OPERATING AREA Salm on Beach
Rainfall Shutdown Guidelines METHOD HA VOLUME
Barkley Community Forest

1
11-
HOE CHUCK (5% RET) 17.1 0
Operations must cease in this area when rainfall amounts reach the following levels.

SB

NCD
³
ENG GRAPPLE (% RET) 0.0 0
75mm during a single shift or 12 hour period. m³/ha
CRUISE HELI (5% RET) 0.0 0
Harvest Plan Map
100mm of accumulated rainfall in a 24 hour period.
50mm may be deducted per 24 hour period for drainage. HAUL UCLU BATO HARVEST AREA 17.1 0 Cutblock: SB10 Tenure: K3S
!
(
15.0 12.9 R/W REMOVED 0.0
!
(
Take specific direction from the site supervisor for changing requirements.
16 Km!
(. !
( !
( Mapsheet: 92C.093 Hammer: K3S/006

S6
SCALE: 1:5,000 TLA 0.0

S5
Avoid ground-based traffic into saturated sites !
(8 ROAD PERMIT R/W 3.4
!
(
0 Albers: 1041807 // 440577 Road Permit: 6
FIELD WORK COPPER
Scale: 1:5000 !
( !
(

S6
DATE !
(
9 Oct-17
!
(
DISPERSED RETENTION (5%) !
( 17.1
!
(
0
Lat/Long: 48°58'48" N // 125°25'47" W Revision Date: February 16, 2018
CHECKED DRF $
+ !
(
8A
!
(
10 NC

NC
DATE S6 2017 GROSS AREA NC D
20.5 !
( S6 0

D
D
!
(

S4
$
+ !
( 11

MAP LEGEND $
+
("
! S!
( !
(
!
(
!
(

S4
NC
22 " !
( ! "
S D
) (
Harvest Activities
Falling Boundary
2
"
) "
) 23 "
S !
(
8 !
( !
( FSZ
Following the Plan
21 0+133 "
)! 1+220 $
+
Yarding Direction ("
)
!
( !
(7 STEP 1: Always read and understand your plans and maps.
Hoe Chuck HC STEP 2: Always match your plan and map to what you find on the ground.
62 61 S3
Grapple G !
(5 "
S
"
)
S3 Stop and ask if what you find on the ground does not match the plan and map.
Heli H STEP 3: Check that you can do the work
20 !
( S4

S4
!
( S3 37 16 Stop and ask if you cannot follow the plan and map

SB
Heli Drop Zone 4 $
+
"
) 07 "
) "
) STEP 4: Know your responsibilities. Ask if you are unsure.

10-
Reserve 0+
Retention Patch 38 36 33
32 " !
(
15

4
60
!
(4 " )

S4
CMT Reserve "
) ) "
) 34"
)
WTRA 19"
) HC SB1
WTRA ( 1+073
! 0-3 !
(6 35
Focus Retention 5%
Adjacent Blocks 18 "
) "
) !
(
17
31A
"
)

S4
Road Features 59 30
39 !
( 0+527 S4
Rock Quarry ô
Q "
) "
) "
)
27 31 "
)
Spoil Site HC "
) 28
End Haul Section 17 "
) 5% "
) 29
Other Roads "
)
0+
Built Road 12
7 !
( 0+155
Construction
Reconstruction (!
0+114 ! ( S3
!
( ) 25
"
Road R/W 26
"
) Riparian Management Plan - SB10
Road Station 0+000 58 "
)
16
Culverts "
) Debris Managem ent
15 !
( Riparian Classification Phase Prescriptions
WBC "
S "
) 0+825 Standard Procedure: No limbing or
CMP !
( 0+778 ! "
) 57 Stream - Reach FRPA Falling Yarding Loading bucking in stream s. Clean introduced
S
" ( " debris from stream s if the debris is
Bridge 14 )
56 blocking fish passage or destabilising
Riparian Management "
) Class RRZ RMZ Activity in RMZ the stream (eg. could form debris jam s
Designated Stream Crossing !
< 6
12 13
in high flow s).
Fish Streams (S1-S4) !
(1 S2 "
) "
)
S5

"
) 1, 16, 20 S3 20 20
Outside Block. Som e portions of RMZs are inside the
Aw ay Aw ay N/A N/A
Non Fish streams (S5, S6)
Non Classified Drainage
!
(2 S6 5
11 16 (Gully) S5 0 30
block.
Outside Block Aw ay Aw ay N/A N/A
"
) 0+ 060
Reach Number "
) !
( 4, 21 S4 0 30 Outside Block Aw ay Aw ay N/A N/A
R1
7 0+602 133 132 Fish bearing reaches. 5m m achine free zones.
FSZ Stream $
+
SB10-2

"
) 10 !
( "
) "
)
Reach Break/Fish Barrier $
+ "
)
SB100 road construction at Stn 0+357, 1+197 - do not
S4

introduce sedim ent to stream s. Im plem ent erosion


Fish Sensitive Zone "
) S6 0+540 !
4 ( 0+258
! $
+ ( 55 and sedim ent controls such as sedim ent fences and
Wetland 137 2(R1), 5 S4 0 30 mulch. Revegetate disturbance post-construction. Aw ay Aw ay Aw ay Standard Procedure
0+
9 "
) 134 ! 0+338
RMA !
( 0+226 44 "
)( "
)
! 135A ) (
" Retain understory vegetation, saplings and non-
3 ! 0+184 (
RRZ $
+ 8 !
( "
) !
(3
Q
"
) !
( !
(0
+2 "
)
131
merch along stream s. Leave pre-existing deadfall
trees and large w oody debris (See Note 1). Do not
Other
3
HC ) "
" S 54
<
! !
( 95 disturb stream banks.
" !
("
) 0+397
)
SB10-1

5% HC
0+ 2

OGMA "
S 53 "
) 6 S4 0 30 Outside Block. Portions of RMZs are inside the block. Aw ay Aw ay N/A N/A
Cruise Plot (In/Out)
!
. B !
(2 !
(1 136
"
) 5% !
(1
39

135 130
CMT Stump 4 <
! S4 "
)
Fish bearing reach
! 2 08 0+313 "
) 17 S4 0 30 Leave pre-existing deadfall trees and large w oody Aw ay Vertical N/A Standard Procedure
"
) 0+ !
(
CMT Bark Stripped # !
( ( 0+290 51
!
52 S3 debris (See Note 1). Do not disturb stream banks.
Legal Pin A
! "
) 50 Fish bearing reach. 5m m achine free zone. Cross at
Legal Line "
)1 "
) 3 & 3 FSZ S4 0 30
designated crossings.
Aw ay
Aw ay/
Aw ay Standard Procedure
Leave pre-existing deadfall trees and large w oody Across
Hoe/Backspar Trail ! !
debris (See Note 1). Do not disturb stream banks.
Rock Bluff
Fisheries Sensitive Zone. 5m m achine free zone.
SU Type Line
Cruise Type Line
!
(
21 3 FSZ S4 0 30 Leave pre-existing deadfall trees and large w oody Aw ay Aw ay Aw ay Standard Procedure
debris (See Note 1). Do not disturb stream banks.

e !
(
20 "
S0+157
Falling Hazard ! S3 !
( 2(R2) S6 0 20 5m m achine free zone. Aw ay Aw ay Aw ay Standard Procedure
S4
100

Harvest Plan Map Geographic Midpoint:

SB10
SB

48°58'48" North
125°25'47" West

You might also like