You are on page 1of 3

IGOM

4.3 IGOM Risk Assessment

The IGOM Technical Group (TG) has undertaken a risk assessment of airside operation (chapter 3 and 4), to
determine which of the IGOM procedures are considered to be Safety Critical.
The Risk Assessment Matrix and the Safety Severity Levels, as published in the Airport Handling Manual
(AHM), are utilized in this determination. IGOM procedures that fall within the red zone defined as 5A, 5B, 5C,
4A, 4B and 3A were identified as safety critical.
In future the safety operational procedures within the IGOM will be periodically reviewed and evaluated
utilizing the data provided by the industry through Global Aviation Data Management (GADM).

IGOM Procedure Safety Risk or Threat


Ref. Risk Index
3.1.2.1 Engine Danger Areas 5A Accident or damage to equipment and/or aircraft, injury
or fatality to personnel due to engine blast
3.1.3.1 General Safety Instructions 5A Accident or damage to equipment and/or aircraft, injury
or fatality to persons
3.1.3.2 Basic Operating 5A Accident or damage to equipment, injury or fatality to
Requirements for GSE personnel
4.5.1 Supervision of Aircraft 5C Damage to aircraft, fatalities
Turnaround Handling
4.5.6 Loading 5C Damage to aircraft, fatalities
4.5.7 Securing of Loads 5C Damage to aircraft, fatalities
3.1.3.4 Ground Support 4B Personnel injury and/or aircraft damage
Equipment Safety Driving
and Parking Inside ERA
3.1.3.6 Passenger Stairs 4B Damage to aircraft
3.1.3.7 Belt Loader 4B Damage to aircraft, injury to personnel

IGOM–x 9TH EDITION, APRIL 2020


Introduction—IGOM

IGOM Procedure Safety Risk or Threat


Ref. Risk Index
3.1.3.8 ULD Loader 4B Damage to aircraft
3.1.3.9 Elevating Equipment 4B Damage to aircraft
3.1.3.10 Tractors/Electric Baggage 4B Damage to aircraft, injury to personnel
Tag
3.3.5 High Winds Activity Table 4B Damage to equipment and/or aircraft, injury to
personnel
3.4 Hand Signals 4B Damage to equipment and/or aircraft
4.1.2.2 Actions After Arrival 4B Personnel injury
4.2 Aircraft Chocking 4B Personnel injury
4.4.2 Cabin Access Doors 4B Personnel injury (fall from height)
4.4.3 Cargo Hold Doors 4B Damage to aircraft
4.6.10 Aircraft Pushback 4B Damage to aircraft
3.1.2.4 FOD–Foreign Object 3A Damage to equipment and/or aircraft
Debris
3.2.1 Fueling Safety Zone 5D Fatality, may lead to fire, emergency preparedness
response
3.2.2 Fuel Spillage 5D Fatality, may lead to fire, emergency preparedness
response
3.2.3 Fueling/Defueling with 5D Damage to facility and/or aircraft, injury or fatality to
Passengers on Board persons
3.8 De-icing-Safety 5D Damage to facility and/or aircraft, injury or fatality to
during Aircraft De-/ persons
anti-icing Operations
3.1.1 Ramp Safety in Aircraft 4C Damage to equipment and/or aircraft, injury to
Handling–Introduction personnel
4.5.2 Aircraft Ground Stability 4C Damage to aircraft
4.6.6 Engine Start Using Air 4C Damage to aircraft
Start Unit
4.6.8 Departure Communication 4C Damage to aircraft
3.1.3.3 Non-Motorized GSE 3B Damage of equipment, injury to personnel
3.1.3.5 Passenger Boarding 3B Damage to aircraft, injury to personnel
Bridge (PBB)
4.1.1 Action Prior to Arrival 3B Damage to aircraft and/or equipment
4.1.2.1 Aircraft Arrival at a Gate or 3B Damage to aircraft and/or equipment
Open Ramp
4.6.1 Aircraft 3B Personnel injury
Departure–Introduction
4.6.2 Action Prior to Departure 3B Personnel injury
4.6.4 Wheel Chock Removal 3B Personnel injury
3.1.3.11 ULD Transporter 3B Damage to equipment and/or aircraft, injury personnel
4.5.5 Cargo Hold Inspection 4D Damage to aircraft
3.3.4 High Wind Conditions 3C Damage to equipment and/or aircraft, injury personnel
Work Instructions

9TH EDITION, APRIL 2020 IGOM–xi


IGOM

IGOM Procedure Safety Risk or Threat


Ref. Risk Index
4.5.3 Safety Requirements 3C Damage to aircraft
Specific to Aircraft
Turnaround Handling
4.5.4 Unloading 3C Injury to personnel
4.5.8 Load Spreading 3C Structural damage to aircraft floor
4.6.12 Nose Gear Steering 3C Damage to aircraft
4.8 Open Ramp Departure 3C Injury to persons
3.3.2 Winter or Slippery Apron 2B Injury to personnel
Conditions
4.5.9 Unit Load Devices (ULDs) 2B Damage to aircraft
4.6.7.2 Communication During 4E Damage to aircraft
Engine Fire
3.3.3 Storms–Lightning Work 3D Injury persons
Instructions
4.6.7.1 Communication During 3D Injury to personnel
Engine Start
3.5 Toilet Servicing 2D Poor hygiene, environmental issues
3.6 Potable Water Servicing 2D Environmental issues, water borne diseases
4.1.3 Ground Support 2D Damage to aircraft
Equipment on Arriving
Aircraft
4.7 Power Push Unit (PPU) N/A Not yet assessed
(Main Gear Towbarless
Tractor)

IGOM–xii 9TH EDITION, APRIL 2020