Professional Documents
Culture Documents
Common Values
Cc 4.72E-05 BNBC art.2.4.6.2, page:10607 Result
Ci 1 BNBC table.6.2.9, page:10607 Input
Vb 215 km/hr BNBC table.6.2.8, page:10606
Bay Width 7.74 m
Bay Width_N 6.10 m
Building Size
Shed Height
Length (m) Width (m) T. Height (m)
(m)
30.74 24.55 5.21 1.81
L/B 0.80
h/l 0.21
ɵ 8.37
Cpe
Wind Ward 0.8
Wall
Lee Ward 0.6
INTERNAL EXTERNAL
Load Data FRAMEl FRAME
(kN/m) (kN/m)
DL (0.05+.1) 0.15 kN/m2 1.16 0.58
LL 0.57 kN/m2 4.41 2.21
Winward Wall & Leeward Wall,Bay Width:7.74m INTERNAL FRAME EXTERNAL FRAME Load at 5.211m
Wind Ward: Lee Ward: Wind Ward: Lee Ward: Wind Ward: Lee Ward: Wind Ward: Lee Ward: Wind Ward: Lee Ward:
Height - m Cz (Exposure-A) Cg (Exposure-A)
Cpe=0.8 Cpe=0.6 (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m) (kN/m)
4.5 0.368 1.654 1.06 0.80 8.22 6.17 4.11 3.08 INTERNAL FRAME EXTERNAL FRAME
6 0.415 1.592 1.15 0.86 8.93 6.69 4.46 3.35
9 0.497 1.511 1.31 0.98 10.15 7.61 5.07 3.80
8.56 6.42 4.28 3.21
12 0.565 1.457 1.44 1.08 11.12 8.34 5.56 4.17
15 0.624 1.418 1.54 1.16 11.95 8.97 5.98 4.48