36 (w/ WP) CONCRETE PLACEMENT OF WALL FOR SUMP PIT A @ 36.62 55.17
64 30-Apr-21 ZONE 1 & SUMP PIT B @ ZONE 3 (VOLUME = OCC Building 8.50 8.50 20.00 220.00 07-May-21 SMTL-BULACAN-21-0507-007 CP01-01-BL-IR-D06-0140 28-May-21 SMTL-BULACAN-21-0528-011 CP01-01-BL-IR-D06-0210 PASSED
36 (w/o WP) 7.6176m³, 36MPa) 37.01 54.66
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot
36 (w/ WP) CONCRETE PLACEMENT FOR PILE CAP GL 1-3/-A-C, 37.26 52.40 TCT-NSCR-21-0619-01 PASSED
107 22-May-21 MAIN GIRDER GL 1-3/A-C, INTEMEDIATE BEAM, GL 1- OCC Building 113.00 111.00 18-19 210-225 29-May-21 SMTL-BULACAN-21-0529-006 CP01-01-BL-IR-D06-0217 19-Jun-21 CP01-01-BL-IR-D06-0289
36 (w/o WP) 2/A-B 37.10 52.56 TCT-NSCR-21-0619-02 PASSED
126 31 01-Jun-21 CONCRETE PLACEMENT FOR PILE CAP GL 10&12/B&C Light Repair Shop 35.50 34.50 18-20 200.00 08-Jun-21 31.44 x CP01-01-BL-IR-D02-0252 29-Jun-21 44.83 TCT-NDCR-21-0629-075 CP01-01-BL-IR-D02-0328 PASSED
127 15 01-Jun-21 LEAN CONCRETING @ ZONE 1 GL 1-3/A-B OCC Building 10.00 10.00 19.00 190.00 08-Jun-21 16.10 TCT-NSCR-21-0608-21 CP01-01-BL-IR-D06-0253 29-Jun-21 26.16 TCT-NDCR-21-0629-07 CP01-01-BL-IR-D06-0329 PASSED
CONCRETE POURING OF PILE CAP AND GRADE BEAM
128 31 02-Jun-21 AT GRIDLINE A1/8-12 Workshop Building 29.00 28.00 17.00 200.00 09-Jun-21 31.52 TCT-NSCR-21-0609-05 CP01-01-BL-IR-D01-0246 30-Jun-21 45.73 TCT-NDCR-21-0630-03 CP01-01-BL-IR-D01-0334 PASSED
( VOLUME = 27.396m³, 31MPa)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot
135 31 07-Jun-21 CONCRETE PLACEMENT FOR PILE CAP GL 11/B&C Light Repair Shop 18.00 18.00 22.00 200.00 14-Jun-21 32.11 TCT-NSCR-21-0614-03 CP01-01-BL-IR-D01-0267 05-Jul-21 45.46 TCT-NSCR-21-0705-03 CP01-01-BL-IR-D02-0351 PASSED
138 15 09-Jun-21 LEAN CONCRETING FOR SLAB @ ZONE 3 GL 10/B-D OCC Building 3.00 3.00 16-Jun-21 20.21 TCT-NSCR-21-0616-10 CP01-01-BL-IR-D06-0276 07-Jul-21 27.94 TCT-NSCR-21-0707-07 CP01-01-BL-IR-D06-0360 PASSED
139 31 09-Jun-21 CONCRETE PLACEMENT FOR GRADE BEAM GL 5-8/B3 Light Repair Shop 18.00 18.00 16-Jun-21 31.66 TCT-NSCR-21-0616-02 CP01-01-BL-IR-D02-0277 07-Jul-21 44.18 TCT-NSCR-21-0707-06 CP01-01-BL-IR-D02-0361 PASSED
53.08; TCT-NSCR-21-0709-07;
36 (w/ WP) 37.22 TCT-NSCR-21-0618-07 CP01-01-BL-IR-D06-0368 PASSED
CONRETE PLACEMENT OF SLAB ON GRADE @ ZONE 3 52.57 TCT-NSCR-21-0709-06
141 11-Jun-21 9-10/A-D OCC Building 57.00 57.00 18-Jun-21 CP01-01-BL-IR-D06-0284 09-Jul-21
52.84; TCT-NSCR-21-0709-08;
36 (w/o WP) 37.91 TCT-NSCR-21-0618-08 CP01-01-BL-IR-D06-0368 PASSED
51.58 TCT-NSCR-21-0709-09
142 31 11-Jun-21 CONCRETE PLACEMENT FOR GRADE BEAM GL 5-8/B1 Light Repair Shop 36.00 36.00 18-Jun-21 33.41 TCT-NSCR-21-0618-10 CP01-01-BL-IR-D02-0285 09-Jul-21 44.79 TCT-NSCR-21-0709-04 CP01-01-BL-IR-D02-0369 PASSED
36 (w/ WP) CONCRETE POURING OF RETAINING WALL, EXTERNAL 36.39 TCT-NSCR-21-0623-05 48.64 TCT-NSCR-21-0714-03 CP01-01-BL-IR-D06-0387 PASSED
151 16-Jun-21 WALL AND COLUMN @ ZONE 1 GL 1-3/A-C, 1-2/D-E, OCC Building 48.00 48.00 23-Jun-21 CP01-01-BL-IR-D06-0301 14-Jul-21
36 (w/o WP) 1-2/E, 2-3/A 36.03 TCT-NSCR-21-0623-06 51.29 TCT-NSCR-21-0714-02 CP01-01-BL-IR-D06-0387 PASSED
181 15 30-Jun-21 LEAN CONCRETING OF SUMP PIT GL 1-2/B1-B3 Light Repair Shop 4.00 2.50 20.00 200.00 07-Jul-21 16.07 TCT-NSCR-21-0707-03 CP01-01-BL-IR-DPO-0357 28-Jul-21 28.62 TCT-NSCR-21-0728-17 CP01-01-BL-IR-D02-0441 PASSED
CONCRETE PLACEMENT FOR PILE CAP AND GRADE
182 31 30-Jun-21 Light Repair Shop 42.00 42.00 20-21 190-200 07-Jul-21 31.86 TCT-NSCR-21-0707-01 CP01-01-BL-IR-D02-0358 28-Jul-21 44.67 TCT-NSCR-21-0728-18 CP01-01-BL-IR-D02-0442 PASSED
BEAM GL 13-16/B1, 15-17/B2-B3
183 15 30-Jun-21 LEAN CONCRETING OF STAIR @ ZONE 1 GL 3-4/C-D OCC Building 2.00 2.00 22.00 190.00 07-Jul-21 16.19 TCT-NSCR-21-0707-04 CP01-01-BL-IR-DPO-0357 28-Jul-21 28.01 TCT-NSCR-21-0728-19 CP01-01-BL-IR-D06-0443 PASSED
195 31 06-Jul-21 CONCRETE POURING OF PILE CAP AT GRIDLINE D/2-4 Workshop Building 27.00 27.00 19.00 195.00 13-Jul-21 32.69 TCT-NSCR-21-0713-07 CP01-01-BL-IR-D01-0382 03-Aug-21 45.24 TCT-NSCR-21-0803-14 CP01-01-BL-IR-D01-0462 PASSED
197 31 08-Jul-21 CONCRETE POURING OF PILE CAP AT GRIDLINE E/4-5 Workshop Building 17.00 17.00 20.00 200.00 15-Jul-21 31.90 TCT-NSCR-21-0715-04 CP01-01-BL-IR-D01-0388 05-Aug-21 45.63 TCT-NSCR-21-0805-01 CP01-01-BL-IR-D02-0466 PASSED
49.32 TCT-NSCR-21-0807-14
CONCRETE POURING OF PILE CAP GL.8/A-E, GL.9/E,
200 36 10-Jul-21 COLUMN GL.6/B, GL.6/C, GL.6/D, & GRADE BEAM OCC Building 124.00 124.00 20.00 215.00 17-Jul-21 35.06 TCT-NSCR-21-0717-02 CP01-01-BL-IR-D06-0395 07-Aug-21 CP01-01-BL-IR-D06-0477 PASSED
GL.7-9/A-D, GL.7-10/E, GL.7-10/D-E 50.95 TCT-NSCR-21-0807-15
51.90 TCT-NSCR-21-0807-16
LEAN CONCRETING FOR GRADE BEAM GL 18-19/B1-
201 15 10-Jul-21 Light Repair Shop 6.50 17-Jul-21 15.47 TCT-NSCR-21-0717-02 CP01-01-BL-IR-D02-0396 07-Aug-21 28.13 TCT-NSCR-21-0807-17 CP01-01-BL-IR-D02-0478 PASSED
B3, 19/A-C
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
202 15 12-Jul-21 Workshop Building 15.00 12.00 20.00 190.00 19-Jul-21 15.48 TCT-NSCR-21-0719-40 CP01-01-BL-IR-D01-0402 09-Aug-21 28.60 TCT-NSCR-21-0809-03 CP01-01-BL-IR-D01-0481 PASSED
GRIDLINE B1-C/20-21
LEAN CONCRETING FOR SLAB @ ZONE 2B GL 4-5/A-E,
203 15 12-Jul-21 OCC Building 21.00 21.00 20.00 200.00 19-Jul-21 15.53 TCT-NSCR-21-0719-39 CP01-01-BL-IR-D06-0403 09-Aug-21 28.72 TCT-NSCR-21-0809-02 CP01-01-BL-IR-D06-0482 PASSED
3-4/D-E
CONCRETE POURING OF PILE CAP & GRADE BEAM AT
204 31 13-Jul-21 GRIDLINE B/9-10 Workshop Building 29.00 29.00 20.00 195.00 20-Jul-21 31.68 TCT-NSCR-21-0720-23 CP01-01-BL-IR-D01-0406 10-Aug-21 45.30 TCT-NSCR-21-0810-13 CP01-01-BL-IR-D01-0488 PASSED
213 36 16-Jul-21 CONCRET POURING OF COLUMN @ GL 5/A&E OCC Building 8.00 8.00 20.00 225.00 23-Jul-21 36.84 TCT-NSCR-21-0723-02 CP01-01-BL-IR-D06-0420 13-Aug-21 52.76 TCT-NSCR-21-0813-08 CP01-01-BL-IR-D06-0503 PASSED
214 15 16-Jul-21 LEAN CONCRETING OF SLAB ON GRADE @ GL 7-8/A-D OCC Building 16.00 16.00 20.00 225.00 23-Jul-21 15.62 TCT-NSCR-21-0723-01 CP01-01-BL-IR-D06-0421 13-Aug-21 28.26 TCT-NSCR-21-0813-09 CP01-01-BL-IR-D06-0504 PASSED
36 (w/ WP) CONCRETE POURING OF SUMP PIT SLAB @ GL 1/B1- 52.59 TCT-NSCR-21-0814-06 PASSED
215 17-Jul-21 LRS Building 3.50 3.50 24-Jul-21 36.71 TCT-NSCR-21-0724-02 CP01-01-BL-IR-D02-0427 14-Aug-21 CP01-01-BL-IR-D02-0509
36 (w/o WP) B2 AND GL. 1/B2-B3 51.59 TCT-NSCR-21-0814-05 PASSED
216 15 17-Jul-21 LEAN CONCRETING OF SLAB ON GRADE @ GL 7-8/D-E OCC Building 3.00 3.00 24-Jul-21 15.75 TCT-NSCR-21-0724-09 CP01-01-BL-IR-D06-0428 14-Aug-21 28.08 TCT-NSCR-21-0814-04 CP01-01-BL-IR-D06-0510 PASSED
219 36 21-Jul-21 CONCRETE POURING OF COLUMN @ GL 7/B & GL.7/E OCC Building 10.00 10.00 28-Jul-21 36.78 TCT-NSCR-21-0728-15 CP01-01-BL-IR-D06-0439 18-Aug-21 53.28 TCT-NSCR-21-0818-03 CP01-01-BL-IR-D06-0523 PASSED
36.16
36 (w/ WP) TCT-NSCR-21-0802-02 52.72 TCT-NSCR-21-0823-04
CONCRETE POURING OF SLAB ON GRADE @ GL 4-5/A- 36.17
220 25-Jul-21 OCC Building 58.00 58.00 01-Aug-21 CP01-01-BL-IR-D06-0452 23-Aug-21 CP01-01-BL-IR-D06-0536 PASSED
E, 3-4/D-E
36.47
36 (w/o WP) TCT-NSCR-21-0802-01 52.28 TCT-NSCR-21-0823-05
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot
37.37
36 (w/ WP) Suspended Slab: GL 1-3/A-C, GL 1-2/C-E 52.89 TCT-NSCR-21-0823-06
Suspended Beams/Girders: GL 1-3/A, 1-3/B, 1-3/C, 1-
2/D, 1-2/E, 1/A-E, 2/A-E, 3/A-C, 1-3/A-B, 36.95
224 26-Jul-21 1-3/B-C, 1-2/C-D, 1-2/D-E OCC Building 200.00 200.00 20.00 225.00 02-Aug-21 TCT-NSCR-21-0803-22 CP01-01-BL-IR-D06-0456 23-Aug-21 CP01-01-BL-IR-D06-0544 PASSED
Zone 2b Beams/Girders: CJ @ (GL 3-4/A, 3-4/B, 3-4/C,
2-3/D, 2-3/E, 3-4/A-B, 3-4/B-C, 2-3/C-D 37.35
36 (w/o WP) 2-3/D-E, 3/C-D) 52.58 TCT-NSCR-21-0823-07
37.26
230 36 30-Jul-21 CONCRETE POURING OF COLUMN @ GL.4/B & GL.4/D OCC Building 9.00 9.00 19.00 215.00 06-Aug-21 35.94 TCT-NSCR-21-0806-21 CP01-01-BL-IR-D06-0469 27-Aug-21 52.11 TCT-NSCR-21-0827-13 CP01-01-BL-IR-D06-0568 PASSED
235 36 31-Jul-21 CONCRETE POURING OF COLUMN @ GL.4/A & GL.4/C OCC Building 9.00 9.00 20.00 220.00 07-Aug-21 37.39 TCT-NSCR-21-0807-20 CP01-01-BL-IR-D06-0475 28-Aug-21 51.05 TCT-NSCR-21-0828-07 CP01-01-BL-IR-D06-0576 PASSED
250 36 09-Aug-21 CONCRETE POURING OF COLUMN @ GL.3/A, GL.3/B OCC Building 8.50 8.50 20.00 220.00 16-Aug-21 37.04 TCT-NSCR-21-0816-01 CP01-01-BL-IR-D06-0511 06-Sep-21 52.63 TCT-NSCR-21-0906-03 CP01-01-BL-IR-D06-614 PASSED
252 31 09-Aug-21 CONCRETE POURING OF PILECAP AT GRIDLINE E/6-9 Workshop Building 36.00 36.00 21.00 195.00 16-Aug-21 31.75 TCT-NSCR-21-0816-05 CP01-01-BL-IR-D01-0513 06-Sep-21 42.53 TCT-NSCR-21-0906-05 CP01-01-BL-IR-D01-616 PASSED
255 15 10-Aug-21 LEAN CONCRETE POURING OF SLAB @ G.L 8-9/A'-B OCC Building 3.50 3.50 17-Aug-21 15.37 TCT-NSCR-21-0817-06 CP01-01-BL-IR-D06-0532 07-Sep-21 28.43 TCT-NSCR-21-0907-02 CP01-01-BL-IR-D06-622 PASSED
257 15 11-Aug-21 LEAN CONCRETE FOR PILE CAP @ GRIDLINE 1/A-C LRS Building 5.00 5.00 20.00 195.00 18-Aug-21 16.76 TCT-NSCR-21-0818-05 CP01-01-BL-IR-D02-0533 08-Sep-21 28.93 TCT-NSCR-21-0908-01 CP01-01-BL-IR-D02-627 PASSED
262 36 14-Aug-21 CONCRETE POURING OF COLUMN @ GL.9/A & GL. 9/B OCC Building 8.00 8.00 21.00 200.00 21-Aug-21 37.71 TCT-NSCR-21-0821-05 CP01-01-BL-IR-D06-0534 11-Sep-21 52.95 TCT-NSCR-21-0911-04 CP01-01-BL-IR-D01-0645 PASSED
267 15 16-Aug-21 LEAN CONCRETING OF GRADE BEAM @ G.L 14-19/C LRS Building 23-Aug-21 16.28 TCT-NSCR-21-0823-11 CP01-01-BL-IR-D02-0555 13-Sep-21 26.34 TCT-NSCR-21-0913-04 CP01-01-BL-IR-D02-0662 PASSED
272 15 18-Aug-21 LEAN CONCRETING FOR GRADE BEAM @ GL. 14-19/B LRS Building 5.00 5.00 20.00 200.00 25-Aug-21 16.07 TCT-NSCR-21-0825-08 CP01-01-BL-IR-D02-0553 15-Sep-21 28.00 TCT-NSCR-21-0915-09 CP01-01-BL-IR-D02-674 PASSED
287 31 23-Aug-21 CONCRETE POURING OF PILE CAP @ GL. 1/B & 1/C LRS Building 16.80 19.00 21.00 180.00 30-Aug-21 31.95 TCT-NSCR-21-0830-28 CP01-01-BL-IR-D02-582 20-Sep-21 45.16 TCT-NSCR-21-0920-06 CP01-01-BL-IR-D02-710 PASSED
313 36 05-Sep-21 CONCRETE POURING OF COLUMN (2F) AT GL 3/E, 4/E OCC Building 6.50 6.50 20.00 225.00 12-Sep-21 36.87 TCT-NSCR-21-0912-01 CP01-01-BL-IR-D06-649 03-Oct-21 49.77 TCT-NSCR-21-1003-03 CP01-01-BL-IR-D06-0768 PASSED
319 36 07-Sep-21 CONCRETE POURING OF COLUMN (2F) AT GL 8/D, 9/D OCC Building 6.50 6.50 20.00 220.00 14-Sep-21 35.89 TCT-NSCR-21-0914-02 CP01-01-BL-IR-D06-663 05-Oct-21 49.33 TCT-NSCR-21-1005-01 CP01-01-BL-IR-D06-781 PASSED
356 31 29-Sep-21 CONCRETE POURING OF PILECAP AT GRIDLINE E/2 Workshop Building 8.00 8.00 22.00 200.00 06-Oct-21 31.57 TCT-NSCR-21-1006-06 CP01-01-BL-IR-D01-786 27-Oct-21 44.84 TCT-NSCR-21-1027-03 CP01-01-BL-IR-D01-914 PASSED
373 31 04-Oct-21 CONCRETE POURING OF PILECAP AT GRIDLINE E/3 Workshop Building 9.00 9.00 20.00 215.00 11-Oct-21 32.12 TCT-NSCR-21-1011-07 CP01-01-BL-IR-D01-819 01-Nov-21 44.28 TCT-NSCR-21-1102-03 CP01-01-BL-IR-D01-0950 PASSED
382 36 07-Oct-21 CONCRETE POURING OF COLUMN (3F) GL. 1/B & 1/C OCC Building 7.50 7.50 20.00 225.00 14-Oct-21 36.65 TCT-NSCR-21-1014-03 CP01-01-BL-IR-D06-837 04-Nov-21 52.77 TCT-NSCR-21-1104-01 CP01-01-BL-IR-D06-0978 PASSED
36 (w/ WP) CONCRETE POURING OF CB-7, CB-6, CB-5 AND CB-4 36.87 TCT-NSCR-21-1015-05 53.00 TCT-NSCR-21-1105-10 PASSED
WITH WATERSTOP (SIKA WATERBAR V-15) AT
385 08-Oct-21 Workshop Building 3.50 3.50 20.00 200.00 15-Oct-21 CP01-01-BL-IR-D01-840 05-Nov-21 CP01-01-BL-IR-D01-0989
GRIDLINE D1-E/19-20, D1-E/16-17, D1-E/13-14, D1-
36 (w/o WP) E/10-11 (SECOND LIFT) 37.01 TCT-NSCR-21-1015-06 53.03 TCT-NSCR-21-1105-11 PASSED
425 31 20-Oct-21 CONCRETE POURING OF PILECAP AT GRIDLINE B/8 Workshop Building 9.00 9.00 20.00 195.00 27-Oct-21 32.10 TCT-NSCR-21-1027-08 CP01-01-BL-IR-D01-910 17-Nov-21 44.37 TCT-NSCR-21-1117-01 CP01-01-BL-IR-D01-1069 PASSED
36 (w/ WP) OCC Building 54.00 54.00 20.00 225.00 37.48 TCT-NSCR-21-1102-16 52.66 TCT-NSCR-21-1122-04 CP01-01-BL-IR-D06-1106 PASSED
CONCRETE POURING OF SLAB ON GRADE AT GL
440 24-Oct-21 31-Oct-21 CP01-01-BL-IR-D06-0944 22-Nov-21
8-9/A-E & GL 9-10/D-E
36 (w/o WP) 38.09 TCT-NSCR-21-1102-17 52.45 TCT-NSCR-21-1122-05 CP01-01-BL-IR-D06-1106 PASSED
459 15 28-Oct-21 LEAN CONCRETE FOR GRADE BEAM AT GL 2-3/B1-B3 LRS Building 10.00 10.00 19.00 200.00 04-Nov-21 16.90 TCT-NSCR-21-1104-09 CP01-01-BL-IR-D02-0977 25-Nov-21 27.94 TCT-NSCR-21-1125-08 CP01-01-BL-IR-D02-1150 PASSED
462 15 29-Oct-21 LEAN CONCRETE FOR SLAB ON PIT AT GL B-B1/9-10 LRS Building 6.00 6.00 20.00 200.00 05-Nov-21 16.24 TCT-NSCR-21-1105-05 CP01-01-BL-IR-D02-0983 26-Nov-21 28.16 TCT-NSCR-21-1126-18 CP01-01-BL-IR-D02-1162 PASSED
463 36 29-Oct-21 AREA 4 OCC STAIR 2 AT ZONE 3, 2ND FLOOR OCC Building 7.00 7.00 19.00 225.00 05-Nov-21 37.18 TCT-NSCR-21-1105-06 CP01-01-BL-IR-D06-0984 26-Nov-21 52.58 TCT-NSCR-21-1126-16 CP01-01-BL-IR-D06-1163 PASSED
475 31 03-Nov-21 CONCRETE POURING OF GRADE BEAM GL. B1/3-6 LRS Building 18.00 18.00 20.00 200.00 10-Nov-21 32.36 TCT-NSCR-21-1110-18 CP01-01-BL-IR-D02-1010 01-Dec-21 44.14 TCT-NSCR-21-1201-09 CP01-01-BL-IR-D02-1213 PASSED
479 36 04-Nov-21 CONCRETE POURING OF COLUMN GL. 5/D (5F) OCC Building 3.00 3.00 25.00 220.00 11-Nov-21 36.71 TCT-NSCR-21-1111-14 CP01-01-BL-IR-D06-1025 02-Dec-21 52.47 TCT-NSCR-21-1202-12 CP01-01-BL-IR-D06-1228 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT 15.74 27.78 TCT-NSCR-21-1202-08 PASSED
482 15 04-Nov-21 GRIDLINE C-D/7-10 Workshop Building 54.00 54.00 20.00 170.00 11-Nov-21 TCT-NSCR-21-1111-10 CP01-01-BL-IR-D01-1028 02-Dec-21 CP01-01-BL-IR-D01-1231
15.98 27.62 TCT-NSCR-21-1202-09 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
483 15 04-Nov-21 Workshop Building 23.00 23.00 20.00 180.00 11-Nov-21 15.74 TCT-NSCR-21-1111-12 CP01-01-BL-IR-D01-1029 02-Dec-21 27.91 TCT-NSCR-21-1202-06 CP01-01-BL-IR-D01-1232 PASSED
GRIDLINE A-A2/10-13
CONCRETE POURING OF MAIN COLUMNS AND
489 36 05-Nov-21 OCC Building 12.50 12.50 21.00 220.00 12-Nov-21 37.30 TCT-NSCR-21-1113-06 CP01-01-BL-IR-D06-1034 03-Dec-21 52.16 TCT-NSCR-21-1203-05 CP01-01-BL-IR-D06-1243 PASSED
PLANTED COLUMN GL. 9/C-E' & 10/E' (5th Floor)
LEAN CONCRETE FOR PILE CAP & GRADE BEAM AT GL
490 15 05-Nov-21 LRS Building 16.00 16.00 20.00 200.00 12-Nov-21 17.56 TCT-NSCR-21-1112-15 CP01-01-BL-IR-D02-1035 03-Dec-21 27.95 TCT-NSCR-21-1203-07 CP01-01-BL-IR-D02-1244 PASSED
6-7/A, 6-7/B
CONCRETE POURING OF CHB UPSTAND @ 2F ZONE 3
491 36 05-Nov-21 OCC Building 3.00 3.00 20.00 210.00 12-Nov-21 37.20 TCT-NSCR-21-1112-14 CP01-01-BL-IR-D06-1036 03-Dec-21 52.14 TCT-NSCR-21-1203-09 CP01-01-BL-IR-D06-1245 PASSED
GL 9-10/A-D
LEAN CONCRETE FOR PILE CAP & GRADE BEAM AT GL
492 15 05-Nov-21 LRS Building 5.00 5.00 22.00 195.00 12-Nov-21 15.91 TCT-NSCR-21-1112-13 CP01-01-BL-IR-D02-1037 03-Dec-21 28.39 TCT-NSCR-21-1203-08 CP01-01-BL-IR-D02-1246 PASSED
1-2/B3 & 2/B3
CONCRETE CASTING OF LEAN CONCRETE FOR
493 15 05-Nov-21 Workshop Building 14.00 14.00 20.00 195.00 12-Nov-21 15.15 TCT-NSCR-21-1112-12 CP01-01-BL-IR-D01-1038 03-Dec-21 27.98 TCT-NSCR-21-1203-04 CP01-01-BL-IR-D01-1247 PASSED
SUNKEN PIT SLAB AT GRIDLINE D1-E/10-13
CONCRETE CASTING OF LEAN CONCRETE FOR
494 15 05-Nov-21 Workshop Building 15.00 15.00 20.00 190.00 12-Nov-21 15.86 TCT-NSCR-21-1112-11 CP01-01-BL-IR-D01-1039 03-Dec-21 27.89 TCT-NSCR-21-1203-06 CP01-01-BL-IR-D01-1248 PASSED
SUNKEN PIT SLAB AT GRIDLINE D-D1/7-10
CONCRETE CASTING OF LEAN CONCRETE FOR
495 15 05-Nov-21 SUNKEN PIT SLAB AT GRIDLINE D-D1/4-7 Workshop Building 15.00 15.00 20.00 185.00 12-Nov-21 17.59 TCT-NSCR-21-1112-10 CP01-01-BL-IR-D01-1040 03-Dec-21 27.96 TCT-NSCR-21-1203-10 CP01-01-BL-IR-D01-1249 PASSED
498 36 06-Nov-21 CONCRETE CASTING UPSTAND ZONE2&3 4F GL.5-10/E OCC Building 3.00 3.00 23.00 225.00 13-Nov-21 36.44 TCT-NSCR-21-1113-09 CP01-01-BL-IR-D06-1046 04-Dec-21 52.04 TCT-NSCR-21-1204-13 CP01-01-BL-IR-D06-1260 PASSED
503 36 09-Nov-21 CONCRETE POURING OF COLUMN (5F) AT GL 7-10/B OCC Building 13.00 13.00 21.00 210.00 16-Nov-21 36.89 TCT-NSCR-21-11156-06 CP01-01-BL-IR-D06-1058 07-Dec-21 52.43 TCT-NSCR-21-1207-15 CP01-01-BL-IR-D06-1277 PASSED
504 15 09-Nov-21 LEAN CONCRETE FOR PIT SLAB GL 8-9/B-C LRS Building 18.00 18.00 21.00 200.00 16-Nov-21 15.76 TCT-NSCR-1116-04 CP01-01-BL-IR-D02-1059 07-Dec-21 27.72 TCT-NSCR-21-1207-18 CP01-01-BL-IR-D02-1278 PASSED
CONCRETE CASTING OF LEAN CONCRETE FOR PIT 22-
505 15 09-Nov-21 Workshop Building 11.00 11.00 21.00 190.00 16-Nov-21 18.48 TCT-NSCR-21-1116-07 CP01-01-BL-IR-D01-1060 07-Dec-21 27.73 TCT-NSCR-21-1207-16 CP01-01-BL-IR-D01-1279 PASSED
02 AT GRIDLINE A2-A3/11-12
CONCRETE CASTING OF LEAN CONCRETE FOR
506 15 09-Nov-21 Workshop Building 9.00 9.00 21.00 200.00 16-Nov-21 15.73 TCT-NSCR-21-1116-03 CP01-01-BL-IR-D01-1061 07-Dec-21 27.82 TCT-NSCR-21-1207-17 CP01-01-BL-IR-D01-1280 PASSED
SUNKEN PIT SLAB AT GRIDLINE D-D1/2-4
CONCRETE POURING OF UPSTAND(4F GL. 5-10/C)
507 36 09-Nov-21 OCC Building 3.00 3.00 21.00 215.00 16-Nov-21 36.97 TCT-NSCR-21-1116-05 CP01-01-BL-IR-D06-1062 07-Dec-21 50.89 TCT-NSCR-21-1207-19 CP01-01-BL-IR-D06-1281 PASSED
AND LINTEL BEAM (GF GL. 9-10/B-D)
CONCRETE PLACEMENT FOR DROP WALL AT GL.12-
508 31 10-Nov-21 LRS Building 8.50 8.50 21.00 200.00 17-Nov-21 32.06 TCT-NSCR-21-1117-11 CP01-01-BL-IR-D02-1067 08-Dec-21 44.03 TCT-NSCR-21-1208-01 CP01-01-BL-IR-D02-1300 PASSED
15/B & C
CONCRETE POURING OF PILE CAP AT GRIDLINE B1/9
509 31 10-Nov-21 Workshop Building 16.00 16.00 22.00 185.00 17-Nov-21 32.18 TCT-NSCR-21-1117-12 CP01-01-BL-IR-D01-1068 08-Dec-21 44.16 TCT-NSCR-21-1208-02 CP01-01-BL-IR-D06-1301 PASSED
AND GRADE BEAM AT GRIDLINE B1/8-10
CONCRETE PLACEMENT FOR PILE CAP AND GRADE
510 31 11-Nov-21 LRS Building 26.50 26.50 23.00 200.00 18-Nov-21 31.75 TCT-NSCR-21-1118-14 CP01-01-BL-IR-D02-1075 09-Dec-21 44.30 TCT-NSCR-21-1209-24 CP01-01-BL-IR-D02-1289 PASSED
BEAM AT GL.1-4/B1
CONCRETE PLACEMENT OF LEAN CONCRETE FOR
511 15 11-Nov-21 LRS Building 2.00 2.00 23.00 180.00 18-Nov-21 16.63 TCT-NSCR-21-1118-13 CP01-01-BL-IR-D02-1076 09-Dec-21 27.64 TCT-NSCR-21-1209-21 CP01-01-BL-IR-D02-1290 PASSED
GRADE BEAM AT GL.4-6/C
CONCRETE POURING OF EC1, STC & COLUMN (4F) AT
512 36 12-Nov-21 OCC Building 7.00 7.00 24.00 225.00 19-Nov-21 36.94 TCT-NSCR-21-1119-21 CP01-01-BL-IR-D06-1077 10-Dec-21 52.35 TCT-NSCR-21-1210-01 CP01-01-BL-IR-D06-1308 PASSED
GL 1/B & ZONE 1
CONCRETE POURING OF STIFFENER COLUMN, LINTEL
513 36 11-Nov-21 BEAM & CHB UPSTAND (GF & 2F) XONE 3 AT GL 8- OCC Building 2.50 2.50 20.00 215.00 18-Nov-21 35.57 TCT-NSCR-21-1118-19 CP01-01-BL-IR-D06-1084 09-Dec-21 49.06 TCT-NSCR-21-1209-25 CP01-01-BL-IR-D06-1291 PASSED
10/B-D, 8-10/A-C
36 (w/ WP) CONCRETE POURING OF SUMP PIT-11 AT GRIDLINE 18-Nov-21 36.65 TCT-NSCR-21-1118-17 CP01-01-BL-IR-D01-1078 52.20 TCT-NSCR-21-1209-23 PASSED
514 11-Nov-21 D1-E/20-21 (THIRD LIFT) Workshop Building 4.00 4.00 24.00 195.00 09-Dec-21 CP01-01-BL-IR-D01-1292
36 (w/o WP) 18-Nov-21 36.48 TCT-NSCR-21-1118-19 CP01-01-BL-IR-D01-1078 52.27 TCT-NSCR-21-1209-22 PASSED
52.22 TCT-NSCR-21-1209-18 PASSED
CONCRETE POURING OF SUNKEN PIT WALL AND SLAB 52.09 TCT-NSCR-21-1209-20 PASSED
515 11-Nov-21 Workshop Building 110.00 108.00 23.00 210.00 18-Nov-21 CP01-01-BL-IR-D01-1079 09-Dec-21 CP01-01-BL-IR-D01-1288
AT GRIDLINE D-E/14-17
52.21 TCT-NSCR-21-1209-21 PASSED
36 (w/o WP) 36.34 TCT-NSCR-21-1118-16 50.13 TCT-NSCR-21-1209-22 PASSED
51.74 TCT-NSCR-21-1209-23 PASSED
CONCRETE PLACEMENT FOR PILE CAP AND GRADE
516 31 12-Nov-21 LRS Building 26.50 26.50 20.00 200.00 19-Nov-21 32.29 TCT-NSCR-21-1119-19 CP01-01-BL-IR-D02-1085 10-Dec-21 44.33 TCT-NSCR-21-1210-02 CP01-01-BL-IR-D02-1309 PASSED
BEAM AT GL.1-4/B2
CONCRETE PLACEMENT FOR BORED PILE 3 OF
517 36 12-Nov-21 MTS 6 4.00 4.00 20.00 215.00 19-Nov-21 36.61 TCT-NSCR-21-1119-20 CP01-01-BL-IR-D01-1086 10-Dec-21 52.53 TCT-NSCR-21-1210-05 CP01-01-BL-IR-MT6-1310 PASSED
EQUIPMENT PAD
CONCRETE CASTING OF LEAN CONCRETE FOR SLAB AT
518 15 12-Nov-21 Workshop Building 13.00 13.00 22.00 200.00 19-Nov-21 15.57 TCT-NSCR-21-1119-18 CP01-01-BL-IR-D01-1087 10-Dec-21 27.88 TCT-NSCR-21-1210-03 CP01-01-BL-IR-D01-1311 PASSED
GRIDLINE C2-D/5-7
CONCRETE POURING OF RETAINING WALL GL.
519 36 13-Nov-21 OCC Building 6.50 6.50 25.00 220.00 22-Nov-21 39.16 TCT-NSCR-21-1122-14 CP01-01-BL-IR-D06-1110 11-Dec-21 52.78 TCT-NSCR-21-1211-06 CP01-01-BL-IR-D06-1321 PASSED
5-10/E'(4F)
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot
526 36 15-Nov-21 CONCRETE POURING OF UPSTAND GL. 9-10/A-D (3F) OCC Building 3.50 3.50 21.00 200.00 22-Nov-21 36.52 TCT-NSCR-21-1122-12 CP01-01-BL-IR-D06-1108 13-Dec-21 52.34 TCT-NSCR-21-1213-11 CP01-01-BL-IR-D06-1335 PASSED
36 (w/ WP) CONCRETE POURING OF PIT 22-02 SLAB AND WALL AT 22-Nov-21 37.17 TCT-NSCR-21-1122-10 CP01-01-BL-IR-D01-1110 51.65 TCT-NSCR-21-1213-15 PASSED
528 15-Nov-21 Workshop Building 14.00 14.00 24.00 195.00 13-Dec-21 CP01-01-BL-IR-D01-1337
36 (w/o WP) GRIDLINE A2-A3/11-12 22-Nov-21 37.44 TCT-NSCR-21-1122-11 CP01-01-BL-IR-D01-1110 52.15 TCT-NSCR-21-1213-16 PASSED
36 (w/ WP) CONCRETE POURING OF SUNKEN PIT WALL AT 36.83 TCT-NSCR-21-1125-23 52.36 TCT-NSCR-21-1216-06 PASSED
543 18-Nov-21 Workshop Building 21.00 21.00 26.00 195.00 25-Nov-21 CP01-01-BL-IR-D01-1142 16-Dec-21 CP01-01-BL-IR-D01-1365
GRIDLINE D/14-17 & E/14-17
36 (w/o WP) 37.07 TCT-NSCR-21-1125-24 52.01 TCT-NSCR-21-1216-07 PASSED
CONCRETE POURING OF SLAB AT GRIDLINE C3-D/14-
544 31 18-Nov-21 Workshop Building 39.00 39.00 23.00 200.00 25-Nov-21 32.00 TCT-NSCR-21-1125-20 CP01-01-BL-IR-D01-1143 16-Dec-21 43.69 TCT-NSCR-21-1216-04 CP01-01-BL-IR-D01-1366 PASSED
17 & E/14-17
CONCRETE PLACEMENT FOR BORED PILE 18 OF
545 36 18-Nov-21 MTS 6 9.00 9.00 21.00 225-250 25-Nov-21 36.39 TCT-NSCR-21-1125-21 CP01-01-BL-IR-MT6-1144 16-Dec-21 52.18 TCT-NSCR-21-1216-03 CP01-01-BL-IR-MT6-1367 PASSED
BUILDING & BORED PILE 09 OF EQUIPMENT PAD
CONCRETE POURING OF COLUMN (5F) AT GL4/A, 4/B,
546 36 19-Nov-21 OCC Building 12.50 12.50 21.00 190.00 26-Nov-21 36.61 TCT-NSCR-21-1126-22 CP01-01-BL-IR-D06-1154 17-Dec-21 51.16 TCT-NSCR-21-1217-13 CP01-01-BL-IR-D06-1373 PASSED
4/C
CONCRETE PLACEMENT FOR BORED PILE 22 & BORED
547 36 19-Nov-21 MTS 6 10.00 10.00 26.00 215-245 26-Nov-21 37.01 TCT-NSCR-21-1126-23 CP01-01-BL-IR-MT6-1155 17-Dec-21 52.28 TCT-NSCR-21-1217-10 CP01-01-BL-IR-MT6-1374 PASSED
PILE 13 OF BUILDING
CONCRETE POURING OF PILE CAP, FOUNDATION
548 31 19-Nov-21 COLUMN AT GRIDLINE A2/5-6 AND GRADE BEAM AT Workshop Building 28.00 28.00 22.00 200.00 26-Nov-21 31.73 TCT-NSCR-21-1126-27 CP01-01-BL-IR-D01-1156 17-Dec-21 44.25 TCT-NSCR-21-1217-09 CP01-01-BL-IR-D01-1375 PASSED
GRIDLINE A2/4-7
CONCRETE POURING OF PILE CAP AND GRADE BEAM
549 31 19-Nov-21 Workshop Building 18.00 18.00 25.00 190.00 26-Nov-21 32.19 TCT-NSCR-21-1126-24 CP01-01-BL-IR-D01-1157 17-Dec-21 44.18 TCT-NSCR-21-1217-08 CP01-01-BL-IR-D01-1376 PASSED
AT GRIDLINE B1/6-7
CONCRETE POURING OF LEAN CONCRETE AT GL.4-6/
550 15 19-Nov-21 LRS Building 6.00 6.00 22.00 180.00 26-Nov-21 16.01 TCT-NSCR-21-1126-25 CP01-01-BL-IR-D01-1158 17-Dec-21 27.69 TCT-NSCR-21-1217-12 CP01-01-BL-IR-D02-1377 PASSED
A&B
CONCRETE POURING OF UPSTAND AT GL.5-10/E' (5F)
551 36 19-Nov-21 OCC Building 2.50 2.50 21.00 210.00 26-Nov-21 37.07 TCT-NSCR-21-1126-25 CP01-01-BL-IR-D06-1159 17-Dec-21 52.02 TCT-NSCR-21-1217-11 CP01-01-BL-IR-D02-1378 PASSED
AND UPSTAND GL.9-10/A-E (3F)
CONCRETE POURING FOR CHB UPSTAND & STIFFENER
552 36 20-Nov-21 OCC Building 2.00 2.00 23.00 215.00 27-Nov-21 36.97 TCT-NSCR-21-1127-09 CP01-01-BL-IR-D06-1179 18-Dec-21 52.35 TCT-NSCR-21-1218-06 CP01-01-BL-IR-D06-1383 PASSED
COLUMN GF ZONE 2 & ZONE 3
TAISEI – DMCI JOINT VENTURE
North – South Commuter Railway Project (CP01)
Elevated Structures 6 Stations and Depot
36 (w/ WP) CONCRETE POURING OF PIGEON HOUSE #3 (1ST LIFT) OCC Building 2.50 2.50 20.00 200.00 36.77 TCT-NSCR-21-1202-15 52.07 TCT-NSCR-21-1223-21 PASSED
575 25-Nov-21 02-Dec-21 CP01-01-BL-IR-D06-1221 23-Dec-21 CP01-01-BL-IR-D06-1438
(RD) ZONE 2
36 (w/o WP) OCC Building 2.50 2.50 20.00 200.00 36.53 TCT-NSCR-21-1202-16 50.89 TCT-NSCR-21-1223-20 PASSED
CONCRETE POURING OF COLUMN (5F) AT GL 2/A, 2/B,
576 36 25-Nov-21 OCC Building 9.50 9.50 23.00 200.00 02-Dec-21 36.79 TCT-NSCR-21-1202-22 CP01-01-BL-IR-D06-1222 23-Dec-21 49.43 TCT-NSCR-21-1223-22 CP01-01-BL-IR-D06-1439 PASSED
2/C
577 36 25-Nov-21 CONCRETE POURING OF SOLAR PANEL SUPPORT (RD) OCC Building 4.00 4.00 24.00 220.00 02-Dec-21 36.54 TCT-NSCR-21-1202-21 CP01-01-BL-IR-D06-1223 23-Dec-21 50.55 TCT-NSCR-21-1223-23 CP01-01-BL-IR-D06-1440 PASSED
36 (w/ WP) CONCRETE POURING OF SUNKEN PIT WALL AT 36.77 TCT-NSCR-21-1203-13 48.74 TCT-NSCR-21-1223-11 PASSED
586 26-Nov-21 Workshop Building 11.00 11.00 20.00 200.00 03-Dec-21 CP01-01-BL-IR-D01-1237 24-Dec-21 CP01-01-BL-IR-D01-1455
GRIDLINE D/12-14 & E/12-14
36 (w/o WP) 36.71 TCT-NSCR-21-1203-14 50.26 TCT-NSCR-21-1223-10 PASSED
CONCRETE POURING OF SLAB AT GRIDLINE C3-D/12-
587 31 26-Nov-21 Workshop Building 24.00 24.00 21.00 200.00 03-Dec-21 31.89 TCT-NSCR-21-1203-11 CP01-01-BL-IR-D01-1238 24-Dec-21 44.17 TCT-NSCR-21-1223-12 CP01-01-BL-IR-D01-1456 PASSED
14 & E/12-14
36 (w/ WP) CONCRETE POURING OF PIGEON HOUSE #4 (1ST LIFT) 36.36 TCT-NSCR-21-1204-15 52.08 TCT-NSCR-21-1227-40 PASSED
596 27-Nov-21 OCC Building 3.00 3.00 26.00 200.00 04-Dec-21 CP01-01-BL-IR-D06-1256 25-Dec-21 CP01-01-BL-IR-D06-1470
(RD) AT GL 10
36 (w/o WP) 37.02 TCT-NSCR-21-1204-15 50.25 TCT-NSCR-21-1227-39 PASSED