QUALITY RELATED CHARACTERISTIC TESTING EQUIPMENT/ CALIBRATION REFERENCE DOCUMENTS
ACTIVITY FREQUENCY RAYMOND CML SWCC/ILF
ACTIVITY TO BE VERIFIED LOCATION TOOLS FREQUNECY ACCEPTANCE CRITERIA MAPA REP
REP. SPECIALIST REP.
1.0 Materials
3.0 Sand
LEGEND: P: PERFORM, A: ACTUAL INSPECTION, W: WITNESS INSPECTION, R: REVIEW DOCUMENTATION, TC: TEST REPORT/CERTIFICATE REQUIRED H: HOLD
MAPA Construction and Trade Co. Inc. RAYMOND Intl. Co. Ltd.
KINGDOM OF SAUDI ARABIA Page 6 of 9
Saline Water Conversion Corporation
TAIF – TURUBAH / RANYAH / Al KHURMAH WTS
Inspection and Test Plan for Cement Mortar Lining of Steel Pipes, Spec. No. M03
Subject:
Fittings, Bends and Welded Joints ILF CONSULTING ENGINEERS
PARTICIPATION
QUALITY RELATED CHARACTERISTIC TESTING EQUIPMENT/ CALIBRATION REFERENCE DOCUMENTS
ACTIVITY FREQUENCY
ACTIVITY TO BE VERIFIED LOCATION TOOLS FREQUNECY ACCEPTANCE CRITERIA RAYMOND CML SWCC/ILF
MAPA REP
REP. SPECIALIST REP.
Chloride Ion content Independent Lab. TPI Lab Tools / M03, Max. 0.05%
3.7 Monthly TPI Lab N/A TC/R R R R
(CI) Test Report Equipment BS 812 Part 117
Bonding Agent
Bonding agent MO3, Relevant Specification and
5.0 Master Cast 141 / Every repair Yard / Site Repair Tools N/A H H R R
workability Standards / Material Data Sheet
Rheomix 141
Manufacturer
Manufactu
6.0 Pozzolith 55-RA Admixture Once Lab Tools / N/A M03, BS-5075 Part 3 TC/R R R R
rer
Equipment
LEGEND: P: PERFORM, A: ACTUAL INSPECTION, W: WITNESS INSPECTION, R: REVIEW DOCUMENTATION, TC: TEST REPORT/CERTIFICATE REQUIRED H: HOLD
MAPA Construction and Trade Co. Inc. RAYMOND Intl. Co. Ltd.
KINGDOM OF SAUDI ARABIA Page 7 of 9
Saline Water Conversion Corporation
TAIF – TURUBAH / RANYAH / Al KHURMAH WTS
Inspection and Test Plan for Cement Mortar Lining of Steel Pipes, Spec. No. M03
Subject:
Fittings, Bends and Welded Joints ILF CONSULTING ENGINEERS
PARTICIPATION
QUALITY RELATED CHARACTERISTIC TESTING EQUIPMENT/ CALIBRATION REFERENCE DOCUMENTS
ACTIVITY FREQUENCY
ACTIVITY TO BE VERIFIED LOCATION TOOLS FREQUNECY ACCEPTANCE CRITERIA RAYMOND CML SWCC/ILF
MAPA REP
REP. SPECIALIST REP.
Once / Batch Plant / 3 months
8.0 Trial Mix Mix Design Yard MO3 and Applicable Standards P/H H H H
Every Project Testing Moulds (Batch Plant)
Visual /
Pipe Receiving / As per Pipe MTC /
9.0 Every Pipe Yard / Site Dimension N/ A M18 ; 78-YA42-F-206 P/TC R R R
Handling/ Shipping Delivery Note
Check
Once / Batch Plant / 3 months MO3 and Applicable Standards /
10.0 Mix Design Yard P/H H H H
Every Project Testing Moulds (Batch Plant) PQT Procedure
Compressive / M03, 28 Days Test
Compressive Test / 7, 14 & 28
10.1 Yard Flexural 6 months Compressive: 55 N/mm² min. P/TC W R W
PQT Bending Test days
Machine Bending: 6 N/mm² min.
M03,AASHTO T277,DIN 1048
Chloride Ion & Rapid Chloride
10.2 Monthly Yard 6 Months Water Perm.: below 4mm P/TC W W/R W/R
Water Penetration Machine
Chloride Perm.: 100-1000
Cement Mortar
11.0
Lining Process
Internal Pipe Surface Each pipe / Blasting
11.1 Visual Inspection Yard / Site N/A M03, ST-2 Finish, ISO 8501-1:2007 A A R A
Preparation Joint Equipment
Every Fittings
Reinforcement (Wire Wire Mesh Size
11.2 above 24 Yard / Site Wire mesh N/A M03, AWWA C205 / C602 TC/R R R R
Mesh) and Bonding Agent
inch
Approved mix
11.3a Mix Proportion (Yard)
design
Sand Sand Scale 3 months M03 W/TC/H W R W/R
Water Daily Yard Water Scale 3 months M03 W/TC/H W R W/R
Additives Measuring Cup N/A M03 W/TC/H W R W/R
Approved mix
11.3b Mix Proportion (Site)
design
Cement Weighing Scale 6 months M03 W/TC/H W R W/R
Sand Weighing Scale 6 months M03 W/TC/H W R W/R
Daily Site
Water Flow Meter 3 months M03 W/TC/H W R W/R
Additives Measuring Cup N/A M03 W/TC/H W R W/R
LEGEND: P: PERFORM, A: ACTUAL INSPECTION, W: WITNESS INSPECTION, R: REVIEW DOCUMENTATION, TC: TEST REPORT/CERTIFICATE REQUIRED H: HOLD
MAPA Construction and Trade Co. Inc. RAYMOND Intl. Co. Ltd.
KINGDOM OF SAUDI ARABIA Page 8 of 9
Saline Water Conversion Corporation
TAIF – TURUBAH / RANYAH / Al KHURMAH WTS
Inspection and Test Plan for Cement Mortar Lining of Steel Pipes, Spec. No. M03
Subject:
Fittings, Bends and Welded Joints ILF CONSULTING ENGINEERS
PARTICIPATION
QUALITY RELATED CHARACTERISTIC TESTING EQUIPMENT/ CALIBRATION REFERENCE DOCUMENTS
ACTIVITY FREQUENCY RAYMOND CML SWCC/ILF
ACTIVITY TO BE VERIFIED LOCATION TOOLS FREQUNECY ACCEPTANCE CRITERIA MAPA REP
REP. SPECIALIST REP.
11.4 Slump Test Flow Table N/A M03, ASTM C-230, AWWA C-205, A/TC A R A/R
Wall “Ambient”
11.5 Ambient 6 months M03 A/TC A R A/R
Mortar Workability / Thermometer
Daily Site Needle
11.6 Mortar Temperatures Temperatures 6 months M03 - 32ºC max A/TC A R A/R
Thermometer
Surface
11.7 Pipe Temperatures 6 months M03 - 35ºC max A/TC A R A/R
Thermometer
Coating
11.8 Lining Thickness Mortar Thickness Each pipe Yard / Site Thickness 6 months M03 / AWWA C-205 A/TC A/W R A/W
Gauge
Mortar Surface Visual Inspection,
11.9 Condition after Pre- Lining cracks and Each Pipe Yard / Site N/A N /A M03 / AWWA C-205 A/TC/H A R A
Set Surface roughness
12.5 Water Curing Visual inspection Each Pipe Yard / Site N/A N/A M03, AWWA C-205 A A R A
LEGEND: P: PERFORM, A: ACTUAL INSPECTION, W: WITNESS INSPECTION, R: REVIEW DOCUMENTATION, TC: TEST REPORT/CERTIFICATE REQUIRED H: HOLD
MAPA Construction and Trade Co. Inc. RAYMOND Intl. Co. Ltd.
KINGDOM OF SAUDI ARABIA Page 9 of 9
Saline Water Conversion Corporation
TAIF – TURUBAH / RANYAH / Al KHURMAH WTS
Inspection and Test Plan for Cement Mortar Lining of Steel Pipes, Spec. No. M03
Subject:
Fittings, Bends and Welded Joints ILF CONSULTING ENGINEERS
PARTICIPATION
QUALITY RELATED CHARACTERISTIC TESTING EQUIPMENT/ CALIBRATION REFERENCE DOCUMENTS
ACTIVITY FREQUENCY
ACTIVITY TO BE VERIFIED LOCATION TOOLS FREQUNECY ACCEPTANCE CRITERIA RAYMOND CML SWCC/ILF
MAPA REP
REP. SPECIALIST REP.
Complete Release
Final Inspection and Report Each Pipe /
13.0 Yard / Site N/A N/A M03, AWWA C-205 W A/W W/R W/R
Release Recommendation Weekly
for Release
Visual and Video
14.0
Inspection