You are on page 1of 1

Rehabilitation and Upgradation of Four Laning of NH-31D from Km 0.00 to Km 83.

785 (Package-1)
Ghoshpukur-Salsalabari Section in the State of West Bengal on EPC Basis

Format No.A/F 12: , Rev No:0 Rev.Date:19.09.2015


Client : National Highways Authority of India
EPC Contractor : L&T Construction, TIIC(RR&EC)
Authority Engineer : Lea Associates South Asia Pvt Ltd

NON-CONFORMANCE REPORT / CLOSURE REPORT

Highway Structure QA/QC

NCR No: Date :

Location :

Non-conformance Observed :

Correction proposed :

Corrective Action Taken :

Evidences for corrective action and closure :

Authority Engineer Representative EPC Representative

Name: Name:

Signature Signature

Date: Date:

You might also like