KIX 2001 INTEGRATED DESIGN 1

WEEK 7 PROGRESS REPORT


Group 10

Date: 26/11/2020

Time: 10:00am

Venue: Online platform- WhatsApp

Present:

1. Au Foon Yee KIL180011


2. Chin Sher Li KIL180016
3. Muhammad Alif Imran bin Ab Hamid KIL170051
4. Muhammad Ikmal Afifi bin Abdul Halim KIL180060

Absent: -

Objective:

1. Present the selected process route PFD (Process Flow Diagram).


2. Discuss on what to improve on the PFD and the system as an overall.

Discussion:

1. Each group are required to present the PFD for the process route that was
chosen earlier from the feasibility study.
2. The PFD will then be commented on what to improve before proceeding to
the technical part of the process.

3. Our group has decided to add another route to our feasibility study. This
route was found to be the most cost efficient one out of the four routes. The
BFD, and the PFD of the route is still in the making. It will go through the
process of improvement as stated before.

4. The feasibility study will be checked thoroughly for further enhancement for
each group.