Fluid Technology International Pvt. Ltd.

Project: Byco SWUF Project Code: 1612

PVC JOINT Client:


Date:
Byco
12/10/2018
Location:
Dwg No.
FTI Workshop
-

REPORT
Doc. No: FTI-1612-PVC-0001 P&ID No.: 1612-FTI-0102-S1
Rev.: - Isometric No.: FTI-1612-ISO-01
Page No.: 1 of 1
Press Time After
Line No. Joint No. Joint Type Diameter Pipe Shedule Pre-Join Treatment FitUp Cooling Time FTI Byco
Cementing
5B J1 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J2 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J3 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J4 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J5 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J6 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J7 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J8 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J9 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J10 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J11 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J12 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min
5B J13 B 12" 80 Cleaned With Thinner Satisfactory 5min 5min

Remarks:

Project In charge QA/QC Client


Name: M. Shuja Azhar Name: Talha Alam Khan Name: Basit Sultan Ahmed
Sign: Sign: Sign:

Date Date Date: