TITLE DIMENSIONALCONTBOLPROCEDURE REFERENCENO.
fr 930212
OFFICE
PCR
SHT I
REVISION
8
1.0 SCOPE
3.0 DEFINITIONS
The
IDENTIFICATION
DC
o 4.0
4.1
MEASUREMENTMETHODS
DIMENSIONAL
CONTROL
PROCEDURE BEFERENCENO,
930212 s H r 3 o F g
OFFICE REVISION
PCR
PFODUCTLIGO BEAM TUBE MODULES MAOEBY CHKDBY MADEBY CHKDSY
CALIFORNIAINSTITUTEOF TECIINOLOGY WLR SWP KSD SWP
DATE OATE DATE DATE
4122194 4t22t94 11/6/95 11t7t95
5.0 COMPONENTINSPECTION
5.1 Components:--The tbllowing list describesthe beamtube componentsand a briei outlineof the
requiredinspections
andreviews.
5.3 Inspection
Rcceivin,s
J
The Purchaser
tabrication. will reviewthesupplierdocumentationduringreceivinginspection.
C. Beam Tube Support Rings: Random dimensions veritied during receivinginspection.The
neasurements takenat receivinginspectionare usedtbr veritlcationof procurementrequirements.
Reviewdocumentation providedby thesupplier.
@
IOENTIFICATION
DC
oI
DIMENSIONAL
CONTROL
PROCEDURE
MADEBY
930212
OFFICE
PCR
CHKDBY
SHT
i.4ADEBY
4 OF
REVISION
CHKDBY
8
I D. SupportWeldedAttachment
The measurements
requirements.
Members:Rantrm dimensions
iI
5.4 Tnspection
DuringFabrication
5.4.1 BeamTubes: The tbllowin_q inspectionsandmt rsuremenls will aken after the spiralmill welding.
The measurements wiil be takenwith the tubesr )portedby rolls or rails and with tempomrymetal
roundoutfixturesinstalled, if required.
A. Measureand record the tube oulsidecircun erenceto determinethe et'lbctivediameterat the
ends,quarterpointsandcenter.Themeasuren'tent takenwith a precisionPi tape.
,will
r ToleranceI Dianierer ]: 49.00"+ 0.28"i - t
I
B. Measureandrecordthe len-sth ol thetubeat Lpproximately 90 deg.intervalsThe measurements
will betakenwith a sLeeltape.
. Minimun CutotlLength= FinalSpecilled L ngthof WeldedBeamTubeAssembly + 0.75".
Thisprrrvides().25"allt-rwance tbr weldshrirkageand 0.50"stockfor machining.
C. Make randomcheckstbr local deviationtiot a rue circle usingan outsidesegmental circular
tenplateandno-gogaugefseeSection6.1.2].
. No-goGaugeSize- 0.121"asmeasured usi g a 9.02"chordlengthcirculartemplate.
at
,f tubefiis usingstandotT blockswith musicwire
lo be ken alongtbur equalquadrantlines.Measurethe
centerand /4 points.Correctthe data for the hodzontalaxis
I
diameter varianceto arriveat tubeaxissfaightnes
. Tolerance- +/- l/8"
E. Make randonrmeasurenren$ and recordsq enessand flatnessof ends using wrap-around
i
template.Measurcthedistance tiom edgeof tube wrap-around template.
o Roughcut End- +/- u4
5.4.2 Beam Tube Fina.lAssemblies: The tbllowing nspectionsand measurements will be takenafter
weldingof stitfeners, pumpportsande pansionjoints whenapplicable,
supports, andendexpanding
I at the end machiningand expandingstationand
and end nrachining.Inspectionswill be per1brme
expansionjoint weldstation,whenapplicable,At heendcuttingandexpanding station,thetubewill
@
IDENTIFICATION
DC
o TITLE DIMENSIONALCONTROLPROCEDUBE
MADESY
930212
OFFICE
PCR
EO ,
CHKDAY
SHT
MADEBY
5
REVISION
CHKDBY
8
5.5 Constructionlnstailation
o
IDENTIFICATION
DC
TITLE DIMENSIONALCONTROLPROCEDURE F E F E R E N CN
EO.
930212
6 . 1 . 1MaximumDit-tbrences in Cross-Sectional
Diam -- The differenceshould not exceed lqo al lhe
noninri diameter D nax.
at anycrosssection, - min.= 12.44mm (0.490").
arc = 230 mm
(e.07")
fr 930272
OFFICE
PCR
s H r T o
REVISION
F g
7.0 RECORDS
"Measurement '
7.1 Record& CheckLisf I seeattarhmentI I shallbe initiatedby the Welding& QC
Managerfor the component,beafl tube,beamt rbe linal assembly and installationinspections. The
tbrm will identify the pieceor assemblyto be .nspected and the required number and locationof
nleasurements to be taken.Theoreticaldimensior
s andtolerances will alsobe shown.The Welding&
QC Supervisor, Engineer inspecttr will takethe requiredmeasurements
or a designated andcomplete
thet'orm.The identificationof themeasuringequpmentshallberecordedon theform, if required.
7.2 The conipleted'Measurement Record& Cherk LisC' will be submittedto the Welding & QC
Managerlbr inclusioninto the tlnal recordpacka