Item No Item Code Description MoU Quantity

1 3.06.7.2 Asphalt work Surface wearing course Cum 599.45


2 3.06.8.1 Asphalt work BMPM Hot mix cum 839.23
3 3.05.7.2 Base course WMMBC brick aggregate Cum 6,285.50
4 3.05.8.2 Base course WMMSC compacted stone aggregate Cum 2,397.00
5 3.08.4.1 Brick Flat Soling SBFS single Layer Sqm 1,717.50
6 3.04.3.2 Brick on end edging (125mm) m 1,966.00
7 4.06.05.02 Brick work with 1st class brick cum 1,256.25
8 3.09.6.1 CC block 375mmX100mmX225mm m 3,000.00
9 3.09.7.1 CC block 375mmX225X150mm each 8,577.00
10 3.09.6.2 CC block L:1000mmXH:500mmXW:(100+150)mm m 4,918.00
11 6.06.01.04 CC block L:300mmXH:300mmXW:150mm each 39,406.00
12 3.09.5.3 CC block1000mmX500mmX250mm each 3,216.00
13 3.09.9 CC block-Labour charge for protective work in laying Cum 111.50
14 6.06.06 CC block-Labour charge for protective work in laying cc blo cum 551.68
15 2.01.1 Clearing and Grubbing Sqm 12,786.80
16 5.03.05.01 Concrete in foundation -Mass cum 699.48
17 5.03.05.01 Concrete in foundation -Mass cum 313.24
18 4.09.02.01 Concrete RCC 1:2:4 cum 25.00
19 4.09.02.02.01 Concrete RCC 1:2:4 cum 39.75
20 4.09.02.03.01 Concrete RCC 1:2:4 Cum 22.60
21 4.09.02.01 Concrete RCC 1:2:4 cum 1,865.28
22 4.09.02.02.01 Concrete RCC 1:2:4 Cum 3,056.28
23 4.09.02.03.01 Concrete RCC 1:2:4 Cum 1,865.28
24 3.07.3.2 Concrete RCC- pavement Cum 4,125.00
25 2.01.02 Drainage spout each 418.00
26 2.02.3.06 Earth filling Work Cum 40,532.89
27 2.02.2.1 Earth filling Work Cum 1,492.80
28 4.05.01.01.01 Earth work in excavation Cum 2,975.00
29 4.05.01.01.01 Earth work in excavation cum 17,532.48
30 6.13.06.1 Expansion joint m 1,331.00
31 3.11.11.1 Geotextile Sqm 3,727.50
32 3.12.01.1 KM post each 4.00
33 5.16.10.01 Painting Sqm 2,459.00
34 3.11.13 Palisading work -Construction & Installing m 50.00
35 5.21.05.05 Pavement block or Tiles Sqm 7,200.00
36 3.07.1 Polythene Sheet .18mm thick Sqm 18,217.50
37 3.07.1 Polythene Sheet .18mm thick Sqm 9,326.40
38 3.06.1.2 Sqm 11,989.00
39 4.11.01.02 Reinforcement kg 377,105.07
40 4.11.01.02 Reinforcement kg 793,540.92
41 5.06.05 Reinforcement MS steel any section kg 16,054.27
42 3.12.01.2 RN plate each 3.00
43 3.12.08 Road marking Thermoplastic paint Sqm 14,822.45
44 3.12.03 RS plate Sqm 25.38
45 3.02.1.1 Sand (FM .50) cum 1,398.00
46 3.02.1.2 Sand Filling (F.M .80) Cum 9,978.80
47 3.10.01.2 Scarifying and loosening -Hard Bed preparation Sqm 8,204.00
48 3.03.4.1 Sub base course(70:30) Cum 5,397.88
49 3.01.4.3 Sub grade Preparation (450mm) BC & SGP Sqm 21,591.00
50 3.06.2.4 Tack coat .75kg/sqm Sqm 11,989.00
51 2.06.1 Turfing on embankment sqm 2,985.00
52 7.08.01.02 uPVC pipes 25mm-200mm dia m 643.20
53 4.13.04 WH weep hole each 1,074.00
Item No Item Code Description MoU Quantity
1 3.06.7.2 Asphalt work Surface wearing course Cum 599.45
2 3.06.8.1 Asphalt work BMPM Hot mix cum 839.23
3 3.05.7.2 Base course WMMBC brick aggregate Cum 6,285.50
4 3.05.8.2 Base course WMMSC compacted stone aggregate Cum 2,397.00
5 3.08.4.1 Brick Flat Soling SBFS single Layer Sqm 1,717.50
6 3.04.3.2 Brick on end edging (125mm) m 1,966.00
7 4.06.05.02 Brick work with 1st class brick cum 1,256.25
8 3.09.6.1 CC block 375mmX100mmX225mm m 3,000.00
9 3.09.7.1 CC block 375mmX225X150mm each 8,577.00
10 3.09.6.2 CC block L:1000mmXH:500mmXW:(100+150)mm m 4,918.00
11 6.06.01.04 CC block L:300mmXH:300mmXW:150mm each 39,406.00
12 3.09.5.3 CC block1000mmX500mmX250mm each 3,216.00
13 3.09.9 CC block-Labour charge for protective work in laying Cum 111.50
14 6.06.06 CC block-Labour charge for protective work in laying cc blo cum 551.68
15 2.01.1 Clearing and Grubbing Sqm 12,786.80
16 5.03.05.01 Concrete in foundation -Mass cum 699.48
17 5.03.05.01 Concrete in foundation -Mass cum 313.24
18 4.09.02.01 Concrete RCC 1:2:4 cum 25.00
19 4.09.02.02.01 Concrete RCC 1:2:4 cum 39.75
20 4.09.02.03.01 Concrete RCC 1:2:4 Cum 22.60
21 4.09.02.01 Concrete RCC 1:2:4 cum 1,865.28
22 4.09.02.02.01 Concrete RCC 1:2:4 Cum 3,056.28
23 4.09.02.03.01 Concrete RCC 1:2:4 Cum 1,865.28
24 3.07.3.2 Concrete RCC- pavement Cum 4,125.00
25 2.01.02 Drainage spout each 418.00
26 2.02.3.06 Earth filling Work Cum 40,532.89
27 2.02.2.1 Earth filling Work Cum 1,492.80
28 4.05.01.01.01 Earth work in excavation Cum 2,975.00
29 4.05.01.01.01 Earth work in excavation cum 17,532.48
30 6.13.06.1 Expansion joint m 1,331.00
31 3.11.11.1 Geotextile Sqm 3,727.50
32 3.12.01.1 KM post each 4.00
33 5.16.10.01 Painting Sqm 2,459.00
34 3.11.13 Palisading work -Construction & Installing m 50.00
35 5.21.05.05 Pavement block or Tiles Sqm 7,200.00
36 3.07.1 Polythene Sheet .18mm thick Sqm 18,217.50
37 3.07.1 Polythene Sheet .18mm thick Sqm 9,326.40
38 3.06.1.2 Prime Coat@1.2 litre/sqm Sqm 11,989.00
39 4.11.01.02 Reinforcement kg 377,105.07
40 4.11.01.02 Reinforcement kg 793,540.92
41 5.06.05 Reinforcement MS steel any section kg 16,054.27
42 3.12.01.2 RN plate each 3.00
43 3.12.08 Road marking Thermoplastic paint Sqm 14,822.45
44 3.12.03 RS plate Sqm 25.38
45 3.02.1.1 Sand (FM .50) cum 1,398.00
46 3.02.1.2 Sand Filling (F.M .80) Cum 9,978.80
47 3.10.01.2 Scarifying and loosening -Hard Bed preparation Sqm 8,204.00
48 3.03.4.1 Sub base course(70:30) Cum 5,397.88
49 3.01.4.3 Sub grade Preparation (450mm) BC & SGP Sqm 21,591.00
50 3.06.2.4 Tack coat .75kg/sqm Sqm 11,989.00
51 2.06.1 Turfing on embankment sqm 2,985.00
52 7.08.01.02 uPVC pipes 25mm-200mm dia m 643.20
53 4.13.04 WH weep hole each 1,074.00
Materials
Stone chips
Unit Price Amount 16mm down 12mm down 9 mm down Stone dust
22,127.94 13,264,593.63
20,396.61 17,117,447.01
5,774.59 36,296,185.45
8,075.14 19,356,110.58
436.71 750,049.43
201.08 395,323.28
8,332.04 10,467,141.91
302.31 906,930.00
159.68 1,369,575.36
807.70 3,972,268.60
142.64 5,620,871.84
619.93 1,993,694.88
1,979.69 220,737.41
1,130.81 623,849.78
13.34 170,575.91
9,732.47 6,807,658.38
9,732.47 3,048,637.83
14,856.37 371,409.25
15,125.33 601,262.12
18,574.97 419,794.32
14,856.37 27,711,289.83
15,125.33 46,227,243.57
18,574.97 34,647,520.04
15,088.21 62,238,866.25
1,908.69 797,832.42
419.31 16,995,844.01
-
205.01 609,904.75
205.01 3,594,333.72
101.70 135,362.70
165.03 615,149.33
3,325.43 13,301.72
245.69 604,151.71
5,385.67 269,283.50
1,577.44 11,357,568.00
16.52 300,953.10
16.52 154,072.13
116.24 1,393,601.36
101.40 38,238,454.30
101.40 80,465,049.69
13,471.36 216,272,877.65
6,340.78 19,022.34
1,030.57 15,275,572.30
3,690.31 93,671.14
885.73 1,238,250.54
996.32 9,942,079.01
31.43 257,851.72
4,659.44 25,151,079.35
163.12 3,521,923.92
75.76 908,286.64
30.00 89,550.00
160.04 102,937.73
638.44 685,684.56
723,702,686.02
S.L. Item Code Description of Item Unit Quantity
15 2.01.1 Clearing and Grubbing Sqm 12,786.80
02 3.10.01.2 Scarifying and loosening -Hard Bed preparation Sqm 8,204.00
03 3.01.4.3 Sub grade Preparation (450mm) BC & SGP Sqm 21,591.00
04 4.05.01.01.01 Earth work in excavation Cum 2,975.00
05 3.02.1.2 Sand Filling (F.M .80) Cum 9,978.80
06 3.03.4.1 Sub base course(70:30) Cum 5,397.88
07 3.04.3.2 Brick on end edging (125mm) m 1,966.00
08 3.05.7.2 Base course WMMBC brick aggregate Cum 6,285.50
09 3.05.8.2 Base course WMMSC compacted stone aggregate Cum 2,397.00
10 3.06.1.2 Prime Coat@1.2 litre/sqm Sqm 11,989.00
11 3.06.8.1 Asphalt work BMPM Hot mix cum 839.23
12 3.06.2.4 Tack coat .75kg/sqm Sqm 11,989.00
13 3.06.7.2 Asphalt work Surface wearing course Cum 599.45
14 3.08.4.1 Brick Flat Soling SBFS single Layer Sqm 1,717.50
15 3.07.1 Polythene Sheet .18mm thick Sqm 18,217.50
16 5.03.05.01 Concrete in foundation -Mass cum 313.24
17 4.06.05.02 Brick work with 1st class brick cum 1,256.25
18 3.07.3.2 Concrete RCC- pavement Cum 4,125.00
19 4.11.01.02 Reinforcement kg 377,105.07
20 3.09.6.2 CC block L:1000mmXH:500mmXW:(100+150)mm m 4,918.00
21 2.02.3.06 Earth filling Work Cum 40,532.89
22 3.11.13 Palisading work -Construction & Installing m 50.00
23 2.06.1 Turfing on embankment sqm 2,985.00
24 3.11.11.1 Geotextile Sqm 3,727.50
25 6.06.01.04 CC block L:300mmXH:300mmXW:150mm each 39,406.00
26 6.06.06 CC block-Labour charge for protective work in laying cc blo cum 551.68
27 5.16.10.01 Painting Sqm 2,459.00
28 3.12.08 Road marking of centre line and stopped line Sqm 1,482.00
29 3.12.01.1 KM post each 4.00
30 3.12.03 RS plate Sqm 25.38
31 3.12.01.2 RN plate each 3.00
32 6.13.06.1 Expansion joint m 1,331.00
33 4.09.02.01 Concrete RCC 1:2:4 cum 25.00
34 4.09.02.02.01 Concrete RCC 1:2:4 cum 39.75
35 4.09.02.03.01 Concrete RCC 1:2:4 Cum 22.60
36 3.09.6.1 CC block 375mmX100mmX225mm m 3,000.00
37 2.02.2.1 Earth filling Work Cum 1,492.80
38 4.05.01.01.01 Earth work in excavation cum 17,532.48
39 3.02.1.1 Sand (FM .50) cum 1,398.00
40 3.07.1 Polythene Sheet .18mm thick Sqm 9,326.40
41 4.09.02.01 Concrete RCC 1:2:4 cum 1,865.28
42 4.09.02.02.01 Concrete RCC 1:2:4 Cum 3,056.28
43 4.09.02.03.01 Concrete RCC 1:2:4 Cum 1,865.28
44 4.11.01.02 Reinforcement kg 793,540.92
45 7.08.01.02 uPVC pipes 25mm-200mm dia m 643.20
46 4.13.04 WH weep hole each 1,074.00
47 2.01.02 Drainage spout each 418.00
48 3.09.7.1 CC block 375mmX225X150mm each 8,577.00
5.21.05.05 Pavement block or Tiles Sqm 7,200.00
49 5.06.05 Reinforcement MS steel any section kg 16,054.27
50 3.09.5.3 CC block1000mmX500mmX250mm each 3,216.00
51 3.09.9 CC block-Labour charge for protective work in laying Cum 111.50
52 6.10.18 Sign board LS 2.00
53 4.01.05.02.01 Site Office maintenance LS 1.00
54 PS item Utility Shifting LS 1.00
55 A-1(GCC) Disposal of construction debris LS 1.00
56 A-1(GCC) EMP LS 1.00
57 A-3(GCC) Drinking water LS 1.00
58 A-4(GCC) Safety Gear LS 1.00
59 4.05.03 Pumping and bailing out of water LS 1.00