Initial
Stage
Check Point Arising risk and/or requirement Countermaesures and Check Check Result
1 Correctness of Preparation Data
Engineering Stage
Drawing coming from Client as fabrication
Low All fabrication drawing prepared by client. M ACC
instruction.
Drawing panel prepared without Confirm EDS will prepare check list to
risk. Soft copy drawing preparation to CNC make sure input data to CNC marking
High M+D ACC
machine program input incomplete. machine comply with Hard copy drawing
revision.
Check and control document for distribution Confirm, Latest document revision use for
Control document are managed
Low and revision, same management prodecure fabrication process, will monitoring during M+D ACC
correctly
should be applied . activities
Fabrication Stage
Already educated persons are nominated as
Operator knowledge for operation CNC
High Operator CNC marking machine and bring M+D ACC
marking machine are limited.
some guidance for CNC marking operate.
Program CNC marking machine
setting without risk
Operator not familiar to operating CNC Education, training and trial process is
High marking machine, due to this the new necessary to increase experience when M+D ACC
machine. operation of the machine.
After work instruction prepare by Foreman. Confirm, Supervisor will carefully check
Work instruction Prepare correctly. Low Work instruction need to carefully check by before sign. Will monitoring during patrol M ACC
supervisor with compare to SWI. activities.
Mistake marking which not comply with Socialization and education to all Assy Gr
Low standard marking panel on CNC marking [Panel] related standard of marking panel. M ACC
machine. Keep monitoring.
N/A there aren't any changing will occur on this proposal Risk will check in Monitoring M
Low situation will be changed but relatively Low risk Risk will check in both Demonstration and Monitoring M+D
High situation will be changed and it havepossiblity relatively High risk