DEAD LOAD COMPUTATIONS

(THIRD FLOOR)
FIXED END MOMENTS
1 to 6 along Gridline A
w L2 P b2a
Beam: G-3 ; b = 0.3m h= 0.45m FEM = ± FEM = ±
12 L2
Unit Wt.con. = 23.56 KN/m3
WF1 = 2.73 kPa h=3.2m L=0.9m 2
t=0.15m FEM BC = - (13.04785)(4.5) = -22.0824688
WF1 = 2.73 kPa h=3.2m L=3.2m 12
t=0.15m
2

Slab self-weight 2.9375 kPa


FEM CB = (13.04785)(4.5) = 22.0824688
12
Ceiling Finish 0.24 kPa
Floor Finish 1.1 kPa 2
Mech. Duct all. 0.25 kPa FEM CE = - (13.04785)(4.5) = -22.0824688
Electrical Load 0.08 kPa 12
Partition Load 0 2
Miscellaneous Load 1 kPa FEM EC = (13.04785)(4.5) = 22.0824688
TOTAL (WDL) 5.6075 kPa 12
2
WALL (WDL)
FEM EG = - (13.04785)(4.5) = -22.0824688
12
Wall (WF1) = (h)(U.W/L)(t)
(13.04785)(4.5)2
WF1 = (3.2m)(2.73kPa/0.9m)(0.15m) FEM ¿ = = 22.0824688
WF1 = 1.456 KN/m 12
2
WF1 = (3.2m)(2.73kPa/03.2m)(0.15m) FEM GI = - (13.04785)(4.5) = -22.0824688
WF1 = 0.4095 KN/m 12
BEAM G-3 (WDL) 2
FEM IG = (13.04785)(4.5) = 22.0824688
Beam (WDL) = (b)(h)(U.W) 12
2
Beam (WDL) = (0.3m)(0.45m)(23.56KN/m) FEM IK = - (12.00135)(5) = -25.0028125
Beam (WDL) = 3.1806 KN/m 12

S-1 = S-6 = WDL + WDL(beam) + WDL(wall) 2


FEM IK = (12.00135)(5) = 25.0028125
12
S-1 WDL1 13.04785
S-1 WDL1 13.04785
S-1 WDL1 13.04785
S-1 WDL1 13.04785
S-6 WDL6 12.00135
* Note: The reactions and value of k can be
found on the excel file (mdm and excel file
of reactions)
S-1&4 WDL1 26.20810967
S-1&4 WDL1 26.20810967
S-1&4 WDL1 26.20810967
S-1&4 WDL1 26.20810967
S-6 WDL6 17.14165967

1 to 6 along Gridline B FIXED END MOMENTS

Beam: G-2 ; b = 0.3m h= 0.45m w L2 P b2a


Unite Wt.con. = 23.56 KN/m3 FEM = ± FEM = ±
12 L2
WF1 = 2.73 kPa h=3.2m L=2m t=0.15m
2
Slab self-weight 2.9375 kPa FEM BC = - (26.20810967)(4.5) =
Ceiling Finish 0.24 kPa 12
Floor Finish 1.1 kPa -44.22618507
Mech. Duct all. 0.25 kPa
2
Electrical Load 0.08 kPa FEM BC = (26.20810967)(4.5) =
Partition Load 0 12
Miscellaneous Load 1 kPa 44.22618507
TOTAL (WDL) 5.6075 kPa
2

WALL (WDL) FEM CE = - (26.20810967)(4.5) =


12
-44.22618507
Wall (WF1) = (h)(U.W/L)(t)
2
WF1 = (3.2m)(2.73kPa/2m)(0.15m) FEM EC = (26.20810967)(4.5) =
WF1 = 0.6552 KN/m 12
44.22618507
2
BEAM G-3 (WDL)
FEM EG = - (26.20810967)(4.5) =
12
Beam (WDL) = (b)(h)(U.W) -44.22618507
Beam (WDL) = (0.3m)(0.45m)(23.56KN/m)
(26.20810967)(4.5)2
Beam (WDL) = 3.1806 KN/m FEM ¿ = =
12
S-1 = S-6 = WDL + WDL(beam) + WDL(wall) 44.22618507
2
FEM GI = - (26.20810967)(4.5) = Beam (WDL) = (b)(h)(U.W)
12
-44.22618507
Beam (WDL) = (0..25m)(0.45m)(23.56KN/m)
2 Beam (WDL) = 2.6505 KN/m
FEM IG = (26.20810967)(4.5) =
12 S-1 = S-6 = WDL + WDL(beam) + WDL(wall)
44.22618507
S-4 WDL4 16.76160114
2
FEM IK = - (17.14165967)(5) = S-4 WDL4 16.76160114
12 S-4 WDL4 16.76160114
-35.71179098 S-4 WDL4 16.76160114
2 S-6 WDL6 16.74659967
FEM IK = (17.14165967)(5) =
12
35.71179098

1 to 6 along Gridline C
FIXED END MOMENTS
Beam: G-2 ; b = 0.3m h= 0.45m
Unite Wt.con. = 23.56 KN/m3
w L2 P b2a
WF2 = 2.73 kPa h=3.2m L=4.5m FEM = ± FEM = ±
t=0.1m 12 L2
WF2 = 2.11 kPa h=3.2m L=5m t=0.1m
2
FEM BC = - (16.76160114 )( 4.5) =
Slab self-weight 2.9375 kPa 12
Ceiling Finish 0.24 kPa -28.28520192
Floor Finish 1.1 kPa
Mech. Duct all. 0.25 kPa 2

Electrical Load 0.08 kPa FEM BC = (16.76160114 )( 4.5) =


12
Partition Load 0
28.28520192
Miscellaneous Load 1 kPa
TOTAL (WDL) 5.6075 kPa 2
FEM CE = - (16.76160114 )( 4.5) =
WALL (WDL) 12
-28.28520192
Wall (WF1) = (h)(U.W/L)(t)
2
FEM EC = (16.76160114 )( 4.5) =
WF1 = (3.2m)(2.11kPa/4.5m)(0.1m) 12
WF1 = 0.1500444444 KN/m 28.28520192
WF1 = (3.2m)(2.11kPa/5m)(0.1m)
WF1 = 0.13504 KN/m 2
FEM EG = - (16.76160114 )( 4.5) =
12
BEAM G-1 (WDL) -28.28520192
Floor Finish 1.1 kPa
2
(16.76160114 )( 4.5) Mech. Duct all. 0.25 kPa
FEM ¿ = = Electrical Load 0.08 kPa
12
28.28520192 Partition Load 0
Miscellaneous Load 1 kPa
2 TOTAL (WDL) 5.6075 kPa
FEM GI = - (16.76160114 )( 4.5) =
12 WALL (WDL)
-28.28520192
2
Wall (WF1) = (h)(U.W/L)(t)
FEM IG = (16.76160114 )( 4.5) =
12 WF1 = (3.2m)(2.11kPa/7m)(0.15m)
28.28520192 WF1 = 0.1872 KN/m

2
FEM IK = - (16.74659967)(5) = BEAM G-4 (WDL)
12
-34.88874931
Beam (WDL) = (b)(h)(U.W)
2
FEM IK = (16.74659967)(5) = Beam (WDL) = (0..4m)(0.4m)(23.56KN/m)
12 Beam (WDL) = 3.7696 KN/m
34.88874931
BEAM G-5 (WDL)

Beam (WDL) = (0..4m)(0.5m)(23.56KN/m)


Beam (WDL) = 4.712 KN/m

S-1 = S-6 = WDL + WDL(beam) + WDL(wall)

S-2 WDL2 28.26616747


S-3 WDL3 8.442516667

A to C along Gridline 1
FIXED END MOMENTS
Beam: G-2 ; b = 0.3m h= 0.45m
Unite Wt.con. = 23.56 KN/m3 w L2 P b2a
FEM = ± FEM = ±
WF1 = 2.73 kPa h=3.2m L=7m t=0.15m 12 L2

Slab self-weight 2.9375 kPa


Ceiling Finish 0.24 kPa
2
FEM BC = - (28.26616747)(7) =
12
-115.4201838
A to C along Gridline 2&4
2
FEM CB = (28.26616747)(7) = Beam: G-2 ; b = 0.3m h= 0.45m
12 Unite Wt.con. = 23.56 KN/m3
115.4201838 No Wall
2
Slab self-weight 2.9375 kPa
FEM CE = - (8.442516667)(2.5) =
12 Ceiling Finish 0.24 kPa
-4.397144097 Floor Finish 1.1 kPa
Mech. Duct all. 0.25 kPa
2 Electrical Load 0.08 kPa
FEM EC = (8.442516667)(2.5) = Partition Load 0
12
Miscellaneous Load 1 kPa
4.397144097
TOTAL (WDL) 5.6075 kPa

BEAM G-6 (WDL)

Beam (WDL) = (b)(h)(U.W)

Beam (WDL) = (0..4m)(0.4m)(23.56KN/m)


Beam (WDL) = 3.7696 KN/m

BEAM G-8 (WDL)

Beam (WDL) = (0..4m)(0.5m)(23.56KN/m)


Beam (WDL) = 4.712 KN/m

S-1 = S-6 = WDL + WDL(beam)

S-2 WDL2 51.44593494


S-3 WDL3 13.11543333
FIXED END MOMENTS

w L2 P b2a
FEM = ± FEM = ±
12 L2
2
FEM BC = - (51.44593494)(7) =
12
-210.070901 A to C along Gridline 3
2
Beam: G-2 ; b = 0.3m h= 0.45m
FEM BC = (51.44593494)(7) = 210.070901 Unite Wt.con. = 23.56 KN/m 3
12
WF1 = 2.73 kPa h=3.2m L=7m t=0.15m
2
FEM CE = - (13.11543333)(2.5) = Slab self-weight 2.9375 kPa
12 Ceiling Finish 0.24 kPa
-6.830954859 Floor Finish 1.1 kPa
2
Mech. Duct all. 0.25 kPa
FEM CE = (13.11543333)(2.5) = Electrical Load 0.08 kPa
12 Partition Load 0
6.830954859 Miscellaneous Load 1 kPa
TOTAL (WDL) 5.6075 kPa

WALL (WDL)

Wall (WF1) = (h)(U.W/L)(t)

WF1 = (3.2m)(2.73kPa/7m)(0.15m)
WF1 = 0.1872 KN/m

BEAM G-6 (WDL)

Beam (WDL) = (b)(h)(U.W)

Beam (WDL) = (0..4m)(0.4m)(23.56KN/m)


Beam (WDL) = 3.7696 KN/m

BEAM G-8 (WDL)

Beam (WDL) = (0..4m)(0.5m)(23.56KN/m)


Beam (WDL) = 4.712 KN/m

S-1 = S-6 = WDL + WDL(beam) + WDL(wall)

S-2 WDL2 51.63313494


S-3 WDL3 13.11543333
FIXED END MOMENTS

w L2 P b2a
FEM = ± FEM = ±
12 L2
2
FEM BC = - (51.63313494)(7) = A to C along Gridline 5
12
-210.835301 Beam: G-2 ; b = 0.3m h= 0.45m
Unite Wt.con. = 23.56 KN/m3
2
WF1 = 2.73 kPa h=3.2m L=7m t=0.15m
FEM BC = (51.63313494)(7) = 210.070901
12
Slab self-weight 2.9375 kPa
2 Ceiling Finish 0.24 kPa
FEM CE = - (13.11543333)(2.5) = Floor Finish 1.1 kPa
12 Mech. Duct all. 0.25 kPa
-6.830954859 Electrical Load 0.08 kPa
2
Partition Load 0
FEM CE = (13.11543333)(2.5) = Miscellaneous Load 1 kPa
12 TOTAL (WDL) 5.6075 kPa
6.830954859
WALL (WDL)

Wall (WF1) = (h)(U.W/L)(t)

WF1 = (3.2m)(2.73kPa/7m)(0.15m)
WF1 = 0.1872 KN/m

BEAM G-6 (WDL)

Beam (WDL) = (b)(h)(U.W)

Beam (WDL) = (0..4m)(0.4m)(23.56KN/m)


Beam (WDL) = 3.7696 KN/m

BEAM G-7 (WDL)

Beam (WDL) = (0..4m)(0.5m)(23.56KN/m)


Beam (WDL) = 4.712 KN/m

S-1 = S-6 = WDL + WDL(beam) + WDL(wall)

S-2 WDL2 28.26616747


S-3 WDL3 13.11543333
FIXED END MOMENTS

w L2 P b2a
FEM = ± FEM = ±
12 L2
2
FEM BC = - (28.26616747)(7) = A to C along Gridline 6
12
-115.4201833 Beam: G-2 ; b = 0.3m h= 0.45m
Unite Wt.con. = 23.56 KN/m3
2
WF1 = 2.73 kPa h=3.2m L=7m t=0.15m
FEM BC = (28.26616747)(7) = WF1 = 2.73 kPa h=1.1m L=1.7m
12
115.4201833 t=0.15m

2
FEM CE = - (13.11543333)(2.5) = Slab self-weight 2.9375 kPa
12 Ceiling Finish 0.24 kPa
-6.830954859 Floor Finish 1.1 kPa
2
Mech. Duct all. 0.25 kPa
FEM CE = (13.11543333)(2.5) = Electrical Load 0.08 kPa
12 Partition Load 0
6.830954859 Miscellaneous Load 1 kPa
TOTAL (WDL) 5.6075 kPa

WALL (WDL)

Wall (WF1) = (h)(U.W/L)(t)

WF1 = (3.2m)(2.73kPa/7m)(0.15m)
WF1 = 0.1872 KN/m
WF1 = (1.1m)(2.73kPa/1.7m)(0.15m)
WF1 = 0.2649705882 KN/m

BEAM G-4 (WDL)

Beam (WDL) = (b)(h)(U.W)

Beam (WDL) = (0..4m)(0.4m)(23.56KN/m)


Beam (WDL) = 3.7696 KN/m
BEAM G-5 (WDL)

Beam (WDL) = (0..4m)(0.5m)(23.56KN/m)


Beam (WDL) = 4.712 KN/m

S-1 = S-6 = WDL + WDL(beam) + WDL(wall)

S-2 WDL2 10.5067


S-3 WDL3 8.70748725

FIXED END MOMENTS

w L2 P b2a
FEM = ± FEM = ±
12 L2
2
FEM BC = - (28.26616747)(7) -
12
2
16.8225 ( 4 ) (3)
2
= -36.82756667
7
2
FEM BC = (28.26616747)(7) +
12
2
16.8225 ( 4 ) (3)
= 36.82756667
72
2
FEM CE = - (8.70748725)(2.5) =
12
-4.535149609
2
FEM CE = (8.70748725)(2.5) =
12
4.535149609