Technical Discussion
Not
Sl. No Description Work Details Include
Include
Earth work in excavation in foundation trenches or drains including
dressing of sides and ramming of bottom including getting out the
excavated earth & refilling the earth supplied in foundation plinth and
under floor in layers not exceeding 60cm in thickness before 1. Earth cutting and filling to located site.
compaction and 40 cm after compaction consolidating each deposited
layer by ramming and watering .This is based on assumption that full
01
plinth area will be excavated for 2.0m since this is loose soil.
Reinforcement for RCC work including supplying bending, binding & 1. Old rod need to clean by steel brush.
placing position complete by using annealed binding wire f 18 gauge 2. As per drawing proper spacing maintain by vendor.
08
etc. and as directed by Consultant.
3. Good quality GI wire use for rod binding.
Brick work with bricks class designation 65 in foundation and plinth in 1. Proper curing & clean the Brick.
09 cement mortar(1:4) below grade slab 2. And necessary precaution should take for start the
Brick work.
Minimum 12mm thick cement plaster (1:5) to wall both inner and 1. Proper curing & clean the surface area.
outer surface, finishing the corner and edges including of sand
10 2. And necessary precaution should take for start the
cleaning the surface, curing etc. all complete as per direction of the
plaster work.
Engineer-in-charge.
1. AS Per previous work in our site.
Unipaver Block fitting work all complete as per direction of the 2. Insure the proper compaction of soil.
11
Engineer-in-charge.
3. Insure any type of leakage not found in drain pit.
RCC Braking work all complete as per direction of the 1. After braking the RCC all debris shifting to as per our
12
Engineer-in-charge. selected area.
# Years of experience.
# Number of Project Completed. (Provide copy of work order)
# Financial condition. (Contractor can submit 2 running bill and a final bill)