This document provides information about the air preheater (APH) system at the 2x600 MW ESSAR POWER MP LIMITED thermal power plant in Mahan. It describes the type of APH as a trisector, rotary unit with a 22kW motor. It then lists 21 pre-start up checks and 1 post shut down check to ensure safe operation of the APH.
This document provides information about the air preheater (APH) system at the 2x600 MW ESSAR POWER MP LIMITED thermal power plant in Mahan. It describes the type of APH as a trisector, rotary unit with a 22kW motor. It then lists 21 pre-start up checks and 1 post shut down check to ensure safe operation of the APH.
This document provides information about the air preheater (APH) system at the 2x600 MW ESSAR POWER MP LIMITED thermal power plant in Mahan. It describes the type of APH as a trisector, rotary unit with a 22kW motor. It then lists 21 pre-start up checks and 1 post shut down check to ensure safe operation of the APH.
System Description: AIR PRE-HEATER MOTOR Type Trisector, rotary type (Ljungstrom) Motor power 22kW Speed 0.9 rpm /0.23 rpm (Low) FLC/Voltage 39.6 A/415V
Pre Start up Checks.
1. No PTW is pending. 2. EPB is in released condition. 3. All manholes and observation doors are closed. 4. APH (A, B) secondary air outlet dampers are close & dampers power supply is ON. 5. APH (A, B) primary air outlet dampers are close & dampers power supply is ON. 6. APH (A, B) flue gas inlet dampers are close & dampers power supply is ON. 7. APH main motor power supply & auxiliary motor power supply is ON. 8. The compressed air source manual valve of the air preheater’s pneumatic motor open and the control solenoid valve of the air preheater’s pneumatic motor is closed. 9. Bypass MIV of the control solenoid valveof the air preheater’s pneumatic motor is closed. 10. CCCW system is in service. 11. Ensure the inlet and outlet valves of the lubrication system of the air presenter’s guide bearing and support bearing is in open condition. 12. Support bearing Cooling water inlet, outlet valves are open. 13. Support bearing oil level is normal. 14. Guide bearing Cooling water inlet, outlet valves are open. 15. Guide bearing oil level is normal. 16. Oil level in gear box is normal (minimum 2/3 position of the oil level gauge). 17. Air preheater water washing and firefighting water pipeline valves are closed. 18. APH Soot blowing system is in healthy condition. 19. Ensure that APH outlet SA damper got full open after starting of APH. 20. Observe for any abnormal sound from gear box or from APH after starting of APH. 21. Ensure APH soot blower is in retract condition.
Post Shut Down Checks
1. Ensure that the APH is stopped safely and there is no abnormal and rubbing sound. ESSAR POWER MP LIMITED 2×600 MW Thermal Power Plant- Mahan