-0884 12-Nov-21 27.92 TCT-NSCR-21-1112-07 CP01-01-BL-IR-D01-1043 PASSED
GRIDLINE A2-B/13-16
CONCRETE POURING OF COLUMNS GL. 4/B&4/C and
418 36 16-Oct-21 Upstand Zone 2 & 3(GF) OCC Building 10.00 10.00 20.00 200.00 23-Oct-21 37.12 TCT-NSCR-21-1023-05 CP01-01-BL-IR-D06-0890 13-Nov-21 52.62 TCT-NSCR-21-1113-11 CP01-01-BL-IR-D06-1050 PASSED

CONCRETE POURING OF COLUMNS GL. 5-6/C-D (4th


419 36 16-Oct-21 OCC Building 14.00 14.00 21.00 220.00 23-Oct-21 36.69 TCT-NSCR-21-1023-06 CP01-01-BL-IR-D06-0891 13-Nov-21 52.68 TCT-NSCR-21-1113-12 CP01-01-BL-IR-D06-1051 PASSED
Floor) Zone 2
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


420 15 17-Oct-21 Workshop Building 25.00 25.00 24.00 180.00 24-Oct-21 16.29 TCT-NSCR-21-1025-25 CP01-01-BL-IR-D01-0896 14-Nov-21 28.13 TCT-NSCR-21-1115-03 CP01-01-BL-IR-D01-1054 PASSED
GRIDLINE A-A2/13-16
CONCRETE CASTING OF COLUMN AT GL. 4-6/A(4F to
421 36 18-Oct-21 OCC Building 10.00 10.00 20.00 200.00 25-Oct-21 37.67 TCT-NSCR-21-1025-23 CP01-01-BL-IR-D06-0898 15-Nov-21 52.81 TCT-NSCR-21-1115-02 CP01-01-BL-IR-D06-1056 PASSED
5F)
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB
422 15 18-Oct-21 ON GRADE GL. B3-C/9-14 LRS Building 22.00 22.00 19.00 185.00 25-Oct-21 16.32 TCT-NSCR-21-1025-24 CP01-01-BL-IR-D02-0899 15-Nov-21 28.15 TCT-NSCR-21-1115-04 CP01-01-BL-IR-D02-1057 PASSED

CONCRETE POURING OF COLUMN GL. 5&6/E' , 5/E


423 36 19-Oct-21 OCC Building 10.00 10.00 20.00 215.00 26-Oct-21 37.56 TCT-NSCR-21-1026-07 CP01-01-BL-IR-D06-904 16-Nov-21 52..83 TCT-NSCR-21-1116-01 CP01-01-BL-IR-D06-1063 PASSED
AND 4/D (4F Zone2)
CONCRETE POURING OF PILECAP, FOUNDATION
424 31 19-Oct-21 COLUMN AT GRIDLIBE B-C/1 AND GRADE BEAM AT Workshop Building 47.00 44.00 20.00 190.00 26-Oct-21 31.46 TCT-NSCR-21-1026-08 CP01-01-BL-IR-D01-905 16-Nov-21 44.46 TCT-NSCR-21-1116-02 CP01-01-BL-IR-D01-1064 PASSED
GRIDLINE A3-C/1

425 31 20-Oct-21 CONCRETE POURING OF PILECAP AT GRIDLINE B/8 Workshop Building 9.00 9.00 20.00 195.00 27-Oct-21 32.10 TCT-NSCR-21-1027-08 CP01-01-BL-IR-D01-910 17-Nov-21 44.37 TCT-NSCR-21-1117-01 CP01-01-BL-IR-D01-1069 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PIT 13-


426 15 20-Oct-21 Workshop Building 23.00 23.00 19.00 190.00 27-Oct-21 15.86 TCT-NSCR-21-1027-07 CP01-01-BL-IR-D01-911 17-Nov-21 28.07 TCT-NSCR-21-1117-02 CP01-01-BL-IR-D01-1070 PASSED
02 AT GRIDLINE B3-C/12-13

36 (w/ WP) 36.84 TCT-NSCR-21-1027-05 52.67 TCT-NSCR-21-1117-03 CP01-01-BL-IR-D01-1071 PASSED


CONCRETE POURING OF PIT 16-02 SLAB & WALL AT
427 20-Oct-21 Workshop Building 7.00 7.00 20.00 200.00 27-Oct-21 CP01-01-BL-IR-D01-912 17-Nov-21
GRIDLINE B3-C/14-15
36 (w/o WP) 36.50 TCT-NSCR-21-1027-06 52.62 TCT-NSCR-21-1117-04 CP01-01-BL-IR-D01-1071 PASSED

CONCRETE POURING OF SLAB AT GRIDLINE B-C2/13-


428 31 20-Oct-21 Workshop Building 158.00 158.00 175.00 20.00 27-Oct-21 31.99 TCT-NSCR-21-1027-04 CP01-01-BL-IR-D01-913 17-Nov-21 44.50 TCT-NSCR-21-1117-05-08 CP01-01-BL-IR-D01-1072 PASSED
17
CONCRETE POURING OF COLUMN GL. 1-3/D AT ZONE
429 36 21-Oct-21 1 (4F) OCC Building 9.50 9.50 21.00 200.00 28-Oct-21 36.91 TCT-NSCR-21-1028-09 CP01-01-BL-IR-D06-0917 18-Nov-21 52.48 TCT-NSCR-21-1118-09 CP01-01-BL-IR-D06-1080 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILECAP


430 15 21-Oct-21 Workshop Building 8.00 8.00 17.00 195.00 28-Oct-21 15.79 TCT-NSCR-21-1028-11 CP01-01-BL-IR-D01-0919 18-Nov-21 28.02 TCT-NSCR-21-1118-10 CP01-01-BL-IR-D01-1081 PASSED
& GRADE BEAM AT GRIDLINE B2/5-7
CONCRETE POURING OF PIT SLAB AT GRIDLINE
431 31 21-Oct-21 LRS Building 348.00 348.00 19.00 200.00 28-Oct-21 32.10 TCT-NSCR-21-1028-08 CP01-01-BL-IR-D02-0920 18-Nov-21 44.27 TCT-NSCR-21-1118-01-07 CP01-01-BL-IR-D02-1082 PASSED
B-C/14-19
CONCRETE POURING OF PLANTED COLUMN AT
432 36 21-Oct-21 OCC Building 6.00 6.00 20.00 205.00 28-Oct-21 37.55 TCT-NSCR-21-1028-10 CP01-01-BL-IR-D06-0921 18-Nov-21 52.63 TCT-NSCR-21-1118-08 CP01-01-BL-IR-D06-1083 PASSED
GRIDLINE GL 7,8 &9/E' AT ZONE 3 (4F)
CONCRETE POURING OF UPSTAND AND 1ST LIFT
433 36 22-Oct-21 OCC Building 13.00 13.00 20.00 215.00 29-Oct-21 35.93 TCT-NSCR-21-1029-08 CP01-01-BL-IR-D06-0925 19-Nov-21 50.80 TCT-NSCR-21-1119-09 CP01-01-BL-IR-D06-1088 PASSED
MASS CONCRETE FOR ELEVATOR PIT AT ZONE 3
CONCRETE POURING OF SLAB AT GRIDLINE B-C2/13-
434 31 22-Oct-21 Workshop Building 26.00 26.00 20.00 170.00 29-Oct-21 31.59 TCT-NSCR-21-1029-09 CP01-01-BL-IR-D01-0926 19-Nov-21 43.51 TCT-NSCR-21-1119-08 CP01-01-BL-IR-D01-1089 PASSED
17

36 (w/ WP) 36.76 TCT-NSCR-21-1029-06 52.60 TCT-NSCR-21-1119-02 CP01-01-BL-IR-D01-1090 PASSED


CONCRETE POURING OF PIT 16-02 WALL AT GRIDLINE
435 22-Oct-21 Workshop Building 11.00 11.00 20.00 200.00 29-Oct-21 CP01-01-BL-IR-D01-0927 19-Nov-21
B3-C/14-15
36 (w/o WP) 36.92 TCT-NSCR-21-1029-07 52.59 TCT-NSCR-21-1119-03 CP01-01-BL-IR-D01-1090 PASSED

CONCRETE POURING OF SLAB AT GRIDLINE A-B1/13-


436 31 22-Oct-21 Workshop Building 174.00 174.00 23.00 170.00 29-Oct-21 31.66 TCT-NSCR-21-1029-05 CP01-01-BL-IR-D01-0928 19-Nov-21 44.26 TCT-NSCR-21-1119-04-07 CP01-01-BL-IR-D01-1091 PASSED
17
CONCRETE POURING OF LEAN CONCRETE FOR PIT
437 15 22-Oct-21 SLAB AT GRIDLINE B1-B3/9-14 LRS Building 29-Oct-21 16.06 TCT-NSCR-21-1029-10 CP01-01-BL-IR-D02-0929 19-Nov-21 28.09 TCT-NSCR-21-1119-01 CP01-01-BL-IR-D02-1092 PASSED

CONCRETE POURING OF COLUMN 1ST LIFT GL. 7-9/D,


438 36 23-Oct-21 9-10/E & PLANTED COLUMN GL.10/E' OCC Building 20.00 20.00 21.00 215.00 30-Oct-21 37.18 TCT-NSCR-21-1130-20 CP01-01-BL-IR-D06-0935 20-Nov-21 52.48 TCT-NSCR-21-1120-04 CP01-01-BL-IR-D06-1103 PASSED

CONCRETE PLACEMENT OF STAIR-2, 1ST AND 2ND


439 36 23-Oct-21 OCC Building 30-Oct-21 37.19 TCT-NSCR-21-1030-19 CP01-01-BL-IR-D06-0936 20-Nov-21 52.49 TCT-NSCR-21-1110-15 CP01-01-BL-IR-D06-1104 PASSED
FLIGHT, 1ST AND 2ND LANDING WITH STAIR BEAM

36 (w/ WP) OCC Building 54.00 54.00 20.00 225.00 37.48 TCT-NSCR-21-1102-16 52.66 TCT-NSCR-21-1122-04 CP01-01-BL-IR-D06-1106 PASSED
CONCRETE POURING OF SLAB ON GRADE AT GL
440 24-Oct-21 31-Oct-21 CP01-01-BL-IR-D06-0944 22-Nov-21
8-9/A-E & GL 9-10/D-E
36 (w/o WP) 38.09 TCT-NSCR-21-1102-17 52.45 TCT-NSCR-21-1122-05 CP01-01-BL-IR-D06-1106 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


441 15 25-Oct-21 Workshop Building 15.00 15.00 20.00 195.00 01-Nov-21 16.26 TCT-NSCR-21-1102-10 CP01-01-BL-IR-D01-0945 22-Nov-21 28.24 TCT-NSCR-21-1122-02 CP01-01-BL-IR-D01-1112 PASSED
GRIDLINE F-G/9-11
CONCRETE POURING OF COLUMNS AT GL 7/A, 8/A,
442 36 25-Oct-21 OCC Building 14.00 14.00 19.00 215.00 01-Nov-21 36.79 TCT-NSCR-21-1102-15 CP01-01-BL-IR-D06-0946 22-Nov-21 52.48 TCT-NSCR-21-1122-06 CP01-01-BL-IR-D06-1113 PASSED
9/A & 10/C
CONCRETE POURING OF PILECAP, FOUNDATION
443 31 25-Oct-21 COLUMN AT GRIDLINE F/7-8 AND GRADE BEAM AT Workshop Building 34.00 34.00 20.00 170.00 01-Nov-21 32.53 TCT-NSCR-21-1102-21 CP01-01-BL-IR-D01-0947 22-Nov-21 44.42 TCT-NSCR-21-1122-03 CP01-01-BL-IR-D01-1114 PASSED
GRIDLINE F/6-9

36 (w/ WP) 37.53 TCT-NSCR-21-1102-18 52.45 TCT-NSCR-21-1123-02 PASSED


CONCRETE PORING OF CATCH BASIN AT GL. 8-9/B1-
444 26-Oct-21 LRS Building 2.50 2.50 20.00 210.00 02-Nov-21 CP01-01-BL-IR-D02-0951 23-Nov-21 CP01-01-BL-IR-D02-1124
B3
36 (w/o WP) 37.29 TCT-NSCR-21-1102-19 52.61 TCT-NSCR-21-1123-03 PASSED

CONCRETE CASTING OF LEAN CONCRETE AT GL


445 15 26-Oct-21 LRS Building 6.00 6.00 20.00 200.00 02-Nov-21 17.01 TCT-NSCR-21-1102-20 CP01-01-BL-IR-D02-0952 23-Nov-21 27.98 TCT-NSCR-21-1123-04 CP01-01-BL-IR-D02-1125 PASSED
A-B/12-13
CONCRETE POURING OF COLUMNS GL7/B, 8/B, 9/B &
446 36 26-Oct-21 OCC Building 14.50 14.50 19.00 210.00 02-Nov-21 37.17 TCT-NSCR-21-1102-11 CP01-01-BL-IR-D06-0953 23-Nov-21 52.32 TCT-NSCR-21-1123-05 CP01-01-BL-IR-D06-1126 PASSED
10/B (4TH FLOOR)

36 (w/ WP) 35.68 TCT-NSCR-21-1102-13 50.83 TCT-NSCR-21-1123-09 PASSED


CONCRETE POURING OF SUNKEN PIT WALL AT
447 26-Oct-21 Workshop Building 12.00 11.00 20.00 200.00 02-Nov-21 CP01-01-BL-IR-D01-0954 23-Nov-21 CP01-01-BL-IR-D01-1127
GRIDLINE D/17-19 AND E/17-19
36 (w/o WP) 36.98 TCT-NSCR-21-1102-14 52.11 TCT-NSCR-21-1123-10 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR


448 15 26-Oct-21 Workshop Building 8.00 8.00 18.00 180.00 02-Nov-21 16.40 TCT-NSCR-21-1102-23 CP01-01-BL-IR-D01-0955 23-Nov-21 28.17 TCT-NSCR-21-1123-06 CP01-01-BL-IR-D01-1128 PASSED
SUNKEN PIT SLAB AT GRIDLINE D1-E/13-16
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB
449 15 26-Oct-21 Workshop Building 15.00 15.00 21.00 185.00 02-Nov-21 16.34 TCT-NSCR-21-1102-22 CP01-01-BL-IR-D01-0956 23-Nov-21 28.12 TCT-NSCR-21-1123-07 CP01-01-BL-IR-D01-1129 PASSED
AT GRIDLINE D-D1/10-13
CONCRETE POURING OF SLAB AT GRIDLINE C3-D/17-
450 31 26-Oct-21 Workshop Building 26.00 26.00 21.00 190.00 02-Nov-21 33.01 TCT-NSCR-21-1102-09 CP01-01-BL-IR-D01-0957 23-Nov-21 44.31 TCT-NSCR-21-1123-01 CP01-01-BL-IR-D01-1130 PASSED
19 & E/17-19
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
451 15 26-Oct-21 Workshop Building 25.00 25.00 20.00 160.00 02-Nov-21 15.77 TCT-NSCR-21-1102-12 CP01-01-BL-IR-D01-0958 23-Nov-21 28.06 TCT-NSCR-21-1123-08 CP01-01-BL-IR-D01-1131 PASSED
GRIDLINE B2-C/10-13
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


452 15 27-Oct-21 Workshop Building 31.00 25.00 20.00 185.00 03-Nov-21 15.83 TCT-NSCR-21-1103-09 CP01-01-BL-IR-D01-0980 24-Nov-21 28.19 TCT-NSCR-21-1124-01 CP01-01-BL-IR-D01-1137 PASSED
GRIDLINE B-B2/10-13
CONCRETE POURING OF ADDITIONAL CONCRETE FOR
453 31 27-Oct-21 Workshop Building 11.00 11.00 22.00 190.00 03-Nov-21 32.74 TCT-NSCR-21-1103-10 CP01-01-BL-IR-D01-0962 24-Nov-21 44.31 TCT-NSCR-21-1124-02 CP01-01-BL-IR-D01-1138 PASSED
GRADE BEAM AT GRIDLINE B3/4-5 & A1/4-5
CONCRETE POURING OF ELEVATOR PIT 2ND
454 36 27-Oct-21 OCC Building 8.00 8.00 19.00 190.00 03-Nov-21 37.13 TCT-NSCR-21-1103-08 CP01-01-BL-IR-D06-0963 24-Nov-21 52.51 TCT-NSCR-21-1124-04 CP01-01-BL-IR-D06-1167 PASSED
LIFT(MASS CONCRETE) ZONE 3

36 (w/ WP) 37.15 TCT-NSCR-21-1104-10 52.77 TCT-NSCR-21-1125-10 PASSED


455 28-Oct-21 CONCRETE POURING OF CATCH BASIN GL. 5/B1-B3 LRS Building 3.00 3.00 20.00 195.00 04-Nov-21 CP01-01-BL-IR-D02-0973 25-Nov-21 CP01-01-BL-IR-D02-1146
36 (w/o WP) 36.60 TCT-NSCR-21-1104-11 52.57 TCT-NSCR-21-1125-11 PASSED

CONCRETE POURING OF PILE CAP AT GRIDLINE B/6-7,


456 31 28-Oct-21 FOUNDATION COLUMN AT GRIDLINE B/8 AND GRADE Workshop Building 45.00 45.00 20.00 185.00 04-Nov-21 32.21 TCT-NSCR-21-1104-13 CP01-01-BL-IR-D01-0974 25-Nov-21 44.31 TCT-NSCR-21-1125-12 CP01-01-BL-IR-D01-1147 PASSED
BEAM AT GRIDLINE B/5-9

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


457 15 28-Oct-21 CAP AND GRADE BEAM AT GRIDLINE A-D/1-2, A-D/5- WRS Building 15.00 15.00 19.00 160.00 04-Nov-21 15.82 TCT-NSCR-21-1104-12 CP01-01-BL-IR-D03-0975 25-Nov-21 28.19 TCT-NSCR-21-1125-13 CP01-01-BL-IR-D03-1148 PASSED
6, A'-C'/3-4

CONCRETE POURING OF SMALL BEAMS CONCRETE


458 36 28-Oct-21 OCC Building 5.00 5.00 17.00 225.00 04-Nov-21 36.77 TCT-NSCR-21-1104-08 CP01-01-BL-IR-D06-0976 25-Nov-21 52.95 TCT-NSCR-21-1125-04 CP01-01-BL-IR-D06-1149 PASSED
STUB & UPSTAND AT GGL 4-6/A-C AND 8-9/A-E

459 15 28-Oct-21 LEAN CONCRETE FOR GRADE BEAM AT GL 2-3/B1-B3 LRS Building 10.00 10.00 19.00 200.00 04-Nov-21 16.90 TCT-NSCR-21-1104-09 CP01-01-BL-IR-D02-0977 25-Nov-21 27.94 TCT-NSCR-21-1125-08 CP01-01-BL-IR-D02-1150 PASSED

CONCRETE POURING OF COLUMN (4TH FLOOR) AT GL


460 36 29-Oct-21 10/A OCC Building 5.00 5.00 19.00 190.00 05-Nov-21 36.83 TCT-NSCR-21-1105-02 CP01-01-BL-IR-D06-0981 26-Nov-21 52.57 TCT-NSCR-21-1126-15 CP01-01-BL-IR-D06-1160 PASSED

CONCRETE CASTING OF LEAN CONCRETE FOR PILE


461 15 29-Oct-21 CAP AT GRIDLINE A2-A3/6 AND GRADE BEAM AT Workshop Building 9.00 7.00 21.00 200.00 05-Nov-21 17.64 TCT-NSCR-21-1105-04 CP01-01-BL-IR-D01-0982 26-Nov-21 28.08 TCT-NSCR-21-1126-19 CP01-01-BL-IR-D01-1161 PASSED
GRIDLINE A2-A3/5-7

462 15 29-Oct-21 LEAN CONCRETE FOR SLAB ON PIT AT GL B-B1/9-10 LRS Building 6.00 6.00 20.00 200.00 05-Nov-21 16.24 TCT-NSCR-21-1105-05 CP01-01-BL-IR-D02-0983 26-Nov-21 28.16 TCT-NSCR-21-1126-18 CP01-01-BL-IR-D02-1162 PASSED

463 36 29-Oct-21 AREA 4 OCC STAIR 2 AT ZONE 3, 2ND FLOOR OCC Building 7.00 7.00 19.00 225.00 05-Nov-21 37.18 TCT-NSCR-21-1105-06 CP01-01-BL-IR-D06-0984 26-Nov-21 52.58 TCT-NSCR-21-1126-16 CP01-01-BL-IR-D06-1163 PASSED

AREA 1 RETAINING WALL AT GL B/14-19 AND B-C/18-


464 31 29-Oct-21 LRS Building 14.00 14.00 20.00 200.00 05-Nov-21 32.86 TCT-NSCR-21-1105-07 CP01-01-BL-IR-D02-0985 26-Nov-21 44.21 TCT-NSCR-21-1126-14 CP01-01-BL-IR-D02-1164 PASSED
19
CONCRETE POURING OF COLUMN (5F TO RD) AT GL
465 36 30-Oct-21 OCC Building 11.00 11.00 18.00 215.00 06-Nov-21 37.76 TCT-NSCR-21-1106 CP01-01-BL-IR-D06-0993 27-Nov-21 52.50 TCT-NSCR-21-1127-03 CP01-01-BL-IR-D06-1185 PASSED
6/D, 7/D & 8/D
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
466 15 29-Oct-21 Workshop Building 8.00 7.00 20.00 190.00 05-Nov-21 18.10 TCT-NSCR-21-1105-03 CP01-01-BL-IR-D01-0986 26-Nov-21 28.16 TCT-NSCR-21-1126-17 CP01-01-BL-IR-D01-1165 PASSED
GRIDLINE B-B2/10-13
CONCRETE POURING OF PILECAP AT GRIDLINE B2/5-9, 44.48 TCT-NSCR-21-1126-20 PASSED
467 31 29-Oct-21 FOUNDATION COLUMN AT GRIDLINE B2/5-7 AND Workshop Building 52.00 52.00 20.00 165.00 05-Nov-21 31.98 TCT-NSCR-21-1105-08 CP01-01-BL-IR-D01-0987 26-Nov-21 CP01-01-BL-IR-D06-1166
GRADE BEAM AT GRIDLINE B2/4-10 44.76 TCT-NSCR-21-1126-21 PASSED
CONCRETE POURING OF COLUMN EC1 & EC1-A (4F)
468 36 30-Oct-21 AT GL 10/A-B, 9-10/A-B, 9-10/B OCC Building 4.00 4.00 20.00 215.00 06-Nov-21 36.78 TCT-NSCR-21-1106 CP01-01-BL-IR-D06-0992 27-Nov-21 52.49 TCT-NSCR-21-1127-02 CP01-01-BL-IR-D06-1186 PASSED

CONCRETE POURING OF ELEVATOR PIT AT AREA 4,


469 36 30-Oct-21 OCC Building 10.00 10.00 20.00 220.00 06-Nov-21 37.17 TCT-NSCR-21-1106 CP01-01-BL-IR-D06-0995 27-Nov-21 52.49 TCT-NSCR-21-1127-04 CP01-01-BL-IR-D06-1187 PASSED
ZONE 1
CONCRETE POURING OF GRADE BEAM GL. B1-B3/ 3-6
470 31 02-Nov-21 AND LEAN CONCRETE FOR PILECAP & GRADE BEAM LRS Building 39.00 39.00 20.00 200.00 09-Nov-21 31.81 TCT-NSCR-21-1109-05 CP01-01-BL-IR-D02-1003 30-Nov-21 44.32 TCT-NSCR-21-1201-07 CP01-01-BL-IR-D02-1202 PASSED
GL.1-2/B1-B2 , 2/B1-B2
CONCRETE POURING OF COLUMN (4F - 2nd LIFT) AT
471 36 03-Nov-21 OCC Building 12.00 12.00 19.00 210.00 10-Nov-21 36.62 TCT-NSCR-21-1110-14 CP01-01-BL-IR-D06-1008 01-Dec-21 52.53 TCT-NSCR-21-1201-10 CP01-01-BL-IR-D06-1211 PASSED
GL 5E, 5-8/E'
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
472 15 02-Nov-21 Workshop Building 22.00 22.00 22.00 170.00 09-Nov-21 15.70 TCT-NSCR-21-1109-06 CP01-01-BL-IR-D01-1004 30-Nov-21 27.68 TCT-NSCR-21-1201-05 CP01-01-BL-IR-D01-1203 PASSED
GRIDLINE A2-B/10-13

CONCRETE CASTING OF LEAN CONCRETE FOR CB-04


473 15 02-Nov-21 Workshop Building 5.50 3.00 22.00 200.00 09-Nov-21 15.74 TCT-NSCR-21-1109-07 CP01-01-BL-IR-D01-1005 30-Nov-21 27.64 TCT-NSCR-21-1201-06 CP01-01-BL-IR-D01-1204 PASSED
AT GRIDLINE D1-E/10-11

CONCRETE POURING OF COLUMN (4F) AT GL 2/A, 2/C,


474 36 02-Nov-21 OCC Building 13.00 13.00 19.00 220.00 09-Nov-21 36.81 TCT-NSCR-21-1110-15 CP01-01-BL-IR-D06-1009 30-Nov-21 52.66 TCT-NSCR-21-1201-11 CP01-01-BL-IR-D06-1212 PASSED
3/B & 3/C

475 31 03-Nov-21 CONCRETE POURING OF GRADE BEAM GL. B1/3-6 LRS Building 18.00 18.00 20.00 200.00 10-Nov-21 32.36 TCT-NSCR-21-1110-18 CP01-01-BL-IR-D02-1010 01-Dec-21 44.14 TCT-NSCR-21-1201-09 CP01-01-BL-IR-D02-1213 PASSED

CONCRETE CASTING OF STIFFENER COLUMN(CHB)


476 36 03-Nov-21 OCC Building 3.50 3.50 21.00 210.00 10-Nov-21 36.59 TCT-NSCR-21-1110-17 CP01-01-BL-IR-D06-1011 01-Dec-21 52.53 TCT-NSCR-21-1201-08 CP01-01-BL-IR-D06-1214 PASSED
AND UPSTAND ZONE 3 GF

36 (w/ WP) 36.59 TCT-NSCR-21-1110-19 50.98 TCT-NSCR-21-1201-02 PASSED


CONCRETE POURING OF PIT 13-02 WALL AT GRIDLINE
477 03-Nov-21 Workshop Building 32.00 32.00 22.00 225.00 10-Nov-21 CP01-01-BL-IR-D01-1012 01-Dec-21 CP01-01-BL-IR-D01-1215
C-D/12-13
36 (w/o WP) 37.94 TCT-NSCR-21-1110-20 52.51 TCT-NSCR-21-1201-01 PASSED

31.50 44.41 TCT-NSCR-21-1201-03 PASSED


CONCRETE POURING OF SLAB ON GRADE GL. C-D/10-
478 31 03-Nov-21 Workshop Building 72.00 72.00 21.00 200.00 10-Nov-21 TCT-NSCR-21-1110-16 CP01-01-BL-IR-D01-1013 01-Dec-21 CP01-01-BL-IR-D01-1216
14
31.52 44.40 TCT-NSCR-21-1201-04 PASSED

479 36 04-Nov-21 CONCRETE POURING OF COLUMN GL. 5/D (5F) OCC Building 3.00 3.00 25.00 220.00 11-Nov-21 36.71 TCT-NSCR-21-1111-14 CP01-01-BL-IR-D06-1025 02-Dec-21 52.47 TCT-NSCR-21-1202-12 CP01-01-BL-IR-D06-1228 PASSED

CONCRETE POURING OF COLUMN GL. 5/C, 6/C, 7/C,


480 36 04-Nov-21 OCC Building 13.00 13.00 21.00 225.00 11-Nov-21 36.82 TCT-NSCR-21-1111-13 CP01-01-BL-IR-D06-1026 02-Dec-21 52.25 TCT-NSCR-21-1202-07 CP01-01-BL-IR-D06-1229 PASSED
8/C (5F)
31.92 44.06 TCT-NSCR-21-1202-02 PASSED
31.61 44.31 TCT-NSCR-21-1202-03 PASSED
481 31 04-Nov-21 CONCRETE POURING OF PIT SLAB AT GL 12-15/B-C LRS Building 198.00 189.00 20.00 200.00 11-Nov-21 TCT-NSCR-21-1111-11 CP01-01-BL-IR-D02-1027 02-Dec-21 CP01-01-BL-IR-D02-1230
31.75 44.31 TCT-NSCR-21-1202-04 PASSED
31.94 44.23 TCT-NSCR-21-1202-05 PASSED
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT 15.74 27.78 TCT-NSCR-21-1202-08 PASSED
482 15 04-Nov-21 GRIDLINE C-D/7-10 Workshop Building 54.00 54.00 20.00 170.00 11-Nov-21 TCT-NSCR-21-1111-10 CP01-01-BL-IR-D01-1028 02-Dec-21 CP01-01-BL-IR-D01-1231
15.98 27.62 TCT-NSCR-21-1202-09 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
483 15 04-Nov-21 Workshop Building 23.00 23.00 20.00 180.00 11-Nov-21 15.74 TCT-NSCR-21-1111-12 CP01-01-BL-IR-D01-1029 02-Dec-21 27.91 TCT-NSCR-21-1202-06 CP01-01-BL-IR-D01-1232 PASSED
GRIDLINE A-A2/10-13
CONCRETE POURING OF MAIN COLUMNS AND
489 36 05-Nov-21 OCC Building 12.50 12.50 21.00 220.00 12-Nov-21 37.30 TCT-NSCR-21-1113-06 CP01-01-BL-IR-D06-1034 03-Dec-21 52.16 TCT-NSCR-21-1203-05 CP01-01-BL-IR-D06-1243 PASSED
PLANTED COLUMN GL. 9/C-E' & 10/E' (5th Floor)
LEAN CONCRETE FOR PILE CAP & GRADE BEAM AT GL
490 15 05-Nov-21 LRS Building 16.00 16.00 20.00 200.00 12-Nov-21 17.56 TCT-NSCR-21-1112-15 CP01-01-BL-IR-D02-1035 03-Dec-21 27.95 TCT-NSCR-21-1203-07 CP01-01-BL-IR-D02-1244 PASSED
6-7/A, 6-7/B
CONCRETE POURING OF CHB UPSTAND @ 2F ZONE 3
491 36 05-Nov-21 OCC Building 3.00 3.00 20.00 210.00 12-Nov-21 37.20 TCT-NSCR-21-1112-14 CP01-01-BL-IR-D06-1036 03-Dec-21 52.14 TCT-NSCR-21-1203-09 CP01-01-BL-IR-D06-1245 PASSED
GL 9-10/A-D
LEAN CONCRETE FOR PILE CAP & GRADE BEAM AT GL
492 15 05-Nov-21 LRS Building 5.00 5.00 22.00 195.00 12-Nov-21 15.91 TCT-NSCR-21-1112-13 CP01-01-BL-IR-D02-1037 03-Dec-21 28.39 TCT-NSCR-21-1203-08 CP01-01-BL-IR-D02-1246 PASSED
1-2/B3 & 2/B3
CONCRETE CASTING OF LEAN CONCRETE FOR
493 15 05-Nov-21 Workshop Building 14.00 14.00 20.00 195.00 12-Nov-21 15.15 TCT-NSCR-21-1112-12 CP01-01-BL-IR-D01-1038 03-Dec-21 27.98 TCT-NSCR-21-1203-04 CP01-01-BL-IR-D01-1247 PASSED
SUNKEN PIT SLAB AT GRIDLINE D1-E/10-13
CONCRETE CASTING OF LEAN CONCRETE FOR
494 15 05-Nov-21 Workshop Building 15.00 15.00 20.00 190.00 12-Nov-21 15.86 TCT-NSCR-21-1112-11 CP01-01-BL-IR-D01-1039 03-Dec-21 27.89 TCT-NSCR-21-1203-06 CP01-01-BL-IR-D01-1248 PASSED
SUNKEN PIT SLAB AT GRIDLINE D-D1/7-10
CONCRETE CASTING OF LEAN CONCRETE FOR
495 15 05-Nov-21 SUNKEN PIT SLAB AT GRIDLINE D-D1/4-7 Workshop Building 15.00 15.00 20.00 185.00 12-Nov-21 17.59 TCT-NSCR-21-1112-10 CP01-01-BL-IR-D01-1040 03-Dec-21 27.96 TCT-NSCR-21-1203-10 CP01-01-BL-IR-D01-1249 PASSED

CONCRETE POURING OF COLUMN @ 5F GL 10/C,


496 36 06-Nov-21 10/D, 10/E OCC Building 10.00 10.00 22.00 200.00 13-Nov-21 36.48 TCT-NSCR-21-1113-04 CP01-01-BL-IR-D06-1044 04-Dec-21 52.59 TCT-NSCR-21-1204-22 CP01-01-BL-IR-D06-1258 PASSED

CONCRETE PLACEMENT FOR DROP WALL AT GL.15-


497 31 06-Nov-21 19/C LRS Building 7.00 7.00 24.00 200.00 13-Nov-21 32.63 TCT-NSCR-21-1113-07 CP01-01-BL-IR-D02-1045 04-Dec-21 44.32 TCT-NSCR-21-1204-11 CP01-01-BL-IR-D02-1259 PASSED

498 36 06-Nov-21 CONCRETE CASTING UPSTAND ZONE2&3 4F GL.5-10/E OCC Building 3.00 3.00 23.00 225.00 13-Nov-21 36.44 TCT-NSCR-21-1113-09 CP01-01-BL-IR-D06-1046 04-Dec-21 52.04 TCT-NSCR-21-1204-13 CP01-01-BL-IR-D06-1260 PASSED

CONCRETE POURING FOR ELEVATOR PIT (2ND LIFT)


499 36 06-Nov-21 OCC Building 6.50 6.50 21.00 195.00 13-Nov-21 36.77 TCT-NSCR-21-1113-10 CP01-01-BL-IR-D06-1047 04-Dec-21 52.49 TCT-NSCR-21-1204-09 CP01-01-BL-IR-D06-1261 PASSED
AT GF, ZONE 1 ELEVATOR 1
CONCRETE POURING OF COLUMNS (4F) ZONE 1 AT GL
500 36 06-Nov-21 OCC Building 10.00 10.00 20.00 200.00 13-Nov-21 37.00 TCT-NSCR-21-1113-08 CP01-01-BL-IR-D06-1048 04-Dec-21 51.65 TCT-NSCR-21-1204-12 CP01-01-BL-IR-D06-1262 PASSED
1/C, 2/B, 3/A
CONCRETE CASTING OF LEAN CONCRETE FOR PILE
501 15 06-Nov-21 Workshop Building 5.00 5.00 22.00 200.00 13-Nov-21 16.21 TCT-NSCR-21-1113-05 CP01-01-BL-IR-D01-1049 04-Dec-21 27.95 TCT-NSCR-21-1204-10 CP01-01-BL-IR-D01-1263 PASSED
CAP & GRADE BEAM AT GL B1/5-7

CONCRETE POURING OF SLAB AT GRIDLINE B-C1/ 10- 44.42 TCT-NSCR-21-1206-07 PASSED


502 31 08-Nov-21 Workshop Building 137.00 133.00 24.00 190.00 15-Nov-21 31.97 TCT-NSCR-21-1115-07 CP01-01-BL-IR-D01-1055 06-Dec-21 CP01-01-BL-IR-D01-1276
14
44.05 TCT-NSCR-21-1206-08 PASSED

503 36 09-Nov-21 CONCRETE POURING OF COLUMN (5F) AT GL 7-10/B OCC Building 13.00 13.00 21.00 210.00 16-Nov-21 36.89 TCT-NSCR-21-11156-06 CP01-01-BL-IR-D06-1058 07-Dec-21 52.43 TCT-NSCR-21-1207-15 CP01-01-BL-IR-D06-1277 PASSED

504 15 09-Nov-21 LEAN CONCRETE FOR PIT SLAB GL 8-9/B-C LRS Building 18.00 18.00 21.00 200.00 16-Nov-21 15.76 TCT-NSCR-1116-04 CP01-01-BL-IR-D02-1059 07-Dec-21 27.72 TCT-NSCR-21-1207-18 CP01-01-BL-IR-D02-1278 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR PIT 22-
505 15 09-Nov-21 Workshop Building 11.00 11.00 21.00 190.00 16-Nov-21 18.48 TCT-NSCR-21-1116-07 CP01-01-BL-IR-D01-1060 07-Dec-21 27.73 TCT-NSCR-21-1207-16 CP01-01-BL-IR-D01-1279 PASSED
02 AT GRIDLINE A2-A3/11-12
CONCRETE CASTING OF LEAN CONCRETE FOR
506 15 09-Nov-21 Workshop Building 9.00 9.00 21.00 200.00 16-Nov-21 15.73 TCT-NSCR-21-1116-03 CP01-01-BL-IR-D01-1061 07-Dec-21 27.82 TCT-NSCR-21-1207-17 CP01-01-BL-IR-D01-1280 PASSED
SUNKEN PIT SLAB AT GRIDLINE D-D1/2-4
CONCRETE POURING OF UPSTAND(4F GL. 5-10/C)
507 36 09-Nov-21 OCC Building 3.00 3.00 21.00 215.00 16-Nov-21 36.97 TCT-NSCR-21-1116-05 CP01-01-BL-IR-D06-1062 07-Dec-21 50.89 TCT-NSCR-21-1207-19 CP01-01-BL-IR-D06-1281 PASSED
AND LINTEL BEAM (GF GL. 9-10/B-D)
CONCRETE PLACEMENT FOR DROP WALL AT GL.12-
508 31 10-Nov-21 LRS Building 8.50 8.50 21.00 200.00 17-Nov-21 32.06 TCT-NSCR-21-1117-11 CP01-01-BL-IR-D02-1067 08-Dec-21 44.03 TCT-NSCR-21-1208-01 CP01-01-BL-IR-D02-1300 PASSED
15/B & C
CONCRETE POURING OF PILE CAP AT GRIDLINE B1/9
509 31 10-Nov-21 Workshop Building 16.00 16.00 22.00 185.00 17-Nov-21 32.18 TCT-NSCR-21-1117-12 CP01-01-BL-IR-D01-1068 08-Dec-21 44.16 TCT-NSCR-21-1208-02 CP01-01-BL-IR-D06-1301 PASSED
AND GRADE BEAM AT GRIDLINE B1/8-10
CONCRETE PLACEMENT FOR PILE CAP AND GRADE
510 31 11-Nov-21 LRS Building 26.50 26.50 23.00 200.00 18-Nov-21 31.75 TCT-NSCR-21-1118-14 CP01-01-BL-IR-D02-1075 09-Dec-21 44.30 TCT-NSCR-21-1209-24 CP01-01-BL-IR-D02-1289 PASSED
BEAM AT GL.1-4/B1
CONCRETE PLACEMENT OF LEAN CONCRETE FOR
511 15 11-Nov-21 LRS Building 2.00 2.00 23.00 180.00 18-Nov-21 16.63 TCT-NSCR-21-1118-13 CP01-01-BL-IR-D02-1076 09-Dec-21 27.64 TCT-NSCR-21-1209-21 CP01-01-BL-IR-D02-1290 PASSED
GRADE BEAM AT GL.4-6/C
CONCRETE POURING OF EC1, STC & COLUMN (4F) AT
512 36 12-Nov-21 OCC Building 7.00 7.00 24.00 225.00 19-Nov-21 36.94 TCT-NSCR-21-1119-21 CP01-01-BL-IR-D06-1077 10-Dec-21 52.35 TCT-NSCR-21-1210-01 CP01-01-BL-IR-D06-1308 PASSED
GL 1/B & ZONE 1
CONCRETE POURING OF STIFFENER COLUMN, LINTEL
513 36 11-Nov-21 BEAM & CHB UPSTAND (GF & 2F) XONE 3 AT GL 8- OCC Building 2.50 2.50 20.00 215.00 18-Nov-21 35.57 TCT-NSCR-21-1118-19 CP01-01-BL-IR-D06-1084 09-Dec-21 49.06 TCT-NSCR-21-1209-25 CP01-01-BL-IR-D06-1291 PASSED
10/B-D, 8-10/A-C
36 (w/ WP) CONCRETE POURING OF SUMP PIT-11 AT GRIDLINE 18-Nov-21 36.65 TCT-NSCR-21-1118-17 CP01-01-BL-IR-D01-1078 52.20 TCT-NSCR-21-1209-23 PASSED
514 11-Nov-21 D1-E/20-21 (THIRD LIFT) Workshop Building 4.00 4.00 24.00 195.00 09-Dec-21 CP01-01-BL-IR-D01-1292
36 (w/o WP) 18-Nov-21 36.48 TCT-NSCR-21-1118-19 CP01-01-BL-IR-D01-1078 52.27 TCT-NSCR-21-1209-22 PASSED
52.22 TCT-NSCR-21-1209-18 PASSED

36 (w/ WP) 35.40 TCT-NSCR-21-1118-15 50.73 TCT-NSCR-21-1209-19 PASSED

CONCRETE POURING OF SUNKEN PIT WALL AND SLAB 52.09 TCT-NSCR-21-1209-20 PASSED
515 11-Nov-21 Workshop Building 110.00 108.00 23.00 210.00 18-Nov-21 CP01-01-BL-IR-D01-1079 09-Dec-21 CP01-01-BL-IR-D01-1288
AT GRIDLINE D-E/14-17
52.21 TCT-NSCR-21-1209-21 PASSED
36 (w/o WP) 36.34 TCT-NSCR-21-1118-16 50.13 TCT-NSCR-21-1209-22 PASSED
51.74 TCT-NSCR-21-1209-23 PASSED
CONCRETE PLACEMENT FOR PILE CAP AND GRADE
516 31 12-Nov-21 LRS Building 26.50 26.50 20.00 200.00 19-Nov-21 32.29 TCT-NSCR-21-1119-19 CP01-01-BL-IR-D02-1085 10-Dec-21 44.33 TCT-NSCR-21-1210-02 CP01-01-BL-IR-D02-1309 PASSED
BEAM AT GL.1-4/B2
CONCRETE PLACEMENT FOR BORED PILE 3 OF
517 36 12-Nov-21 MTS 6 4.00 4.00 20.00 215.00 19-Nov-21 36.61 TCT-NSCR-21-1119-20 CP01-01-BL-IR-D01-1086 10-Dec-21 52.53 TCT-NSCR-21-1210-05 CP01-01-BL-IR-MT6-1310 PASSED
EQUIPMENT PAD
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
518 15 12-Nov-21 Workshop Building 13.00 13.00 22.00 200.00 19-Nov-21 15.57 TCT-NSCR-21-1119-18 CP01-01-BL-IR-D01-1087 10-Dec-21 27.88 TCT-NSCR-21-1210-03 CP01-01-BL-IR-D01-1311 PASSED
GRIDLINE C2-D/5-7
CONCRETE POURING OF RETAINING WALL GL.
519 36 13-Nov-21 OCC Building 6.50 6.50 25.00 220.00 22-Nov-21 39.16 TCT-NSCR-21-1122-14 CP01-01-BL-IR-D06-1110 11-Dec-21 52.78 TCT-NSCR-21-1211-06 CP01-01-BL-IR-D06-1321 PASSED
5-10/E'(4F)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE POURING OF LEAN CONCRETE FOR


520 15 13-Nov-21 LRS Building 3.50 3.50 22.00 190.00 20-Nov-21 16.30 TCT-NSCR-21-1120-09 CP01-01-BL-IR-D02-1097 11-Dec-21 27.64 TCT-NSCR-21-1211-05 CP01-01-BL-IR-D02-1322 PASSED
CORBEL GL. 19/B1-B3
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
521 15 13-Nov-21 Workshop Building 8.00 8.00 20.00 190.00 20-Nov-21 15.94 TCT-NSCR-21-1120-10 CP01-01-BL-IR-D01-1098 11-Dec-21 27.69 TCT-NSCR-21-1211-02 CP01-01-BL-IR-D01-1323 PASSED
GRIDLINE C2-D/5-7
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
522 15 13-Nov-21 GRIDLINE B2-C/7-10 AND FOR PIT 15-04b AT Workshop Building 32.00 32.00 23.00 170.00 20-Nov-21 16.57 TCT-NSCR-21-1120-08 CP01-01-BL-IR-D01-1099 11-Dec-21 28.12 TCT-NSCR-21-1211-03 CP01-01-BL-IR-D01-1324 PASSED
GRIDLINE B3-C/9-10

CONCRETE POURING OF PILE CAP, FOUNDATION


523 31 13-Nov-21 COLUMN AT GRIDLINE A3/7-8 AND GRADE BEAM AT Workshop Building 22.00 22.00 23.00 195.00 20-Nov-21 31.39 TCT-NSCR-21-1120-07 CP01-01-BL-IR-D01-1100 11-Dec-21 43.96 TCT-NSCR-21-1211-04 CP01-01-BL-IR-D01-1325 PASSED
GRIDLINE A3/6-9
CONCRETE POURING OF COLUMNS (5F) AT GL 10/A &
524 36 13-Nov-21 OCC Building 5.50 5.50 24.00 215.00 20-Nov-21 36.53 TCT-NSCR-21-1120-11 CP01-01-BL-IR-D06-1101 11-Dec-21 52.31 TCT-NSCR-21-1211-07 CP01-01-BL-IR-D06-1326 PASSED
EC1 AT ZONE 3
CONCRETE PLACEMENT FOR BORED PILE 01, BORED
525 36 13-Nov-21 MTS 6 8.00 8.00 21.00 230.00 20-Nov-21 36.37 TCT-NSCR-21-1120-14 CP01-01-BL-IR-MT6-1102 11-Dec-21 52.37 TCT-NSCR-21-1211-01 CP01-01-BL-IR-MT6-1327 PASSED
PILE 08 OF EQUIPMENT PAD

526 36 15-Nov-21 CONCRETE POURING OF UPSTAND GL. 9-10/A-D (3F) OCC Building 3.50 3.50 21.00 200.00 22-Nov-21 36.52 TCT-NSCR-21-1122-12 CP01-01-BL-IR-D06-1108 13-Dec-21 52.34 TCT-NSCR-21-1213-11 CP01-01-BL-IR-D06-1335 PASSED

CONCRETE PLACEMENT FOR BORED PILE 06 OF


527 36 15-Nov-21 EQUIPMENT PAD, BORED PILE 12 OF BUILDING MTS 6 9.00 9.00 21.00 230.00 22-Nov-21 37.11 TCT-NSCR-21-1122-13 CP01-01-BL-IR-MT6-1109 13-Dec-21 52.30 TCT-NSCR-21-1213-17 CP01-01-BL-IR-MT6-1336 PASSED

36 (w/ WP) CONCRETE POURING OF PIT 22-02 SLAB AND WALL AT 22-Nov-21 37.17 TCT-NSCR-21-1122-10 CP01-01-BL-IR-D01-1110 51.65 TCT-NSCR-21-1213-15 PASSED
528 15-Nov-21 Workshop Building 14.00 14.00 24.00 195.00 13-Dec-21 CP01-01-BL-IR-D01-1337
36 (w/o WP) GRIDLINE A2-A3/11-12 22-Nov-21 37.44 TCT-NSCR-21-1122-11 CP01-01-BL-IR-D01-1110 52.15 TCT-NSCR-21-1213-16 PASSED

44.23 TCT-NSCR-21-1213-12 PASSED


CONCRETE POURING OF SLAB AT GRIDLINE A-B1/10-
529 31 15-Nov-21 14 Workshop Building 144.00 144.00 24.00 180.00 22-Nov-21 31.54 TCT-NSCR-21-1122-07 CP01-01-BL-IR-D01-1111 13-Dec-21 CP01-01-BL-IR-D01-1338
44.14 TCT-NSCR-21-1213-13 PASSED
43.66 TCT-NSCR-21-1213-14 PASSED
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
530 31 16-Nov-21 LRS Building 3.50 30.50 20.00 200.00 23-Nov-21 31.69 TCT-NSCR-21-1123-17 CP01-01-BL-IR-D02-1117 14-Dec-21 44.11 TCT-NSCR-21-1214-05 CP01-01-BL-IR-D02-1343 PASSED
GL 1-4/B3
CONCRETE POURING OF COLUMN (5F) AT GL 5/A &
531 36 16-Nov-21 OCC Building 6.50 6.50 20.00 220.00 23-Nov-21 33.61 TCT-NSCR-21-1123-11 CP01-01-BL-IR-D06-1118 14-Dec-21 50.77 TCT-NSCR-21-1214-06 CP01-01-BL-IR-D06-1344 PASSED
6/A
CONCRETE PLACEMENT FOR BORED PILE 05 OF
532 36 16-Nov-21 MTS 6 9.00 9.00 19.00 230.00 23-Nov-21 36.82 TCT-NSCR-21-1123-16 CP01-01-BL-IR-MT6-1119 14-Dec-21 52.11 TCT-NSCR-21-1214-04 CP01-01-BL-IR-MT6-1345 PASSED
EQUIPMENT PAD, BORED PILE 11 OF BUILDING
CONCRETE POURING OF PILE CAP AT GRIDLINE A2/7-
533 31 16-Nov-21 8, FOUNDATION COLUMN AT GRIDLINE A2/7 AND Workshop Building 23.00 23.00 25.00 180.00 23-Nov-21 32.67 TCT-NSCR-21-1123-13 CP01-01-BL-IR-D01-1120 14-Dec-21 43.86 TCT-NSCR-21-1214-01 CP01-01-BL-IR-D01-1346 PASSED
GRADE BEAM AT GRIDLINE A2/6-9
CONCRETE POURING OF PC1B, PC2 AND GB2AM,
534 31 16-Nov-21 WRS Building 35.00 35.00 25.00 200.00 23-Nov-21 32.02 TCT-NSCR-21-1123-12 CP01-01-BL-IR-D03-1121 14-Dec-21 43.31 TCT-NSCR-21-1214-07 CP01-01-BL-IR-D03-1347 PASSED
GB2B AT GRIDLINE A'-C'/3-4
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
535 15 16-Nov-21 Workshop Building 45.00 45.00 23.00 200.00 23-Nov-21 18.60 TCT-NSCR-21-1123-15 CP01-01-BL-IR-D01-1122 14-Dec-21 28.33 TCT-NSCR-21-1214-02 CP01-01-BL-IR-D01-1348 PASSED
GRIDLINE A-B/1-3
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
536 15 16-Nov-21 Workshop Building 34.00 34.00 22.00 190.00 23-Nov-21 17.26 TCT-NSCR-21-1123-14 CP01-01-BL-IR-D01-1123 14-Dec-21 27.63 TCT-NSCR-21-1214-03 CP01-01-BL-IR-D01-1349 PASSED
GRIDLINE B-C/1-3

44.04 TCT-NSCR-21-1215-03 PASSED


537 31 17-Nov-21 CONCRETE POURING OF SLAB AT GRIDLINE C-D/7-11 Workshop Building 122.00 117.00 26.00 180.00 24-Nov-21 31.61 TCT-NSCR-21-1124-08 CP01-01-BL-IR-D01-1132 15-Dec-21 CP01-01-BL-IR-D01-1352
44.19 TCT-NSCR-21-1215-04 PASSED
44.14 TCT-NSCR-21-1215-05 PASSED
CONCRETE POURING OF PILE CAP, FOUNDATION
538 31 17-Nov-21 COLUMN AT GRIDLINE A3/5-6 AND GRADE BEAM AT Workshop Building 22.00 22.00 24.00 210.00 24-Nov-21 31.71 TCT-NSCR-21-1124-09 CP01-01-BL-IR-D01-1133 15-Dec-21 43.93 TCT-NSCR-21-1215-01 CP01-01-BL-IR-D01-1353 PASSED
GRIDLINE A3/4-7
CONCRETE PLACEMENT FOR BORED PILE 04 & BORED
539 36 17-Nov-21 MTS 6 8.00 8.00 16.00 220-235 24-Nov-21 36.41 TCT-NSCR-21-1124-05 CP01-01-BL-IR-MT6-1134 15-Dec-21 52.10 TCT-NSCR-21-1215-02 CP01-01-BL-IR-MT6-1354 PASSED
PILE 10 OF EQUIPMENT PAD
CONCRETE CASTING OF LEAN CONCRETE FOR
540 15 18-Nov-21 Workshop Building 17.00 15.00 20.00 175.00 25-Nov-21 16.79 TCT-NSCR-21-1125-22 CP01-01-BL-IR-D01-1139 16-Dec-21 27.69 TCT-NSCR-21-1216-05 CP01-01-BL-IR-D01-1362 PASSED
SUNKEN PIT SLAB AT GRIDLINE D1-E/7-10
541 31 18-Nov-21 CONCRETE POURING OF CORBEL AT GL.19/B1-B3 LRS Building 5.00 5.00 22.00 225.00 25-Nov-21 31.93 TCT-NSCR-21-1125-25 CP01-01-BL-IR-D02-1140 16-Dec-21 44.00 TCT-NSCR-21-1216-01 CP01-01-BL-IR-D02-1363 PASSED
CONCRETE POURING OF CHB UPSTAND, LINTEL BEAM
542 36 18-Nov-21 OCC Building 3.00 3.00 20.00 225.00 25-Nov-21 36.87 TCT-NSCR-21-1125-19 CP01-01-BL-IR-D06-1141 16-Dec-21 46.35 TCT-NSCR-21-1216-02 CP01-01-BL-IR-D06-1364 PASSED
& STIFFENER COLUMN AT GF ZONE 3

36 (w/ WP) CONCRETE POURING OF SUNKEN PIT WALL AT 36.83 TCT-NSCR-21-1125-23 52.36 TCT-NSCR-21-1216-06 PASSED
543 18-Nov-21 Workshop Building 21.00 21.00 26.00 195.00 25-Nov-21 CP01-01-BL-IR-D01-1142 16-Dec-21 CP01-01-BL-IR-D01-1365
GRIDLINE D/14-17 & E/14-17
36 (w/o WP) 37.07 TCT-NSCR-21-1125-24 52.01 TCT-NSCR-21-1216-07 PASSED
CONCRETE POURING OF SLAB AT GRIDLINE C3-D/14-
544 31 18-Nov-21 Workshop Building 39.00 39.00 23.00 200.00 25-Nov-21 32.00 TCT-NSCR-21-1125-20 CP01-01-BL-IR-D01-1143 16-Dec-21 43.69 TCT-NSCR-21-1216-04 CP01-01-BL-IR-D01-1366 PASSED
17 & E/14-17
CONCRETE PLACEMENT FOR BORED PILE 18 OF
545 36 18-Nov-21 MTS 6 9.00 9.00 21.00 225-250 25-Nov-21 36.39 TCT-NSCR-21-1125-21 CP01-01-BL-IR-MT6-1144 16-Dec-21 52.18 TCT-NSCR-21-1216-03 CP01-01-BL-IR-MT6-1367 PASSED
BUILDING & BORED PILE 09 OF EQUIPMENT PAD
CONCRETE POURING OF COLUMN (5F) AT GL4/A, 4/B,
546 36 19-Nov-21 OCC Building 12.50 12.50 21.00 190.00 26-Nov-21 36.61 TCT-NSCR-21-1126-22 CP01-01-BL-IR-D06-1154 17-Dec-21 51.16 TCT-NSCR-21-1217-13 CP01-01-BL-IR-D06-1373 PASSED
4/C
CONCRETE PLACEMENT FOR BORED PILE 22 & BORED
547 36 19-Nov-21 MTS 6 10.00 10.00 26.00 215-245 26-Nov-21 37.01 TCT-NSCR-21-1126-23 CP01-01-BL-IR-MT6-1155 17-Dec-21 52.28 TCT-NSCR-21-1217-10 CP01-01-BL-IR-MT6-1374 PASSED
PILE 13 OF BUILDING
CONCRETE POURING OF PILE CAP, FOUNDATION
548 31 19-Nov-21 COLUMN AT GRIDLINE A2/5-6 AND GRADE BEAM AT Workshop Building 28.00 28.00 22.00 200.00 26-Nov-21 31.73 TCT-NSCR-21-1126-27 CP01-01-BL-IR-D01-1156 17-Dec-21 44.25 TCT-NSCR-21-1217-09 CP01-01-BL-IR-D01-1375 PASSED
GRIDLINE A2/4-7
CONCRETE POURING OF PILE CAP AND GRADE BEAM
549 31 19-Nov-21 Workshop Building 18.00 18.00 25.00 190.00 26-Nov-21 32.19 TCT-NSCR-21-1126-24 CP01-01-BL-IR-D01-1157 17-Dec-21 44.18 TCT-NSCR-21-1217-08 CP01-01-BL-IR-D01-1376 PASSED
AT GRIDLINE B1/6-7
CONCRETE POURING OF LEAN CONCRETE AT GL.4-6/
550 15 19-Nov-21 LRS Building 6.00 6.00 22.00 180.00 26-Nov-21 16.01 TCT-NSCR-21-1126-25 CP01-01-BL-IR-D01-1158 17-Dec-21 27.69 TCT-NSCR-21-1217-12 CP01-01-BL-IR-D02-1377 PASSED
A&B
CONCRETE POURING OF UPSTAND AT GL.5-10/E' (5F)
551 36 19-Nov-21 OCC Building 2.50 2.50 21.00 210.00 26-Nov-21 37.07 TCT-NSCR-21-1126-25 CP01-01-BL-IR-D06-1159 17-Dec-21 52.02 TCT-NSCR-21-1217-11 CP01-01-BL-IR-D02-1378 PASSED
AND UPSTAND GL.9-10/A-E (3F)
CONCRETE POURING FOR CHB UPSTAND & STIFFENER
552 36 20-Nov-21 OCC Building 2.00 2.00 23.00 215.00 27-Nov-21 36.97 TCT-NSCR-21-1127-09 CP01-01-BL-IR-D06-1179 18-Dec-21 52.35 TCT-NSCR-21-1218-06 CP01-01-BL-IR-D06-1383 PASSED
COLUMN GF ZONE 2 & ZONE 3
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


553 15 20-Nov-21 Workshop Building 20.00 20.00 26.00 195.00 27-Nov-21 15.87 TCT-NSCR-21-1127-08 CP01-01-BL-IR-D01-1182 18-Dec-21 27.75 TCT-NSCR-21-1218-01 CP01-01-BL-IR-D01-1385 PASSED
GRIDLINE C-C2/5-7

CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT


554 15 20-Nov-21 GRIDLINE F-G/7-9 Workshop Building 45.00 31.00 26.00 200.00 27-Nov-21 16.31 TCT-NSCR-21-1127-12 CP01-01-BL-IR-D01-1183 18-Dec-21 27.68 TCT-NSCR-21-1218-04 CP01-01-BL-IR-D01-1386 PASSED

CONCRETE POURING OF GRADEBEAM AND PEDESTAL


555 31 20-Nov-21 LRS Building 24.00 24.00 20.00 200.00 27-Nov-21 32.13 TCT-NSCR-21-1127-13 CP01-01-BL-IR-D02-1184 18-Dec-21 44.01 TCT-NSCR-21-1218-03 CP01-01-BL-IR-D02-1387 PASSED
GL. 5-8/C
CONCRETE POURING OF COLUMNS (5F) AT GL 3/A,
556 36 20-Nov-21 OCC Building 9.50 9.50 20.00 205.00 27-Nov-21 36.50 TCT-NSCR-21-1127-10 CP01-01-BL-IR-D06-1177 18-Dec-21 52.44 TCT-NSCR-21-1218-05 CP01-01-BL-IR-D06-1388 PASSED
3/B, 3/C
CONCRETE PLACEMENT FOR BORED PILE 17 & BORED
557 36 20-Nov-21 MTS 6 10.00 10.00 24.00 230-240 27-Nov-21 36.32 TCT-NSCR-21-1127-11 CP01-01-BL-IR-MT6-1178 18-Dec-21 52.23 TCT-NSCR-21-1218-02 CP01-01-BL-IR-MT6-1389 PASSED
PILE 21 OF BUILDING
558 36 21-Nov-21 CONCRETE POURING OF COLUMN GL 3/D & 4/D OCC Building 6.50 6.50 20.00 225.00 28-Nov-21 36.96 TCT-NSCR-21-1129-16 CP01-01-BL-IR-D06-1181 19-Dec-21 52.07 TCT-NSCR-21-1220-12 CP01-01-BL-IR-D06-1390 PASSED
CONCRETE POURING OF PILECAP AT GRIDLINE B1/8,
559 31 21-Nov-21 FOUNDATION COLUMN AT GRIDLINE B1/7 AND Workshop Building 18.00 18.00 20.00 190.00 28-Nov-21 30.98 TCT-NSCR-21-1129-14 CP01-01-BL-IR-D01-1189 19-Dec-21 44.20 TCT-NSCR-21-1220-11 CP01-01-BL-IR-D01-1391 PASSED
GRADE BEAM AT GRIDLINE B1/7-9

36.55 51.89 TCT-NSCR-21-1220-05 PASSED


36 (w/ WP) TCT-NSCR-21-1129-12
CONCRETE POURING OF SUNKEN PIT WALL AND SLAB 36.68 49.47 TCT-NSCR-21-1220-06 PASSED
560 21-Nov-21 Workshop Building 63.00 63.00 22.00 175.00 28-Nov-21 CP01-01-BL-IR-D01-1190 19-Dec-21 CP01-01-BL-IR-D01-1392
AT GRIDLINE D-E/12-14
37.34 51.70 TCT-NSCR-21-1220-03 PASSED
36 (w/o WP) TCT-NSCR-21-1129-13
36.55 52.44 TCT-NSCR-21-1220-04 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR PIT 15-
561 15 22-Nov-21 Workshop Building 16.00 16.00 23.00 180.00 29-Nov-21 15.70 TCT-NSCR-21-1129-05 CP01-01-BL-IR-D01-1192 20-Dec-21 27.81 TCT-NSCR-21-1220-02 CP01-01-BL-IR-D01-1402 PASSED
04a AND SLAB AT GRIDLINE B-B2/8-10

36.79 52.16 TCT-NSCR-21-1220-09 PASSED


36 (w/ WP) TCT-NSCR-21-1129-07
CONCRETE POURING OF SUNKEN PIT WALL AND SLAB
562 22-Nov-21 AT GRIDLINE D-E/19-21 Workshop Building 60.00 60.00 22.00 200.00 29-Nov-21 36.02 CP01-01-BL-IR-D01-1193 20-Dec-21 51.82 TCT-NSCR-21-1220-10 CP01-01-BL-IR-D06-1403 PASSED
36.39 52.39 TCT-NSCR-21-1220-07 PASSED
36 (w/o WP) TCT-NSCR-21-1129-08
36.53 52.16 TCT-NSCR-21-1220-08 PASSED
CONCRETE PLACEMENT FOR BORED PILE 16 OF
563 36 22-Nov-21 MTS 6 10.00 10.00 22.00 225.00 29-Nov-21 37.05 TCT-NSCR-21-1129-06 CP01-01-BL-IR-MT6-1217 20-Dec-21 52.30 TCT-NSCR-21-1220-01 CP01-01-BL-IR-MT6-1404 PASSED
BUILDING
CONCRETE CASTING OF LEAN CONCRETE FOR PIT A AT
564 15 23-Nov-21 Workshop Building 9.00 9.00 22.00 200.00 30-Nov-21 15.86 TCT-NSCR-21-1201-22 CP01-01-BL-IR-D01-1197 21-Dec-21 27.72 TCT-NSCR-21-1221-02 CP01-01-BL-IR-D01-1412 PASSED
GL C1/1-4 AND PIT B AT GL C3/1-4
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB
565 15 23-Nov-21 LRS Building 30-Nov-21 15.72 TCT-NSCR-21-1201-15 CP01-01-BL-IR-D02-1198 21-Dec-21 27.74 TCT-NSCR-21-1221-03 CP01-01-BL-IR-D02-1413 PASSED
ON GRADE ALONG GL 6-8/B1-B3
CONCRETE POURING of PILE CAP at GL B1/5,
566 31 23-Nov-21 FOUNDATION COLUMN at GL B1/6 and GRADE BEAM Workshop Building 21.00 21.00 20.00 200.00 30-Nov-21 32.01 TCT-NSCR-21-1201-71 CP01-01-BL-IR-D01-1199 21-Dec-21 44.01 TCT-NSCR-21-1221-01 CP01-01-BL-IR-D01-1414 PASSED
at B1/4-6

CONCRETE POURING FOR LINTEL BEAM, STIFFINER


567 36 23-Nov-21 COLUMN & CHB UPSTAND AT ZONE 3 GF & ZONE 3 2F OCC Building 2.00 2.00 20.00 200.00 30-Nov-21 36.63 TCT-NSCR-21-1201-17 CP01-01-BL-IR-D06-1200 21-Dec-21 51.96 TCT-NSCR-21-1221-04 CP01-01-BL-IR-D06-1415 PASSED

CONCRETE POURING OF CHB UPSTAND AT ZONE 2 &


568 36 23-Nov-21 OCC Building 2.00 2.00 20.00 220.00 30-Nov-21 37.27 TCT-NSCR-21-1201-16 CP01-01-BL-IR-D06-1201 21-Dec-21 52.33 TCT-NSCR-21-1221-05 CP01-01-BL-IR-D01-1416 PASSED
3 (2F) AND ZONE 3 (3F)

CONCRETE CASTING OF LEAN CONCRETE FOR PIT 12-


03 AT GRIDLINE C-D/4-5 AND CB-01, CB-02, AND CB-
569 15 24-Nov-21 Workshop Building 15.00 15.00 25.00 200.00 01-Dec-21 16.23 TCT-NSCR-21-1201-21 CP01-01-BL-IR-D01-1205 22-Dec-21 27.74 TCT-NSCR-21-1222-03 CP01-01-BL-IR-D01-1428 PASSED
03 AND LEAN CONCRETE FOR SLAB AT GRIDLINE D1-
E/20-21

CONCRETE POURING OF CHB UPSTAND AT ZONE 2 &


570 36 24-Nov-21 OCC Building 2.00 2.00 24.00 215.00 01-Dec-21 36.98 TCT-NSCR-21-1201-20 CP01-01-BL-IR-D06-1206 22-Dec-21 52.20 TCT-NSCR-21-1222-04 CP01-01-BL-IR-D6-1429 PASSED
3 (2F) AND ZONE 3 (3F)
CONCRETE POURING OF COLUMNS (RD) AT GL 9/A,
571 36 24-Nov-21 9/B, 10/A, 10/B OCC Building 9.00 9.00 20.00 220.00 01-Dec-21 36.32 TCT-NSCR-21-1202-19 CP01-01-BL-IR-D06-1207 22-Dec-21 52.09 TCT-NSCR-21-1222-05 CP01-01-BL-IR-D6-1430 PASSED

44.15 TCT-NSCR-21-1222-06 PASSED


32.06 TCT-NSCR-21-1201-13 44.15 TCT-NSCR-21-1222-07 PASSED
44.15 TCT-NSCR-21-1222-08 PASSED
572 31 24-Nov-21 CONCRETE POURING OF PIT SLAB AT GL 8-12/B-C LRS Building 304.00 304.00 22.00 200.00 01-Dec-21 CP01-01-BL-IR-D02-1208 22-Dec-21 CP01-01-BL-IR-D02-1431
44.30 TCT-NSCR-21-1222-09 PASSED
32.22 TCT-NSCR-21-1201-14 44.15 TCT-NSCR-21-1222-10 PASSED
44.27 TCT-NSCR-21-1222-11 PASSED
CONCRETE POURING OF ADDITIONAL CONCRETE FOR
573 31 24-Nov-21 Workshop Building 22.00 22.00 20.00 200.00 01-Dec-21 32.00 TCT-NSCR-21-1201-18 CP01-01-BL-IR-D01-1209 22-Dec-21 44.19 TCT-NSCR-21-1222-12 CP01-01-BL-IR-D01-1432 PASSED
GRADE BEAM AT GRIDLINE A2/6-8 & A3/6-9
CONCRETE POURING OF PC1 AND GB2C, GB1, GB2A
574 15 24-Nov-21 WRS Building 37.00 37.00 26.00 195.00 01-Dec-21 31.94 TCT-NSCR-21-1201-19 CP01-01-BL-IR-D03-1210 22-Dec-21 44.02 TCT-NSCR-21-1222-13 CP01-01-BL-IR-D03-1433 PASSED
AT GRIDLINE A-D/5-6

36 (w/ WP) CONCRETE POURING OF PIGEON HOUSE #3 (1ST LIFT) OCC Building 2.50 2.50 20.00 200.00 36.77 TCT-NSCR-21-1202-15 52.07 TCT-NSCR-21-1223-21 PASSED
575 25-Nov-21 02-Dec-21 CP01-01-BL-IR-D06-1221 23-Dec-21 CP01-01-BL-IR-D06-1438
(RD) ZONE 2
36 (w/o WP) OCC Building 2.50 2.50 20.00 200.00 36.53 TCT-NSCR-21-1202-16 50.89 TCT-NSCR-21-1223-20 PASSED
CONCRETE POURING OF COLUMN (5F) AT GL 2/A, 2/B,
576 36 25-Nov-21 OCC Building 9.50 9.50 23.00 200.00 02-Dec-21 36.79 TCT-NSCR-21-1202-22 CP01-01-BL-IR-D06-1222 23-Dec-21 49.43 TCT-NSCR-21-1223-22 CP01-01-BL-IR-D06-1439 PASSED
2/C

577 36 25-Nov-21 CONCRETE POURING OF SOLAR PANEL SUPPORT (RD) OCC Building 4.00 4.00 24.00 220.00 02-Dec-21 36.54 TCT-NSCR-21-1202-21 CP01-01-BL-IR-D06-1223 23-Dec-21 50.55 TCT-NSCR-21-1223-23 CP01-01-BL-IR-D06-1440 PASSED

CONCRETE POURING OF CHB UPSTAND AT GL 9-10/A-


578 36 25-Nov-21 D (4F) & TRAINING ROOM (5F) OCC Building 3.00 3.00 23.00 205.00 02-Dec-21 36.93 TCT-NSCR-21-1202-20 CP01-01-BL-IR-D06-1224 23-Dec-21 52.08 TCT-NSCR-21-1223-25 CP01-01-BL-IR-D06-1441 PASSED

CONCRETE PLACEMENT FOR CORBEL (ADD CON) AT


579 31 25-Nov-21 GL 19/B1-B3 LRS Building 2.50 2.50 24.00 210.00 02-Dec-21 31.80 TCT-NSCR-21-1202-18 CP01-01-BL-IR-D02-1225 23-Dec-21 44.25 TCT-NSCR-21-1223-19 CP01-01-BL-IR-D02-1442 PASSED

44.23 TCT-NSCR-21-1223-17 PASSED


580 31 25-Nov-21 CONCRETE POURING OF SLAB AT GRIDLINE C-D/5-8 Workshop Building 92.00 92.00 25.00 185.00 02-Dec-21 31.58 TCT-NSCR-21-1202-14 CP01-01-BL-IR-D01-1226 23-Dec-21 CP01-01-BL-IR-D01-1443
44.30 TCT-NSCR-21-1223-18 PASSED
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result MONTH: Jan-2022


7 DAYS 28 DAYS
Required Actual Volume
Ordered
Strength (F'c - Date Casted Work Item Location Temp. Slump Average Average REMARKS
Volume (m³) Testing Date Report Number IR Number Testing Date Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa)

CONCRETE PLACEMENT FOR BORED PILE 26 OF


581 36 25-Nov-21 MTS 6 5.00 5.00 23.00 235.00 02-Dec-21 37.64 TCT-NSCR-21-1202-17 CP01-01-BL-IR-MT6-1227 23-Dec-21 52.26 TCT-NSCR-21-1223-06 CP01-01-BL-IR-MT6-1444 PASSED
BUILDING
CONCRETE POURING OF LEAN CONCRETE FOR PIT
582 15 26-Nov-21 LRS Building 7.00 7.00 22.00 200.00 03-Dec-21 36.14 TCT-NSCR-21-1203-12 CP01-01-BL-IR-D02-1233 24-Dec-21 27.60 TCT-NSCR-21-1223-09 CP01-01-BL-IR-D02-1451 PASSED
SLAB AT GL 18-19/B1-C
CONCRETE POURING OF GRADE BEAM PEDESTAL AT
583 31 26-Nov-21 LRS Building 25.00 25.00 22.00 200.00 03-Dec-21 31.99 TCT-NSCR-21-1203-20 CP01-01-BL-IR-D02-1234 24-Dec-21 43.93 TCT-NSCR-21-1223-08 CP01-01-BL-IR-D02-1452 PASSED
GL B/5-9 & C/6-8
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
584 15 26-Nov-21 Workshop Building 18.00 18.00 21.00 200.00 03-Dec-21 16.33 TCT-NSCR-21-1203-17 CP01-01-BL-IR-D01-1235 24-Dec-21 27.97 TCT-NSCR-21-1223-16 CP01-01-BL-IR-D01-1453 PASSED
GRIDLINE C-D/4-5
CONCRETE POURING OF PC1 AND GB2C, GB1, GB2A
585 31 26-Nov-21 WRS Building 37.00 37.00 25.00 195.00 03-Dec-21 32.18 TCT-NSCR-21-1203-18 CP01-01-BL-IR-D03-1236 24-Dec-21 44.16 TCT-NSCR-21-1223-24 CP01-01-BL-IR-D03-1454 PASSED
AT GRIDLINE A-D/1-2

36 (w/ WP) CONCRETE POURING OF SUNKEN PIT WALL AT 36.77 TCT-NSCR-21-1203-13 48.74 TCT-NSCR-21-1223-11 PASSED
586 26-Nov-21 Workshop Building 11.00 11.00 20.00 200.00 03-Dec-21 CP01-01-BL-IR-D01-1237 24-Dec-21 CP01-01-BL-IR-D01-1455
GRIDLINE D/12-14 & E/12-14
36 (w/o WP) 36.71 TCT-NSCR-21-1203-14 50.26 TCT-NSCR-21-1223-10 PASSED
CONCRETE POURING OF SLAB AT GRIDLINE C3-D/12-
587 31 26-Nov-21 Workshop Building 24.00 24.00 21.00 200.00 03-Dec-21 31.89 TCT-NSCR-21-1203-11 CP01-01-BL-IR-D01-1238 24-Dec-21 44.17 TCT-NSCR-21-1223-12 CP01-01-BL-IR-D01-1456 PASSED
14 & E/12-14

CONCRETE PLACEMENT FOR BORED PILE 02 OF


588 36 26-Nov-21 MTS 6 9.00 9.00 23.00 225-230 03-Dec-21 36.53 TCT-NSCR-21-1203-21 CP01-01-BL-IR-MT6-1239 24-Dec-21 50.67 TCT-NSCR-21-1223-15 CP01-01-BL-IR-MT6-1457 PASSED
EQUIPMENT PAD AND BORED PILE 23 OF BUILDING

CONCRETE POURING OF SOLAR PANEL SUPPORT (RD)


589 36 26-Nov-21 OCC Building 9.00 9.00 20.00 220.00 03-Dec-21 36.47 TCT-NSCR-21-1203-16 CP01-01-BL-IR-D06-1240 24-Dec-21 49.38 TCT-NSCR-21-1223-14 CP01-01-BL-IR-D06-1458 PASSED
AT GL 7-10/C-E'

CONCRETE POURING OF COLUMN, EC1 & STC (5F) AT


590 36 26-Nov-21 OCC Building 13.00 13.00 21.00 200.00 03-Dec-21 36.72 TCT-NSCR-21-1203-15 CP01-01-BL-IR-D06-1241 24-Dec-21 49.51 TCT-NSCR-21-1223-07 CP01-01-BL-IR-D06-1459 PASSED
GL 1/A, 1/B, 1/C, 1/D & 2D
CONCRETE POURING OF STIFFENER COLUMN (5F) AT
591 36 26-Nov-21 OCC Building 1.50 1.50 20.00 200.00 03-Dec-21 37.50 TCT-NSCR-21-1203-19 CP01-01-BL-IR-D06-1242 24-Dec-21 52.27 TCT-NSCR-21-1223-13 CP01-01-BL-IR-D06-1460 PASSED
GL 5-9/E'
CONCRETE PLACEMENT FOR BORED PILE 14 AND
592 36 27-Nov-21 MTS 6 10.00 10.00 23.00 235.00 04-Dec-21 37.67 TCT-NSCR-21-1204-21 CP01-01-BL-IR-MT6-1252 25-Dec-21 51.40 TCT-NSCR-21-1227-35 CP01-01-BL-IR-MT6-1466 PASSED
BORED PILE 27 OF BUILDING

CONCRETE POURING OF STIFFENER COLUMN AND


593 36 27-Nov-21 OCC Building 3.00 3.00 21.00 210.00 04-Dec-21 37.50 TCT-NSCR-21-1204-20 CP01-01-BL-IR-D06-1253 25-Dec-21 52.28 TCT-NSCR-21-1227-41 CP01-01-BL-IR-D06-1467 PASSED
LINTEL BEAM GL.7-8/C, GL.7-9/D-E & GL.6-8/C-E (GF)

CONCRETE POURING OF LEAN CONCRETE FOR SOG AT


594 15 27-Nov-21 LRS Building 10.00 10.00 23.00 185.00 04-Dec-21 15.67 TCT-NSCR-21-1204-19 CP01-01-BL-IR-D02-1254 25-Dec-21 27.82 TCT-NSCR-21-1227-38 CP01-01-BL-IR-D02-1468 PASSED
GL 6-8/B3-C
CONCRETE POURING OF LEAN CONCRETE FOR SOG AT
595 15 27-Nov-21 LRS Building 7.00 7.00 24.00 200.00 04-Dec-21 16.29 TCT-NSCR-21-1204-18 CP01-01-BL-IR-D02-1255 25-Dec-21 27.63 TCT-NSCR-21-1227-37 CP01-01-BL-IR-D02-1469 PASSED
GL 14-19/B1-B

36 (w/ WP) CONCRETE POURING OF PIGEON HOUSE #4 (1ST LIFT) 36.36 TCT-NSCR-21-1204-15 52.08 TCT-NSCR-21-1227-40 PASSED
596 27-Nov-21 OCC Building 3.00 3.00 26.00 200.00 04-Dec-21 CP01-01-BL-IR-D06-1256 25-Dec-21 CP01-01-BL-IR-D06-1470
(RD) AT GL 10
36 (w/o WP) 37.02 TCT-NSCR-21-1204-15 50.25 TCT-NSCR-21-1227-39 PASSED

CONCRETE POURING OF PILE CAP AT GRIDLINE E1/6-


597 31 27-Nov-21 8, FOUNDATION COLUMN AT GRIDLINE E1/6-8 AND Workshop Building 30.00 30.00 24.00 195.00 04-Dec-21 32.24 TCT-NSCR-21-1204-17 CP01-01-BL-IR-D01-1257 25-Dec-21 44.02 TCT-NSCR-21-1227-36 CP01-01-BL-IR-D01-1471 PASSED
GRADE BEAM AT GRIDLINE E1/5-8, E-F/6

CONCRETE POURING OF LEAN CONCRETE FOR SOG AT


598 15 29-Nov-21 LRS Building 11.00 11.00 20.00 190.00 06-Dec-21 15.81 TCT-NSCR-21-1206-09 CP01-01-BL-IR-D02-1269 27-Dec-21 27.17 TCT-NSCR-21-1227-31 CP01-01-BL-IR-D02-1481 PASSED
GL 6-8/B-B1
44.06 TCT-NSCR-21-1227-29 PASSED
599 31 29-Nov-21 CONCRETE POURING of SLAB at GL A2-B3/1-3 Workshop Building 99.00 99.00 20.00 225.00 06-Dec-21 31.87 TCT-NSCR-21-1206-15 CP01-01-BL-IR-D01-1270 27-Dec-21 CP01-01-BL-IR-D01-1482
44.14 TCT-NSCR-21-1227-30 PASSED
CONCRETE CASTING ON LEAN CONCRETE FOR CP1A
600 15 29-Nov-21 WRS Building 6.00 6.00 21.00 200.00 06-Dec-21 16.11 TCT-NSCR-21-1206-22 CP01-01-BL-IR-D03-1271 27-Dec-21 27.39 TCT-NSCR-21-1227-32 CP01-01-BL-IR-D03-1483 PASSED
and GB2A at GL A-D/3-4
50.43 TCT-NSCR-21-1227-22 PASSED
36 (w/ WP) 36.33 TCT-NSCR-21-1206-09 49.47 TCT-NSCR-21-1227-23 PASSED
CONCRETE POURING on SUNKEN PIT WALL and SLAB 49.48 TCT-NSCR-21-1227-24 PASSED
601 29-Nov-21 at GL D-E/8-13 Workshop Building 126.00 126.00 20.00 225.00 06-Dec-21 CP01-01-BL-IR-D01-1272 27-Dec-21 CP01-01-BL-IR-D01-1484
49.74 TCT-NSCR-21-1227-25 PASSED
36 (w/o WP) 36.11 TCT-NSCR-21-1206-10 48.83 TCT-NSCR-21-1227-26 PASSED
49.15 TCT-NSCR-21-1227-27 PASSED
CONCRETE POURING OF LINTEL BEAM & STIFFINER
602 36 29-Nov-21 OCC Building 4.00 4.00 24.00 210.00 06-Dec-21 36.75 TCT-NSCR-21-1206-20 CP01-01-BL-IR-D06-1273 27-Dec-21 48.84 TCT-NSCR-21-1227-21 CP01-01-BL-IR-D06-1485 PASSED
COLUMN AT GL 6-8/C-E
CONCRETE POURING OF RETAINING WALL AT GL 9-
603 31 29-Nov-21 13/B&C LRS Building 16.00 16.00 23.00 220.00 06-Dec-21 31.73 TCT-NSCR-21-1206-18 CP01-01-BL-IR-D02-1274 27-Dec-21 43.81 TCT-NSCR-21-1227-33 CP01-01-BL-IR-D02-1486 PASSED

CONCRETE PLACEMENT FOR BORED PILE 07 OF


604 36 29-Nov-21 MTS 6 9.00 9.00 24.00 230-235 06-Dec-21 36.68 TCT-NSCR-21-1206-21 CP01-01-BL-IR-MT6-1275 27-Dec-21 49.43 TCT-NSCR-21-1227-28 CP01-01-BL-IR-MT6-1487 PASSED
EQUIPMENT PAD AND BORED PILE 15 OF BUILDING

CONCRETE POURING OF LEAN CONCRETE FOR CATCH


605 15 01-Dec-21 LRS Building 2.00 2.00 20.00 200.00 08-Dec-21 15.64 TCT-NSCR-21-1208-03 CP01-01-BL-IR-D02-1297 29-Dec-21 27.58 TCT-NSCR-21-1228-03 CP01-01-BL-IR-D02-1496 PASSED
BASIN AT GL 2/B1-B3
CONCRETE POURING OF LINTEL BEAM & STIFFINER
606 36 01-Dec-21 COLUMN & UPSTAND AT GL 5/D-E (4F), 9-10/A-D(2F), OCC Building 1.50 1.50 19.00 225.00 08-Dec-21 36.26 TCT-NSCR-21-1208-04 CP01-01-BL-IR-D06-1298 29-Dec-21 52.30 TCT-NSCR-21-1228-05 CP01-01-BL-IR-D06-197 PASSED
5-7/E' & 5-9/D-E'(4F)
CONCRETE CASTING FOR LEAN CONCRETE FOR PIT 15-
607 15 01-Dec-21 Workshop Building 31.00 31.00 20.00 200.00 08-Dec-21 16.34 TCT-NSCR-21-1208-05 CP01-01-BL-IR-D01-1299 29-Dec-21 27.95 TCT-NSCR-21-1228-04 CP01-01-BL-IR-D01-198 PASSED
06 @ GL B2-C/5-8
CONCRETE PLACEMENT FOR BORED PILE 28 & BORED
608 36 01-Dec-21 MTS 6 10.00 10.00 20.00 230-240 08-Dec-21 36.59 TCT-NSCR-21-1213-24 CP01-01-BL-IR-MT6-1293 29-Dec-21 51.44 TCT-NSCR-21-1228-02 CP01-01-BL-IR-MT6-1499 PASSED
PILE 20 OF BUILDING
CONCRETE POURING OF PILE CAP AND GRADE BEAM
609 31 02-Dec-21 LRS Building 09-Dec-21 31.59 TCT-NSCR-21-1209-09 CP01-01-BL-IR-D02-1282 30-Dec-21 43.98 TCT-NSCR-21-1229-06 CP01-01-BL-IR-D02-1503 PASSED
AT GL 6-9/A
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot

Summary of Compressive Strength Test Result


24 HOURS 2 DAYS 3 DAYS 5 DAYS 7 DAYS 14 DAYS 28 DAYS
Required Actual Volume
Strength (F'c - Date Casted Work Item Location Ordered Average REMARKS
Volume (m³) Temp. Slump Testing Date Average Report Number IR Number Testing Date Average Report Number IR Number Testing Date Average Report Number IR Number Testing Date Average Report Number IR Number Testing Date Average Report Number IR Number Testing Date Result Report Number IR Number Testing Date Average Report Number IR Number
MPa) (Celcius) (mm.) Result (MPa) Result (MPa) Result (MPa) Result (MPa) Result (MPa) Result (MPa)
(MPa)