You are on page 1of 12

Doc No: NOCL-KEN-

NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-


LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 1 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

PROCESS DESIGN BASIS

PROJECT

ATF STORAGE FACILITY AT GAUTAM BUDDHA


INTERNATIONAL AIRPORT BHAIRAHAWA, NEPAL

OWNER
NEPAL OIL CORPORATION LIMITED (NOCL)

PREPARED BY
M/S GABATIA ENGINEERS & CONSULTANTS

0 31.07.20 ISSUE FOR APPROVAL CPK CPK ACS


REV REV DATE PURPOSE PREPD REVWD APPD
Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 2 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

CONTENTS

1 INTRODUCTION & PROJECT SCOPE

2 CODES & STANDARDS

3 ABBRIVIATIONS

4 FLUID PROPERTIES

5 ENVIRINMENTAL DATA

6 MATERIAL OF CONSTRUCTION

7 DESIGN CRITERIA

8 HAZARDOUS AREA CLASSIFICATION

9 CORROSION ALLOWANCE
Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 3 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

1. Introduction & Project Scope

Nepal Oil Corporation Limited (NOC) (Nepali: नेपाल आयल निगम लिमिटे ड) is a monopoly state owned
trading enterprise of Nepal that imports, stores and distributes various petroleum products in the
country. In Nepal, no private or other companies are allowed to import Petrol and Diesel other than
NOC.

Nepal Oil Corporation is planned to establish Aviation turbine Fuel (ATF) storage facility Bhairahawa.
The corporation is set to establish the ATF storage facility for upgrade construction of Gautam Buddha
International Airport (GBIA)

As a part of this M/S Gabatia Engineers and Consultants awarded with Detail Engineering services for
Process and Piping works. Plant typically consists of below equipment’s / facilities:

1  Underground tank assembly


2  Pipelines and fittings
3  Valves and strainers
4 Pump and motor assembly
5 Float Suction Assembly
 6 Filtration system
7 TLF Facility
Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 4 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

Following is the Proposed Plot Area:


Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 5 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

2. Codes and Standards

The system will be designed in accordance with the latest addition of the codes and standard.

1. ANSI American National Standard Institute

2. API American Petroleum Institute

3. ASME American Society of Mechanical Engineers

4. IBR Indian Boiler Regulation

5. IS Indian Standard Specifciations

6. Nepal Local Governing Body Rules and Regulations


Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 6 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

3. Abbreviations:

1. ESD Emergency Shutdown Valve

2. LPM LITRE PER MINUTE

3. MSL Mean Sea Level

4. NOCL Nepal Oil Corporation Limited

5. OFC Optical Fibre Cable

6. PLC Programmable Logic Controller

7. DCS Distributed control system

8. SCADA Supervisory Control & Data Acquisition

9. CV Control Valve

10. UZV ON-OFF VALVE


Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 7 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

4. Fluid Properties

Fluid Name : Aviation Transmission Fluid (ATF)

Density : 770 - 830 kg/m3

Viscosity : 1.5 - 3.4 Centi Stokes

Vapor pressure : Negligible

Solids : N/A
Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 8 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

5. Environmental Data

Location  Rupandehi District in Province No. 5 in Nepal.

Cordinates 27°30′20″N 083°24′58″ E

Amb. Temperature (Min / Max) 5 / 55 °C

Average rainfall 600 mm

Average relative humidity  70 %

Seismic Zone ZONE III As per IS1893 part 1

Altitude 60 m

Wind Speed 15 kmph

Wind Direction South west


Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 9 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

6. Material of Construction

S.No Description Material of Construction Remarks

1 Process Piping ERW / API 5L / ASME B36.10

2 Tanks IS 2062

3 Pumps CS body SS Impeller


Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 10 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

7. Design Criteria

A. Line Sizing Criteria:

Following are the allowable limits for line sizing to avoid erosion, or flashing of fluid.

Service Allowable Velocity ∆P / 100m

ATF Pump Piping = 3 m/s 0.8 bar / 100m

Gravity Upto 1 m/s

Vapor 15 m/s

Compressed Gases 20 m/s

B. Pump Sizing Criteria:

1. Max. Shut off head shall not exceed 125% of the Rated differential head.

2. Rated pump head at discharge flange.

NPSH:
The required value of NPSH is about 2 to 3m (5 to 10 ft) for small centrifugal pumps, but it is
increases with pump capacity, impeller speed and discharge pressure, and values up to 15 m (50ft)
are recommended for very large pumps.

NPSH = net positive suction head at reference point (usually center line of the impeller), m
Ha = absolute pressure of the suction vessel, m
Hvpa = fluid vapor pressure at pumping temperature, m
Hst = static head to suction reference line (usually center point of the impeller), m
Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 11 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

Hfs = suction line losses, m

Pump Power:

Pump power will be calculated by:

P = power, kW

H = head, m

Q = flow, m3/hr

SG = specific gravity

n= pump efficiency, decimal

C. PIPING / VALVES / FLANGES

Piping: shall be designed for handling of ATF as per ASME B 31.6 or API 5L or equivalent as
applicable.

Valves:
Steel valves conforming to relevant API standards shall be used. Cast iron valves shall not be used.

Fittings:
Steel flanges and flanged fittings shall conform to relevant ANSI31.4.
Doc No: NOCL-KEN-
NEPAL OIL CORPORATION ENGINEERING Prepare : CPK GEC-ATF-PR-DB-
LIMITED (NOCL) CONSULTANCY SERVICES 001
Review : CPK Rev 0
Approve : A C S Sheet 12 of 12
GABATIA ENGINEERS &
G CONSULTANTS PROCESS DESIGN BASIS Date :31.07.20

8. Hazardous Area Classification

Hazardous are classification is considered as Zone2, Group IIB, Temperature Class T3

9. Corrosion Allowance

Internal Corrosion Allowance: 1.5 mm (minimum)