SARL APCONTROL ENERGIE ET INDUSTRIE ALGERIE

ZI Hassi Messaoud,
Algeria
Tel +213661346212
www.applus.com

INSPECTION REPORT

Customer: NESR Work Order. No.: AP-0020-74


Segment : G-ENERGY Rig No.: N/A
Work Location : IRARA BASE NESR Inspection Report No.: AP-0020-74 / 135

Date of Inspection: 09.03.2020

Specification: API RP 7G2 EDITION 08/2009

Inspection method: MPI ( FLUORESCENT ) and black ink-white contrast


Equipment used: AC Yoke: 13127 DC Coil: 013020191 UV Light: 2089922
Other:
Min Black light intensity : 2983 µW/cm2 MIN VISIBLE LIGHT : 500 Lux Settling test ml/100ml : 3 Coil A/T : 14300

Description: Serial no:

7'' RUNNING TOOLS GEA-0430

Results: BOX Results: BOX


Connection 3 1/2 IF Visual and MPI performed on body & thread Connection -
Tong space 13 1/2'' Tong space -
And Found: OK
Outside Dia. 4 3/4'' Outside Dia. -
Bevel Dia. OK Bevel Dia. -
Seal Width OK Seal Width -
C'bore Dia. OK C'bore Dia. -
C'bore Length OK C'bore Length -
Boreback Dia. N/A Float bore Dia. -
Boreback Length N/A Float bore Length -
Length: 50 3/16''
Condition OK Condition -

Supervisor : O-SOUILAH Inspector : BEN AMOR-S

SD-Shoulder Damage TD-Thread Damage CORR-Corrosion ST-Streched Threads CR-Cracked BB-Belled Box OT-Over Torqued PRO-Worn Profile DIM-Dimensional W-Wash Out OS-Over Size US-Under Size GT -Galled