The document records 5 instances where a recovery boiler had to shut down due to issues with a 5MW turbine power boiler between August 14th and September 2nd. On each occasion, the 5MW turbine main breaker either tripped or failed, disrupting the power supply to the recovery boiler and requiring it to shut down.
The document records 5 instances where a recovery boiler had to shut down due to issues with a 5MW turbine power boiler between August 14th and September 2nd. On each occasion, the 5MW turbine main breaker either tripped or failed, disrupting the power supply to the recovery boiler and requiring it to shut down.
The document records 5 instances where a recovery boiler had to shut down due to issues with a 5MW turbine power boiler between August 14th and September 2nd. On each occasion, the 5MW turbine main breaker either tripped or failed, disrupting the power supply to the recovery boiler and requiring it to shut down.
14-Aug-17 2:00 AM C 15-Aug-17 6:00 AM C 16-Aug-17 08:00PM B 22-Aug-17 02:10AM C 2-Sep-17 08:00AM A Shut Down Due To Power Boiler Reason 5MW Turbine Main Breaker Tripped 5MW Turbine Main Breaker Tripped 5MW Turbine Power Supply Failure 5MW Turbine Main Breaker Tripped 5MW Turbine Main Breaker Tripped