Accelerating public development by
transforming key citizen services
TRAINING SESSION
TRAINING Overview
• AutoPlan BPAS is a Computer Aided Design (CAD) based software to enable Building
Plan Submission and subsequent scrutiny as per ZR/Bylaws.
• It verifies the plans submitted for Building Plan Approval System based on Bylaws
and Zonal Regulations and generate Reports for the plan
– AutoPlan Verify
2
TRAINING Overview
• AutoPlan Author is a fast, stable and user-friendly software which shall be used by
the Architect / Engineer.
• It is used to prepare the input file (.apz file) which has to be submitted along with
application through online for Building Plan Approval System.
3
TRAINING Overview
• Building plans are prepared in AutoCAD and the prepared Building Plan shall be
marked using AutoPlan Author to prepare the application file (.apz file).
• AutoPlan Author verifies the prepared drawing and generates verification results
and sample Reports so that the Architect / Engineer can confirm whether the
building plan is acceptable to Building Bye-laws and Zonal Regulations before
applying to Building Plan Approval System.
• AutoPlan Author highlights the failed objects in drawing for corrections with
required / permissible values as per Building Bye-laws and Zonal Regulations.
4
PROCESS Overview of the System
5
SETUP How to renew AutoPlan Author License?
– Windows OS
– AutoCAD (Full Version) 13.0 and above
– Adobe Acrobat PDF Reader
6
ADVANTAGES AutoPlan Author
• If you are using AutoCAD Standard Version 13.00 and above, You can use the Author mode to mark
the objects in the drawing.
• This is simple way of using the BPAS system.
• You are not required to manage layers, colors, line types and styles and related properties
• If you are using any other CAD software, we still give you freedom to use the BPAS system by using
AutoPlan CN (CAD Neutral) version
7
ADVANTAGES AutoPlan CAD Neutral
8
OVERVIEW AutoPlan CAD Neutral
9
EXAMPLE AutoPlan CAD Neutral
Examples of Layers
Site Boundary:
Item Layer Name Colour Code Line Type Number of Items
10
EXAMPLE AutoPlan CAD Neutral
Examples of Layers
Road:
11
EASE AutoPlan CAD Neutral
How easy it is to create these layers?
• There is a simple way for that too. No need to create the layers.
• You can download the layer template and insert in your drawing to literally
import the layer.
• What you do is just select the objects and transfer to the prescribed layers.
12
DIFFERENCE AutoPlan CAD Neutral
The difference
• Users should be careful and responsible for the correctness of the drawing.
13
TRAINING STEPS
0 0 0
1 3 5
REGULATIO
INITIAL BUILDING
N
SETUP DETAILS
SCRUTINY
0 0 0
2 4 6
14
INITIAL
01 SETUP
SETUP How to Activate AutoPlan Author?
• Install Author tool, downloaded from Technical person's portal to activate AutoPlan Author, click
Activate button
• Select the License file which shall be downloaded from Technical persons portal and click open
button
16
SETUP How to renew AutoPlan Author License?
17
PROJECT
02 DETAILS
PROJECT New Project
• New Project can also be created by clicking New Project icon in Tools bar
– Engineer Details
– Ownership Details
– Project Details
– Land Details
– Lease Details
19
PROJECT Project Information
20
PROJECT Drawing File Details
21
PROJECT Architect & Developer Details
• Architect details will be loaded from License file details which was entered during Technical Person
Registration in TPs portal.
• Enter the details of Developer such as Name, Address, email and phone number
22
PROJECT Engineer Details
• Enter the details of Structural engineer and License engineer such as Name, Address,
email, phone number, registration number and validity of registration number
23
PROJECT Ownership Details
• Enter the details of Owners such as Name, Father name, mother name, Address, email, phone
number
• Select “Is Applicant” if the owner is the applicant and multiple owner details can be saved
24
PROJECT Project Details
• Select the land use details of project such as Zone, Land Use category, Land Use sub category, etc
• Enter the details of Building such as Building Type, Building Name, Floor Details
• Project Start and End date
• Multiple Buildings can be saved
25
DRAWING Land Details
• Enter the details of Land such as Address, Khata number, Plot Number, Plot Area Property ID
Number etc.,
• Multiple Buildings can be saved
26
DRAWING Lease Details
27
BUILDING
03 DETAILS
DRAWING Floor Details
29
DRAWING Connected Floor Details
• Enter a name for the connection, select the connection type whether Simple Passage Connection or
Total Area connection and select the building and floor to be added to connection
30
DRAWING Room Library
• Select the room type under which the room has to be added to library
• Enter the Room Name, Length, Width and Height, mark Area, Floor Level and Ceiling Level and click
Save button
31
DRAWING Light and Ventilation Library
32
MARKING
04 FORMS
MARKING Mark Site Area
34
MARKING Mark Floor Level
35
MARKING Mark Car Parking
36
REGULATION
05 SCRUTINY
SCRUTINY Verification
• Click on Verify All button in the marking control Form or click Edit→ Verify All
• Verify All grid will open in which all the verification items will be displayed with Required /
Permissible value, Proposed value and Verification Status
38
SCRUTINY Sample Scrutiny Report
39
SCRUTINY Highlighting of failed verification
40
APZ FILE
06 GENERATION
APZ FILE APZ file generation
42
Thank You