You are on page 1of 1

N

A B TOP VIEW

SEE DRAWING :

SAND FILTERS

+1153.35

+1153.35

+1153.60
0.15

0.15
0.15

0.15
0.15

0.15

+1153.60 +1153.60 +1153.60


0.15

Beam Beam Beam Beam Beam Beam

Collector ND 200

E Scrapper Scrapper Scrapper E


on concrete block Ht : 10cm on concrete block Ht : 10cm on concrete block Ht : 10cm

AXIAL LOAD XXXX daN AXIAL LOAD XXXX daN AXIAL LOAD XXXX daN
M04 M04 M04
RADIAL LOAD XXXX daN RADIAL LOAD XXXX daN RADIAL LOAD XXXX daN
TORQUE XXXX daN/m TORQUE XXXX daN/m TORQUE XXXX daN/m

Beam Beam Beam Beam Beam Beam

1.50 1.50 1.50


1.60

+1153.60

1.50 3.29 1.50 3.30 1.50


1.50

LEGEND :
STATIC LOAD STATIC LOAD STATIC LOAD
CWS = Civil work supply CL = Center line
610 daN 610 daN 610 daN
AXIAL LOAD AXIAL LOAD AXIAL LOAD PS = Process supply (Equipment) GL = Ground level

132.5 daN 132.5 daN 132.5 daN WL = Water level CW = See formwork drawing
RADIAL LOAD RADIAL LOAD RADIAL LOAD
43.5 daN 43.5 daN 43.5 daN
+1153.60 +1153.60 +1153.60 +1147.69
TORSION TORQUE TORSION TORQUE TORSION TORQUE
NOTES :
147.6 daN/m 147.6 daN/m 147.6 daN/m
BENDING TORQUE BENDING TORQUE BENDING TORQUE -Levels and dimensions are in meters. They apply to finished structures
139.1 daN/m 139.1 daN/m 139.1 daN/m -Pipe diameters in millimeters.
7.50

Agitator Agitator Agitator


-Aluminium handrails: height =1.10 m
on concrete block Ht : 10cm on concrete block Ht : 10cm on concrete block Ht : 10cm
A ajuster en fonction
-Penstocks , jib crane and electrical agitator fixation : to be determined at a later stage
D du TN definitif D
-Formwork DWG not yet submitted
M03 M03 M03
-The dimensions of the holes and hatches indicate the free passage.

CONSTRUCTION :

1.20
+1150.60
FLOCCULATION FLOCCULATION FLOCCULATION
CHAMBER 1 CHAMBER 2 CHAMBER 3 -Tolerance : +/- 1 cm Unless stated otherwise - As per international standards.
-The structure must be watertight ( inside and outside )
-The structure must be stable (full or empty)
1.20 -1 Tank empty the other full or vice-versa
JIB CRANE SUPPORT JIB CRANE SUPPORT -For each compartment: compartment can be full, adjacent compartment empty
-The pump concrete base will be confirmed with selected pumps supplier
LIFTING LOAD LIFTING LOAD -Traveling crane loads shall be confirmed with selected supplier
500 daN 500 daN

The Employer
0.90

1.50

THE REPUBLIC OF TANZANIA


MWANZA URBAN WATER SUPPLY AND SANITATION

AUTHORITY
COAGULATION COAGULATION
COAGULATION CHAMBER 2 CHAMBER 3
The Financing Partners
CHAMBER 1

Agitator Agitator Agitator

STATIC LOAD STATIC LOAD STATIC LOAD


390 daN 390 daN 390 daN
The Engineer/consultant
AXIAL LOAD 1.10 1.10 AXIAL LOAD 1.10 AXIAL LOAD
157.6 daN 157.6 daN 157.6 daN
889, rue de la Vieille Poste - CS 89017 -
RADIAL LOAD RADIAL LOAD RADIAL LOAD 34965 Montpellier CEDEX 2
FRANCE
33.6 daN 33.6 daN 33.6 daN
TORSION TORQUE TORSION TORQUE TORSION TORQUE
The Contractor
37.9 daN/m 37.9 daN/m 37.9 daN/m

8.50
BENDING TORQUE BENDING TORQUE BENDING TORQUE
120.9 daN/m 120.9 daN/m 120.9 daN/m

C C
REMINERALIZATION REMINERALIZATION REMINERALIZATION LAKE VICTORIA WATER AND SANITATION PROJECT (WATER SUPPLY, WASTEWATER AND SANITATION) FOR MWANZA CITY
AND SATELLITE TOWNS (MISUNGWI, MAGU AND LAMADI)
CHAMBER 1 CHAMBER 2 CHAMBER 3 DESIGN AND BUILD OF BUTIMBA INTAKE, RAW WATER PIPELINE AND WATER TREATMENT PLANT (WTP)
Contract N°: AE/042/2015-2016/W/03c

TITLE:

REMINERALIZATION-COAGULATION-FLOCCULATION-LAMELLAR SEDIMENTATION

TOP VIEW

REF:

Issuer Area Type of document Document number Rev. Status

V C G P 3 0 0 C W D 0 3 0 1 A1 P R E

A xx/xx/2020 CDU FDI FBA FIRST ISSUE

REV DATE PREPARED CHECKED APPROVED OBSERVATIONS/MODIFICATIONS

SCALE FORMAT AREA:

1/50 A0

0 1 2 3 4 5m

A B

This document is the property of Vinci Construction Grands Projets. It cannot be communicated to third parties or reproduced even partially without prior consent
in writing © COPYRIGHT
A0