Professional Documents
Culture Documents
RFP پیوست شماره 1 PDF
RFP پیوست شماره 1 PDF
(RVT/SSV)
(Description and Responsibility Matrix)
1
NAK (Tehran Region
Table of Contents
Description ............................................................................................................................................................3
Test Requirements................................................................................................................................................3
Payment Milestones..............................................................................................................................................7
Contract Duration..................................................................................................................................................8
2
Description:
NAK intends to outsource some of the 2G, 3G, LTE RVT/SSV drive tests in Tehran Province including
Tehran city, small cities and roads.
NAK will keep all the rights to decrease or increase the scope of work for the subcontractor based on
performance, pace and quality of their work.
Penalties will be applied to any low performing items by the subcontractor and will be included as a part
of the contract.
Any fault during the tests or recording non-proper log files or in post processing or reporting by
subcontractor, will results in repeating same drive tests or post processing\preparing the reports again
without any additional payments.
This Service is related to get Drive Test Team Service consist of Drive Test Engineer with Equipment +
Car with Driver (DT Team & Car Driver should NOT be the same)
All cost should be paid by subcontractor to get traffic limitation zone permission for all DT teams.
All mission cost and food alliance should be paid by subcontractor to DT teams if needs to pay.
Area of Tests:
Tehran Province including Tehran city, small cities and roads.
-Note: All DT Teams consist of Drive Test Engineers, Cars and Drivers should be ready and send their
personal information to NAK before start of the project to get Drive testers permission in whole Tehran.
Test Requirements:
All type of scenarios (IDlE, Connected, Technology Locked/Unlocked and…) for different Technologies
2G/3G/LTE (Including MIMO, CA, MC, VOLTE, Multi RAB tests and …) & SSV
They should have 2 Drive test Teams with VOLTE test Capability (Each Team needs to have 2×VOLTE
Handset to perform MOS (VOLTE to VOLTE) and one handset should available to perform VOLTE to
measure just eSRVCC (no need MOS in this phone)).
- Based on Test and Post Processing Tools, all Requirement software, tools and license to
Perform Drive Test and Post Processing should be preparing by Subcontractor.
- Car Drivers and Drive Testers should not be the same.
- All drive testers should be able to do SSV tests and stationary test.
Post Processing
Subcontractor is responsible for post processing and analysis of drive tests defined by NAK. Post
Processing and analysis include all log file analysis, coverage and quality analysis, DT KPI analysis,
root cause analysis, CS and PS voice and data analysis for 2G, 3G, LTE, importing log to post
3
processing tool, creating reports and generating queries, post processing report templates will be
defined by NAK. Post Processing teams should be able to prepare reports for RVT/SSV as well.
4
Post Processor engineer 3
TEMS Investigation version 20 or above or NEMO SW (Handy, Media Router &
Outdoor) or both of them based on project requirements (9 for DT team.
11
3 ACTIX, TEMS Discovery SW (Compatible version with scenario test) for
Post Processing engineers
Laptop with good performance for tests 8
GPS 8
High performance PC to analysis log files with ACTIX and TEMS Discovery (SSD, 3
etc….)
Responsibility Matrix:
DT Responsibility Matrix is as below table:
R – Responsibility; S – Support, I – Information
5
Quality of Drive Test teams R
Report Templates S R
Cell file\Ref for test: Creation and Updating R S
TEMS Discovery version 20.1 or higher to be confirmed by NAK R S
Actix software, version to be defined by NAK R S
Post Processing engineer (3 person for all drive test teams of subcontractor) to be
R I
confirmed by NAK and seating in NAK company
6
For the purpose of the execution, the supplier shall provide at its own expense, including any license
fee, all resources, tools and any equipment that are directly or indirectly required. The supplier shall
only use the tools and measurement equipment defined or approved by NAK.
The supplier will perform Calibration monthly for all the provided tools to ensure validity of the collected
measurements.
Subcontractor should have MCI SIM card for All Technology (2G, 3G and 4G). SIM Charge cost and
mission or other cost for Drive Test Activity should be paid by Subcontractor.
Subcontractor should be ready to perform Benchmark Test for MCI and other operators (MTN or
RighTel). These tests maybe order by NAK.
Payment Milestones:
100% of the Purchase Order value for one month is provided when monthly DT and Post
Processing activities, reports, complete technical analyzed reports and others are submitted to and
approved by the NAK Tehran NPO Manager.
All issues that happened during test should be informed to Team Leaders and other responsible
engineers in NAK by DT Coordinator that assigned by subcontractor in this project.
Delay and missing item is not acceptable so it can affect all the payment.
Re-Drive issue related to Drive Test Mistake or Report will be affected the payment so they should
focus to assigned expert teams.
All mentioned items in this RFC will be affect to Payment so should follow 100% by Subcontractor and
deliver on time.
Invoice will be paid monthly per team after NAK TEHRAN NPO Manager Approved.
Contract Duration:
Contract duration will be 12 months, considering subcontractor’s performance, It can be extended to 1
year.
Note: Please be informed a technical evaluation meeting with companies is essential before finalizing
the Tender result.