You are on page 1of 10

Page 1

TABLE OF CONTENTS

i. Title Page

ii. Table of Contents

iii. Chapter 1: Company Profile

iv. Chapter 2: Weekly Progress Report

v. Chapter 3: Assessment of Practicum Program

 What I have learned from the experience?

 My experiences with the people around me

 The most memorable event during my practicum

 What I can recommend for the improvement of the Practicum program

 My advice to those who will take their practicum / OJT in the near future

vi. Pertinent Documents

 Letter of Applications

 Endorsement Letter

 Affidavit of Trainings

 Waiver Form

 Training Schedule form

 Certificate of Completion

 Evaluation form

 MOA
Page 2

COMPANY PROFILE

Hi-System Builders Development Corporation is a full-service real estate development

company. They cater to all residential, commercial and institutional construction needs. They have over

a decade of operation in general construction. The company was founded in 1992. Majority of their

projects are in residential and apartment construction; their experience guarantees the quality that they

have worked hard and smart for.


Page 3

WEEKLY PROGRESS REPORT

WEEK 1

DAY DATE DAILY ACCOMPLISHMENT NO. OF


WORKING
HOURS
Monday 01-July-19 Site Visit (Pias Camp 7, Cuidad Grande Bakakeng,
Phase 1 Eagle Crest Bakakeng, Phase 2 Eagle Crest 8
Bakakeng, Phase 3 Eagle Crest Bakakeng)
Tuesday 02-July-19 Went to Buyagan La Trinidad, Benguet for another 8
Site Visit
Wednesday 03-July-19 Assisted Engr. Marlon in getting daily work update 8
on Ginete Site (Eagle Crest Subd., Phase 1,
Bakakeng, Baguio City)
Thursday 04-July-19 0

Friday 05-July-19 Assisted Engr. Marlon in getting daily work update 8


and weekly progress report in every site

Hi-System Builders – this is the company where I conducted my On-the-Job Training. On my first

day of training, I was very nervous because I don’t know what task or job, they will assign to me. General

Manager, Engr. Samson K. Tomas, introduced me to Engr. Marlon Magalong and Engr. Jerand our site

engineers.

Our site Engineers accompanied me for a site visit in their ongoing projects in Baguio City. The

first site is a two-storey roof deck house and another two-storey house beside it. We also visited their

three ongoing five-storey dormitory building in different areas. During that moment, Engr. Marlon

taught me on how to get daily work update and terms that I’m not familiar in construction. I was able to

learn many things which are related in my course in a short period of time.

My first week was really good and my interest in construction grew a lot.
Page 4

WEEK 2

DAY DATE DAILY ACCOMPLISHMENT NO. OF


WORKING
HOURS
Monday 08-July-19 Daily work update in Bernardez and Ginete Site
8

Tuesday 09-July-19 Daily work update Ginete Site 8

Wednesday 10-July-19 Went to Buyagan, La Trinidad to get Daily work 8


update
Thursday 11-July-19 0

Friday 12-July-19 Daily work update in Bernardez Site 8

On the second week of my On-the-Job Training, I was assigned to get the daily work update and

watch over the workers because Engr. Marlon was on the other site. My Supervisor told me that we

focus on the two five-storey dormitory building that has given an ultimatum. The Bernardez site was at

94% progress and Ginete site was at 65% progress.

Daily work update must have the following information:

 The date

 Weather condition

 Materials needed

 Work performed
Page 5

WEEK 3

DAY DATE DAILY ACCOMPLISHMENT NO. OF


WORKING
HOURS
Monday 15-July-19 Daily work update in Bernardez and Ginete Site
8

Tuesday 16-July-19 Daily work update in Bernardez Site and Pouring of 8


concrete in Lao Site
Wednesday 17-July-19 0

Thursday 18-July-19 Daily work update in Bernardez Site 8

Friday 19-July-19 Daily work update in Bernardez Site 8

Saturdau 20-July-19 Daily work update in Bernardez Site 6

On the third week of training, Engr. Marlon scheduled Tuesday for pouring a concrete slab and

beams on Lao site. I was assigned to count for the concrete mix ratio to retain the strength and quality

of the concrete. I really learned a lot in this training especially the role of a site engineer. I saw the

dedication, technical skills and how Engr. Marlon manage the people around him in site.

I was also asked to Assist Engr. Marlon to get the daily work update on the other sites.
Page 6

WEEK 4

DAY DATE DAILY ACCOMPLISHMENT NO. OF


WORKING
HOURS
Monday 22-July-19 Daily work update in Bernardez and Ginete Site
8

Tuesday 23-July-19 Daily work update in Bernardez Site, Visited new 8


site
Wednesday 24-July-19 Bernardez Site, Meeting with Engr. Samson Tomas 8
in Ginete site
Thursday 25-July-19 Daily work update in Bernardez Site 8

Friday 26-July-19 Daily work update in Bernardez Site 10

Saturday 27-July-19 Daily work update in Bernardez Site 6

This week was heavy as the previous week because the turnover of Bernardez site dated August

1, 2019. Our company have only 2 weeks to finish the remaining 5%. My task was to watch over the

workers while Engr. Marlon is getting work update on other sites. I enjoyed it because I was able to be

socialized with workers and learn many terms like the materials or tools that they are using. I was also

starting to be comfortable with the people I work with as well as in the workplace.

We also visited our new site that are currently installing a bank house and ready for layout. On

Friday, Engr. Samson Tomas set a meeting in Ginete site. He discussed about the errors or problems that

he saw in the site. I was so amazed for his leadership skills, decision making, project management,

excellent knowledge of design and visualization and his proven work experience. Because of the

meeting, I got overtime and went home 7pm in the evening. I was able to work on Saturday for me to

finish the training before the first semester starts.


Page 7

WEEK 5

DAY DATE DAILY ACCOMPLISHMENT NO. OF


WORKING
HOURS
Monday 29-July-19 Daily work update in Bernardez
8

Tuesday 30-July-19 Daily work update in Bernardez Site 8

Wednesday 31-July-19 Daily work update in Bernardez Site 8

Thursday 1-August- Turnover of Bernardez site, Repair Estimation 8


19
Friday 2-August- Daily work update in Ginete Site 10
19
Saturday 3-August- Daily work update in Ginete Site 7
19

Same as previous week, I was assigned to get the daily work update in Bernardez and Ginete site

and watch over the workers. Our company managed to finish the Bernardez site on date. After the

turnover of Bernardez site, we moved to Green Valley, Baguio City to estimate the repair request of the

previous client.
Page 8

WEEK 6

DAY DATE DAILY ACCOMPLISHMENT NO. OF


WORKING
HOURS
Monday 5-August- Daily work update in Ginete
19 10

Tuesday 6-August- Daily work update in Ginete Site 8


19
Wednesday 7-August- Daily work update in Ginete Site 8
19
Thursday 8-August- Daily work update in Ginete Site 8
19
Friday 9-August- Daily work update in Ginete Site and Weekly 8
19 Progress Report

This is my last week of On-the-Job Training, the task that I did this week were just the same as

the previous week. The weekly progress report in Ginete site was on 75%. Engr. Samson Tomas told me

to get overtime this week to fill up with my absences.

I was happy because I will finally finish my training but somehow sad because I will be leaving the

Company where I had lots of memories and I will be missing the people who teach a lot of things to me

related to my course. They are the one who helped me to love my course more and molding myself to

be the individual I am right now.


Page 9

ASSESMENT OF PRACTICUM PROGRAM

The training I had in the Hi-System Builders is learning many experiences each day. I was exposed

in the actual work in construction, became more familiar with the terms that are usually using in

construction and learned what are the duties and responsibilities of a site engineer. To be specific, I

learned how to get the daily work update or man per day update in site, estimation of repair and the

process of construction in actual work. Aside from those things, I was able to realize the importance of

theories and formulas that were discussed in the school. Also, to appreciate even the simplest lessons

studied in school.

The people around me are very encouraging and motivating. They are very talented individuals, I

found that they were very solution-focused, positive, driven and god fearing. It was invigorating and

uplifting just to be around them, and this was one of the most motivating periods of my life.

The most memorable event during my practicum was when our project engineer called to pour a

concrete slab on our site in Bakakeng. At that day, the weather condition was bad because of drizzling

rain. His instruction was to finish the job in a day. I was assigned to count the concrete mix ratio to retain

the strength and quality of concrete. Our site engineer told us to work or move faster so we can finish it

on time.

My recommendation for the improvement of the Practicum program is that provide a OJT

manual for the students to be guided in conducting OJT.

My advice to those who ill take their practicum soon is that don’t be afraid to ask your supervisor

questions. They understand that you are learning and they must take their jobs seriously because this

practicum will really help develop their skills.