This document contains a list of materials purchased on various dates between June 16, 2018 and July 12, 2018. It includes the date, material, unit of measurement, quantity, invoice number, unit price, and total for each item. The materials purchased include rebar, wire, nails, cement, bricks, concrete, sand, tubes and other construction supplies. A total of over $30,000 worth of materials were purchased over this period for a construction project.
This document contains a list of materials purchased on various dates between June 16, 2018 and July 12, 2018. It includes the date, material, unit of measurement, quantity, invoice number, unit price, and total for each item. The materials purchased include rebar, wire, nails, cement, bricks, concrete, sand, tubes and other construction supplies. A total of over $30,000 worth of materials were purchased over this period for a construction project.
This document contains a list of materials purchased on various dates between June 16, 2018 and July 12, 2018. It includes the date, material, unit of measurement, quantity, invoice number, unit price, and total for each item. The materials purchased include rebar, wire, nails, cement, bricks, concrete, sand, tubes and other construction supplies. A total of over $30,000 worth of materials were purchased over this period for a construction project.
fecha materiales und cant boleta n° precio unitario total
6/16/2018 fierro corrugado de 5/8" var 70.00 40.60 2842.00
yeso bls 1.00 9.00 9.00 3437 clavo de 3" kg 15.00 3.50 52.50 clavo de 4" kg 15.00 3.50 52.50
6/17/2018 fierro corrugado de 1/2" kg 28.00 26.00 728.00
fierro corrugado de 3/8" kg 42.00 3440 14.60 613.20 alambre # 16 kg 50.00 3.50 175.00
6/18/2018 fierro corrugado de 5/8" kg 14.00 40.60 568.40
fierro corrugado de 3/8" kg 30.00 14.60 438.00 3442 cemento yura HS bls 100.00 21.50 2150.00 sika gln 5.00 23.00 115.00 6/18/2018 blocker 2 de 2da und 80.00 1045 1.30 104.00
6/19/2018 fierro corrugado de 6 mm kg 18.00 5.95 107.10
fierro corrugado de 1/2" kg 36.00 26.00 936.00 3445 alambre # 8 kg 100.00 3.50 350.00 cemento yura HS bls 50.00 21.50 1075.00
6/30/2018 ladrillo hercules 01 und 2500.00 3471 1.25 3125.00
7/4/2018 ladrillo hercules 01 und 2000.00 3477 1.25 2500.00 7/6/2018 cemento yura HE und 50.00 22.90 1145.00 3488 plancha tecnoport 1" und 5.00 11.00 55.00
7/12/2018 ladrillo hercules 01 und 1000.00 3497 1.25 1250.00
7/12/2018 cemento yura HE bls 50.00 1178 22.90 1145.00
6/20/2018 hormigon vol 5.00 160.00 800.00
220 eliminacion de desmonte vol 8.00 100.00 800.00