Abstract - By taking researching into current combined accelerator. For the convenience of control, speed control and
power system, a new combined system powered by gas turbine propulsion, fuel saving, asynchronous motor can be used as a
and asynchronous motor is proposed. Mathematical models of cruise device. In the hybrid power device, gas turbine and
the different parts of the Gas Turbine and Motor power system induction motors play their respective advantages. This
were researched in this paper. Module method was taken to build
advantage is applicable to the large change in control system
the simulation model of different parts, including gas turbine,
asynchronous motor, synchronous-self-shifting clutch, parallel and can solve the problem of size, unit weight endurance, the
gear box, parallel controller and propeller, and obtain the whole fuel consumption rate and other issues in the ship power plant.
system. The simulation model of gas turbine was built by external II. Hybrid power system structure
characteristic; asynchronous motor in method of current
hysteresis band PWM control, and realized flux-weaking control; In this paper, we mainly consider two kinds of propulsion.
the S.S.S. clutch model was taken advantage of when paralleling. (1)Asynchronous motor is a propulsion motor to drive the
A strategy to switch between two patterns of shipping was operation of the ship in normal voyage, the gas turbine is in a
designed, thus leading to the combined power system; a
Stalling state or idle state as required. (2) The asynchronous
paralleling controller was applied to help paralleling. Researches
were taken about the strategy of controlling of two power and
motor and the gas turbine are all of the propellers operating at
shock when paralleling. It was proved in this paper that the an accelerated speed.
whole combined system works well, the parallel controller works According to the gas turbine driving conditions, hybrid
well to reduce the shock and the strategy of paralleling is systems can be divided into two types: (1) A gas turbine drives
efficient. two propellers at the same time through the role of
thetransmission gear box ,as shown in Fig.1(a). (2)The two
Index Terms - combined power; controller; S.S.S. clutch; gas turbines reduces the rotating speed by reducing the gear
par allel; simulation. box and each with a propeller load, as shown in Fig. 1(b).
In the system, the diesel generator set is used to supply
I. INTRODUCTION power for the whole ship, including the equipment power, the
Modern marine power plant mainly includes diesel living power utility and the electric power needed by the
engine, steam turbine, motor, nuclear power plant, these asynchronous motor. The output end of the gas turbine can
devices have their own advantages and disadvantages. The accelerate or decelerate the gear box as required and in order
reference[1]-[6] mentioned in the joint propulsion mode. This to realize the power switch, the output end needs to
way is the hybrid method studied in this paper. This way is the synchronize the clutch automatically. The choice of one or
hybrid power studied in this paper. The hybrid power system two gas turbines is based on the actual required power. Due to
consists of two types of propulsion units, At low speed, Only the nature of the clutch, in order to achieve astern way, you
one propulsion unit is working, At high and full speed, the can use adjustable pitch propeller or the use of reversing gear
other propulsion system work or two propulsion system work box.
together. The ship hybrid propulsion system is very suitable
for the situation of large change of working condition.
According to the current research at home and abroad, the
more mature is the combination of gas turbine and diesel
engine, more commonly used is the combination of diesel
engine and diesel engine, the combination of diesel engine and (a) Schematic diagram of single –turbine hybrid system
gas turbine, the combination of gas turbine and gas turbine.
Gas-fierd generator is a new type of hybrid power. A gas
turbine and an electric motor are used as a hybrid power
device. At present, there is no literature on this hybrid
propulsion system. In order to obtain the maximum power
required for the maximum speed of short time, the gas turbine (b) Schematic diagram of two gas turbine hybrid power
with large power and small unit weight is used as an Fig. 1 Structure of ship with combined power
i d2 i q2 I s2 (2)
184
The torque can be used as an integrand of the inertia equation IV. PARALLEL CONTROL AND SIMULATION
and get the speed of gas turbine.
Taking into account the actual situation, the working
Synchronous-self-shifting clutch ( Referred to as 3S
process of the ship: Normal operation, the ship driven by the
clutch) is mainly composed of driving link, follower and asynchronous motor, this time the gas turbine can have two
middleware. The middleware is on the driving part, and the kinds of work, that is in a stop working state or not to provide
two portions are connected to each other with spiral spline. power for the ship idling state, this time the gas turbine output
According to the rotative speed difference, 3S clutch can speed lower than the rotational speed of the parallel gearbox
automatically engage and disengage, play the role of providing input shaft. When the ship needs to improve the speed of
or withdrawing the power. navigation, given the speed of the motor and gas turbine, both
In this paper, the non-relay clutch is studied, the non-relay motors are accelerated at the same time. As the output speed
clutch relies on ratchet and pawl to complete separation and increases, the speed exceeds the base speed of the
reunion. The power of the non-relay clutch is smaller than that asynchronous motor, the induction motor enters the field
of the relay clutch. weakening speed range, the output torque decreases, the
3S clutch is the key to the study of parallel operation torque required to propel the ship is complemented by the gas
control process, must establish an accurate mathematical turbine.
model. Through the stress analysis of the driving part, Three kinds of commonly used parallel controller:
follower and middleware, the corresponding torque equation Single feedback speed governor, Master - slave governor,
can be obtained. Double feedback speed governor. In this paper, the dual
The torque equation of the driving part is feedback governor is used as the parallel controller, and the
d1 dual feedback governor is used to receive the feedback value
M 1 ( M f M z M f' ) J11 (4) of the speed of the gas turbine and the motor at the same time.
dt Based on the difference of the rotational speed, the current
J1 、 1 、 1 are the moment of inertia, palstance and speed setting of the gas turbine and motor is modified.
angular acceleration of the driving part, respectively. According to the difference of the rotational speed, the current
The torque equation of the middleware is speed setting of the gas turbine and the motor is fixed on the
M f M z M f ' M r M r ' J z (1 r ) (5) basis of the set value. The basic principles are as follows:
The torque equation of the follower is n1* n0 PID(n2 f n1 f ) (10)
d2
M r M r ' M 2 J 2 2 (6) *
n n0 PID(n1 f n2 f ) (11)
dt 2
In the formula, J 2 、 2 are the moment of inertia and the In the equation: n0 for the set speed, n1 f for the engine
angular acceleration of the follower respectively. speed feedback value, n2 f for the motor speed feedback value.
The specific contents of the stress analysis of the non relay Asynchronous motor model using Simulink module in
clutch refer to the reference [14 -16]. the packaging model, the power is 75KW. The gas turbine is
Let M1 and N1 be the input torque and rotational speed of simulated by 160KW asynchronous motor packaging model.
the equipment 1, M2 and N2 are the input torque and The simulation uses fixed step ode4 algorithm, the step size is
rotational speed of the equipment 2 respectively, and M and N set to 2ms.
are the output torque and rotational speed respectively. 75KW asynchronous motor parameters as shown in
Considering the transmission efficiency of the gear box, the Table 1:
equation is obtained.
Table 1: Parameters of asynchronous motor with 75KW
( M 1 n1 M 2 n2 ) M n (7)
The propeller absorbs the power of the main engine and Rated Power (PN) 75KW
converts it into the propulsion required for the motion of the Line Voltages (Vl) 400V
ship and moves along with the vessel in the axial direction.
Operating Frequency (fN) 50Hz
The propeller is subjected to a resistance moment M p in the
Rated Speed (nN) 1487r/min
water, which is opposite to direction of the thrust of the
propeller. In order to overcome the resistance moment, the Stator Resistance (Rs) 0.03552
propeller should rotate at the given speed np , the thrust of the Leakage Inductance (Ls’) 0.000335H
propeller is Tp . Rotor Resistance (Rr) 0.02092
For the geometric parameters of the propeller, the Leakage Inductance (Lr’) 0.00035H
propeller diameter D, water density are constant, torque and Mutual Inductance (Lm) 0.0151H
thrust are expressed as Pole Pairs (p) 2
M p c1 np2 (8) Rotational Inertia (J) 1.25 kg m 2
2
Tp c2 np (9) Friction Coefficient (f) 0.03914 N m s
185
Table 2: Parameters of asynchronous motor with 160KW parallel connection has an impact on the output torque, from
figure 9, the parallel connection has an impact on output speed.
Rated Power (PN) 160KW 0.015
Lr/m
Stator Resistance (Rs) 0.01379 0.005
In accordance with Figure 2 to build the system Fig. 5 Displacement of the middle part of S.S.S. clutch
simulation model. 2000
T1-T2/(M-m)
After the induction motor is started for 0.7s by the controller, 500
the gas turbine is started and the rotational speed of the gas 0
turbine and motor wait for the speed command; set the target 0 0.5 1 1.5 2
t/s
2.5 3 3.5 4
speed of 2800r / min, two machines start to parallel. Fig. 6 Output torque of gas turbine and asynchronous motor
After starting the induction motor, the load torque is 3000
asynchronous motor, so that the gas turbine does not output 1500
the gas turbine should be able to distribute 1800 size of the 0 0.5 1 1.5 2 2.5 3 3.5 4
load, the motor should be able to allocate 200 size of the load. t/s
After two motors are connected in parallel, their output speed Fig. 7 Output speed of gas turbine and asynchronous motor
should be equal. 3000
1
1500
M/(n-m)
0.9 1000
500
0.8
0
Psir
0.7
-500
0 0.5 1 1.5 2 2.5 3 3.5 4
t/s
0.6
0.4
0 0.5 1 1.5 2 2.5 3 3.5 4 2500
t/s
2000
Fig. 4 Setting flux linkage of asynchronous motor
Asynchronous motor achieve a weak magnetic speed in 1500
n/(r/min)
key component of the power cut-over, the clutch model work 500
control strategy requirements, Gas turbine in cut into the 0 0.5 1 1.5 2
t/s
2.5 3 3.5 4
power in 1.5s moment. As can be seen from figure 8, the Fig. 9 Output speed of gas paralleling gear box
186
V. CONCLUSION
The simulation results show that the design of the new
hybrid powertrain system, such as gas turbine and electric
motor, is correct. Dual feedback paralleling regulator and the
gas turbine, the motor within the various regulators run
properly, and achieved good results; Clutch model and
paralleling gear box and other important equipment model are
correct. Control strategy design is effective, the impact of the
parallel connection can be reduced by the adjustment of the
parallel controller. Therefore, the integrated design of the
hybrid system is correct, this design can provide some
reference for the follow-up research in this area.
REFERENCES
[1] WANG Mingwei, MI Jie, LI Shuying, et. al. Research on Control
System of Combined Diesel and Gas Turbine (CODAG) Power
Plant[J]. Ship Engineering, 2006, 28(2):39-42.(in Chinese)
[2] PAN Baolong, LIU Yongwen. Simulation Analysis of the Diesel
Speeding Clutch of CODAG Power Plant.Ship Engineering[J]. Ship
Engineering, 2008, 30:54-57. (in Chinese)
[3] LI Shuying, LI Yang, SUN Yufeng, et. al. Experimental Research of
Combined Diesel and Gas Trubine (CODAG) plant[J]. Gas Turbine
Technology, 2007, 20(1):58-62. (in Chinese)
[4] WANG Mingwei.Study on Simulation and Experiment of CODAG
Power Plant[D]. Harbin: Harbin Engineering University, 2006
[5] MI Jie.The Research of Control System of Combined Diesel and Gas
Turbine Power Plant (CODAG)[D]. Harbin: Harbin Engineering
University, 2006
[6] FENG Xiangqian.Foreign Ships Overview of Combined Power[D].
The Chinese Society of Naval Architecture and Marine Engineering
Turbine Group,1988
[7] XU Xingyi.Selecting The Flux Reference for Induction Machine
Drives in the Field Weakening Region[J] . IEEE Transactions on
Industry Applications,1992,28(6):1353-1358. (in Chinese)
[8] Kim S H,Sul S K. Voltage Control Strategy for Maximum Torque
Operation of an Induction Machine in the Field-weakening Region[J].
IEEE Trans.on Industrial Electronics,1997,44(4):512-518
[9] ZHANG Zhihua.Introduction to Marine Power Plant[M]. Harbin:
Harbin Engineering University Press, 2006
[10] WU Sen, WANG Yongsheng Establishing Mathematical Model
Method based on the External Characteristic of Maring Gas Turbine[J].
Shipbuilding of China, 2008, 49(4):61-64. (in Chinese)
[11] JIANG Jiaming. The Study of the Dynamics Simulation for the S.S.S.
clutch[D]. Harbin: Harbin Engineering University, 2010. (in Chinese)
[12] WANG Mi.The Simulation Study on the Dynamic Behavior of
COGAG Power Plant[D]. Harbin: Harbin Engineering University,
2007
[13] LI Yang.The Simulation Study on Marine Gas Turbine of Electricity
Generation[D]. Harbin: Harbin Engineering University, 2006
[14] TIAN Ying, SUN Yufeng, LU Qingchun. Simulation of Synchronous-
self-shifting Slutches based on Matlab. J Tsinghua Univ (Sci & Tech),
2004, 44(2):255-257. (in Chinese)
[15] XU Bin. The Simulation Research on the Control Technology of the
Naval Ship's Paralleled Main Twin-engine[J]. Journal of SSSRI, 2001,
24(2):96-101. (in Chinese)
187